This amendment to a federal solicitation provides responses to bidder questions about Project WV NP NERI 107(2) located in Fayette County, West Virginia. The project involves roadway improvements including granular backfill, MSE wall construction, geotechnical patching, pipe culverts, inlets, manholes, curb and gutter, asphalt paved waterway, and guardrail replacement. The responses clarify that the 20-ton weight limit bridge will not be bypassed but may be upgraded, vegetation can be removed year-round except for trees over 3 inches in diameter from November to April, and that full road closures will only be permitted from November 1, 2024 to March 24, 2025. The amendment maintains the proposal due date of January 30, 2024 and confirms the intent is to award all schedules by June 30, 2024 and issue notice to proceed concurrently for schedules A, B, and C.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7324R000010 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN:ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1401/23/20240003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/22/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project WV NP NERI 107(2)
The purpose of this Amendment is to:
1) Respond to bidder questions.
2) The proposal due date of January 30, 2024, 2:00 pm EST remains unchanged.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0003
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0003 Project WV NP NERI 107(2)
New River Gorge national Park and Preserve Solicitation: 693C73-24-R-000010
The purpose of this Amendment is to:
1) Respond to bidder questions.
2) The proposal due date of January 30, 2024, 2:00 pm EST remains unchanged.
Responses to Questions
1) Question: Upon an extensive site visit, we observed that the only access to Cunard Road is a bridge with a 20-ton weight limit. Will the contractor be granted the ability to create an easement for bypassing the bridge and it(s) 20-ton weight limit? Are there any additional access points that can be created for the project during this work operation?
Updated Response: The Government spoke with the West Virginia Department of Highways (WVDOH) District Bridge Engineer. The 20-ton current posting for the bridge at 38.001089, -
81.041468 is correct. The bridge is less than 20 feet long, thus, there is no inspection report requirement for the bridge and no inspection report available. The WVDOH’s current plan is to replace the culvert at 37.998773, -81.039622 and immediately afterwards, perform a superstructure rehabilitation on the bridge which will remove the 20-ton posting. This work is supposed to be finished by November 1, 2024.
2) Question: The Specifications do NOT allow us to remove or trimming of vegetation larger than 3-inches diameter at breast height (DBH) (…) from April 1 to November 15.
If we are unable to remove vegetation between April 1 and November 15, there is no way we can start work and meet (the a. Below is the 2nd excerpt on Time Allowed. If we are issued a contract in March then an NTP hypothetically shortly after we will not be able to achieve the schedule below. My first question is, will the NTP be delayed until November 15 due to trimming of vegetation?
Response: The Special Contract Requirements (SCRs) are clear that the vegetation can be removed at any time, and only trees that are larger than 3-inches in diameter at breast height can be removed between November 15 and April 1. The Government hopes that the project will be awarded by March 1, and the Contractor can remove the vegetation between mid-March and April 1, and, if that is not possible, they can remove it after November 15.
Amendment 0003
Info Page 2 of 2
3) Question: My next question is, based (on the calendar days duration on Page 30 of the Solicitation (page B-10), why) wouldn’t the Schedule B days of 30 days and Schedule C days of 25 days be added in succession to the 96 days for Schedule A? It appears that if Schedule B and/or C are awarded after Schedule A, a new NTP will be issued for these Schedules. By how it is worded, we could potentially have to complete A, B, and C all in the same time frame. We are recommending that if B and C are awarded, they be in awarded the days noted, BUT in succession to A. I believe that is the intent because by adding 96+30+25 = 151 days. 151 days after November 15 is April 15, 2025, which is what is noted in yellow above. Please advise if this is correct.
Follow up question: Due to the very difficult nature of accessing this project, we will need to take up both lanes (while) performing our work, therefore, we won’t be able to start until Nov 1, 2024.
Since there is only one way in and out it is impossible to be able to put multiple crews on multiple areas at a time. We can only do one section at a time due to stone deliveries etc. Based on this, for us to perform the work in Schedule A is going to take 156 days, which is well above the 96 days given in the schedule below. In order to complete Schedule A in this 156-days we also need to work 6 days a week at 24 hours/day (which we are capable of doing). So based on the fact that we need to work 6 days a week at 24 (hour)/day it is not possible to achieve the 96-day schedule.
My question is, can we be allowed the 96 days, plus the Option 1 of 30 days and the Option 2 of 25 days for a total of 151 days to complete Schedule A if just Schedule A is awarded? If Schedule B and/or is Schedule C is awarded, would we be allowed to complete those in the Fall of 2025 (After Nov 1) no later than April 15, 2026?
Response: The intent is to award all schedules by June 30, 2024, and to issue the Notice To Proceed (NTP) for all schedules at the same time. It is expected that all work will be completed concurrently. The Government will permit full roadway closure only from November 1, 2024, to March 24, 2025. In accordance with the SCRs - weekend, National Legal Holiday, and night work is not permitted on this project. In accordance with Subsection 156.08 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects – FP-14, daylight is defined as “one-half hour after sunrise to one-half hour before sunset”. It is up to the Contractor on how to plan and organize the work and on how many crews will be working at the same time.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0003 |
| Project WV NP NERI 107(2) |
| New River Gorge national Park and Preserve |
| Solicitation: 693C73-24-R-000010 |