Port Gen Breaker.pdf

PDF 195 KB Posted

Attached to
Regulatory Dry Dock Training Vessel Kings Pointer(TVKP) Federal contract opportunity
Solicitation number
6933A222Q000016
Issued by
Department of Transportation Maritime Administration

About this file

This document provides details on a federal contract opportunity for dry dock repairs of the regulatory training vessel Kings Pointer. The U.S. Department of Transportation Maritime Administration is seeking industrial support services and materials through a firm fixed price purchase order to perform dry dock repairs in accordance with the specifications in the Statement of Work. The solicitation number for this opportunity is 6933A222Q000016 and repairs will be conducted at the Maritime Administration facility in Norfolk, Virginia. Interested parties should review the requirements and pricing terms for the dry dock repairs of the Kings Pointer training vessel.

View the file

Other files for this federal contract opportunity

Other files attached to Regulatory Dry Dock Training Vessel Kings Pointer(TVKP), newest first.
File Type Posted
Amdt 0001 6933A222Q000016 FY22 Dry dock combined synopsis solicitation.pdf PDF
Windward Gauging Pump Flat.pdf PDF
Schedule of Materials Item 227.pdf PDF
Questions and answers.pdf PDF
DWG 1547-5220.pdf PDF
Siemans-Allis Switchgear Insturctions Type LA-600A.pdf PDF
Port Containment 2.pdf PDF
Main Deck Water Tight Door Outside.pdf PDF
Main Deck Watertight Door Inside.pdf PDF
2020 anchor chain gauging TSKP.pdf PDF
2020 NFSY Anode Report.pdf PDF
keel cooler drawing.pdf PDF
Crane Diesel Manual.pdf PDF
Engine Room Water Tight Door Indicator Kick Pipe.pdf PDF
1316-802 Rev B TV KINGS POINTER General Arrangements and Profile.pdf PDF
1780-2550 Stern Thruster AD.pdf PDF
1547-4420 Rev 3 Bow Thruster Arr.pdf PDF
EDG Watertight Door Outside.pdf PDF
KINGS POINTER Tank Tables 15 Oct 13.pdf PDF
April 2022 RRF Coatings Guidelines.xls XLS spreadsheet
Prop Shaft detail.pdf PDF
Siemens-Allis Switchgear Parts Ordering Guide Type LA-600A.pdf PDF
Port Containment 3.pdf PDF
Port Containment 4.pdf PDF
Section 2.6 of TE-1 through TE-6.pdf PDF
Day Tank Fuel Lines 1.pdf PDF
Crane Lubrication and Maintenance Drawing.pdf PDF
1547-4801_Shafting Arr and Det.pdf PDF
1547-5250_Vents Rev 7 Vents Piping diagram.pdf PDF
1547-4705_Rudder Details.pdf PDF
KATO Generator End Foundation and Vibration Dampeners.pdf PDF
Gen Breaker Access.pdf PDF
Generator Foundation 2.pdf PDF
Gen Breakers Exterior.pdf PDF
DWG 1547-1401.pdf PDF
Attachment I TSKP 2022 DD SOW .pdf PDF
Attachment II Vendor Pricing.xlsx XLSX spreadsheet
MSI Main Engine Quote redacted.docx DOCX document
Shell Expansion Drawing.pdf PDF
1547-2515_Rev 6 Transverse Bhds.pdf PDF
ABS Rules Part 7 Chapter 6.pdf PDF
Crane Lubrication and Maintenance Schedule.pdf PDF
1316-555 Rev C TV KINGS POINTER FIRE AND SAFETY PLAN.pdf PDF
Flooring Sample.pdf PDF
Head Exhaust Ducting Pic.pdf PDF
1316-901 Kings Pointer Docking Plan.pdf PDF
Generator Foundation 1.pdf PDF
EDG Watertight Door Inside.pdf PDF
2019 Freedom Star Gauge Calibration List.xls XLS spreadsheet
Port CP Hoses 1.pdf PDF
Show all 50

Regulatory Dry Dock Training Vessel Kings Pointer(TVKP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .