This is Amendment 01 to a Request for Proposal (RFP) issued by Oak Ridge National Laboratory (ORNL), a Department of Energy science laboratory managed by UT-Battelle, LLC. The RFP solicits proposals for the design and manufacture of polarizing and non-polarizing neutron mirrors and wafers coated with neutron absorbers for nested mirror optics. The primary change in Amendment 01, dated June 22, 2026, extends the offers due date from June 24, 2026 to June 26, 2026 at 5:00 p.m. EDT and adds Attachment G containing Amendment 01 Q&A to Offerors. Additionally, the amendment corrects a specification error in Attachment A (XGH-TS-20-0002-R00, Article 4.2), where the coating should be Fe/Si instead of Fe/Ti; offerors are instructed to note the correct coating in their proposals.
The anticipated subcontract period of performance extends from award through September 30, 2026. The procurement is conducted on a competitive basis with one award intended. The NAICS code is 334516 (Analytical Laboratory Instrument Manufacturing) with a 1,000-employee threshold. This is not a small business set-aside. The subcontract type is firm fixed price. Payment terms are Net 30 days for large business or foreign business, or Net 15 days for domestic small business, with electronic funds transfer required. Delivery is FOB Destination–Freight Prepaid to ORNL in Oak Ridge, Tennessee for domestic shipments, and DAP for international shipments. The award will be made to the responsible offeror submitting the lowest-priced technically acceptable offer. Offerors exceeding $15,000 must complete representations and certifications forms (Attachment D for international offerors or Attachment E for domestic offerors). All proposals must be submitted in U.S. Dollars and include detailed cost breakdowns by category (direct labor, subcontracts, materials and equipment, other direct costs, indirect expenses, and fee or profit). The procurement officer is Bill Mitchum, reachable at mitchumwc@ornl.gov or (865) 341-2745.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 01 REQUEST FOR PROPOSAL (RFP)
RFP No.: RFP-PR424551
Request for Proposal BSD-CS-2282 (Rev.2) October 1, 2025
AMENDMENT 01 REQUEST FOR PROPOSAL
AMENDMENT 01
Date: 06/22/2026 RFP No.: RFP-PR472297
Description: This Amendment adds Attachment G - Amendment 01 Q&A to Offerors 6-22-26, including reference to a correction needed in Attachment A - XGH-TS-20-0002-R00, Article 4.2, where Coating should be Fe/Si instead of Fe/Ti.
Attachment A will not be revised before the Offers Due Date and Offerors should note the correct coating for their proposals.
The Amendment also extends the Offers Due date.
Changes are in the following RFP Articles:
2. RFP INFORMATION
From: Offers Due By: 06/24/2026, 5 p.m. EDT To: Offers Due By: 06/26/2026, 5 p.m. EDT
3. List of RFP Attachments:
ADD: Attachment G - Amendment 01 Q&A to Offerors 6-22-26
All other information, specifications, and drawings, terms, and conditions remain unchanged.
mitchumwc@ornl.gov.
CONFORMED REQUEST FOR PROPOSAL (RFP) Changes Highlighted in Yellow
1. INTRODUCTION
Date: 06/16/2026 RFP No.: RFP-PR472297 RFP Description: Polarizing and Non-polarizing Neutron Mirrors and Wafers Coated with Neutron Absorbers for Nested Mirror Optics
Subject: RFP for the ORNL Neutron Sciences Directorate In Response Refer to: RFP No. RFP-PR472297
ORNL Procurement Officer: Bill Mitchum
Email: mitchumwc@ornl.gov
Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) science and energy laboratory, conducting basic and applied research to deliver transformative solutions to compelling problems in energy and security. ORNL is managed and operated by UT-Battelle, LLC (Company). ORNL’s diverse capabilities span a broad range of scientific and engineering disciplines, enabling the Laboratory to explore fundamental science challenges and to carry out the research needed to accelerate the delivery of solutions to the marketplace.
mailto:mitchumwc@ornl.gov
Request for Proposal
The Company is pleased to invite your firm, herein referred to as “Offeror,” to submit a proposal in support of the subject effort, as outlined in the attached Statement of Work or Specification and/or Technical Direction attached.
