Plans - WV NP NERI 107(2).pdf
PDF 23 MB Posted
- Attached to
- New River Gorge National Park & Preserve
- Solicitation number
- 693C73-24-R-000010
About this file
This file relates to a federal solicitation for construction services. The solicitation number is 693C73-24-R-000010 issued by the Department of Transportation Federal Highway Administration for work at the New River Gorge National Park & Preserve. The solicitation seeks bids for construction plans detailed in the attached 23MB PDF file. The file contains construction drawings but does not specify pricing terms, response dates, or set aside provisions. The opportunity is listed as a solicitation by the DOT FHWA for renovations at the national park located in West Virginia.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF THE INTERIOR
Title Sheet
Symbols And Abbreviations
Typical Section
Tabulation of Quantities
Erosion and Sediment Control Narrative
Erosion and Sediment Control Plans
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
NATIONAL PARK SERVICE
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 0.17 Miles
ADT (2024)
ADT (2044)
DHV
%Truck
D
V (MPH)
55/45
SPECIFICATIONS:
and Bridges on Federal Highway Projects, FP-14
Standard Specifications for Construction of Roads
BRIDGE:
DESIGN DESIGNATION:
e(max) 6%
C/A None
Know what'sbelow.
before you dig.Call
R
Administration
Federal Highway
U.S. Department of Transportation
A01
A02-A03
A04
D01-D05
M01
M02-M04
10.9%
None
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
FAYETTE COUNTY, WEST VIRGINIA
Charleston
KEY MAP
STATE OF WEST VIRGINIA
Morgantown
Beckley burg
Parkers-
Clarksburg
Bluefield
Martinsburg
N
PROJECT WV NP NERI 107(2)
SCALE IN MILES
0 40 80
0.34 MilesLANE MILES:
B01-B02
NO.
SHEET
C01-C03
Schedule Description Station to Station (miles)
Length
A 0.09100+93 to 105+86
RIP Cycle
Plan and Profile Sheets
REPAIR OF SLIDES ON CUNARD RIVER ACCESS ROAD USING MSE WALLS
PROJECT WV NP NERI 107(2)
Cunard River Access Road (Route 107)
Location Map
NOVEMBER, 2023
improvements, and other miscellaneous work.
guardrail replacement with MGS, drainage reconstruction of roadway sections, gravel resurfacing, walls, welded wire face deep patch repairs, Construction of Mechanically Stabilized Earth (MSE)
WIDTH SURFACE BASE SUBGRADE
11" RA N/A
GB57
Depth Varies, SCHEDULE
20'
20'
C
B
A
ROAD
Access Rd (Existing)
Cunard River
Access Rd (Existing)
Cunard River
Access Rd (Existing)
Cunard River
B 0.05 6
Project Manager
Yanina Kirtley
Lead Designer
Shoukat Nawaz
Highway Design Manager
D. Hasson, F. Choudhry
S01-S32 Standards And Details
Cunard River Access Road (Route 107) 107+68 to 110+40
C Cunard River Access Road (Route 107)
117+50 to 118+00
0.03 6119+30 to 119+65
121+40 to 121+90
T01-T52 Cross Sections
K01-K04 Drainage Profile
Survey Information SheetA05
±20'
811 or 800-245-4848
C04-C09 Summaries and Schedules
Alignment Chain DescriptionA06-A09
A10 Superelevation Tables
11" RA N/A
GB57
Depth Varies, 11" RA N/A
GB57
Depth Varies, A11 Gutter Slope Tables
Whittaker
Burnwell Page
Kincaid
Hamilton
Kingston
Decota
Artie
Clear Creek
Saxon Harper
Prosperity
Bradley
Pax
Long Branch
Mt Hope
Beckwith
Fayetteville
Lansing LookoutEdmond
Winona
Gatewood
SewellNewtown
Oak Hill CarlisleDothan
Scarbro
Glen Jean
Terry
Piney View
Stanaford
Wright Grandview
Quinnimont
Layland
Lawton
N
NO SCALE
WV NP NERI 107(2)
Clifftop
Landisburg
Arnett
New River r e vi R weN
Ne w R ive r
New River
:2
P
M
N o v e m b e r
A
S h e e t]
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\A
W V
N P
N E
R I
(2 tt l.
d g n
PROJECT
NUMBER
A01
NPS Drwg No. 637/188071 NPS PMIS No. 258999
WV NP NERI 107(2)
0.00EL.
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION NEW RIVER GORGE NATIONAL PARK AND PRESERVE
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AMD
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point bench mark back approach amendment ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:4
N o v e m b e r
S
H E
E T
P
R O
J E
C T
S \n e ri \1
(2
H
W Y
D
E S
\C A
D D
\A -A
W
V N
P N
E R
I (2 s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A02
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION NEW RIVER GORGE NATIONAL PARK AND PRESERVE
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2 roadway aggregate, method 2 minimum nominal long-term strength mechanically-stabilized earth midwest guardrail system linear feet or linear foot pounds per cubic foot granular backfill, #57 stone existing elevation cubic yard uft
RA
MNLTS
MSE
MGS
LNFT
lb/c
GB57
ex.or exist.
EL
CUYD
Riprap placement
:1
O c to b e r
S H
E E
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\A
-A
W
V N
P N
E R
I
(2 s y m .d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
NO SCALE
100+93
BEGIN Schedule A, limits of the staging areas before mobilization.
See Subsection 156.07(d) for areas designated for staging. Verify the 5.
Keep two parking spaces open for trail users during the full closure.4.
signals (see Standard 635-9) when full roadway closures are not permitted.
Use lane closures with flaggers (see Standard 635-6) or temporary traffic3.
the full roadway closure.
according to Subsection 156.04. Install road closure signs 14 days prior to
Use a full roadway closure on Cunard River Access Road when permissible 2.
conditions as approved by the CO.
spacing of devices may change to fit fieldof the MUTCD. Final location and
Install temporary traffic control devices in accordance with the latest edition1.
