About this file

This is a Power Transformer Maintenance Checklist for Unit 1 transformers at Deerhaven, a facility operated by GRU (Gainesville Regional Utilities) in Florida. The checklist provides a comprehensive maintenance and inspection protocol for power transformers, specifically addressing three transformers: T-61, T-62, and T-65. The scope of work for transformers T-61 and T-62 includes procurement and replacement of radiators, wiring between transformer cabinets and transformer components, along with complete testing and inspection. Transformer T-65 is limited to testing only. The life extension project aims to extend the operational life of these Unit 1 transformers for an additional five years.

The maintenance checklist outlines detailed inspection and testing requirements including physical condition assessment, control cabinet verification, liquid level confirmation in main tanks and bushings, equipment cleaning, temperature monitoring (ambient, winding, and top oil), and multiple performance tests including power factor winding testing, winding resistance testing, bushing testing, TTR (turns ratio) testing, and excitation testing. Additional requirements include calibration of temperature gauges with replacement if readings exceed 20 degrees off nominal, verification of pressure relief devices, liquid level alarms, sudden pressure relays, pressurized inert gas systems, loss of AC alarms, and fan operation. The checklist requires completion of a Testing Maintenance Order inspection sheet and includes provisions for personnel sign-off, comments documentation, and coordination with GRU relay technicians to ensure comprehensive maintenance and readiness of the transformers.

View the file

Other files

File Type Posted
Life_Extension_for_Deerhaven_Unit_1_Transformers.pdf PDF
T61.JPEG JPEG file
T61_.JPEG JPEG file
T61___.JPEG JPEG file
T62.JPEG JPEG file
T62_Nameplate.JPG JPG image
T65.JPEG JPEG file
T62_.JPEG JPEG file
T61_Nameplate.JPG JPG image
T62___.JPEG JPEG file
T65_.JPEG JPEG file
T65_Nameplate.JPEG JPEG file
T61_T62_Outline_Drawing.pdf PDF
Oil_Analysis_T62_20260105_(1).pdf PDF
T61_T62_Cabinet_Wiring_Diagram_(1).pdf PDF
Oil_Analysis_T61_20260105_(1).pdf PDF
Oil_Analysis_T61_20260105.pdf PDF
DH_Unit_1_Transformers_Life_Extension_Specification_2026-093.docx DOCX document
Power_Transformer_Maintenance_Checklist_Unit_1.pdf PDF
T61_T62_Cabinet_Wiring_Diagram.pdf PDF
Oil_Analysis_T62_20260105.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Power Transformer Maintenance

Checklist

Inspect physical condition

Inspect control cabinet

Verify correct liquid level in tanks and bushings

Main tank Bushings

Clean equipment

Ambient temperature

Winding temperature Top oil temperature

Complete PF winding testing Complete Winding Resistance testing

Complete PF bushing testing Complete TTR testing

Complete exitation testing

Winding temperature gauge

Calibrate gauge ( Replace gauge if > 20° off )

First contact Second contact Third contact

Top oil temperature gauge

Calibrate gauge ( Replace gauge if > 20° off )

First contact Second contact Third contact

Verify operation of pressure relief device

Verify operation of liquid level alarm

Verify operation of sudden pressure relay (coordinate with GRU relay tech)

Inspect the pressurized inert gas system

General Inspection

Transformer Testing

Component Inspection

Power Transformer Maintenance

Checklist

Verify "lose of AC" alarm

Verify fans operate

Verify completion of Testing MxOrder inspection sheet

Close Testing MxOrder (By GRU)

Personnel :

Wrap‐up

Comments