The Company reserves the right to update this RFP by amendment prior to date of award.
The Offeror’s proposal shall be prepared in accordance with the information provided in this RFP. Specific responses to the Company’s requirements are necessary to enable the Company to evaluate Offeror’s understanding of and capability to accomplish the stated objectives. Throughout the proposal, the Offeror shall provide sufficient detail to substantiate the validity of all stated claims, comments, or positions. All proposed concepts must be shown to be technically feasible and achievable within the allotted time limitations, and all performance and schedule requirements must be shown to be realistic. The response shall correspond to the requirements of this RFP, unless otherwise specified in writing by the Company. All Offerors are strongly encouraged to maintain an active registration in SAM.gov to facilitate verification of small business status and eligibility.
2. RFP INFORMATION
Solicitation Number: RFP-PR472297 Offers Due By: 06/26/2026 @ 5:00 p.m. EDT Offer Validity Period: 120 days NAICS Code: 334516 Analytical Laboratory Instrument Manufacturing, 1,000 employees Subcontract Type Anticipated: Firm Fixed Price Small Business Set-Aside: No Description of Supplies/Services Sought: Polarizing and Non-polarizing Neutron Mirrors and Wafers Coated with Neutron Absorbers for Nested Mirror Optics Anticipated Subcontract Period of Performance: Award – 09/30/2026
3. LIST OF RFP ATTACHMENTS
Attachment No. Description Document Title (Date/Revision)
Attachment A
Specification
XGH-TS-20-0002-R00 Polarizing and Non-polarizing Neutron Mirrors and Wafers Coated with Neutron Absorbers for Nested Mirror Optics
06/01/2026
Attachment B ORNL Terms and Conditions
Terms and Conditions – Fixed Price –
BSD-CS-2150 (10/01/2025)
10/01/2025
Attachment C
Prime Contract T&C Flow Downs
UT-Battelle Prime Supplemental Flowdown Document: Additional Terms and Conditions for Subcontracts/Purchase Orders Under Prime Contract No. DE-AC05-
00OR22725 (01/13/2026)
01/13/2026 https://contracts.ornl.gov/wp-content/uploads/2025/09/Terms-Conditions-Fixed-Price-BSD-CS-2150-10.01.2025.pdf https://contracts.ornl.gov/wp-content/uploads/2025/09/Terms-Conditions-Fixed-Price-BSD-CS-2150-10.01.2025.pdf https://contracts.ornl.gov/wp-content/uploads/2026/01/Prime-Flowdown-Clauses-BSD-CS-2258-01.13.2026-1.pdf https://contracts.ornl.gov/wp-content/uploads/2026/01/Prime-Flowdown-Clauses-BSD-CS-2258-01.13.2026-1.pdf https://contracts.ornl.gov/wp-content/uploads/2026/01/Prime-Flowdown-Clauses-BSD-CS-2258-01.13.2026-1.pdf https://contracts.ornl.gov/wp-content/uploads/2026/01/Prime-Flowdown-Clauses-BSD-CS-2258-01.13.2026-1.pdf https://contracts.ornl.gov/wp-content/uploads/2026/01/Prime-Flowdown-Clauses-BSD-CS-2258-01.13.2026-1.pdf https://contracts.ornl.gov/wp-content/uploads/2026/01/Prime-Flowdown-Clauses-BSD-CS-2258-01.13.2026-1.pdf
Request for Proposal
Attachment D
Representations and Certifications International
Representations and Certifications – International (BSD-CS-2123)
10/01/2025
Attachment E
Representations and Certifications Abbreviated
Representations and Certifications – Abbreviated (BSD-CS-2260)
03/01/2026
Attachment F Exhibit
Exhibit 2, Representation of Limited Rights Data and Restricted Computer Software (10/13/2025)
10/13/2025
Attachment G Questions & Answers Amendment 01 Q&A to Offerors 6-22-26
06/22/2026
4. STATEMENT OF WORK/SPECIFICATIONS
See attachment A above.