NOTES:
CUNARD RIVER ACCESS ROAD
110+40
END Schedule B, and 121+40 to 121+90
119+30 to 119+65, 117+50 to 118+00, Schedule C, 105+86
END Schedule A, 107+68
BEGIN Schedule B, BARRICADE
MOUNT ON TYPE 3
ROAD
CLOSED
R11-2 light, Type A
Mount warning
See Note 5
First staging area, Special 2
Special 3
4 5
CLOSED
ROAD
AHEAD
CLOSED
ROAD
1000 FT
W20-3 W20-3
4.6" 44.8" 4.6"
54"
6"
6"D 4.5" 6"D 4.5" 6"D 4.5" 6"D 4.5" 6"D
6"
60"
BORDER
R=7.5"
TH=0.88"
IN=0.59"
5.65" 36.9" 5.65"
48"
6"
6"D 4.5" 6"D
7.5"
30"
BORDER
R=3.75"
TH=0.88"
IN=0.59"
See Notes 4 and 5
Second staging area, Special 3
5.65" 36.9" 5.65"
48"
6"
6"D 4.5" 6"D
7.5"
30"
BORDER
R=3.75"
TH=0.88"
IN=0.59"
4.6" 44.8" 4.6"
54"
27"
6"D
15"
6"
6"D 4.5" 6"D 4.5" 6"D 4.5" 6"D 4.5"
48"
BORDER
R=6"
TH=0.88"
IN=0.59"
Special 1
See Detail E635-15
Place Bipartisan Infrastructure Law sign, B ro o k ly n L o o p
U.S. DEPARTMENT OF TRANSPORTATION
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
:3 o v e m b e r
C u n a r d
R iv e r A c c e s s R o a d
S h e
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\A
W V
N P
N E
R I
(2 lo c .d g n
LOCATION MAP
PROJECT
A04
PK
FHWAAC
18"x45.4' CPP
18"x32.6' CPP
.5
Long. 81.02289482°
Lat. 37.99867681°
PK
FHWAAC
Long. 81.02274757°
Lat. 38.00035613°
PK
Long. 81.02549687°
Lat. 38.00385596°
PK
PK
PK
PK
60D NAIL
PK
MON
MJ35014
PK
60D NAIL
PK
A z . 3
.2
ROUGH
ROAD
A z
.8
A z.
.1
.9
.2
A z .6
ELECTRIC
SPEED
LIMIT
18"x35.7' CPP
+ 2X3 PIER
A z . 1
.8 x
C P P
+S T
O N
E W
A L L
A z.
.3
CONC.
> 25FT HT.
18"x42' CPP
18"x58
.8' CPP
A z . 1
.9
.3
D CRAWL SPACE
Az. 101.3°
16.3'
18"x44.4' CPP A z .3
.2
3'
77.5'
Az. 280.8°
Az. 287.9°
18"x3 4.3' C
PP
.7
A z . 3
.9
Az. 98.4°
28.2'
.7
A z . 1
.9
6" C
PP D
RAINOUT. 1
.22'6" C
PP D
RAINOUT. 1
.58'
6" CPP DRAIN
OUT. 1175.06'
C P P D
R A
IN
O U T .3
21.
9'
A z .5
.8
Az.
1.9
6" CPP
OUT. 1212.54'
C
P P
O U
T .1
18"x35.9' CPP
A z . 3
.1
.3
26.2'
Az. 97.2°
A z . 1
.1
.2
N N N N
NNNN
N N N N
N
.2
A z.
0.
6°
PK
CP-PK1138.170363772.6001961587.270MJ35014
PK1284.220365539.3501961152.9704010
PK1258.350365295.6601961285.3804009
PK1222.510364988.3501961405.9904008
PK1193.720364708.6301961486.1604007
PK-60D1135.550364325.4701961723.1004006
PK1115.280364171.4401961714.4604005
PK1107.840363849.3201961653.9604004
PK1082.400363565.5101961716.7804003
PK-60D1065.400363853.8701961796.9704002
PK1065.780364002.9901961792.1304001
PK-FHWAAC1056.300364264.7301961944.8102002
PK1013.380363653.2401961902.2302001
CodeElevation Northing EastingName
Survey Project Coordinate List
Project : WV NP NERI 107(2)
Geoid Model : GEIOD 1980 (Conus)
Vert. Datum : NAVD88
Hor. Datum : NAD 1983 (Conus)
Zone : West Virignia South Zone
Coordinate System : US State Plane 1983 US Survey Foot
Azimuth angle shown is based on north axis at clockwise rotation.
NOTE:
:4
N o v e m b e r
S U
R V
E Y
I N
F O
R M
A T
IO
N
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\A W
V N
P N
E R
I (2 s u rv
.d g n
SURVEY INFORMATION
PROJECT
A05
:0 o v e m b e r
A li g n m e n t
C h a in
D e s c r ip ti o n
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\A -A
W
V N
P N
E R
I (2 h o ri z o n ta l a li g n m e n t.
d g n
ALIGNMENT CHAIN DESCRIPTION
PROJECT
A06
:2
A o v e m b e r
A li g n m e n t
C h a in
D e s c r ip ti o n
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\A -A
W
V N
P N
E R
I (2 h o ri z o n ta l a li g n m e n t.
d g
A07
:3 u g u s t
A li g n m e n t
C h a in
D e s c r ip ti o n
S h e fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\A
-A
W
V N
P N
E R
I
(2 h o ri z o n ta l a li g n m e n t.
d g
A08
:0 o v e m b e r
A li g n m e n t
C h a in
D e s c r ip ti o n
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\A -A
W
V N
P N
E R
I (2 h o ri z o n ta l a li g n m e n t.
d g
A09
:4 o v e m b e r
S u p e r e le v a ti o n T a b le s
S h e fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\A W
V N
P N
E R
I (2 s u p .d g
SUPERELEVATION TABLES
A10
:5 o v e m b e r
G u tt e r S lo p e T a b le s
S h e
C
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\A
W V
N P
N E
R I
(2 g u tt e r_ s lo p e s .d g
GUTTER SLOPE TABLES
A11
See sheet A11 for gutter cross slope table.8.
See sheet A10 for superelevation tables (e).7.
Final paving will be completed on a future project.6.
transition areas.
Adjust the slope as necessary in wall height 5.
Install paved waterway from 109+03 to 110+40.4.
Subsection 605.03.
Place screen in all outlet drains according to 3.
See the Standards and Details for more information.2.
See Section 255 for excavation requirements.1.
