Plans - NY FLAP DOT 63(1).pdf
PDF 15 MB Posted
- Attached to
- Roadway Improvements to NYS Route 63
- Solicitation number
- 693C73-23-B-000012
About this file
This file describes a federal contract opportunity for roadway improvements. The solicitation number is 693C73-23-B-000012 from the Department of Transportation Federal Highway Administration for roadway improvements to New York State Route 63. Plans for the project can be found in the attached 15MB PDF file. The opportunity is for required construction services to improve the roadway. The contract is expected to be awarded in 2023.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Sheet
Symbols And Abbreviations
Location Map
Typical Section
Tabulation of Quantities
Construction Plans
Erosion and Sediment Control Narrative
Erosion and Sediment Control Plans
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 1.1 Miles
ADT (2023)
ADT (2043)
DHV
%Truck
D
V (MPH)
60/40
9%
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
e(max) 8%
C/A None miscellaneous work.
Audible Roadway Delineators (CARDs), and other installation of guardrail, pavement markings, Centerline box culvert and pipe culverts. The work also includes
The work includes asphalt overlay and replacement of
GENESEE AND ORLEANS COUNTIES, NEW YORK
ROADWAY IMPROVEMENT TO NYS ROUTE 63
(miles)
Length StationsSchedule Description
Know what'sbelow.
before you dig.Call
R
Administration
Federal Highway
U.S. Department of Transportation
SHEET
NO
A01
A02-A03
A04
B01
C01
D01-D08
M01
M03-M06
LANE MILES:
U.S. DEPARTMENT OF THE INTERIOR
OF TRANSPORTATION
NEW YORK STATE DEPARTMENT
NYSDOT
PROJECT NY FLAP DOT 63(1)
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD: SUBGRADE
3" ACP Overlay
ROAD: WIDTH
24'
SURFACE BASE
N/A
NYS Route 63
MAY, 2023
Project Manager
Dan Weston
Lead Designer
Chris Burnell
Highway Design Manager
Jamal Ghazi Alam
N
RochesterBuffalo Syracuse
Albany
New York
Binghamton
SCALE IN MILES
STATE OF NEW YORK
KEY MAP
Basom
New York State Th ruway
Barre Center
Clarendon
Batavia
South Byron
East Oakfield
Pembroke
Millville
Medina
Alban
31 31A
2.2 Miles
Project NY FLAP DOT 63(1)
Project NY FLAP DOT 63(1)
INTERSTATE
INTERSTATE
INTERSTATE
A Mill and Overlay
NYS Route 63 1.1
Schedules and SummariesC02-C03
K01-K02 Drainage Cross Sections
N
7"-9.5" ACP over 7"-8.5" PCC N/A
S01-S29 Standards And Details
A05 Alignment Data
138+12 to 195+30
209+79 to 209+89
224+75 to 225+89
244+60 to 245+75
A06-A08 Survey Control Data
NYSDOT MAINTENANCE JURISDICTION:
M02 Erosion and Sediment Control Wetland Impacts
B Culvert Replacements
NYS Route 63 156+04
209+84
225+32
245+17
N/A
STATE PROJECT
NUMBER
SHEET
NY NY FLAP DOT 63(1) A01
:1
P
M
M a y
T it le
S h e e t
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\A
-N
Y -F
L A
P
D O
T
-1 tt l.
d g n c
Inside diameter ID
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline C
Concrete Pavement
GACPGyratory Mix, Asphalt
Gage(gauge) ga.
Galvanized galv.
Expansion joint exp. jt.
Excavation exc.
ESALEquivalent Single Axle Load
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
BWBroken White
Bench mark BM
Beginning beg.
Bearing brg.
Balance point BP
BATBackslope Anchor Terminal
Back BK
Footing ftg.
FATFlared Anchor Terminal
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
DSYDouble Solid Yellow
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
West W
Vertical point of intersection VPI
Vehicle per hour vph embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
North N
Normal crown NC or NCR
Nominal Max. Size Aggregate NMSA
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
Pavement pvmt.
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
SBTSteel Backed Timber
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
SWSolid White
Section Sec.
x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
P/LP/L
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
26 25 69426 25 694ROUTE NUMBERS
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
EOP
EOG
N
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
INTERSTATE U.S. STATE
AREA PATTERN
MATERIAL SOURCE
NORTH ARROW
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
Sheet 1 of 2
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
L
:2
A
S e p te m b e r
A
C
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\N Y
F L
A P
D O
T
(1
C
A D
D \A
-A
-N
Y -F
L A
P
D O
T
-1 s y m .d g n
SYMBOLS AND ABBREVIATIONS
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) A02
R/W R/W
R/W R/W
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
P/E C/E
FOUND
36 31
6 1
PROJECTED
SECTION CORNER
SECTION CORNER4
SECTION16
P/E C/E
TB or TP
P P or
UD UD
W W
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fiber optics SD=storm drain, T=telephone, W=water G=gas, O=oil, P=power, SS=sanitary sewer, UNDERGROUND UTILITIES
No Symbol
TB or TP
P P or or
UD UD
W W
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
wall facewall face
TB or TP or
MEDIAN & SIDE (CONCRETE) BARRIER
No Symbol
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:PROPOSEDEXISTING
Sheet 2 of 2
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
FENCE, TORTOISE BARRIER
FIBER ROLLS
CULVERT IDENTIFICATION NUMBER
BRIDGE IDENTIFICATION NUMBER BIN
CIN
ASPHALT CONCRETE PAVEMENT ACP
U.S. DEPARTMENT OF TRANSPORTATION
:2
S e p te m b e r
A
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk S e ts
\N Y
-F L
A P
D
O T
-1
\d g n \A
-A
-N
Y -F
L A
P
D O
T
-1 s y m .d g n
SYMBOLS AND ABBREVIATIONS
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) A03
E 1199755.010
N 1136984.360
138+12
NY FLAP DOT 63(1)
BEGIN PROJECT
E 1199789.429
N 1147746.059
245+74
NY FLAP DOT 63(1)
END PROJECT
See Note 3.