5. PROPOSAL PREPARATION
Preparation of Offers. (a) Offerors are expected to examine the drawings, specifications, descriptions, terms and conditions, and all instructions. Failure to do so will be at the Offeror's risk. (b) Each Offeror shall furnish the information required by the solicitation. The Offeror shall sign the offer. Erasures or other changes must be initialed by the person signing the offer. (c) Unit price for each unit offered shall be shown and such price shall include packing and shipping materials unless otherwise specified. A total price shall be entered for each item offered. Any tariffs shall be expressly stated and priced separately. In case of discrepancy between a unit price and total price, the unit price will be presumed to be correct. (d) Offeror must state a definite time for delivery of supplies or performance of services unless otherwise specified in the solicitation. Time, if stated as a number of days, will include Saturdays, Sundays, and holidays unless offeror expressly states offer is in business days. (e) Offers in strict accordance with the solicitation are desired.
Any exceptions should be referenced to related documents by title, page, and paragraph, and should be set forth in detail. (f) This request does not commit Company to pay for any costs incurred in the preparation and submission of an offer or for any other costs incurred prior to the execution of an Agreement.
Explanation to Prospective Offerors. Any explanation desired by a prospective Offeror regarding the meaning or interpretation of the solicitation, drawings, specification, etc., must be requested with sufficient time allowed for a reply to reach all prospective Offerors before submission of their offers. Any information given to a prospective Offeror will be furnished to all prospective Offerors if such information is necessary in submitting offers or if the lack of such information would be prejudicial to any other prospective Offerors.
Proposal Format. Offeror is requested to submit their proposal in MS Excel, MS Word, or PDF formats. Proposals must be submitted on the forms furnished by the Company. If no form is provided, Offeror may submit their proposal in a format of their choosing.
Contractual / Administrative Authority. No direction to proceed or other instruction to begin work shall be binding upon Company except when specifically issued and confirmed in writing by Company Procurement Officer. Offeror’s acceptance of, or reliance upon any direction to proceed or other instruction by Company’s technical personnel, or other representatives not specifically authorized to issue formal purchase order commitments, shall be at Offeror’s own risk and shall not constitute a binding purchase commitment upon Company.
https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf
Request for Proposal
Acknowledgement of Amendments. Receipt of an amendment to a solicitation must be acknowledged in writing.
Proposal Contact. Any questions regarding any portion of this RFP must be coordinated through the Company’s Procurement Officer, identified as Company’s Contact in the Introduction. No written or verbal correspondence will be permitted with any other member of the Company without coordination through the Company’s Procurement Officer.
Failure to comply with this requirement may result in the Offeror’s disqualification from consideration for award. The Company is open to proposal clarification questions/discussions in regard to this RFP via the email address or telephone number provided in the Introduction.
Omissions. It shall be clearly understood that, not-withstanding the detailed requirements contained herein, it is the Offeror’s responsibility to identify and quote any aspect or area which may have been omitted in this RFP and which will nevertheless be necessary to meet the general requirements of the defined effort.
Opportunity for Enhancement. In the interest of cost effectiveness, the Offeror is encouraged to identify and propose alternatives to specifications that, in its judgment, may offer limited value in consideration of cost or price. Further, the Offeror is invited to suggest practical performance incentives that may be introduced to the advantage of both Offeror and Company.
Proposal Acceptance. The Company reserves the right to (a) consider proposals or modifications to proposals received after the due date should such action be determined to be in the best interest of Company or its customer, and/or (b) make award without written or oral discussion.
Affordability. This effort is in support of the U.S. Government, who has a vital mission and constrained resources, and it is incumbent upon industry to provide our customer with high quality and affordable solutions. The Company considers this challenge to be a major discriminator in our proven performance and demonstrated value to our customers. The Company has developed a number of initiatives to drive value for our customer, and we expect our partners in our supply chain to do the same. It is requested as part of your proposal in response to this RFP that you articulate and demonstrate specifics in your offer that are affordable and meet or exceed all technical and schedule requirements. Your response to these criteria will be an element of the proposal evaluation and award decision process.
