Posting_A2_-_COST_WORKSHEET_IFB__1PA6V92126.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- IFB 1PA6V92126 CZU Flashover Simulator
- Solicitation number
- 0000040544
- Issued by
- California
About this file
This is a Cost Worksheet for an Invitation to Bid (IFB) submitted to CAL FIRE in California for the procurement of a Flashover Simulator. The simulator is required to support the operational duties of CAL FIRE's CZU (Santa Cruz Unit) personnel located in Felton, California. The IFB package requires bidders to submit all requested documentation, signed and dated as indicated, with specific attention to delivery dates, warranty requirements, and additional administrative specifications outlined in Attachment 1 - Admin Requirements. Prospective vendors must provide comprehensive cost information through this worksheet to establish pricing for equipment supply and delivery.
The Cost Worksheet serves as the pricing submission mechanism for the flashover simulator procurement, requiring bidders to detail all associated costs for the equipment and related services. Bidders must ensure compliance with all administrative requirements, including delivery timelines and warranty provisions, as specified in the IFB documentation. The worksheet is designed to standardize cost information across all bids received, enabling CAL FIRE to conduct an equitable comparative analysis of vendor proposals and make an informed award decision based on cost and other evaluation criteria established in the IFB package.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Worksheet
| Department of Forestry and Fire Protection - Business Service Office, Procurement | ||||||
| Document ID # 1PA6V92126 - Flashover Simulator | ||||||
| Attachment 2 - Cost Worksheet | ||||||
| Bidder: | Blank | |||||
| Instructions: Unit and Extended Cost must include both shipping and handling costs. Refer to IFB Cost language, Section 16, for completion instructions. Bidder must complete the Yellow Input Cells only. | ||||||
| Line Item | Quantity | Unit of Measure | Commodity Description | Proposed Product Description | Unit Cost | Extension Cost |
| 1-1 | 1 | Each | Flashover Simulator ST-PRO | |||
| 1-2 | 1 | Each | Freight |
| Subtotal: | $ - 0 | |
| Sales Tax: | 9.50% | |
| Total Cost: | $ - 0 |
| Note: Extension is automatically calculated (Contract Unit Price x Quantity) |
| End of Sheet |
Page &P
File details come from the government source that posted it. Updated .