Install PCMS.
See Note 3.
Install PCMS.
12 miles
Rochester
Staging area
186+40
Gravel Parking
34.5 miles
Buffalo
PCMS with the CO.
Coordinate the final location and message for3.
closures.
See Detail E635-B for all other lane 2.
closures for construction of box culverts.
Use Details E635-A and E635-C for lane 1.
NOTES:
SCALE IN MILE
0 1 2
N
U.S. DEPARTMENT OF TRANSPORTATION
:5
M a r c h
L o c a ti o n
M a p
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk S e ts
\N Y
-F L
A P
D
O T
-1
\D g n \A
-N Y
-F L
A P
D
O T
-1 lo c .d g n
LOCATION MAP
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) A04
U.S. DEPARTMENT OF TRANSPORTATION
:2
S e p te m b e r
A
E n g in e e ri n g S o ft w a re
\O p e n R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk
S e ts
\N Y
-F L
A P
D
O T
-1
\D g n \A
-N
Y -F
L A
P D
O T
-1 a li
.d g n
ALIGNMENT DATA
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) A05
SET REBAR/CAP STA. 169+13.09636.141199801.2101149385.552CBP290
SET REBAR/CAP STA. 164+19.43626.521199803.5251148891.895CBP280
SET REBAR/CAP STA. 159+27.36622.081199804.7181148399.821CB270
SET REBAR/CAP STA. 153+57.85619.521199808.3061147830.325CB260
SET REBAR/CAP STA. 148+48.40619.591199809.0581147320.878CB250
SET REBAR/CAP STA. 143+21.14618.961199811.3771146793.621CB240
SET REBAR/CAP STA. 137+67.14618.521199813.3591146239.626CB230
SET REBAR/CAP STA. 132+22.21617.161199814.6131145694.695CB220
SET REBAR/CAP STA. 127+40.40617.711199815.7741145212.889CB210
SET REBAR/CAP STA. 121+69.67617.391199814.8241144642.163CB200
SET REBAR/CAP STA. 116+84.72617.341199815.0911144157.205CB190
SET REBAR/CAP STA. 111+95.55625.651199770.1021143670.115CB180
SET REBAR/CAP STA. 105+10.61619.501199815.5121142986.683CB170
SET REBAR/CAP STA. 98+91.75617.421199772.6231142369.305CB160
SET REBAR/CAP STA. 93+23.19615.841199763.9431141800.818CB150
SET REBAR/CAP STA. 88+18.27615.661199807.4031141297.764CB140
SET REBAR/CAP STA. 81+63.26616.321199770.8521140643.774CB130
N.Y.S.D.O.T. REBAR/CAP STA. 75+84.00616.251199763.3751140064.564CB120
N.Y.S.D.O.T. REBAR/CAP STA. 63+13.62617.231199790.9791138794.489CB110
N.Y.S.D.O.T. REBAR/CAP STA. 50+00.00616.431199735.3081137482.046CB100
REBAR/CAP STA. 43+54.46617.961199769.9631136837.437CB90
REBAR/CAP STA. 39+35.10617.981199731.4731136419.843CB80
REBAR/CAP STA. 34+48.70617.511199726.5391135933.472CB70
REBAR/CAP STA. 28+82.51617.581199757.0041135368.103CB60
REBAR/CAP STA. 23+81.73617.681199753.3501134867.340CB50
REBAR/CAP STA. 18+73.88618.721199713.0221134361.089CB40
REBAR/CAP STA. 12+76.03629.321199744.9481133764.093CB30
NUMBER
REMARKSELEV.EASTINGNORTHINGPOINT
U.S. SURVEY FEETUNITS:
NAVD 88 (GEOID 12B)VERTICAL DATUM:
NEW YORK STATE PLANE COORDINATE SYSTEM, WEST ZONE, NAD 83 (CORS 2011) HORIZONTAL DATUM:
N
EX
T
M
IL
ES
V Z
N G
G R
A V E L
D R
IV
E
D R
IV
E
G R
A V E L
F L
U S
H
G O
O D
1" P
IP
E
W
IT
N E S S
P
O S T
T
A L L
I
B E
A M
D R
IV
E
A S P
H A L T
"U S
F
IS
W
IL
D L
IF
E
D
IS
K
IN
N C
R E T E
N A T
IO
N
D L
IF
F
U G E
E N T E
R
IN
G
IR
O Q
U O
IS
N G
N M
N N
STA. 6+35.22
REBAR/CAP
CB 20
STA. 12+76.03
REBAR/CAP
CB 30
4'
Az. 91°A z . 3
A z . 1
A z
W
IL
D L
F
U G E
N A T
IO
N A L
W
IL
D L
F
U G E (2
N A T
IO
N A L
N o f
C B
N N
STA. 18+73.88
REBAR/CAP
CB 40
STA. 23+81.73
REBAR/CAP
CB 50
1'
2'
Az. 90°
Az. 273°
A z
0°
N o f
C B
N
EX
T
1/
M
IL
E
NN
STA. 34+48.70
REBAR/CAP
CB 70
STA. 28+82.51
REBAR/CAP
CB 60
55'
1'
2'
Az. 91°
A
z. 308°
Az. 269°
Sheet 1 of 3
NO SCALE
NOTE:
Azimuth angle shown is based on north axis at clockwise rotation.1.