Payment. Payment shall be made by electronic funds transfer (EFT). EFT enrollment shall be completed during the Ariba registration process.
Discounts. Prompt payment discounts will be included in the evaluation of offers, provided the period of the offered discount is sufficient to permit payments within such period in the regular course of business under the delivery, inspection, and payment provisions of the solicitation.
Rights to Technical Data in Successful Proposals. Should an Agreement be awarded based on a proposal, it is policy, in consideration of the award, to obtain unlimited rights for the Government in technical data (but not commercial or financial information) contained in a successful proposal upon which award of an Agreement is based. To exclude technical data contained in a proposal from the Government’s rights, the offer must:
(1) Advise the Company that the technical data, or portions thereof that are identified by the Offeror, are covered by the restrictive notice regarding the disclosure and use of proposal information in accordance with the provision of this RFP entitled Treatment of Offer Information and request that such protection be maintained by excluding the data from the Government’s rights; or
(2) Establish to the Company’s satisfaction that identified portions of the technical data do not relate directly to or will not be utilized in the work to be performed under the Agreement, and request that such portions be excluded from the Government’s rights.
Request for Proposal
If unlimited rights to technical data in successful proposals, as set forth in the first paragraph of this section are to be acquired, it shall be by use of the clause below titled, “Rights to Proposal Data (Technical).” Any excluded technical data will be identified by inserting appropriate proposal page numbers in the clause, which clause enables the identification of data to be excluded from the Government’s rights, as discussed in the first paragraph of this section. Such exclusion is not dispositive of the protective status of the data, but any excluded technical data, as well as any commercial and financial information contained in the proposal, will be used for evaluation purposes only. If there is a need to have access to any of the excluded technical data during contract performance, their acquisition will be as limited rights data, if they so qualify, in accordance with FAR 27.404- 1(d).
Rights to Proposal Data (Technical)
Except for data contained on pages , it is agreed that as a condition of the award of this subcontract and notwithstanding the conditions of any notice appearing thereon, the Government shall have unlimited rights (as defined in the “Rights in Data – General” clause contained in this subcontract in and to the technical data contained in the proposal dated, , upon which this subcontract is based.
Government-Furnished Property. No material, labor, or facilities will be furnished by the Company or the Government unless otherwise provided in the solicitation.
Award of Subcontract. (a) Unless specified otherwise elsewhere in this solicitation, the Agreement will be awarded to the responsible Offeror whose offer represents the best value, total cost and/or price of the acquisition and other factors considered.
(b) The Company reserves the right to reject any or all offers and to waive informalities and minor irregularities in offers received.
(c) Except as may otherwise be provided in the solicitation, the Company may accept any item or group of items of any offer, unless the Offeror qualifies the offer by specific limitations.
(d) The Company may accept within the time specified therein, any offer (or part thereof, as provided in (c) above), whether or not there are negotiations subsequent to its receipt, unless the offer is withdrawn by written notice received by the Company prior to award. If subsequent negotiations are conducted, they shall not constitute a rejection or counteroffer on the part of the Company.
(e) It is the Company’s intent to award based on initial offers. Accordingly, each offer should be submitted on the most favorable terms, from a price and technical standpoint that the Offeror can submit. However, the Company may allow for proposal revisions if the Company deems it necessary.
Brand Name or Equal. (a) If items called for by this solicitation have been identified by a "brand name or equal" description (including identification of products by make and model), such identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics of products that will be considered satisfactory.
Offers proposing "equal" products (including products of the brand name manufacturer other than the one described by the brand name) will be considered for award if such products are clearly identified in the offer and are determined by the Company to meet fully the salient characteristics’ requirements listed in the solicitation.
(b) Unless the Offeror clearly indicates in the offer that it is offering an "equal" product, the offer shall be considered as offering the brand name product referenced in the solicitation.
Request for Proposal
(c)(1) If the Offeror proposes to furnish an "equal" product, the brand name, if any, of the product to be furnished shall be clearly identified in the offer. The evaluation of offers and the determination as to equality of the product offered shall be the responsibility of the Company and will be based on information furnished by the Offeror.
CAUTION TO OFFERORS: The Company is not responsible for locating or securing any information that is not furnished with the offer. Accordingly, the Offeror must furnish as part of the offer all descriptive material (such as cuts, illustrations, drawings, or other information) necessary for the Company to (i) determine whether the product offered meets the salient characteristics’ requirements of the solicitation, and (ii) establish exactly what the Company would be binding itself to purchase by making an offer.
(2) If the Offeror proposes to modify a product to make it conform to the requirements of the solicitation, it shall (i) include in the offer a clear description of such proposed modifications and (ii) clearly mark any descriptive material to show the proposed modifications.
Unbalanced Pricing. The Company may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items and option items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. An offer may be rejected if the Company determines that the lack of balance poses an unacceptable risk to the Company.
Conditions Affecting the Work. Offerors should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve Offerors from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Company will assume no responsibility for any understanding or representations concerning conditions made by any of their officers or agents prior to the execution of the Agreement, unless that understanding or representation is expressly stated in the Agreement resulting from this solicitation.
Treatment of Offer Information. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Company or the Government except for evaluation purposes, shall:
(a) Mark the title page with the following legend:
This proposal includes information that shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, an Agreement is awarded to this Offeror as a result of—or in connection with—the submission of this information, the Company and the Government shall have the right to duplicate, use, or disclose the information to the extent provided in the resulting Agreement. This restriction does not limit the Company’s and the Government's right to use information contained in this information if it is obtained from another source without restriction. The information subject to this restriction are contained in pages [insert numbers or other identification of pages]; and
(b) Mark each page of information it wishes to restrict with the following legend:
Use or disclosure of information contained on this page is subject to the restriction on the title page of this proposal.
Company Profile. Provide a company profile to include business classification (e.g. Large, Small, Disadvantaged, etc.).
Signing Authority. Provide the names, positions, email address, and phone numbers of persons authorized to negotiate this proposal, contractually commit the Offeror, or persons to be contacted for clarification or
Request for Proposal questions.
Proposal Validity. Unless otherwise stated in the Offeror’s proposal, the Offeror’s proposal shall be valid for 120 calendar days.
FOB and Shipping Terms for Domestic Shipments. Freight Terms: FOB Destination – Freight Prepaid – (ORNL Facility – Oak Ridge TN)
Incoterms for International Shipments. Incoterms: DAP – (ORNL Facility – Oak Ridge TN)
Offeror Business Information. Complete business address of the Offeror, the corporate name to be used on any resultant contract, and the remittance address if different from that above. Identify “parent company” or “sponsoring corporation” name, also provide such identity as appropriate.
Subcontract Type. Identify proposed subcontract type if other than the anticipated subcontract type located in Attachment B: ORNL Terms and Conditions.
Withdrawal of Offers. Offers may be withdrawn by written notice received by the Procurement Officer at any time before award.
COST PROPOSAL REQUIREMENTS:
All proposals shall be submitted in U.S. Dollars (USD). The Offeror may submit their pricing information in their own format.
This proposal may be subject to a government price audit.
The cost breakdowns shall identify the following information: direct labor, subcontracts, materials and equipment, other direct costs, indirect expenses, and fee or profit.
Labor. For direct labor, identify the labor category, hours, and fully burdened labor rates. Identify each direct labor category and include a brief job description and minimum education and experience requirements for each subcontractor labor category proposed. If the period of performance is for more than one year, show the information for each year proposed. Please identify all Key Personnel proposed.
Subcontractors. Include all subcontractor proposals. All subcontracted labor must identify labor category, hours, and fully burdened rates. Identify each subcontractor labor category and include a brief job description and minimum education and experience for each subcontractor labor category proposed. If lower tier subcontractor will travel, furnish equipment, materials, supplies, etc. additional quotations are required.
Materials and Equipment. Include a breakdown of each item along with supporting documentation for prices proposed, e.g., quotes from suppliers and/or catalog cut sheets with pertinent pricing.
Milestone Payment Plan. The Company may consider a proposed payment plan with the Offeror’s response.
Proposed payments must demonstrate significant progress against the schedule incorporated into the subcontract.
