Text version

Exhibit I Attachment B (Rev. 0, 2-23-09) Subcontractor Submittal Requirements Summary

Exhibit I Attachment B for Analytical Laboratory Services (Rev. 0.1, 2-17-15) Subcontractor Submittal Requirements Summary

Dated 12/19/2018

THIS TEMPLATE IS TO BE USED FOR DEVELOPMENT OF SUBCONTRACTS FOR ENVIRONMENTAL PROGRAMS.

Exhibit I, “Subcontractor Submittal Requirements”, is the master document for communicating the requirements for submittal transmittal to N3B and any required follow-up action following N3B review.

Exhibit I, Attachment A, "Subcontractor Transmittal / Status Sheet" is to be used by a subcontractor to transmit information for N3B review.

Exhibit I, Attachment B, “Subcontractor Submittal Requirements Summary”, combines the submittal requirements from all Exhibits.

After Exhibits D, F, G and H have been finalized, the STR or Requester must tailor and complete this attachment to reflect submittal requirements for all Exhibits including the project specific Scope of Work and subcontract terms and conditions, prior to submittal of the purchase request (PR) to Procurement. The completed attachment must be included with the PR package. In order to tailor and complete this attachment:

Items (rows) not applicable to this specific project or acquisition must be deleted.

For each item, verify/modify all Exhibit references, submittal schedule, submittal type, and N3B Reviewers including Lead Reviewer designation for this specific project or acquisition.

Additional items (rows) may be added as needed for a particular project or acquisition. If added, applicable information must be provided in each column.

Attachment B (under Exhibit D, Engineering) contains a link to the listing of most or all the submittals required by the N3B Master Specifications maintained on the Master Specifications webpage which can be used to tailor the submittals for this specific project or acquisition.

For design-build projects, completion of Attachment B for engineering and quality submittals is design-dependent and therefore the responsibility of the SUBCONTRACTOR'S Architect/Engineer. SUBCONTRACTOR shall complete those portions of Attachment B at the preliminary design stage (e.g. 60%) and submit for N3B review. SUBCONTRACTOR shall submit the revised Attachment B at final design stage (90%) for N3B review. The reviewed Attachment B will be incorporated into Exhibit I and re-issued as a no-cost Change Order. The AE shall complete technical and quality requirements sections of Exhibit I for a follow-on construction subcontract, based on removing submittals for specification sections and paragraphs not required and adding specification sections and paragraph the AE creates.

Subcontractor Submittal Requirements Summary

NOTICE

Failure to submit required submittals as delineated on this form may result in withholding of payment in accordance with subcontract terms and conditions.

Submit To:
Overnight Delivery Address:
Regular Mailing Address:

SUBMITTAL SCHEDULE

A
Per Subcontract Schedule
S
Prior to Shipment
Z
When Required
SANN
Semi Annual
B
Prior to Balance of Payment
U
Prior to Use
ANN
Annually
WKLY
Weekly
F
Prior to Fabrication
W
Prior to Commencing Work
DAY
Daily
WRR
Implemented at work release level on Blanket Agreements
M
Prior to Mobilization
X
Prior to Purchase
MON
Monthly
BI-WKLY
Every 2 weeks
N
Prior to Notice to Proceed
Y
Prior to Progress Payment for Each Specific Task
QRTLY
Quarterly

SUBMITTAL TYPE REQUIRED

D
Drawings
ED
Electrical Diagrams
P
Prints /photocopies
SD
Shop Drawings
EM
Electronic media
II
Installation Instructions
PD
Performance Data - Curves
SP
Spare Parts and Maintenance Materials
CA
Calculations
ML
Materials/Parts List/Design Mixes
PH
Photographs
TR
Test Reports
CD
Catalog Data
OM
Operations & Maintenance Data
RD
Project Record Documents
WA
Warranties
CT
Certifications
OT
Other
S
Sample
(2)
(*) indicates quantity
R
Report
O
Original
SC
Samples/Colors
SPEC

REVIEWER DESIGNATION (For N3B Use Only)

CA
Contract Administrator
IT
Information Technology
RM
Regulatory Manager
CFO
Chief Financial Office
LR
Labor Relations
SA
Safety
CON
Construction
LTS
Long Term Stewardship
SBM
Small Business Office Manager
DC
Derivative Classifier
NFS
Nuclear/Facility Safety
SCM
STR Manager
EC
Environmental Compliance
NMC
Nuclear Materials & Accountability
SEC
Security
ES&H
Environmental Safety & Health
OCI
Office of Counterintelligence
SST
Secondary SCC
ERM
Emergency Management
PCE
Project Controls
STR
Subcontract Technical Representative
FM
Facility Manager
PHS
Physical Security
TA
Transportation
FP
Fire Protection
PM
Project Manager
TL
Technical Lead
HR
Human Resources
PS
Personnel Security
TRN
Training
HRE
HR Employee Concern
QA
Quality Assurance
VC
Visitor Control
HRS
HR Secondary
RAD
RADCON
WGS
Waste Generator Services
IH
Industrial Hygiene
RM/L
Risk Manager/Legal
(*)
Denotes Lead Reviewer