U.S. DEPARTMENT OF TRANSPORTATION
:2 u g u s t
A
S u r v e y S h e e fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_
D e v \C
A D
D \A
-N
Y -F
L A
P D
O T
-1 s u r.
d g n
SURVEY CONTROL DATA
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) A06
N o f
C B
STA. 98+91.75
REBAR/CAP
CB 160
2'
Az. 269°
N
STA. 93+23.19
REBAR/CAP
CB 150
STA. 88+18.27
REBAR/CAP
CB 140
STA. 81+63.26
REBAR/CAP
CB 130
13'
1'
1'
Az. 270°
A z
Az. 89°
A z . 3
A z
Az. 98°
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
N
EX
T
M
IL
E
N
STA. 75+84.00
REBAR/CAP
N.Y.S.D.O.T.
CB 120
5'
Az. 270°
A z . 3
N a t io n a l
H e r it a g o r r id o r
E r ie a n a t w a y
E N T E
R
IN
G
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
N A
T
IO
N A
L
P A
R K
S E
R V
IC
E
N O
R T
H
D R
IV
E G
R A
V E L
IN
V :6
.0
C M P
IN
V :6
.7
C M P
M A
R K E
R S
R
NN
E L E
V :6
.4
R E F
U G E
S
IG
N
1.
u
A .G
E A S T
P
O
T
F
D L
IF
E
S
B
N
IL
IN
B M
N o f
C B
N N N
A L
U M
IN
U
C
F
D L
IF
E
S E
R V
IC
E
U .S
D E P
A R T
M E
F
IN
T E
R
IO
R
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
S T
R E E T
S T
O P
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
W
IL
D L
F
U G E
IR
O
Q U
T
IO
N A L
STA. 105+10.61
REBAR/CAP
CB 170
STA. 111+95.55
REBAR/CAP
CB 180
STA. 116+84.72
REBAR/CAP
CB 190
5'
7'
3'
Az. 92°
A z . 1
Az. 270°
Az. 90° A z
Sheet 2 of 3
NO SCALE
H A
Z Z
A R
D
B R I
D G
E
H A
Z Z
A R
D
B R I
D G
E
I
N
R E F L E C T
O R
R E F L E C T
O R
R E F L E C T
O R
N N
STA. 50+00.00
REBAR/CAP
N.Y.S.D.O.T.
CB 100
STA. 63+13.62
REBAR/CAP
N.Y.S.D.O.T.
CB 110
9'
4'
A z . 1
Az. 91°
A z
Az. 271°
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
N
STA. 39+35.10
REBAR/CAP
CB 80
1'
A z
Az. 269°
B .I
.N
H A Z
A R
D
B R
ID
G E
H A Z
A R
D
B R
ID
G E
H A Z
A R
D
B R
ID
G E
H A Z
A R
D
B R
ID
G E
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
G U
ID
IL
B
X
B
A M
N
STA. 43+54.46
REBAR/CAP
CB 90
N
EX
T
1/
M
IL
E
H A
Z Z
A R
D
B R I
D G
E
H A
Z Z
A R
D
B R I
D G
E
U.S. DEPARTMENT OF TRANSPORTATION
:2 u g u s t
A
S u r v e y S h e e fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_
D e v \C
A D
D \A
-N
Y -F
L A
P D
O T
-1 s u r.
d g n
SURVEY CONTROL DATA
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) A07
Sheet 3 of 3
NO SCALE
M A
R K E
R S
R
' N o f 1
N
STA. 121+69.67
REBAR/CAP
CB 200
2'
Az. 93°
D R
IV
E
G R
A V E L
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
IN
V :6
.2
C M P
V A
U L T L
O C
K E
D
IA
A
IN
A G E
R E F L E
C T
O R
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
NNN
STA. 137+67.14
REBAR/CAP
CB 230
STA. 132+22.21
REBAR/CAP
CB 220
STA. 127+40.40
REBAR/CAP
CB 210
84°
2'
5'1'1
2'
A z . 1
Az. 90°
Az. 90° Az. 274°
' N o f C
B
N
STA. 143+21.14
REBAR/CAP
CB 240
2'
Az. 90° R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
T
R E
E
' N o f C
B
W
IL
D L
F
U G E
E N T E
R
IN
G
IR
O Q
U
T
IO
N A L
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
R E F
U G E
W
IL
D L
IF
E
N A T
IO
N A L
.5
O D
1/
R E
B A
R
T
T
N N N
STA. 148+48.40
REBAR/CAP
CB 250
STA. 153+57.85
REBAR/CAP
CB 260
STA. 159+27.36
REBAR/CAP
CB 270
19'
1'
1'
A z
Az. 87°
Az. 88°
A z
Az. 268°
U.S. DEPARTMENT OF TRANSPORTATION
:4
N o v e m b e r
A
S u r v e y S h e e
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk S e ts
\N Y
-F L
A P
D
O T
-1
\D g n \A
-A
-N
Y -F
L A
P
D O
T
-1 s u r.
d g n
SURVEY CONTROL DATA
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) A08
between the lifts.
nominal maximum size aggregate. Place tack coat Place asphalt pavement in lifts of 4-5 times the6.
