PMTL 2 - UNDERGROUND ELECTRICAL DISTRIBUTION AND MANHOLE SYSTEM INSPECTION - PER MANHOLE_ANNUAL.pdf

PDF 125 KB Posted

Attached to
Medium Voltage Electrical Distribution System Maintenance Federal contract opportunity
Solicitation number
W50S8D25Q17CL
Issued by
Department of the Army National Guard

About this file

This document is a Preventive Maintenance Task List (PMTL) for Underground Electrical Distribution and Manhole System Inspection, detailing an annual inspection procedure. The PMTL provides a comprehensive 8-step process for manhole inspection, including gathering maps and safety equipment, performing confined space entry procedures, verifying manhole markings, pumping water if necessary, inspecting electrical circuits and equipment for damage, clearing debris, and compiling a list of discrepancies. Each step is allocated specific labor hours, with the entire annual inspection process taking approximately 1.33 labor hours. The document is approved for enterprise use as of 01/03/2022 and is categorized under the Electrical Systems work group, with the equipment type identified as G4015110195001 from the AFPMTL source.

View the file

Other files for this federal contract opportunity

Other files attached to Medium Voltage Electrical Distribution System Maintenance, newest first.
File Type Posted
RFI 2.pdf PDF
Solicitation Amendment 0001.pdf PDF
Performance Work Statement - Revised 29 May 2025.pdf PDF
RFI 1.pdf PDF
Base Map - Electrical Distribution.jpg JPG image
PMTL 1 - TRANSFORMER OIL PAD MOUNTED_ANNUAL.pdf PDF
Wage Determination.pdf PDF
Performance Work Statement.pdf PDF
One Line Diagram.pdf PDF
Switch Gear and Manhole Site Plan.pdf PDF
PMTL 3- SUBSTATION_MAINTENANCE_MONTHLY_QUARTERLY_SEMI_ANNUAL.pdf PDF
Pricing Worksheet.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2/15/24, 2:03 PM PMTL G4015110195001

https://usaf.dps.mil/teams/10758/PMTL/Module/PMTL Details.aspx?EID=369 1/1

Equipment Type: G4015110195001 PMTL Source: AFPMTL

Component: Underground Electrical Distribution and Manhole System Inspection - Per Manhole Short Title: Underground Elec Per Manhole

Work Group: ELECTRICAL SYSTEMS

Equipment Component Status: Approved for Enterprise Use as of 01/03/2022

1 Collect maps, tools, and safety equipment 0 0 0.083 X

2 Don Personal Protective Equipment, follow confined space entry procedures, and perform lock-out tag-out procedures as required for the steps below: 0 0 0.25 X

3 Verify proper manhole markings, circuit layout, placement on maps, and remove cover. 0 0 0.166 X

4 Pump water from manhole (if necessary). If manhole has a sump pump verify it is operational. 0 0 0.333 X

5 Inspect the exterior and interior of the manhole for damage or decay. 0 0 0.083 X

6 Visually inspect electrical circuits, equipment, and mounting hardware for signs of damage and deterioration. 0 0 0.083 X

7 Clear manhole and worksite area of debris, and secure the manhole. 0 0 0.166 X

8 Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s) 0 0 0.166 X

Annually 0 0 1.33

Step PM Components (Task Description) Hours Minutes Labor-hrs A