NOTES:
MNLTS = Minimum Nominal Long-term strength, see Subsection 714.04
Note:
For geogrid quantity calculations, add 4.5 ft to Reinforcement Length to account for wrapped face.*
Granular Backfill (#57 stone)Backfill Type
4000400040004000Reinforcement MNLTS, T (lb/cuft)
12182230Minimum Reinforcement Length*, L (ft)
1.51.51.51.5Reinforcement Vertical Spacing, S (ft)
8141921Reinforcement Layers, N
122128.531.5Maximum Wall Height, H (ft)
107+68 to 110+40103+95 to 105+86102+00 to 103+95100+93 to 102+00
Schedule BSchedule A
MECHANICALLY STABILIZED EARTH SCHEDULE
e e (see Note 7) ground
Existing waterway)
(behind paved
Existing ground
CL
Roadway posts with a 12" block
Remove and install MGS, Type 2, Class A steel Proposed profile grade
2% geotextile, Class 1, Type B
Separation-stabilization
Granular backfill (#57 stone)
Limits of Construction
E255-A
See Detail
Minimum Reinforcement Length, L
M a x im u m W a ll
H e ig h t, H
4' Min.
Embankment construction, place granular backfill (#57 stone) stone) backfill, (#57 place granular construction, Embankment
8"
Method A, Class 3
Place riprap
Place underdrain
Limit of excavation (see Note 1) or f latt er1V:1 .5H
Roadway excavation
10' Traveled Way 10' Traveled Way
2%
Top of MSE wall
Bottom of MSE wall
Reinforcement Vertical Spacing, S (ft) type 5 (Schedule B), see Note 4 asphalt. Construct paved waterway, Remove existing paved waterway, (see Note 8) concrete, 13-inch depth construct curb and gutter, gutter, concrete, Remove existing curb and
V :1
H and gutter)
(behind curb
Existing ground topsoil, 4-inch depth, and establish turf.
Place rolled erosion control product, Type 4, 1V:
2.5
H (se e N ote 5)
Roadway aggregate, Method 2, 11-inch depth
Roadway excavation, 6-inch depth
Separation-stabilization geotextile, Class 2, Type E
Removal of pavement, asphalt, 5-inch depth
4-inch depth
Aggregate-topsoil course, 4' flatter
2% or
3' Shldr.2' and establish turf topsoil, 4-inch depth, product, Type 4, Place rolled erosion control
4-inch depth
Aggregate-topsoil course, V :1
H
U.S. DEPARTMENT OF TRANSPORTATION
WELDED WIRE FACED MSE WALL
SCHEDULES A AND B
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
:2 o v e m b e r
B
C u n a r d G a b io
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\B
-B
W
V N
P N
E R
I
(2 ty p
.d g n
TYPICAL SECTION
PROJECT
B01
119+30 to 119+65 and 121+40 to 121+90 e geotextile, Class 1, Type B
Separation-stabilization or fla tte r1V:
2H
Existing ground
CL
Patch Vertical Spacing, S (ft)
Match existing profile grade
E255-B
See Detail
Traveled Way place granular backfill, #57 stone
Embankment construction, Roadway excavation
8"
13-inch depth curb and gutter, concrete, gutter, concrete, construct
Remove existing curb and
2%
1V:3H or f latter topsoil, 4-inch depth, and establish turf
Place rolled erosion control product, Type 4, Limit of excavation
117+50 to 118+00
Roadway aggregate, Method 2, 11-inch depth
Roadway excavation, 6-inch depth
Separation-stabilization geotextile, Class 2, Type E
Removal of pavement, asphalt, 5-inch depth
Limits of Construction
Traveled Way
Patch Length, L
15%
Final paving will be completed on a future project.2.
See the Standards and Details for more information.1.
NOTES:
e geotextile, Class 1, Type B
Separation-stabilization
4-inch depth
Aggregate-topsoil course, Existing ground
Patch Vertical Spacing, S (ft) E255-B
See Detail
Traveled Way
#57 stone backfill, place granular construction, Embankment
Roadway excavation
8"
2%
1V:1.5H
Limit of excavation
Limits of Construction
Traveled Way
Patch Length, L
D e p th
D
R e in f o r c e m e t
5%
CL
waterway, type 5 construct paved waterway, asphalt, Remove existing paved
MNLTS = Minimum Nominal Long-term strength, see Subsection 714.04
Note:
For geogrid quantity calculations, add 4.5 ft to Reinforcement Length to account for wrapped face.*
400040004000 Reinforcement MNLTS, T (lb/cuft)
262622 Patch Length*, L (ft)
1.51.51.5Patch Vertical Spacing, S (ft)
333Patch Layers, N
4.54.54.5Reinforcement Depth, D (ft)
121+40 to 121+90119+30 to 119+65117+50 to 118+00
Schedule C
DEEP PATCH REPAIR SCHEDULE
Bottom of reinforcement depth
Top of reinforcement depth information see sheet D05 for more at 118+00, outlet connection
Install underdrain and
Place riprap method A, Class 3
Bottom of reinforcement depth
Top of reinforcement depth
Maintain existing ditch elevation
Roadway aggregate, Method 2, 11-inch depth
Roadway excavation, 6-inch depth
Separation-stabilization geotextile, Class 2, Type E
Removal of pavement, asphalt, 5-inch depth
Match existing profile grade
4-inch depth
Aggregate-topsoil course, Shldr.
Shldr.
Class A steel posts with a 12" block
Remove and install MGS, Type 2, 4'3'10'10' and establish turf topsoil, 4-inch depth, control product, Type 4, Place rolled erosion and establish turf topsoil, 4-inch depth, product, Type 4, erosion control
Place rolled
2' minimum for the outlet drain
Limit of excavation for the deep patch
Limit of excavation
D e p th
D
R e in f o r c e m e t
U.S. DEPARTMENT OF TRANSPORTATION
WELDED WIRE FACE DEEP PATCH REPAIR
SCHEDULE C
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
:0 o v e m b e r
B
D e e p
P a tc h
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\B
-B
W
V N
P N
E R
I
(2 ty p
.d g n
TYPICAL SECTION
PROJECT
B02
Sheet 1 of 3
SCHEDULE A
:3 o v e m b e r
T a b u la ti o n o f Q u a n ti ti e s
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
TABULATION OF QUANTITIES
PROJECT
C01
Sheet 2 of 3
SCHEDULE B
:3 o v e m b e r
T a b u la ti o n o f Q u a n ti ti e
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
TABULATION OF QUANTITIES
PROJECT
C02
Sheet 3 of 3
SCHEDULE C
:4 o v e m b e r
T a b u la ti o n o f Q u a n ti ti e
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
TABULATION OF QUANTITIES
PROJECT
C03
Sheet 1 of 6
:2
N o v e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C04
Sheet 2 of 6
:5
N o v e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C05
Sheet 3 of 6
:5
N o v e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C06
Sheet 4 of 6
:3
N o v e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C07
Sheet 5 of 6
:5
N o v e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C08
Sheet 6 of 6
:5
N o v e m b e r
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\C
-C
W
V N
P N
E R
(2 q n t.
d g n
SUMMARIES AND SCHEDULES
PROJECT
C09
GABION WALL
+ GABION WALL
PK
DAMAGE
ROAD
PK
METAL GUARDRAIL
100+93.00
BEGIN WORK
from 100+93 to 105+86
Aggregate, Method 2 pavement with Roadway
Remove and reconstruct
(See note 1) sections 98+18 to 110+40
Remove existing guardrail and terminal
101+38.78 drainage items, Sections for installation of inlet and see the Drainage Cross
Remove the existing culvert and
102+72.49 drainage items, Sections for installation of inlet and see the Drainage Cross
Remove the existing culvert and
NOTES:
1. Verify the limits of removal of existing guardrail and terminal section system.
Install MGS guardrail and terminal section in the locations of the existing system.