401.15 and 414.06(c).
transverse construction joints according to Subsections Apply asphalt joint adhesive to all longitudinal and5.
aggregate-topsoil and all other disturbed areas.
Provide turf establishment on shoulder area receiving4.
overlay at a slope of 1:10 or flatter.
Furnish aggregate-topsoil course to fill drop off from3.
Match existing roadway cross slope.2.
existing asphalt pavement adjacent to the shoulder.
Remove all vegetation and material off the 1.
NOTES:
2% 2%
Asphalt Tack Coat
See Note 2 NMSA, <0.3 Million ESAL 1" GACP, No. 4 Sieve
Asphalt Tack Coat
See Detail E617-A.
Install Box Beam Guide Rail (typ.)
Ground Existing
5' 5'12' 12'
7" to 9.5" Asphalt Concrete Pavement (ACP)
NYS Route 63 Pavement Overlay
CL
Shldr.
Paved
Shldr.
PavedTravel Lane Travel Lane
PG 64V-22)
(Polymer Fibers, Type 1-A Pavement Roughness, 2" GACP, 3/8" NMSA, 0.3 to <3 Million ESAL
EXISTING PROPOSED
7" to 8.5" Portland Cement Concrete Pavement (PCC)
See Note 3 & 4.
& Turf Establishment (typ.)
Aggregate-topsoil Course
Geotextile, Class 2, Type E at Culvert Replacement Full Depth Patch, Type 1
Existing aggregate base
Existing asphalt pavement pavement and aggregate base Remove existing asphalt
In accordance with Section 403. See Note 6 6" depth or match existing depth, ACP, Type 1
(minimum lift thickness of 4 inches) Aggregate Base Grading C or D, 9-inch depth
Existing subbase (variable depth)
Embankment Construction
W
R
Existing Right-of-way
W
R
W
R
Va rie s
Limits of Construction
ROW Limits (Approx. 66')
Varies
SCHEDULE A
SCHEDULE B
U.S. DEPARTMENT OF TRANSPORTATION
:1
M a r c h
B
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_
D e v \C
A D
D \B
-N
Y -F
L A
P D
O T
-1 ty p .d g n
TYPICAL SECTION
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) B01
U.S. DEPARTMENT OF TRANSPORTATION
:4
M a r c h
C
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\C
-C
-N Y
-F L
A P
D
O T
-1 q ty .d g n
TABULATION OF QUANTITIES
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) C01
Sheet 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION
:0
M a r c h
C
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\C
-C
-N Y
-F L
A P
D
O T
-1 q ty .d g n
SCHEDULES AND SUMMARIES
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) C02
Sheet 2 of 3
1. Install Centerline Audible Roadway Delineator
(CARDs) using Detail E634-A.
2. Install Pavement Markings using Detail E634-03.
NOTES
U.S. DEPARTMENT OF TRANSPORTATION
:4
M a r c h
C
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\C
-C
-N Y
-F L
A P
D
O T
-1 q ty .d g n
SCHEDULES AND SUMMARIES
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) C03
Sheet 3 of 3
U.S. DEPARTMENT OF TRANSPORTATION
:5
M a r c h
C
S h e e t
S h e t]
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\C
-C
-N Y
-F L
A P
D
O T
-1 q ty .d g n
SCHEDULES AND SUMMARIES
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) C04
615615
615615
N00°34'08"E
20" Sanitary Force Main(Future)
SMH
SV
615615
615615
N
615 615 615
615615
N01°49'35"E
.6
.9
PT
PC
.1
SV
SMH
20" Sanitary Force Main(Future) 615 615 615
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 25 50
See Detail E617-A
138+35 TO 144+50 (LT)
Install Guardrail System G3
Construction centerline
S T
A . 1
M A
T C
H L
IN
A . 1
M A
T C
H L
IN
E
S T
A
M A
T C
H L
IN
E
SCHEDULE A
BEGIN PROJECT
See Detail E617-A
138+12 TO 144+50 (RT)
Install Guardrail System G3
See Detail E617-A
138+12 To 138+35 (LT)
Install Terminal Section, Type G3
137+47 To 137+71
BIN 1028790
Begin Guardrail Installation
E 1199755.01
N 1136984.36
138+12
Existing Edge of Roadway
138+12 to 138+70 (RT)
Remove existing guardrail
:0 a r c h
D
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\D
-D
N
Y -F
L A
P
D O
T
-1
P N
P .d g n
SCHEDULE A
130+00 TO 144+50
NYS ROUTE 63
CONSTRUCTION PLAN
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) D01
MARKER
20" Sanitary Force Main(Future) 615
N
Z
N00°34'42"E
MARKER
SV
SMH
Z
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 25 50
Construction centerline
See Drainage Cross Section Sheet, Detail E253-A, E602-A and E602-C
(Schedule B)
Place Gabions (Wildlife Benching)
Three-Sided Precast RCB with Wingwalls
Install 19' Span x 7' Rise x 40' Length
Remove Existing Box Culvert
CIN 410048 - Sta. 156+04
See Detail E619-A