All Other Costs Proposed. The Offeror shall submit complete details of any other costs not specifically identified or addressed above. The details shall be presented in a manner that will enable a comprehensive and thorough evaluation to be conducted.
Request for Proposal
EXCEPTIONS/NON-COMPLIANCE:
Exception(s) to or non-compliance with any portion of this RFP shall be clearly identified in a separate Exceptions/Non-Compliance section referencing the specific document, page, paragraph, and item. Exceptions identified in the Offeror’s Technical Proposal need not be restated in this section. You are required to explain the reason(s) for the non-compliance and identify any alternate solutions to achieve compliance. Any exceptions that are taken to the provisions of this RFP will be considered in evaluating the Offeror’s proposal and may result in your offer being deemed non-responsive. The absence of a proposal section entitled “Exceptions/Non-Compliance” or a statement indicating “no exceptions are taken” implies complete and unequivocal acceptance of all requirements, terms, and conditions.
CONDITIONS OF PROPOSAL/ASSUMPTIONS:
The Offeror shall identify any conditions and/or assumptions of its proposal in a separate Conditions of Proposal/Assumptions section. The Offeror shall include a list of any Company/Government equipment and/or information needed as a condition of performance. Offeror shall include its assertion of Limited or Restricted Rights in Data and/or Software.
SUPPLEMENTARY REQUIREMENTS:
Representations and Certifications – International (For International Offerors only). If your proposal exceeds $15,000, Offeror must complete and return a copy of Attachment D - Representations and Certifications – International (BSD-CS- 2123).
Representations and Certifications – Abbreviated (For Domestic Offerors only). If your proposal exceeds $15,000, Offeror must complete and return a copy of Attachment E - Representations and Certifications – Abbreviated (BSD-CS- 2123).
Exhibit 2, Representation of Limited Rights Data and Restricted Computer Software. Offeror must complete and return a copy of Attachment F – Exhibit 2, Representation of Limited Rights Data and Restricted Computer Software.
Foreign End Products. The Offeror shall list as foreign end products those end products that are manufactured outside of the United States that do not qualify as domestic end products. List all foreign end products proposed and their country of origin.
6. COMPETITION
This RFP is being issued on a competitive basis. The Company intends to make one award.
Access to ORNL Site. Vendor personnel may come onto the ORNL site only if they have a current ORNL badge or a visitor's pass. Persons who need visitors' passes to deliver offers or participate in site visits must provide their e-mail address to the Procurement Officer on a workday at least 24 hours in advance. The Site Administrator will send a link to a secure portal (via-email) where vendor personnel provide the following information: (i) Full name, (ii) employer, (iii) social security number, (iv) date of birth, (v) gender and (vi) country of citizenship. Visitors' passes must be picked up at the Visitor Center, Building 5200. Government issued photo identification is required.
Questions. Questions concerning this RFP must be submitted in writing, via email, to the Procurement Officer listed in the Introduction of this RFP. Information given to one prospective offeror will be furnished to all prospective offerors if a lack of the information would be prejudicial to them.
Request for Proposal
7. BASIS OF AWARD
Basis of Award – Lowest Price Technically Acceptable (LPTA). An award resulting from this solicitation will be made to the responsible offeror submitting the lowest-priced offer that is technically acceptable. Offers will be evaluated for technical acceptability. An offer that is evaluated as unacceptable will not be considered for award. In your proposal, please clearly document how your offer meets or exceeds the requirements of the Specifications, making sure to note and explain any deviation(s). Make specific written response to items that cannot be met.
8. SPECIAL PROVISIONS
Exhibit 2, Representation of Limited Rights Data and Restricted Computer Software (10/13/2025) Exhibit 9, Technical Data (10/13/2025) Exhibit 17, Rights to Proposal Data (Technical) (10/13/2025)
Exhibits and Special Articles and Forms may be found at https://contracts.ornl.gov/documents-index/.
9. PAYMENT TERMS
Payment terms are Net 30 (Large Business or foreign business) or Net 15 (US domestic Small Business) days upon final acceptance of the product/service. All payments will be made in U.S. Dollars (USD). Payment shall be made by electronic funds transfer.