2. Before work begins, submit methods for approval to connect the proposed MSE wall to the existing wall.
3. Refer to the Superelevation Tables for pavement superelevation.
105+86.00
END WORK
104+98.60 of drainage items, Cross Sections for installation and inlet and see the Drainage
Remove the existing culvert
Proposed bottom of MSE wall
Proposed edge of shoulder
105+86.00 (See Note 2)
Tie MSE wall to existing wall class 3
Place rip rap, Place rip rap, class 3
Place rip rap, class 3
CUNARD R
IVER ACCESS ROAD
See Note
See Note 1
C1
C2
C3
C4
C5
C6
100+93 to 105+86
Install curb and gutter, 100+93.00
10.82' right, Edge of travelway, 100+93.00
10.03' left, Edge of travelway, 101+13.00
10.00' right, Edge of travelway, 101+13.00
10.00' left, Edge of travelway, 105+65
10.00' right, Edge of travelway, 105+65
10.00' left, Edge of travelway, 105+86
9.87' right, Edge of travelway, 105+86
9.10' left, Edge of travelway, 10'
10' 100+93 pavement, Sawcut
105+86
Sawcut pavement, Install MGS, Type 2, Class A steel posts, see Note 1
Slope stake limits (typ.)
Remove existing curb and gutter
100+93 to 105+86
N
N=365220.0893
E=1961311.1189
PI 103+24.06
Δ = 28°04'00"
R = 150.00'
T = 37.49'
L = 73.48'
PI 101+13.38
Δ = 25°31'41"
R = 90.00'
T = 20.39'
L = 40.10'
PI 100+49.96
Δ = 29°06'38"
R = 85.00'
T = 22.07'
L = 43.19'
PI 102+12.96
Δ = 34°53'59"
R = 130.00'
T = 40.86'
L = 79.18'
C1 C2 C3 C4
N=364763.9224
E=1961478.4728
C5 C6
SCALE IN FEET
0 20 40
U.S. DEPARTMENT OF TRANSPORTATION
CUNARD RIVER ACCESS ROAD
SCHEDULE A
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
S4 1°4
1'3 8"E
S12°35'00"E S38
°06 '41
"E S03°12'42"E
S31°1 6'42"
E S14°42'37"E
S18°20'20"E
.9
.0
.5
C 1
.8
C 1
.1
.2
.6
.0
P O
B
PI 104+99.46
Δ = 03°37'43"
R = 650.00'
T = 20.59'
L = 41.17'
PI 104+07.23
Δ = 16°34'05"
R = 100.00'
T = 14.56'
L = 28.29'
:2 o v e m b e r
P L
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\D -D
W
V N
P N
E R
I (2
C u n a rd
R iv e r
A c c e s s R o a d .d g n
PLAN
PROJECT
D01
Proposed profile grade
Bottom of MSE wall bottom of MSE wall
Existing ground at
Top of MSE wall
Existing ground
101+38.78, See K Sheets
48" pipe culvert
Sheets
102+72.49, See K
48" pipe culvert
Sheets
48" pipe culvert 104+98.60, See K
Sheets
102+72.49, See K
24" pipe culvert
Sheets
101+38.78, See K
24" pipe culvert
Sheets
104+98.60, See K
24" pipe culvert
100+93.00
BEGIN WORK,
105+86.00
END WORK,
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROFILE
SCHEDULE A
100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50
1,150 1,150
1,160 1,160
1,170 1,170
1,180 1,180
1,190 1,190
1,200 1,200
1,210 1,210
1,220 1,220
1,230 1,230
1,240 1,240
1,250 1,250
1,260 1,260
1,270 1,270
1,280 1,280
1,290 1,290
1,300 1,300
-12.28%
-15.89%
-1.03%
.1
.2
.9
.4
' VC175
16K =
'184SSD =
' VC105
7K =
'67HLSD =
,2
.4
100+93.00
El.= 1,208.00
101+21.00
El.= 1,205.33
101+29.00
El.= 1,202.00
101+69.00
El.= 1,199.00
101+77.00
El.= 1,196.00
102+49.00
El.= 1,193.00
102+57.00
El.= 1,190.33
104+57.00
El.= 1,187.00
104+65.00
El.= 1,185.67
104+97.00
El.= 1,184.00
105+86.00
El.= 1,184.00
105+86.00
El.= 1,199.00
100+93.00
El.= 1,239.50
101+21.00
El.= 1,236.50
101+29.00
El.= 1,233.50
101+53.00
El.= 1,230.50
101+69.00
El.= 1,227.50 101+77.00
El.= 1,224.50
102+33.00
El.= 1,223.00
102+49.00
El.= 1,221.50
102+57.00
El.= 1,218.50
104+09.00
El.= 1,215.50
104+17.00
El.= 1,214.00
104+57.00
El.= 1,211.00
104+73.00
El.= 1,208.00
104+81.00
El.= 1,206.50 104+97.00
El.= 1,205.00
105+29.00
El.= 1,202.00
105+37.00
El.= 1,200.50
105+61.00
El.= 1,199.00
:4 o v e m b e r
C u n a r d
R iv e r A c c e s s R d
P r o f il e
S h e
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\D
-D
W
V N
P N
E R
I
(2
C u n a rd
R iv e r
A c c e s s R o a d
.d g n
PROJECT
D02
60D NAIL
DAMAGE
ROAD
DAMAGE
ROAD+
(See note 1)
110+40 terminal sections 98+18 to
Remove existing guardrail and
107+68.00
BEGIN WORK
drainage items, 109+00.41
Sections for installation of and see the Drainage Cross
Remove existing culvert and inlet
NOTES:
1. Verify the limits of removal of existing guardrail and terminal section system.
Install MGS guardrail and terminal section in the locations of the existing system.