152+28 To 155+96 (LT & RT) along Guardrail
Install Fence, Tortoise Barrier
See Detail E619-A
156+12 To 158+12 (LT & RT) along Guardrail
Install Fence, Tortoise Barrier
S T
A . 1
M A
T C
H L
IN
E
S T
A . 1
M A
T C
H L
IN
E
S T
A
M A
T C
H L
IN
E
S T
A
M A
T C
H L
IN
E
154+98 To 157+11 (LT & RT)
Removal of Guardrail
154+50
Sawcutting Pavement
See Detail E556-A
155+94.50 To 156+13.50 (LT & RT)
Install Bridge Railing, Steel, Three Rail
See Detail 617-A
144+50 To 151+90 (RT)
Install Guardrail System G3
See Detail E617-A
144+50 To 151+90 (LT)
Install Guardrail System G3
See Detail E617-A
152+60 To 155+62.50 (RT)
Install Guardrail System G3
See Typical Section
155+77.50 To 156+30.50
Asphalt Concrete Pavement Patch, Type 1
Schedule B
See Detail E401-01
154+50 To 155+77.50
Milling Transition
152+04 To 152+28
BIN 1028800
Existing Edge of Roadway
Existing Edge of Roadway
Proposed Edge of Travel Lane
Paved Shoulder
Proposed Edge of
BEGIN ASPHALT OVERLAY
E 1199772.65
N 1138622.25
154+50
See Detail E617-A
152+60 To 155+62.50 (LT)
Install Guardrail System G3
151+05 To 151+90 (RT)
Removal of guardrail
151+22 To 151+90 (LT)
Removal of guardrail
152+60 To 153+16 (RT)
Removal of guardrail
152+60 To 153+28 (LT)
Removal of guardrail
See Detail E617-A
156+45.50 To 159+00 (LT & RT)
Install Guardrail System G3 See Note 2 closures during construction of box culverts.
Use Details E635-A and E635-C for single lane 2.
schedule A except as noted.
All work on this sheet to be completed under1.
NOTES:
See Detail E617-B
155+62.50 To 155+94.50 (LT & RT)
Beam Guide Rail Transition)
(NYSDOT Steel Bridge Railing to Box
Install Structure Transition Railing
See Detail E617-B
156+13.50 To 156+45.50 (LT & RT)
Bridge Railing to Box Beam Guide Rail Transition)
Install Structure Transition Railing (NYSDOT Steel
DNK-2
FHK-3
:5
A p r il
D
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\D
-D
N
Y -F
L A
P
D O
T
-1
P N
P .d g n
SCHEDULE A & B
144+50 TO 159+00
NYS ROUTE 63
CONSTRUCTION PLAN
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) D02
615615
615 615
N00°22'45"E N00°38'04"E
.0
.2
.8
SV
SMH
615615
615 615
N
615 615
N00°11'49"E N01°59'21"E N00°39'09"W
.7
.3
.4
.5
SMH
SV
615 615
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 25 50
Proposed Edge of Paved Shoulder
Proposed Edge of Travel Lane Construction centerline
Construction centerline
S T
A
M A
T C
H L
IN
E
S T
A
M A
T C
H L
IN
E
S T
A . 1
M A
T C
H L
IN
E
S T
A . 1
M A
T C
H L
IN
E
See Detail E617-A
159+00 To 166+60 (LT & RT)
Install Guardrail System G3 (typ.)
See Detail E617-A
167+30 To 173+50 (RT)
Install Guardrail System G3 (typ.)
See Detail E617-A
167+30 To 173+50 (LT)
Install Guardrail System G3 (typ.)
See Detail E401-01
167+00 To 168+35
Milling Transition
See Detail E401-01
165+41 To 166+76
Milling Transition
3-inch mill and overlay
166+76 To 167+00
BIN 1028810
Proposed Edge of Paved Shoulder
Proposed Edge of Travel Lane
165+77 To 166+60 (RT & LT)
Removal of guardrail
167+30 To 168+01 (RT)
Removal of guardrail
167+30 To 168+00 (LT)
Removal of guardrail
:0
M a r c h
D
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\D
-D
N
Y -F
L A
P
D O
T
-1
P N
P .d g n
SCHEDULE A
159+00 TO 173+50
NYS ROUTE 63
CONSTRUCTION PLAN
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) D03
615 615
N00°21'52"E N01°11'37"W N01°08'53"E N00°51'28"W
.5
SMH
SV
20" Sanitary Force Main(Future)
MARKER
615 615
N
615615
615 615
N00°09'10"E
615615
615 615
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 25 50
Proposed Edge of Paved Shoulder
Proposed Edge of Travel Lane Width = 14'
R = 25'
S T
A
M A
T C
H L
IN
E
S T
A
M A
T C
H L
IN
E
S T
A . 1
M A
T C
H L
IN
E
S T
A . 1
M A
T C
H L
IN
E
Proposed Edge of Paved Shoulder Proposed Edge of Travel Lane
See Detail E617-A
173+50 To 186+02 (LT)
Install Guardrail System G3 (typ.)
See Detail E617-A
173+50 To 188+00 (RT)
Install Guardrail System G3 (typ.)
See Detail E617-A
173+50 To 188+00 (RT)
Install Guardrail System G3 (typ.)
See Detail E617-A
173+50 to 186+02 (LT)
Install Guardrail System G3 (typ.)
See Detail E617-A
186+02 To 186+25 (LT)
Install Terminal Section, Type G3
See Detail E617-A
186+62 To 186+85 (LT)
Install Terminal Section, Type G3
Construction centerline
See Detail E617-A
186+85 To 188+00 (LT)
Install Guardrail System G3 (typ.)