10. DELIVERY, SHIPPING, PACKAGING - DOMESTIC SHIPMENTS
Freight Terms: FOB Destination – Freight Prepaid – (ORNL Facility – Oak Ridge TN)
ORNL PO number must be clearly identifiable in the shipping address field of the shipping label. Payment for goods received may be delayed in the event the ORNL PO number is not clearly identifiable
SHIPPING TERMS
Delivery Drivers Must be U.S. Citizens: All deliverables coming onsite to a DOE laboratory, including Oak Ridge National Laboratory (ORNL), must be delivered by a United States citizen. If a foreign national attempts to deliver anything to the ORNL site, the driver will be asked instructed to turn around and will not be allowed onsite
Packing and Shipment
The Seller is responsible for all packing and shipping provisions to ensure that the equipment arrives to the Company's site in an undamaged condition. The Instrument shall be suitably packed, rigidly crated, braced and protected against weather, damage, and strain during shipment.
SNS Delivery Hours
Deliveries are accepted Monday through Friday, from 7:00 a.m. to 2:30 p.m. (Local Time). For shipments being delivered to RATS II, any deliveries arriving at alternate times must be coordinated specifically with the Company's https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-9-Technical-Data-BSD-CS-2012-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-17-Right-to-Proposal-Data-Technical-BSD-CS-2024-2025.10.13-1.pdf https://contracts.ornl.gov/documents-index/
Request for Proposal
Receiving Department or may be rejected. For SNS Construction deliveries, the Company will not accept any shipment offloads outside this time schedule, no exceptions.
The Seller shall notify the Technical Project Officer (TPO) prior to shipment of the equipment being delivered to make the appropriate arrangements for site access, scheduling, use of local labor, and any other access/delivery issues as may arise.
11. DELIVERY, SHIPPING, PACKAGING – INTERNATIONAL SHIPMENTS
Incoterms: DAP – (ORNL Facility – Oak Ridge TN)
Must reference ORNL PO number on all freight/shipping material Imports to ORNL (September 22,2016)
Critical Communication (11/22/2025)
(a) The Supplier must specify on the bill of lading or air waybill (e.g., "Notify Party," "Broker Select," "Handling Information" fields) that the Company’s customs broker be notified to arrange U.S. Customs clearance. This directive identifies the broker as:
V. Alexander & Company 110 Tyson Blvd., Suite 202, Alcoa, TN 37701 Attn: Maphra Wilson (Import Department) Phone: 865-970-7461 (ext. 4120), Fax: 865-970-7490 email: < mwilson@valexander.com, < tcollins@valexander.com
(b) The location for U.S. Customs clearance to occur must be specified as:
U.S. Port 2016 - Knoxville, Tennessee
(c) U.S. Customs Importer Security Filing (ISF) regulations require electronic receipt and approval of certain shipment data elements prior to loading material on ocean vessels. Most of these elements are typically listed on the commercial or pro-forma invoice. A Supplier using ocean transport must provide V. Alexander with this information through the electronic VNET system at least 72 hours prior to loading. V. Alexander will then notify the Supplier when U.S. Customs has approved loading. For details on use of the VNET system and ISF regulations, contact V. Alexander or visit www.valexander.com
(d) The shipment must be consigned to the following:
UT-Battelle, LLC Oak Ridge National Laboratory (ORNL) for the U.S. Department of Energy 1 Bethel Valley Road Oak Ridge, Tennessee 37831 Contact: (Goods Recipient/Invoice Approver): To be provided with agreement.
Phone: To be provided with agreement.
Note: Fees, fines, and/or other assessments resulting from failure to follow these critical communication steps will be recouped from the Supplier.
Process
(a) The following provisions are included to ensure no duty is improperly paid. Material supplied may be exempt from United States import duties.