2. Before work begins, submit methods for approval to connect the proposed MSE wall to the existing wall.
3. Refer to the Superelevation Tables for pavement superelevation.
110+40.00
END WORK
see Note 1
Install MGS, Type 2, Class A steel posts, Proposed edge of shoulder
Slope stake limit (typ.)
107+68.00 (See Note 2)
Tie MSE wall to existing wall
Place rip rap, class 3
109+03 to 110+40
Remove existing paved waterway
109+03 to 110+40
Install paved waterway, Type 5
C7
C8
107+68 to 109+03
Remove existing curb and gutter
107+68 to 109+03
Install curb and gutter, Proposed bottom of MSE wall
110+15
Install MGS tangent terminal
107+68
11.00' Left, Edge of travelway, 107+68
8.62' Right, Edge of travelway, 107+90
10.00' Right, Edge of travelway, 107+90
10.00' Left, Edge of travelway, 109+03
Elevation = 1,157.82', 11.50' Right, centerline, Paved waterway
109+31
Elevation = 1,154.34', 14.00' Right, centerline, Paved waterway
109+90
Elevation = 1,148.31'
14.00' Right, centerline, Paved waterway
110+40
Elevation = 1,141.45'
13.06' Right, centerline, waterway
Paved
110+40
10.42' Right, Edge of travelway, 110+20
10.00' Left, Edge of travelway, 110+40
10.11' Left, Edge of travelway, 110+30
Elevation = 1,143.15', 13.12' Right, centerlihe, waterway
Paved
Edge of travelway, 10.00' Right, 110+20
10'
10' to 110+40.00 from 107+68.00
Method 2, Aggregate, Roadway pavement with reconstruct
Remove and
107+68
Sawcut pavement, 110+40
Sawcut pavement, N
N=364592.6558
E=1961539.6264
CUNARD RIVER ACCESS ROAD
PI 108+00.13
Δ = 23°47'30"
R = 440.00'
T = 92.69'
L = 182.71'
C7
N=364379.5389
E=1961694.4342
PI 110+28.20
Δ = 31°55'53"
R = 340.00'
T = 97.27'
L = 189.48'
C8
U.S. DEPARTMENT OF TRANSPORTATION
CUNARD RIVER ACCESS ROAD
SCHEDULE B
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
S42 °07 '50
"E S10°11'57"E
.4
.1
.4
:2 o v e m b e r
C u n a r d
R iv e r A c c e s s R d
P la n
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\D -D
W
V N
P N
E R
I (2
C u n a rd
R iv e r
A c c e s s R o a d .d g n
PLAN
PROJECT
D03
Proposed profile grade
Bottom of MSE wall
Existing ground at bottom of MSE wall
Top of MSE wall
Existing ground
Sheets
109+00.41 See K
48" pipe Culvert
Sheets
109+00.41 See K
24" pipe Culvert 107+68.00
BEGIN WORK,
110+40
END WORK,
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROFILE
SCHEDULE B
106+00 106+50 107+00 107+50 108+00 108+50 109+00 109+50 110+00
1,100 1,100
1,110 1,110
1,120 1,120
1,130 1,130
1,140 1,140
1,150 1,150
1,160 1,160
1,170 1,170
1,180 1,180
1,190 1,190
1,200 1,200
1,210 1,210
1,220 1,220
1,230 1,230
1,240 1,240
1,250 1,250
110+50 111+00 111+50
-12.28%
-15.45%
-13.79%
-13.36%
-8.53%
.5
.1
.0
.5
.0
.0
' VC61
29K =
'547SSD =
' VC60
11K =
'235SSD =
' VC60
9K =
'79HLSD =
,1
.2
107+68.00
El.= 1,174.00
107+84.00
El.= 1,172.50
107+92.00
El.= 1,171.00
108+08.00
El.= 1,168.00
108+24.00
El.= 1,165.00 108+40.00
El.= 1,162.00
108+64.00
El.= 1,159.00
108+80.00
El.= 1,157.50
108+88.00
El.= 1,156.00
109+12.00
El.= 1,153.00
109+36.00
El.= 1,150.00
109+68.00
El.= 1,148.50
109+84.00
El.= 1,147.00
110+00.00
El.= 1,145.50
110+08.00
El.= 1,144.00
110+24.00
El.= 1,142.50
110+32.00
El.= 1,141.00
107+68.00
El.= 1,162.00
107+92.00
El.= 1,159.00
108+08.00
El.= 1,156.33
108+24.00
El.= 1,153.33
108+40.00
El.= 1,150.33
108+64.00
El.= 1,147.00
108+88.00
El.= 1,144.00
109+12.00
El.= 1,141.33
109+36.00
El.= 1,138.00
110+08.00
El.= 1,135.00
110+40.00
El.= 1,135.00
:5 o v e m b e r
C u n a r d
R iv e r A c c e s s R d
P r o f il e
S h e
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\D
-D
W
V N
P N
E R
I
(2
C u n a rd
R iv e r
A c c e s s R o a d
.d g n
PROJECT
D04
K
P I E
R
P I E
R
P I E
R
D
NAI
L
X P I E
R
G A B
IO
N B
O T T O
M
ROCK OUTCROP
P K
STO
N E
W
ALL
DAMAGE
ROAD
DAMAGE
ROAD
DAMAGE
ROAD
W A
S H
O U
T
F T H
T
F T H
T
PK
DAMAGE
ROAD
DAMAGE
ROAD
D C
R A
W L S
P A
C E
GPS
MJ35014
NOTES:
1. Verify the limits of removal of the existing guardrail and terminal section system. Install
MGS guardrail in the location of the existing system. Place a special trailing end terminal at station 118+68.
2. Install an elbow joint to join the underdrain outlet with an extended section of non-perforated pipe. Bury the underdrain outlet pipe, elbow, and the extended section in a trench to achieve positive drainage at the end that is flush with the ground surface. Pipe locations may be adjusted to fit field conditions as approved by CO. Add riprap, Method A, Class 3 at the outlet.
