Amendment 0002 - WV NP NERI 107(2).pdf
PDF 342 KB Posted
- Attached to
- New River Gorge National Park & Preserve
- Solicitation number
- 693C73-24-R-000010
About this file
This document contains an amendment and related federal contract opportunity. The amendment extends the proposal due date for project WV NP NERI 107(2) to January 30, 2024 at 2:00 pm EST. It also responds to bidder questions regarding access, clearing limitations, blasting, use of the gravel road for staging, and consideration of contractor-designed retaining walls. The related federal contract opportunity is for the New River Gorge National Park & Preserve project, with an estimated value between $5-10 million. The project consists of MSE wall construction, roadway excavation, guardrails and other miscellaneous work. Certified small businesses will submit technical and price proposals in a two-step RFP process. The solicitation number is 693C73-24-R-000010.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7324R000010 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN:ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1401/19/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/22/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project WV NP NERI 107(2)
The purpose of this Amendment is to:
1) Respond to bidder questions.
2) The proposal due date is extended to January 30, 2024 at 2:00 pm EST.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0002
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002 Project WV NP NERI 107(2)
New River Gorge National Park and Preserve Solicitation: 693C73-24-R-000010
The purpose of this Amendment is to:
1) Respond to bidder questions.
2) The proposal due date is extended to January 30, 2024 at 2:00 pm EST.
Responses to Questions
1) Question: Per the general summary, there is nothing indicating how the asphalt shall be replaced. Considering the amount of material that is being removed and replaced (and the overabundance of traffic in and out) how will the existing asphalt roadway be paid to be replaced in its entirety?
Response: Asphalt paving is not included under this project but will be completed under a future project. Only gravel resurfacing of the slide location is to be done under this project. Please review the project plans for the required work.
2) Question: Upon an extensive site visit, we observed that the only access to Cunard Road is a bridge with a 20-ton weight limit. Will the contractor be granted the ability to create an easement for bypassing the bridge and it’s 20-ton weight limit? Are there any additional access points that can be created for the project during this work operation?
Response: The bridge in question is not on the Park’s Right Of Way (ROW), and the Government has requested a bridge inspection report from the State DOT. The State DOT advised on January 18, 2024, that they will be providing the requested information as much as they can, but the 20-ton limit is correct and will remain. The Government will post the additional information as soon as it is received. It is up to the Contractor to obtain easements outside of the Park’s ROW on state, county, or private property. The Government cannot think of any alternate access points since the only detour has a collapsed culvert that may not be repaired soon enough by the State.
3) Question: What are the clearing limitations? There are several areas along Cunard Road that would become more accessible for work if clearing limitations were defined or extended. Can additional areas be cleared for access points?
Response: The only Limits of Disturbance (LOD) that are currently allowed are those that are shown in the plans. Contact the CO after the award if additional ground disturbance is proposed outside the LOD shown in the plans, however, this is unlikely to be allowed since the Government may need to revise NEPA and the Contractor may need to obtain permits.
Amendment 0002
Info Page 2 of 2
4) Question: Are blasting and explosives permitted within this contract?
Response: The Contractor may approach the CO about blasting after project award. Blasting is not included in the NEPA documentation. Blasting may require consultation with USFWS and would likely not be allowed during the active bat protection season, April 1- Nov 15. The Park may have restrictions on blasting also due to nearby recreational uses and natural resources. The wall design assumed some weathered rock excavation (rippable rock). Contractor should contact the CO during construction if sound rock is encountered, and the Government will decide if further excavation is required based on the design requirements. Even though we do not expect excessive amount of sound rock excavation, the Contractor needs to account for this risk. Blasting is not the only method used for sound rock excavation. The use of a rock hammer or multiple rock hammers can also work.
5) Question: There is a single lane gravel/stone road running parallel along the existing river, is this all able to be utilized within the work limits for staging, loading, stock(pil)ing, etc.?
Response: The road can be used for staging, loading and stockpiling during the project within the first half mile from the parking lot where it is wider than one lane. The road needs to remain open to the public outside of the November 1st to March 24th Cunard River Access Road full closure period.
6) Question: Considering the rocky topography. How would you like contingency proposals for hammering or blasting rock?
Response: The Government provided boring data as part of the solicitation. The data includes the soil types and classification. The Government will not consider contingency proposals for rock removal. This work is to be bid under the roadway excavation pay item.
7) Question: Would FHWA consider allowing for the MSE Walls to be constructed as Section 257 – Contractor-Designed Retaining Walls?
Response: The Offeror(s) are to bid on the project as is. After the award to the low bidder, the Contractor can present Value Engineering proposals which may or may not be approved by the CO. See Subsection 103.03 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) for the Value Engineering Requirements.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0002 |
| Project WV NP NERI 107(2) |
| Cunard River Access Road Slide Repairs with MSE Walls |
| Solicitation: 693C73-24-R-000010 |