Request for Proposal
(b) Except as noted, no later than 72 hours before shipment, the Supplier must provide the following documents to the Company's Import Broker and Company's Transportation Department at the addresses provided below:
(1) Bill of lading/airway bill naming UT-Battelle, LLC as the consignee (required by day of shipment) (Note: use express bill of lading for ocean transport)
(2) Commercial or pro-forma invoice for item(s) to be delivered to Oak Ridge, TN, USA,
(3) Itemized packing list,
(4) Name of carrier, and
(5) Estimated delivery date.
(c) The commercial or pro-forma invoice must include, at a minimum:
(1) Name and address of the Supplier,
(2) Description of the item(s),
(3) Quantities of the item(s) described,
(4) Value of the item(s) to be delivered in US Dollars,
(5) HTSUS number(s),
(6) Country of origin,
(7) U.S. Customs Entry in Knoxville, TN, USA; Port 2016; McGhee/Tyson Airport (TYS),
(8) Incoterms 2010 - DAP, Oak Ridge National Laboratory,
(9) Purchase order or contract number (if applicable),
(10) ORNL contact name (goods recipient/invoice approver), and
(11) Project name SNS Polarizing and Non-polarizing Neutron Mirrors and Wafers Coated with Neutron Absorbers for Nested Mirror Optics.
All documents listed above must be in English.
(d) No later than the day of shipment, the Supplier must provide written notice to Company's Import Broker confirming the name of the carrier and estimated date of arrival, and if available, the flight number or name of the transporting vessel.
Additional data must be electronically provided at least 72 hours prior to loading if ocean transport will be utilized.
(e)Notices for the Company's Import Broker must be sent via fax and email to: V. Alexander and Company, Attn: Maphra Wilson (Import Department); Fax: 865-970-7490; email:mwilson@valexander.com, tcollins@valexander.com.
(f) Notices for the Company's Transportation Department shall be sent via email to logistics@ornl.gov.
(g) All shipping documents and packages must be clearly marked with the following:
Shipment to ORNL for the United States Department of Energy under Contract No. DE-AC05-00OR22725. Upon arrival of shipment, NOTIFY V. ALEXANDER AND COMPANY
(865) 970-7461
FOR CUSTOMS CLEARANCE.
Packing and Shipment
The Seller is responsible for all packaging to ensure that the Helium-3 arrives to the Company's site in an undamaged condition.
SNS Delivery Hours
Request for Proposal
Deliveries are accepted Monday through Friday, from 7:00 a.m. to 2:30 p.m. (Local Time). For shipments being delivered to RATS II, any deliveries arriving at alternate times must be coordinated specifically with the Company's Receiving Department or may be rejected. For SNS Construction deliveries, the Company will not accept any shipment offloads outside this time schedule, no exceptions.
The Seller shall notify the Technical Project Officer (TPO) prior to shipment of the equipment being delivered to make the appropriate arrangements for site access, scheduling, use of local labor, and any other access/delivery issues as may arise.
12. CLOSING
Should additional information be required on any of these requests please do not hesitate to contact the undersigned Procurement Officer below.
Sincerely, Bill Mitchum Email: mitchumwc@ornl.gov Phone: Desk: (865) 341-2745 | Mobile: (865)-313-0985 mailto:mitchumwc@ornl.gov
| AMENDMENT 01 REQUEST FOR PROPOSAL |
| CONFORMED REQUEST FOR PROPOSAL (RFP) Changes Highlighted in Yellow |
| 2. RFP INFORMATION |
| 3. LIST OF RFP ATTACHMENTS |
| 4. STATEMENT OF WORK/SPECIFICATIONS |
| 5. PROPOSAL PREPARATION |
| COST PROPOSAL REQUIREMENTS: |
| EXCEPTIONS/NON-COMPLIANCE: |
| CONDITIONS OF PROPOSAL/ASSUMPTIONS: |
| SUPPLEMENTARY REQUIREMENTS: |
| 6. COMPETITION |
| 7. BASIS OF AWARD |
| 8. SPECIAL PROVISIONS |
| 9. PAYMENT TERMS |
| 10. DELIVERY, SHIPPING, PACKAGING - DOMESTIC SHIPMENTS |
| 11. DELIVERY, SHIPPING, PACKAGING – INTERNATIONAL SHIPMENTS |
| 12. CLOSING |