3. Refer to the Superelevation Tables for pavement superelevation.
4. Sawcut the pavement at the beginning and ending of each geotechnical deep patch.
5. Use conserved topsoil before bringing in new topsoil.
121+90
END WORK
119+65
END WORK
119+30
BEGIN WORK
121+40
BEGIN WORK
117+50
BEGIN WORK
118+00
END WORK
to 121+90, see Note 4 a geotechnical deep patch from 121+40
Remove pavement and reconstruct with width = 1', see Note 4
119+30 to 119+65, right shoulder a geotechnical deep patch from
Remove pavement and reconstruct with from 117+50 to 118+00, see Note 4 with a geotechnical deep patch
Remove pavement and reconstruct
(See Note 2)
1082.50'
22.00', Elev =
118+20, Offset
End outlet pipe
C11
C15 C14
C13
C12
C16
(See Note 1)
119+61
118+68 to sections, and terminal guardrail existing
Remove
Place riprap, class 3
Note 2) joint (See
Install elbow
119+65
119+40 to tangent terminal, Install MGS
Install MGS guardrail, Class A, steel post 118+68 to 119+40
121+00
120+75 to tangent terminal, Install MGS steel post, 121+00 to 121+90
Install MGS guardrail, Class A, 121+90 to 122+15
Install MGS tangent terminal, 117+50 to 117+60
9.50' Left, 9.25' to
Edge of travelway, 118+00
117+90 to
10.65' Left, 9.50' to
Edge of travelway, 117+60
117+50 to
9.50' Right, 9.54' to travelway, Edge of
117+90 to 118+00
9.50' to 9.22' Right, Edge of travelway, 12.00' Left
12.25' to
119+40, 119+30 to
Edge of travelway, 119+30 to 119+65 paved waterway, Type 5, Remove and install
10.80' to 10.00', Left
121+40 to 121+50, Edge of travelway, 12.00' Left
119+65, Edge of travelway, Edge of travelway, 121+40 to 121+50, 10.00' to 9.80', Left
121+40 to 121+90 paved waterway, Type 5, Remove and install
117+50 to 118+00 curb and gutter, Remove and install
10'
10'
Slope stake limit (typ.)
N
N= 363,873.3441
E= 1,961,793.4604
N= 363,652.6990
E= 1,961,756.3325
N= 363,619.4509
E= 1,961,745.6283
N= 363,826.1198
E= 1,961,777.2082
N=363,677.6294
E=1,961,684.1397
N=363,677.6294
E=19,61,683.7665
PI 121+18.01
Δ = 15°47'27" (RT)
R = 365.00' T = 50.62' L = 100.59'
PI 119+38.89
Δ = 34°55'27" (LT)
R = 158.25' T = 49.78' L = 96.46'
PI 116+86.18
Δ = 11°32'01" (LT)
R = 260.00' T = 26.26' L = 52.34'
PI 114+29.56
Δ = 24°48'39" (LT)
R = 335.00' T = 73.69' L = 145.06'
PI 119+24.24
Δ = 152°21'20" (LT)
R = 25.00' T = 101.61' L = 66.48'
C10
CUNARD RIVER ACCESS ROAD
C11 C12 C13 C14
C10
C15 C16
U.S. DEPARTMENT OF TRANSPORTATION
CUNARD RIVER ACCESS ROAD
SCHEDULE C
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
S22°23'38"W
S02°25'01"E
N04°03'51 "E
N19° 51'
18" E
N15°37'22"W
.6
R C
118+ 89.11
PC
.7
.2
R
C
.3
.8
P O
E
PI 122+57.58
Δ = 35°28'39" (LT)
R = 115.00' T = 36.79' L = 71.21'
PI 117+68.36
Δ = 00°00'00" (RT)
R = 0.00' T = 0.00' L = 0.00'
:2
N o v e m b e r
C u n a rd
R iv e rA c c e s s R d
P la n
S h e
P R
O J E
C T
S \n e ri \1
(2
H W
Y
D E
S \C
A D
D \D
-D
W V
N P
N E
R I
(2
C u n a rd
R iv e r
A c c e s s R o a d .d g n
PLAN
PROJECT
D05 see Detail ET 602-5A
Install 24" pipe culvert 24 LF, see Detail ET 602-5A
Install 48" pipe culvert 24 LF, Elevation 1235.25'
101+38, Proposed invert inlet, Elevation 1234.00'
101+39, Proposed invert outlet, see Detail E604-A
Install manhole type A, Elevation 1203.54'
101+39, Proposed invert inlet, Elevation 1202.00'
101+40, Proposed invert outlet, Remove existing pipe
Method A, Class 3
Place riprap, 101+38, grate FL Elev. 1239.94'
Proposed Type 4D inlet (See Detail E604-02), 14.96' Left
101+40, Elevation 1239.61', Top of manhole, for gutter cross slope
See the Gutter Slope Tables
U.S. DEPARTMENT OF TRANSPORTATION
CUNARD RIVER ACCESS ROAD
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
DRAINAGE PROFILE
STA. 101+38.78
101+38.78
-60 -50 -40 -30 -20 -10 0 10 20
1,190 1,190
1,200 1,200
1,210 1,210
1,220 1,220
1,230 1,230
1,240 1,240
1,250 1,250
1,260 1,260
1,240.20Des Grade =
Slope 6.42%
Slope 5.21%
Key-in
2' x 2'
20'
-20%
20'
-60 -50 -40 -30 -20 -10 0 10 20
1,190
1,200
1,210
1,220
1,230
1,240
1,250
1,260
-4.4% +4.0% 1:5.4
CL
1,239.28 Subgrade =
1,239.97 Original Grnd =
Skew = 6.81°
:5
N o v e m b e r
D r a in a g e X
S
.7
N
E W
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\K -K
W
V N
P N
E R
I (2
C u n a rd
R iv e r
A c c e s s R o a d d ra in a g e x s s .d g n
:5
N o v e m b e r
:5
N o v e m b e r
K01
NPS Drwg No. 637/188071 NPS PMIS No. 258999
NUMBER
See Detail ET 602-5A
Install 48" pipe culvert 17.3 LF, Method A, Class 3
Place riprap, for gutter cross slope
See Gutter Slope Tables to receive 12' frame.
