About this file
This document is a Preventive Maintenance Task List (PMTL) for Underground Electrical Distribution and Manhole System Inspection, detailing an annual inspection procedure. The PMTL provides a comprehensive 8-step process for manhole inspection, including gathering maps and safety equipment, performing confined space entry procedures, verifying manhole markings, pumping water if necessary, inspecting electrical circuits and equipment for damage, clearing debris, and compiling a list of discrepancies. Each step is allocated specific labor hours, with the entire annual inspection process taking approximately 1.33 labor hours. The document is approved for enterprise use as of 01/03/2022 and is categorized under the Electrical Systems work group, with the equipment type identified as G4015110195001 from the AFPMTL source.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 2.pdf | ||
| Solicitation Amendment 0001.pdf | ||
| Performance Work Statement - Revised 29 May 2025.pdf | ||
| RFI 1.pdf | ||
| Base Map - Electrical Distribution.jpg | JPG image | |
| PMTL 1 - TRANSFORMER OIL PAD MOUNTED_ANNUAL.pdf | ||
| Wage Determination.pdf | ||
| Performance Work Statement.pdf | ||
| One Line Diagram.pdf | ||
| Switch Gear and Manhole Site Plan.pdf | ||
| PMTL 3- SUBSTATION_MAINTENANCE_MONTHLY_QUARTERLY_SEMI_ANNUAL.pdf | ||
| Pricing Worksheet.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2/15/24, 2:03 PM PMTL G4015110195001
https://usaf.dps.mil/teams/10758/PMTL/Module/PMTL Details.aspx?EID=369 1/1
Equipment Type: G4015110195001 PMTL Source: AFPMTL
Component: Underground Electrical Distribution and Manhole System Inspection - Per Manhole Short Title: Underground Elec Per Manhole
Work Group: ELECTRICAL SYSTEMS
Equipment Component Status: Approved for Enterprise Use as of 01/03/2022
1 Collect maps, tools, and safety equipment 0 0 0.083 X
2 Don Personal Protective Equipment, follow confined space entry procedures, and perform lock-out tag-out procedures as required for the steps below: 0 0 0.25 X
3 Verify proper manhole markings, circuit layout, placement on maps, and remove cover. 0 0 0.166 X
4 Pump water from manhole (if necessary). If manhole has a sump pump verify it is operational. 0 0 0.333 X
5 Inspect the exterior and interior of the manhole for damage or decay. 0 0 0.083 X
6 Visually inspect electrical circuits, equipment, and mounting hardware for signs of damage and deterioration. 0 0 0.083 X
7 Clear manhole and worksite area of debris, and secure the manhole. 0 0 0.166 X
8 Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s) 0 0 0.166 X
Annually 0 0 1.33
Step PM Components (Task Description) Hours Minutes Labor-hrs A