Submittal No./ Submittal Description

Reference

Submittal Schedule
Submittal Type
N3B Response Needed?
N3B Reviewer

(For N3B Use Only)

Commercial Document Requirements (CDR)

1.0 Exhibit C Schedule

1.1 Schedule of Quantities and prices C form A W

OT

N

STR/TL/QA

2.0 Exhibit D Scope of Work and Technical Requirements

2.1
Electronic Data Deliverables and Analytical Data Package Deliverables
D 2.2, D 5.1, D 5.2
Z
EM/R
N
STR/TL/QA
2.2
Corrections to EDD and/or analytical report PDF
D 2.2.2, D 5.3.3
Within 48 hours for EDD, within 4 days for complete submittal.
EM/R
N
STR/QA/TL
2.3
Personnel Requirements and Training
D 2.7, D 3.7, D 4.7.2, D 4.11.2
Within 30 days of award and within 30 days of changes or revisions for the duration of the subcontract.
EM/R
N
STR/TL/QA
2.4
Certification and Accreditations
D 3.2, D 4.7.1, D 4.7.2
Within 30 days of award and within 30 days of changes or revisions for the duration of the subcontract.
CT
N
STR/TL/QA
2.5
Quality Assurance Plan (QAP)/Laboratory Quality Assurance Plan (LQAP)
D 3.3.1
Within 30 days of award and within 30 days of changes or revisions for the duration of the subcontract.
OT
N
STR/TL/QA
2.6
List of all analytical procedures by method and matrix
D 3.3.1.7
Within 30 days of award and within 30 days of changes or revisions for the duration of the subcontract.
OT
N
STR/TL/QA
2.7
Standard Operating Procedures (SOPs)
D 3.3.2
Within 30 days of award and within 30 days of changes or revisions for the duration of the subcontract.
SPEC
N
STR/TL/QA
2.8
Performance Evaluation Sample Analysis
D 3.4, D 5.2.15
Within 30 days of
R
Y
STR/QA
2.9
Instrument Logs and Response Checks
D 3.8.1
Z
PD
N
STR/TL/QA
2.10
Case Files
D 3.13.1
Z
OT
N
STR/TL/QA
2.11
CARS
D 3.14
Within 14 days of request
R
N
STR/TL/QA
2.12
MDL Studies
D 4.3.1
Z/QRTLY
R
N
STR/TL
2.13
Radiological Safety Plan
D 4.6.1
Within 30 days of award and within 30 days of changes or revisions for the duration of the subcontract.
R
N
STR/TL/QA

4.0 Exhibit H Quality Assurance Requirements

4.1
Project Specific Quality Assurance Program
QC-01A
10 calendar days after award
RD
Y
STR/QA
4.2
Qualification and Certification of Personnel and Staff
QC-03
W
OM
Y
STR/QA
4.3
Traceability - Item
QC-04
Z
RD
Y
STR/QA/TL
4.4
Certificate of Conformance
QC-06
Z
RD
Y
STR/QA/TL
4.5
Manufacturing, Inspection, Maintenance, Repair, and/or Test Procedures
QC-07
Z
RD
Y
STR/QA/TL
4.6
Engineering Evaluation / Analysis Report
QC-08A
Z
RD
Y
STR/QA/TL
4.8
Certification of Calibration for SUBCONTRACTOR M&TE
QC-12A
Z
RD
Y
STR/QA/TL
4.10
Shelf Life Certifications/Storage Requirements
QC-16
10 calendar days after award
RD
Y
STR/QA/TL
4.11
First Article Inspection/Review
QC-19
WRR
RD
Y
STR/QA/TL
4.12
Contractor’s Right of Access to Subcontractor’s Facility (Visit)
QC-22
Z
OT
N
STR/QA/TL
4.13
Nonconformance Reporting
QC-25
Within 3 days of occurrence
RD
Y
STR/QA/TL
4.14
Corrective Action Reports
QC-26
Within 4 days of Formal notification
RD
Y
STR/QA/TL
4.15
Suspect/Counterfeit Items
QC-27
Z
RD
Y
STR/QA/TL
4.16
Serialization and Marking
QC-28
Z
RD
Y
STR/QA/TL
4.17
Handling, Receiving, Storage, Shipping, and Packaging
QC-29
WRR
RD
Y
STR/QA(*)/TL
4.18
Documents and Records
QC-34
Z
RD
N
STR/QA(*)/TL
4.19
Software Quality Assurance
QC-36
Z
RD
N
STR/QA(*)/TL
4.20
Other
QC-37
Z
RD
Y
STR/QA(*)/TL

Subcontract No. PR# RFP-0000000