Modify inlet box length
102+72.49, grate FL Elev. 1222.69', Proposed Type 4D inlet (See Detail E604-02A), 17.53' Left
102+71, Elevation 1223.77', Top of manhole, Elevation 1191.54'
102+72.49, Proposed invert inlet, Elevation 1218.00'
102+72.49, Proposed invert inlet, see Detail ET 602-5A
Install 24" pipe culvert 24 LF, Elevation 1216.75'
102+72.49, Proposed invert outlet, Elevation 1190.00'
102+72.49, Proposed invert outlet, see Detail E604-A
Install manhole type A, U.S. DEPARTMENT OF TRANSPORTATION
CUNARD RIVER ACCESS ROAD
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
DRAINAGE PROFILE
STA. 102+72.49
102+72.49
-70 -60 -50 -40 -30 -20 -10 0 10
1,180 1,180
1,190 1,190
1,200 1,200
1,210 1,210
1,220 1,220
1,230 1,230
1:6.2
30'
Slope 9.1 1%
Key-in
2' x 2'
Slope 5.21%
-70 -60 -50 -40 -30 -20 -10 0 10
1,180 1,180
1,190 1,190
1,200 1,200
1,210 1,210
1,220 1,220
1,230 1,230
-1.2% -4.3%
CL
1,223.97 Des Grade =
1,223.05 Subgrade =
1,223.60 Original Grnd =
30'
Skew = -6.03°
:5
N o v e m b e r
D r a in a g e X
S
.4
N
E W
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\K -K
W
V N
P N
E R
I (2
C u n a rd
R iv e r
A c c e s s R o a d d ra in a g e x s s .d g n
:5
N o v e m b e r
:5
N o v e m b e r
K02
NPS Drwg No. 637/188071 NPS PMIS No. 258999
NUMBER
Method A, Class 3
Place riprap, Elevation 1187.00'
104+98.60, Proposed invert outlet, Elevation 1206.04'
104+98.60, Proposed invert inlet, gutter cross slope
See Gutter Slope Tables for
104+98.60, grate FL Elev. 1210.73'
Proposed Type 4D inlet (See Detail E604-02), see Detail ET 602-5A
Install 24" pipe culvert 24 LF, Elevation 1204.80'
104+98.60, Proposed invert outlet, Elevation 1188.54'
104+98.60, Proposed invert outlet, see Detail ET 602-5A
Install 48" pipe culvert 14.9 LF, see Detail E604-A
Install manhole type A, 15.99' Left
104+99, Elevation 1210.66', Top of manhole, U.S. DEPARTMENT OF TRANSPORTATION
CUNARD RIVER ACCESS ROAD
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
DRAINAGE PROFILE
STA. 104+98.60
104+98.60
-60 -50 -40 -30 -20 -10 0 10 20
1,160 1,160
1,170 1,170
1,180 1,180
1,190 1,190
1,200 1,200
1,210 1,210
1,220 1,220
1,230 1,230
13'
Key-in
2' x 2'
Slope 5.21%
Slope 1 0.69%
-60 -50 -40 -30 -20 -10 0 10 20
1,160 1,160
1,170 1,170
1,180 1,180
1,190 1,190
1,200 1,200
1,210 1,210
1,220 1,220
1,230 1,230
-3.2% +3.2% 1:5.9
CL
1,211.08 Des Grade = 1,210.16 Subgrade =
1,211.03 Original Grnd =
13'
-20%
Skew = 1.09°
:2
N o v e m b e r
D r a in a g e X
S
.6
N
E W
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\K -K
W
V N
P N
E R
I (2
C u n a rd
R iv e r
A c c e s s R o a d d ra in a g e x s s .d g n
:2
N o v e m b e r
:2
N o v e m b e r
K03
NPS Drwg No. 637/188071 NPS PMIS No. 258999
NUMBER
Elevation 1144.00'
109+00.41, Proposed invert outlet, gutter cross slope
See Gutter Slope Tables for
109+00.41, grate FL Elev. 1157.81'
Proposed Type 4D inlet (See Detail E604-02), Elevation 1153.12'
109+00.41, Proposed invert inlet, see Detail ET 602-05A
Install 24" pipe culvert 24 LF, 16.03' Left
109+00, Elevation 1158.33', Top of manhole, Elevation 1151.87'
109+00.41, Proposed invert outlet, Method A, Class 3
Place riprap, see Detail ET 602-05A
Install 48" pipe culvert 9.6 LF, Elevation 1145.54'
102+72.49, Proposed invert inlet, see Detail E604-A
Install manhole type A, U.S. DEPARTMENT OF TRANSPORTATION
CUNARD RIVER ACCESS ROAD
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
DRAINAGE PROFILE
STA. 109+00.41
109+00.41
-60 -50 -40 -30 -20 -10 0 10 20
1,130 1,130
1,140 1,140
1,150 1,150
1,160 1,160
1,170 1,170
Slope 5.21%
30'
Key-in
2' x 2'
Slope 17.5
8%
109+00.41
-60 -50 -40 -30 -20 -10 0 10 20
1,130 1,130
1,140 1,140
1,150 1,150
1,160 1,160
1,170 1,170
-1.8% +1.8%
CL
1,158.60 Des Grade =
1,157.68 Subgrade =
30'
-20%
Original Grnd = 1,158.57
Skew = 0.38°
:2
N o v e m b e r
D r a in a g e X
S
.4
N
E W
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\K -K
W
V N
P N
E R
I (2
C u n a rd
R iv e r
A c c e s s R o a d d ra in a g e x s s .d g n
:2
N o v e m b e r
:2
N o v e m b e r
K04
NPS Drwg No. 637/188071 NPS PMIS No. 258999
NUMBER
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
No new impervious surface will be created under work of this project.
The receiving water is the New River.
at Schedule A (MSE wall), 0.42 acres at Schedule B (MSE wall) and 0.13 acres at Schedule C (deep patches).
guardrail installation and slope stabilization. The total disturbed areas for the three locations is approximately 0.85 acres
Soil disturbing activities include clearing and grubbing, reinforced soil slope construction, roadway reconstruction, miscellaneous work.
roadway sections, gravel resurfacing, guardrail replacement with MGS, drainage improvements, and other
Schedule C: Construction of welded wire face deep patch repairs, reconstruction of miscellaneous work.
roadway sections, gravel resurfacing, guardrail replacement with MGS, drainage improvements, and other
Schedule B: Construction of Mechanically Stabilized Earth (MSE) walls, reconstruction of miscellaneous work.
roadway sections, gravel resurfacing, guardrail replacement with MGS, drainage improvements, and other
Schedule A: Construction of Mechanically Stabilized Earth (MSE) walls, welded wire face deep patch repairs, reconstruction of
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
Construction exit - maintain travel through all exits and clean debris within the roadway and excavation areas.
Sediment traps - inspect sediment traps regularly and clean sediment deposits from trap.
device. Dispose of the sediment legally off-site.
