1547-4705_Rudder Details.pdf

PDF 334 KB Posted

Attached to
Regulatory Dry Dock Training Vessel Kings Pointer(TVKP) Federal contract opportunity
Solicitation number
6933A222Q000016
Issued by
Department of Transportation Maritime Administration

About this file

This document outlines a federal contract opportunity for dry dock repairs to a training vessel. The U.S. Department of Transportation Maritime Administration is soliciting offers for industrial support services and materials to perform dry dock repairs to the regulatory training vessel Kings Pointer according to the specifications in the Statement of Work. Solicitation number 6933A222Q000016 will be used to procure these dry dock repair services, with issuance of a firm fixed price purchase order anticipated to the selected offeror. The work will take place in Norfolk, Virginia. No other details are provided in this document regarding response dates, award dates, pricing terms, or set asides.

View the file

Other files for this federal contract opportunity

Other files attached to Regulatory Dry Dock Training Vessel Kings Pointer(TVKP), newest first.
File Type Posted
combined Amdt 0002 6933A222Q000016 FY22 Dry dock combined synopsis solicitation.pdf PDF
DWG 1547-5220.pdf PDF
Amdt 0001 6933A222Q000016 FY22 Dry dock combined synopsis solicitation.pdf PDF
Windward Gauging Pump Flat.pdf PDF
Schedule of Materials Item 227.pdf PDF
MSI Main Engine Quote redacted.docx DOCX document
Shell Expansion Drawing.pdf PDF
1547-2515_Rev 6 Transverse Bhds.pdf PDF
ABS Rules Part 7 Chapter 6.pdf PDF
Crane Lubrication and Maintenance Schedule.pdf PDF
1316-555 Rev C TV KINGS POINTER FIRE AND SAFETY PLAN.pdf PDF
Flooring Sample.pdf PDF
Head Exhaust Ducting Pic.pdf PDF
1316-901 Kings Pointer Docking Plan.pdf PDF
Generator Foundation 1.pdf PDF
EDG Watertight Door Inside.pdf PDF
2019 Freedom Star Gauge Calibration List.xls XLS spreadsheet
Siemans-Allis Switchgear Insturctions Type LA-600A.pdf PDF
Port Containment 2.pdf PDF
Main Deck Water Tight Door Outside.pdf PDF
Main Deck Watertight Door Inside.pdf PDF
2020 anchor chain gauging TSKP.pdf PDF
2020 NFSY Anode Report.pdf PDF
keel cooler drawing.pdf PDF
Crane Diesel Manual.pdf PDF
Engine Room Water Tight Door Indicator Kick Pipe.pdf PDF
1316-802 Rev B TV KINGS POINTER General Arrangements and Profile.pdf PDF
1780-2550 Stern Thruster AD.pdf PDF
1547-4420 Rev 3 Bow Thruster Arr.pdf PDF
EDG Watertight Door Outside.pdf PDF
KINGS POINTER Tank Tables 15 Oct 13.pdf PDF
April 2022 RRF Coatings Guidelines.xls XLS spreadsheet
Port CP Hoses 1.pdf PDF
Port CP Hoses 2.pdf PDF
MA-57_Drydock_Report.pdf PDF
Port Containment 1.pdf PDF
LIPS CP DWG A0 05745.pdf PDF
1547-2510_ Rev 7 Long_l Struct Sections.pdf PDF
Day Tank Fuel Lines 2.pdf PDF
1780-4419 Stern Thruster Compt Arrangement1of1.pdf PDF
Engine Room Water Tight Door Indicator Kick Pipe 2.pdf PDF
1547-4701 Rev 3 Rudder Arr.pdf PDF
1547-1420 Docking Plan.pdf PDF
ABS Rules Part 7 Chapter 5 Sections 1 and 2.pdf PDF
6933A222Q000016 FY22 Dry dock combined synopsis solicitation.pdf PDF
Prop Shaft detail.pdf PDF
Siemens-Allis Switchgear Parts Ordering Guide Type LA-600A.pdf PDF
Port Containment 3.pdf PDF
Port Containment 4.pdf PDF
Section 2.6 of TE-1 through TE-6.pdf PDF
Show all 50

Regulatory Dry Dock Training Vessel Kings Pointer(TVKP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .