Questions and answers.pdf

PDF 74 KB Posted

Attached to
Regulatory Dry Dock Training Vessel Kings Pointer(TVKP) Federal contract opportunity
Solicitation number
6933A222Q000016
Issued by
Department of Transportation Maritime Administration

About this file

This document contains questions and answers regarding dry dock repairs for the training vessel Kings Pointer. The vessel requires saltwater cooler piping maintenance including replacement of fittings, valves, and zinc anodes. Propeller cleaning and painting services are also within scope. Responses indicate that ASME and military welding standards are acceptable, along with 3000# socket weld fittings for piping. Valve quantities and locations are specified. One 1500 bow thruster is present with a 1200mm diameter, 4-bladed propeller. Power tools are permitted for surface preparation where needed. All coatings shall be Sherwin Williams paints.

View the file

Other files for this federal contract opportunity

Other files attached to Regulatory Dry Dock Training Vessel Kings Pointer(TVKP), newest first.
File Type Posted
combined Amdt 0002 6933A222Q000016 FY22 Dry dock combined synopsis solicitation.pdf PDF
Amdt 0001 6933A222Q000016 FY22 Dry dock combined synopsis solicitation.pdf PDF
Windward Gauging Pump Flat.pdf PDF
Schedule of Materials Item 227.pdf PDF
Prop Shaft detail.pdf PDF
Siemens-Allis Switchgear Parts Ordering Guide Type LA-600A.pdf PDF
Port Containment 3.pdf PDF
Port Containment 4.pdf PDF
Section 2.6 of TE-1 through TE-6.pdf PDF
Port Gen Breaker.pdf PDF
Day Tank Fuel Lines 1.pdf PDF
Crane Lubrication and Maintenance Drawing.pdf PDF
1547-4801_Shafting Arr and Det.pdf PDF
1547-5250_Vents Rev 7 Vents Piping diagram.pdf PDF
1547-4705_Rudder Details.pdf PDF
KATO Generator End Foundation and Vibration Dampeners.pdf PDF
Gen Breaker Access.pdf PDF
Generator Foundation 2.pdf PDF
Gen Breakers Exterior.pdf PDF
DWG 1547-1401.pdf PDF
Attachment I TSKP 2022 DD SOW .pdf PDF
Attachment II Vendor Pricing.xlsx XLSX spreadsheet
Siemans-Allis Switchgear Insturctions Type LA-600A.pdf PDF
Port Containment 2.pdf PDF
Main Deck Water Tight Door Outside.pdf PDF
Main Deck Watertight Door Inside.pdf PDF
2020 anchor chain gauging TSKP.pdf PDF
2020 NFSY Anode Report.pdf PDF
keel cooler drawing.pdf PDF
Crane Diesel Manual.pdf PDF
Engine Room Water Tight Door Indicator Kick Pipe.pdf PDF
1316-802 Rev B TV KINGS POINTER General Arrangements and Profile.pdf PDF
1780-2550 Stern Thruster AD.pdf PDF
1547-4420 Rev 3 Bow Thruster Arr.pdf PDF
EDG Watertight Door Outside.pdf PDF
KINGS POINTER Tank Tables 15 Oct 13.pdf PDF
April 2022 RRF Coatings Guidelines.xls XLS spreadsheet
Port CP Hoses 1.pdf PDF
Port CP Hoses 2.pdf PDF
MA-57_Drydock_Report.pdf PDF
Port Containment 1.pdf PDF
LIPS CP DWG A0 05745.pdf PDF
1547-2510_ Rev 7 Long_l Struct Sections.pdf PDF
Day Tank Fuel Lines 2.pdf PDF
1780-4419 Stern Thruster Compt Arrangement1of1.pdf PDF
Engine Room Water Tight Door Indicator Kick Pipe 2.pdf PDF
1547-4701 Rev 3 Rudder Arr.pdf PDF
1547-1420 Docking Plan.pdf PDF
ABS Rules Part 7 Chapter 5 Sections 1 and 2.pdf PDF
6933A222Q000016 FY22 Dry dock combined synopsis solicitation.pdf PDF
Show all 50

Regulatory Dry Dock Training Vessel Kings Pointer(TVKP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and answers

1. Please provide Windward Gauging from April 2022?

Attachment

2. Please provide HVAC Diagram DWG: 1547-6001?

3. Both ASME, which is approved by the Navy, and MIL welding procedures, as well as qualified welders to these procedures, that are available for approval by ABS. Is this acceptable?

Answer YES

4. Will 3000# Socket weld fittings be acceptable for all fittings (Elbows, Tees unions , etc.)? Answer YES

5. Please state exact amount of valves and placement in scope Item 227 to include:

Answer: : Item 227

- 2 each 1.5" gate valves (red. gear coolers only, cooler inlet) , 4 each 1.5" globe valves

(Cooler discharge), 4 each 1.5" ball valves. -All valves to meet or exceed ABS standards.

-No preferred brand

-150#

- All bronze

-Preferably all valves will be flanged, threaded valves can be used where needed

(clearance issues, etc.), but unions must be installed for removal and maintenance of threaded valves and piping.

6. Where flanges are needed, what rating shall be used (150#, 300#)?

Answer: 150

7. Is a PI&D (piping schematic ) for the SALTWATER COOLER PIPING that shows the reduction gear coolers and CPP coolers and existing routing drawing available that shows sources, users that also details of connection points.

8. Is a piping Spec available for this vessel regarding the SALTWATER COOLER

PIPING?

9. Please provide details of threaded sacrificial zinc anodes and their placement/quantity.

Answer: 2 each 3/4" zincs per system. Red. gear: closest as possible to cooler, one on inlet side, one on outlet side. CPP: In accessible spots, one on inlet side, one on outlet side. For CPP system, the shipyard can determine what will be easiest and check with me to ensure that they are easily accessible.

10. 1 ½” Sch 120 is unavailable in lower bore sizes. Please confirm schedule size, 80 or

160?

Answer: Schedule 80 will be acceptable for these systems.

Work Item 205 See Valves

11. How many valves are electrically actuated?

Answer: No valves are electrically actuated, one valve is pneumatically actuated (bow thruster exhaust)

Work Item 208 Propellers Cleaning

12. Does the bow thruster have a propeller on the port and starboard sides or only one propeller?

Answer: One CP propeller

13. What is the size and diameter of each propeller?

Answer: 1,200mm diameter

14. How many blades are present on each propeller?

4 blades

Prep and Coatings Scope

15. Is power tooling an acceptable alternative to abrasive blasting in small areas or where abrasive blasting could damage equipment?

Answer: Yes

16. Is Sherwin Williams paint suitable for all painting on the vessel? Some of the work items mention International paint (i.e. Crane Maintenance) while others mention

Sherwin Williams.

Answer: Yes all coatings are to be Sherwin Williams.

17. Could MARAD provide an estimation of the number of spools to be galvanized and the approximate weight of each spool?

Answer: Spools are not to be galvanized.

File details come from the government source that posted it. Updated .