Fiber roll - remove sediment deposits from behind the fiber roll when they reach half the height of the end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to culverts.
and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days problems.
The CO may direct installation of certain controls in order to forestall or mitigate potential or existing erosion
Apply intermediate controls during rough grading operations.
Phase II Intermediate Controls construction limits.
does not leave the project site. Perimeter controls include fiber roll and other specified measures outside the Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
:3 o v e m b e r
M
P
R O
J E
C T
S \n e ri \1
(2
H
W Y
D
E S
\C A
D D
\M W
V N
P N
E R
I (2 e s c n a r.
d g n
NARRATIVE
EROSION AND SEDIMENT CONTROL
PROJECT
M01
GABION WALL
+ GABION WALL
PK
DAMAGE
ROAD
PK
METAL GUARDRAIL
N
Install fiber roll (typ.)
Slope stake limits
Place riprap, Method A, Class 3 (typ.)
CUNARD R
IVER A
CCESS
ROAD
N=365220.0893
E=1961311.1189
100+93.00
BEGIN WORK
105+86.00
END WORK
N=364763.9224
E=1961478.4728
NOTES:
1. Obtain approval for the limits of the construction exit.
2. See the Standards and Details for more information.
100+93
Schedule A, see Note 1, exit prior to construction of
Install temporary construction
Limit of disturbance
SCHEDULE A
:3 o v e m b e r
C u n a r d
R iv e r A c c e s s R d
P la n
S h e
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\M
-M
W
V N
P N
E R
I
(2
C u n a rd
R iv e r
A c c e s s R o a d
.d g n
PLAN
EROSION AND SEDIMENT CONTROL
PROJECT
M02
60D NAIL
DAMAGE
ROAD
DAMAGE
ROAD+
N
Install fiber roll (typ.)
Slope stake limits
CUNARD RIVER ACCESS ROAD
Place riprap, Method A, Class 3 (typ.)
110+40.00
END WORK
N=364379.5389
E=1961694.4342
N=364592.6558
E=1961539.6264
107+68.00
BEGIN WORK
NOTES:
1. Obtain approval for the limits of the construction exit.
2. See the Standards and Details for more information.
109+00
Schedule A, during construction of
Install inlet protection
107+68 of Schedule B, see Note 1, exit prior to the construction
Install temporary construction
Limit of disturbance
110+77
Install inlet protection, SCHEDULE B
:3 o v e m b e r
C u n a r d
R iv e r A c c e s s R d
P la n
S h e
P R
O J E
C T
S \n e ri
\1
(2
H
W Y
D
E S
\C A
D D
\M
-M
W
V N
P N
E R
I
(2
C u n a rd
R iv e r
A c c e s s R o a d
.d g n
PLAN
EROSION AND SEDIMENT CONTROL
PROJECT
M03
K
P I E
R
P I E
R
P I E
R
D
NAI
L
PK
X P I E
R
G A B
IO
N B
O T T O
M
ROCK OUTCROP
P K
STO
N E
W
ALL
C O
N C
DAMAGE
ROAD
DAMAGE
ROAD
DAMAGE
ROAD
W A
S H
O U
T
F T H
T
F T H
T
PK
DAMAGE
ROAD
DAMAGE
ROAD
D C
R A
W L S
P A
C E
GPS
MJ35014
Slope stake limits
Slope stake limits
Slope stake limits
Install fiber roll (typ.)
Install fiber roll (typ.)
118+40
Method A, Class 3, placement of riprap, sediment trap prior to
Install and remove
CUNARD RIVER ACCESS ROAD
N= 363,826.1198
E= 1,961,777.2082
121+40
BEGIN WORK
121+90
END WORK
N= 363,873.3441
E= 1,961,793.4604
N= 363,652.6990
E= 1,961,756.3325
119+65
END WORK
N= 363,619.4509
E= 1,961,745.6283
119+30
BEGIN WORK
N=363,677.6294
E=1,961,684.1397
117+50
BEGIN WORK
N=363,677.6294
E=19,61,683.7665
118+00
END WORK
NOTES:
1. Obtain approval for the limits of the construction exit.
2. See the Standards and Details for more information.
121+25
Install inlet protection, 122+67
Install inlet protection, 117+50 see Note 1, to construction of Schedule C, Install temporary construction exit prior
Limit of disturbance
Limit of disturbance
Limit of disturbance
Install sediment trap, 118+50
SCHEDULE C
SCALE IN FEET
0 20 40
S22°23'38"W
S02°25'01"E
N04°03 '51"E
N19 °5
1'1 8"
E
N15°37'22"W
:0
N o v e m b e r
C u n a r d
R iv e r A c c e s s R d
P la n
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\M -M
W
V N
P N
E R
I (2
C u n a rd
R iv e r
A c c e s s R o a d .d g n
PLAN
EROSION AND SEDIMENT CONTROL
PROJECT
M04
100+93.00
BEGIN WORK
105+86.00
END WORK
CUNARD R
IVER ACCESS ROAD
100+00
W8-12 signs
Install W8-8 and
105+86
W8-12 signs
Install W8-8 and
NOTE:
All striping will be placed after placement of the asphalt pavement layer during construction of project WV NP NERI 107(3).
N
N=365220.0893
E=1961311.1189
N=364763.9224
E=1961478.4728
ROUGH
ROAD
NO
CENTER
LINE
ROUGH
ROAD
NO
CENTER
LINE
U.S. DEPARTMENT OF TRANSPORTATION
CUNARD RIVER ACCESS ROAD
SCHEDULE A
NEW RIVER GORGE NATIONAL PARK AND PRESERVE
:5 o v e m b e r
C u n a r d
R iv e r A c c e s s R d
P la n
S h e
P R
O J E
C T
S \n e ri
\1 (2
H
W Y
D
E S
\C A
D D
\P -P
W
V N
P N
E R
I (2 s ig n .d g n
SIGNING PLAN
PROJECT
P01
107+68.00
BEGIN WORK
110+40.00
END WORK
111+40
W8-12 signs
Install W8-8 and
107+00
W8-12 signs
Install W8-8 and
NOTE:
All striping will be placed after placement of the asphalt pavement layer during construction of project WV NP NERI 107(3).
N
N=364592.6558
E=1961539.6264
N=364379.5389
E=1961694.4342
ROUGH
ROAD
NO
CENTER
LINE
ROUGH
ROAD
NO
CENTER
LINE
NO. DATE BY REVISION
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .