PMTL 1 - TRANSFORMER OIL PAD MOUNTED_ANNUAL.pdf
PDF 78 KB Posted
- Attached to
- Medium Voltage Electrical Distribution System Maintenance Federal contract opportunity
- Solicitation number
- W50S8D25Q17CL
- Issued by
- Department of the Army National Guard
About this file
This document is a detailed maintenance checklist for annual transformer oil pad mounted inspections. The checklist outlines seven specific maintenance tasks, each with an allocated labor time, including: examining the transformer exterior for damage, checking the ground system, recording oil level/pressure/temperature, verifying auxiliary device operation, drawing and testing an oil sample, cleaning the transformer and surrounding area, and completing a maintenance report. The tasks are designed to ensure comprehensive inspection and documentation of transformer condition, with a section for noting any discrepancies that may require follow-on work orders. The checklist also includes a condition index rating system (Green+/Green/Green- to Red+/Red/Red-) and spaces to record start/end times, date, and technician signature.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 0001.pdf | ||
| Performance Work Statement - Revised 29 May 2025.pdf | ||
| RFI 2.pdf | ||
| RFI 1.pdf | ||
| Base Map - Electrical Distribution.jpg | JPG image | |
| PMTL 2 - UNDERGROUND ELECTRICAL DISTRIBUTION AND MANHOLE SYSTEM INSPECTION - PER MANHOLE_ANNUAL.pdf | ||
| Wage Determination.pdf | ||
| Performance Work Statement.pdf | ||
| One Line Diagram.pdf | ||
| Switch Gear and Manhole Site Plan.pdf | ||
| PMTL 3- SUBSTATION_MAINTENANCE_MONTHLY_QUARTERLY_SEMI_ANNUAL.pdf | ||
| Pricing Worksheet.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSFORMER OIL PAD MOUNTED_ANNUAL
RSMeans
PM Components
LABOR
HOURS
____ 1. Examine the exterior of the transformer for any damage, cracks, rust or leaks;
0.014 check around bushings, gaskets and pressure relief device.
____ 2. Check the condi on of the ground system.
0.170
____ 3. Check and record the oil level, pressure and temperature readings.
0.263
____ 4. Check fans, motors and other auxiliary devices for proper opera on where applicable
0.022
____ 5. Draw oil sample from top of transformer and have sample tested for dielectric
0.525 strength; replace removed oil.
____ 6. Clean transformer exterior and the surrounding area.
0.066
____ 7. Fill out maintenance checklist and report deficiencies.
0.022
Discrepancies for Follow-on Work Orders:
1.
2.
3.
4.
Check appropriate condi on index.
( ) Green + ( ) Green ( ) Green - ( ) Yellow + ( ) Yellow ( ) Yellow - ( ) Red + ( ) Red ( ) Red
Start Time: _____________________________________________
End Time: ______________________________________________
Date: __________________________________________________
Signature: ______________________________________________