Power_Transformer_Maintenance_Checklist_Unit_1_(2).pdf
PDF 78 KB Posted
- Attached to
- Life Extension for Deerhaven Unit 1 Transformers
- Solicitation number
- 2026-093
- Issued by
- Alachua County, Graceville City, Florida
About this file
This is a Power Transformer Maintenance Checklist for Unit 1 transformers at Deerhaven, a facility operated by GRU (Gainesville Regional Utilities) in Florida. The checklist provides a comprehensive maintenance and inspection protocol for power transformers, specifically addressing three transformers: T-61, T-62, and T-65. The scope of work for transformers T-61 and T-62 includes procurement and replacement of radiators, wiring between transformer cabinets and transformer components, along with complete testing and inspection. Transformer T-65 is limited to testing only. The life extension project aims to extend the operational life of these Unit 1 transformers for an additional five years.
The maintenance checklist outlines detailed inspection and testing requirements including physical condition assessment, control cabinet verification, liquid level confirmation in main tanks and bushings, equipment cleaning, temperature monitoring (ambient, winding, and top oil), and multiple performance tests including power factor winding testing, winding resistance testing, bushing testing, TTR (turns ratio) testing, and excitation testing. Additional requirements include calibration of temperature gauges with replacement if readings exceed 20 degrees off nominal, verification of pressure relief devices, liquid level alarms, sudden pressure relays, pressurized inert gas systems, loss of AC alarms, and fan operation. The checklist requires completion of a Testing Maintenance Order inspection sheet and includes provisions for personnel sign-off, comments documentation, and coordination with GRU relay technicians to ensure comprehensive maintenance and readiness of the transformers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Life_Extension_for_Deerhaven_Unit_1_Transformers.pdf | ||
| T61.JPEG | JPEG file | |
| T61_.JPEG | JPEG file | |
| T61___.JPEG | JPEG file | |
| T62.JPEG | JPEG file | |
| T62_Nameplate.JPG | JPG image | |
| T65.JPEG | JPEG file | |
| T62_.JPEG | JPEG file | |
| T61_Nameplate.JPG | JPG image | |
| T62___.JPEG | JPEG file | |
| T65_.JPEG | JPEG file | |
| T65_Nameplate.JPEG | JPEG file | |
| T61_T62_Outline_Drawing.pdf | ||
| Oil_Analysis_T62_20260105_(1).pdf | ||
| T61_T62_Cabinet_Wiring_Diagram_(1).pdf | ||
| Oil_Analysis_T61_20260105_(1).pdf | ||
| Oil_Analysis_T61_20260105.pdf | ||
| DH_Unit_1_Transformers_Life_Extension_Specification_2026-093.docx | DOCX document | |
| Power_Transformer_Maintenance_Checklist_Unit_1.pdf | ||
| T61_T62_Cabinet_Wiring_Diagram.pdf | ||
| Oil_Analysis_T62_20260105.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Power Transformer Maintenance
Checklist
Inspect physical condition
Inspect control cabinet
Verify correct liquid level in tanks and bushings
Main tank Bushings
Clean equipment
Ambient temperature
Winding temperature Top oil temperature
Complete PF winding testing Complete Winding Resistance testing
Complete PF bushing testing Complete TTR testing
Complete exitation testing
Winding temperature gauge
Calibrate gauge ( Replace gauge if > 20° off )
First contact Second contact Third contact
Top oil temperature gauge
Calibrate gauge ( Replace gauge if > 20° off )
First contact Second contact Third contact
Verify operation of pressure relief device
Verify operation of liquid level alarm
Verify operation of sudden pressure relay (coordinate with GRU relay tech)
Inspect the pressurized inert gas system
General Inspection
Transformer Testing
Component Inspection
Power Transformer Maintenance
Checklist
Verify "lose of AC" alarm
Verify fans operate
Verify completion of Testing MxOrder inspection sheet
Close Testing MxOrder (By GRU)
Personnel :
Wrap‐up
Comments
Date :