Offset from CL = 40'
Install Approach Apron
:4 a r c h
D
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\D
-D
N
Y -F
L A
P
D O
T
-1
P N
P .d g n
SCHEDULE A
173+50 TO 188+00
NYS ROUTE 63
CONSTRUCTION PLAN
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) D04
615 615
N01°22'02"W N00°42'34"E
SV
SMH
20" Sanitary Force Main(Future)
615615
615 615
N
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 25 50
Proposed Edge of Travel Lane
Construction centerline
Construction centerline
S T
A
M A
T C
H L
IN
E
S T
A
M A
T C
H L
IN
E
S T
A . 1
M A
T C
H L
IN
E
Proposed Edge of Paved Shoulder
195+00
Sawcutting Pavement
See Detail E617-A
188+00 To 194+20 (RT)
Install Guardrail System G3 (typ.)
See Detail E617-A
188+00 To 195+08 (LT)
Install Guardrail System G3 (typ.)
See Detail E617-A
195+08 To 195+30 (LT)
Install Terminal Section, Type G3
196+05 To 197+13
BIN 1028820
See Detail E401-01
193+65 To 195+00
Milling Transition
END ASPHALT OVERLAY
E 1199792.78
N 1142672.10
195+00
Existing Edge of Roadway
E 1199792.81
N 1142702.18
195+30
SCHEDULE A
END GUARDRAIL INSTALLATION
:2
M a r c h
D
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\D
-D
N
Y -F
L A
P
D O
T
-1
P N
P .d g n
SCHEDULE A
188+00 TO 203+00
NYS ROUTE 63
CONSTRUCTION PLAN
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) D05
615 615
615 615
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 25 50
See Drainage Cross Section Sheet, Detail ET 601-4 and Detail ET 602-07
Install 2 Concrete, Headwall for 24-inch Pipe Culvert
Install 24" x 60' Length Pipe Culvert
Remove Existing Pipe Culvert
CIN 151391 - Sta. 209+84
Existing Edge of Roadway
209+79
Sawcutting Pavement
209+89
Sawcutting Pavement
See Typical Section
209+79 To 209+89
Asphalt Concrete Pavement Patch, Type 1
Construction centerline
BEGIN CONSTRUCTION
END CONSTRUCTIONE 1199794.51
N 1144151.11
209+79
E 1199794.52
N 1144161.11
209+89
:4 a r c h
D
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\D
-D
N
Y -F
L A
P
D O
T
-1
P N
P .d g n
SCHEDULE B
CULVERT - 209+94
NYS ROUTE 63
CONSTRUCTION PLAN
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) D06
N00°17'19"E N00°23'34"W
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 25 50
See Drainage Cross Section Sheet and Details E602-A and E602-C
Three-Sided Precast RCB with Wingwalls
Install 10' Span x 6' Rise x 50' Length
Remove Existing Pipe Culverts
CIN 116868 - Sta. 225+32
Proposed Edge of Paved Shoulder
Construction centerline
Proposed Edge of Travel Lane
224+75
Sawcutting Pavement
225+89
Sawcutting Pavement
See Typical Section
225+25 To 225+39
Asphalt Concrete Pavement Patch, Type 1
END ASPHALT OVERLAY
E 1199797.45
N 1145761.08
225+89
2" Mill & Overlay
BEGIN ASPHALT OVERLAY
E 1199797.20
N 1145647.08
224+75
2" Mill & Overlay
Existing Edge of Roadway closures during construction of box culverts.
Use Details E635-A and E635-C for single lane
NOTE:
See Note.
FHK-10
:4 a r c h
D
S h e
E n g in e e ri n g S o ft w a re
\O p e n R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk
S e ts
\N Y
-F L
A P
D
O T
-1
\d g n \D
-D
N
Y -F
L A
P D
O T
-1
P
N P
.d g n
SCHEDULE B
CULVERT - 225+32
NYS ROUTE 63
CONSTRUCTION PLAN
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) D07
36"
N00°14'16"W
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 25 50
See Drainage Cross Section Sheet and Details E602-A and E602-C
Three-Sided Precast RCB with Wingwalls
Install 10' Span x 6' Rise x 48' Length
Remove Existing Pipe Culverts
CIN 116888 - Sta. 245+17
Construction centerline
Proposed Edge of Travel Lane
244+60
Sawcutting Pavement
245+74
Sawcutting Pavement
See Typical Section
245+10 To 245+24
Asphalt Concrete Pavement Patch, Type 1
END PROJECT
E 1199789.429
N 1147746.059
245+74
End 2" Mill & Overlay
Proposed Edge of Paved Shoulder
Existing Edge of Roadway
BEGIN ASPHALT OVERLAY
E 1199789.90
N 1147632.06
244+60
2" Mill & Overlay closures during construction of box culverts.
Use Details E635-A and E635-C for single lane
NOTE:
See Note.
FHK-10
:0 a r c h
D
S h e
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk S e ts
\N Y
-F L
A P
D
O T
-1
\D g n \D
-D
N Y
-F L
A P
D
O T
-1
P
N P
.d g n
SCHEDULE B
CULVERT - 245+17
NYS ROUTE 63
CONSTRUCTION PLAN
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) D08
156+04 - CIN 410048
150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
580 580
590 590
600 600
610 610
620 620
630 630
618.57Des Grade =
19' Span x 7' Rise x 40' Length Three Sided Precast Reinforced Concrete Box Culvert
See Detail E556-A Install Bridge Railing, Steel, Two Rail (typ.)
See Detail E602-D Install 10' Wingwall at a 70° Angle (typ.)
Flowline Invert Outlet Elevation = 611.20'
Flowline Invert Inlet Elevation = 611.25'
Elevation = 609.25' Bottom of Box Culvert
Existing Ground Surface
Install Box Culvert. See Notes and Detail E602-A
Slope 0.125%
Elevation = 609.20' Bottom of Box Culvert
Native Streambed Material
See Detail E253-A Wildlife Benching (not shown for clairity) Depth = 24"
Embedment
W RExisting Right-of-Way (Typ.)
Finished Ground/Bottom of Waterway
W R
(Future work done by others) Estimated Invert Elevation = 604' Proposed 20" Sanitary Force Main
-2.0% 1:10 -2.0%1:10
209+84 - CIN 151391
150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
590 590
600 600
610 610
620 620
630 630
618.39Des Grade =
24-Inch x 60 Feet Pipe Culvert
Existing Ground Surface
See Detail ET 601-4 Install Concrete, Headwall (typ.)
Invert Inlet Elevation = 614.11'
See Detail ET 602-07 Install 24" Pipe Culvert
Invert Outlet Elevation = 613.07'
Finished Ground/Bottom of Waterway
W RExisting Right-of-Way (Typ.)
W R
(Future work done by others) Estimated Invert Elevation = 608.50' Proposed 20" Sanitary Force Main
DRAINAGE CROSS SECTIONS
ROADWAY IMPROVEMENT TO ROUTE 63
FHWA, Office of Federal Lands Highway
SCALE IN FEET
0 10 20 for review and approval according to subsection 104.03.
all reinforcement, and submit design drawings to the CO Design concrete box culvert, headwalls, and wingwalls, including 3.
Field verify all dimensions.2.
Furnish Waterproofing Membrane according to Section 559.1.
NOTES:
Bevel concrete box culvert 1 inch along inside edge at culvert entrance.6.
Provide a minimum cover of 6 inches over the culvert.5.
incidental to diversion channel pay item.
Provide dry excavation using diversion channel. Dewatering is 4.
-2.0% -2.0%1:5 1:12
Slope 1.73%
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) K01
8:58 AM 30 March 2023 ]K01 - Sheet [M:\PROJECTS\_ACCESS\NY\Projects\NY 04_NY FLAP DOT 63(1)\Proj_Dev\CADD\K01-K02-NY-FLAP_DOT_63-1_DRG_XS.dgn
225+32 - CIN 116868
150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
590 590
600 600
610 610
620 620
630 630
618.14Des Grade =
617.89Subgrade =
Embeded Depth = 36"
See Detail E602-D
Install 5' Wingwall at a 70° Angle (typ.)
Flowline Invert Inlet Elevation = 612.30'
Elevation = 609.30'
Bottom of Box Culvert
Flowline Invert Outlet Elevation = 612.20'
Elevation = 609.20'
Bottom of Box Culvert
Install Box Culvert. See Notes and Detail E602-B
Existing Ground
10' Span x 6' Rise x 50' Length Three Sided Precast Reinforced Concrete Box Culvert
Slope 0.2%
Material
Native Streambed
W
RExisting Right-of-Way (Typ.)
W
R
Finished Ground/Bottom of Waterway
(Future work done by others) Estimated Invert Elevation = 607' Proposed 20" Sanitary Force Main
-2.0% -2.0%1:13 1:16
245+17 - CIN 116888
150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
590 590
600 600
610 610
620 620
630 630
620.43Des Grade =
Embeded Depth = 36"
Flowline Invert Inlet Elevation = 614.50'
Elevation = 611.50' Bottom of Box Culvert
Install Box Culvert. See Notes and Detail E602-B
Finished Ground/Bottom of Waterway
Slope 0.2%
Flowline Invert Outlet Elevation = 614.40'
Elevation = 611.40' Bottom of Box Culvert
See Detail E602-D Install 5' Wingwall at a 70° Angle (typ.)
Existing Ground Surface
10' Span x 6' Rise x 48' Length Three Sided Precast Reinforced Concrete Box Culvert
Material Native Streambed
W R
W RExisting Right-of-Way (Typ.)
(Future work done by others) Estimated Invert Elevation = 606.50' Proposed 20" Sanitary Force Main
DRAINAGE CROSS SECTIONS
ROADWAY IMPROVEMENT TO ROUTE 63
FHWA, Office of Federal Lands Highway
SCALE IN FEET
0 10 20
NOTES:
for review and approval according to subsection 104.03.
all reinforcement, and submit design drawings to the CO Design concrete box culvert, headwalls, and wingwalls, including 3.
Field verify all dimensions.2.
Furnish Waterproofing Membrane according to Section 559.1.
Bevel concrete box culvert 1 inch along inside edge at culvert entrance.5.
Provide a minimum cover of 6 inches over the culvert.4.
-2.0% -2.0%1:6 1:6
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) K02
1:41 PM 2 March 2023 ]K02 - Sheet [C:\Engineering_Software\OpenRoads Designer CE 10.10\Project_WorkSets\NY-FLAP_DOT_63-1\dgn\K01-K02-NY-FLAP_DOT_63-1_DRG_XS.dgn construction limits.
does not leave the project site. Perimeter controls include silt fence and other specified measures outside the
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
The Runoff Coefficient prior to construction is 0.95. The Runoff Coefficient after construction will be 0.95.
No new impervious surface will be created by the resurfacing the roadway.
0.02 acres. The receiving water is Lake Ontario.
There are minor soil disturbing activities due to replacing culverts. The total disturbed area for the project is approximately and other miscellaneous work.
culverts. The work also includes installation of guardrail, pavement markings, Centerline Audible Roadway Delineators (CARDs), This project consists of resurfacing of 0.8 mile of NYS Route 63. The work includes asphalt overlay, replacing box and pipe
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
that have reached their rated capacity.
damage, and for capacity. Immediately cease pumping and replace damaged filter bags, or bags
Filter bags - Check the filter bags daily during dewatering operations for punctures, tears, or other
Repair temporary diversion berm as needed after events or as directed by the CO.
Temporary diversion berm - inspect the temporary diversion berm daily and maintain while in use.
when it reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspection.
Fiber roll - Inspect weekly and after each runoff event. Removal sediment deposits from the fiber roll end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to culverts.
and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days areas surrounding the culverts as called out in the Erosion and Sediment Control plans.
Apply intermediate controls during rough grading operations. Install fiber roll and diversion berms in
Phase II Intermediate Controls
U.S. DEPARTMENT OF TRANSPORTATION
:5
D e c e m b e r
M
S h e
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r C
E
.1
\P ro je c t_
W o rk S e ts
\N Y
-F L
A P
D
O T
-1
\D g n \M
-N Y
-F L
A P
D
O T
E
S N a rr a ti v e
.d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) M01
Construction centerline
Box Culvert Replacement
CIN 410048 - 156+04
Proposed Edge of Travel Lane
Proposed Edge of Paved Shoulder
Wetland Boundary
Limits of Disturbance
Wetland Impacts: 235 SQFT
Wetland Impacts: 650 SQFT
LEGEND
BEGIN ASPHALT OVERLAY
154+50
N 1138622.25
E 1199772.65
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 20 40
Wetland Impacts
(Total Impacts: 885 SQFT)
:0
M a r c h
M
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\M
N Y
-F L
A P
D
O T
-1
E
S
-W e tl a n d .d g n
SCHEDULE B
CIN 410048 - STA. 156+04
CONTROL - WETLAND IMPACTS
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) M02
NOTE:
Phragmites located around Sta. 156+04 on left side (west) of roadway. Refer to
Section 107 and subsection 201.05A regarding construction activities in the area.
Construction centerline
Box Culvert Replacement
CIN 410048 - 156+04
Proposed Edge of Travel Lane
Proposed Edge of Paved Shoulder
See Detail E157-04
Install Fiber Roll (typ.)
See Detail E157-08
Install temporary diversion berm (typ.)
Proposed Edge of Travel Lane Limits of Disturbance (typ.)
Cut/Fill Limits (typ.)
BEGIN ASPHALT OVERLAY
154+50
N 1138622.25
E 1199772.65
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 20 40
:5 a r c h
M
S h e
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk S e ts
\N Y
-F L
A P
D
O T
-1
\d g n \M
-M
N Y
-F L
A P
D
O T
-1
E
S
.d g n
SCHEDULE B
CIN 410048 - STA. 156+04
CONTROL PLAN
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) M03
615 615
Construction centerline
See Detail E157-04
Install Fiber Roll (typ.)
24" Pipe Culvert Replacement
CIN 151391 - 209+94
BEGIN CONSTRUCTION
END CONSTRUCTION
209+79
N 1144151.11
E 1199794.51
209+89
N 1144161.11
E 1199794.52
NOTE:
Phragmites located around Sta. 209+84 on both sides of roadway. Refer to
Section 107 and subsection 201.05A regarding construction activities in the area.
Limits of Disturbance (typ.)
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 20 40
:3 a r c h
M
S h e
E n g in e e ri n g S o ft w a re
\O p e n R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk
S e ts
\N Y
-F L
A P
D
O T
-1
\D g n \M
-M
N
Y -F
L A
P D
O T
-1
E
S
.d g n
SCHEDULE B
CIN 151391 - STA. 209+94
CONTROL PLAN
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) M04
N
Construction centerline Proposed Edge of Travel Lane Proposed Edge of Paved Shoulder
Proposed Box Culvert
Removal of 3-36" Pipe Culverts
CIN 116868 - 225+32
BEGIN CONSTRUCTION
END CONSTRUCTION
225+89
N 1145761.08
E 1199797.45
224+75
N 1145647.08
E 1199797.20
See Detail E157-04
Install Fiber Roll (typ.)
Limits of Disturbance (typ.)
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 20 40
:5 a r c h
M
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\M
-M
N
Y -F
L A
P
D O
T
-1
E
S .d g n
SCHEDULE B
CIN 116868 - STA. 225+32
CONTROL PLAN
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) M05
N
Construction centerline
Proposed Edge of Travel Lane
Proposed Edge of Paved Shoulder
Proposed Box Culvert
Removal of 3-36" Pipe Culverts
CIN 116888 - 247+17
BEGIN CONSTRUCTION
END CONSTRUCTION
244+60
N 1147632.06
E 1199789.90
245+75
N 1147746.06
E 1199789.43
Limits of Disturbance (typ.)
See Detail E157-04
Install Fiber Roll (typ.)
U.S. DEPARTMENT OF TRANSPORTATION
SCALE IN FEET
0 20 40
:0 a r c h
M
S h e
E n g in e e ri n g
S o ft w a re
\O p e n
R o a d s D e s ig n e r
C E
.1
\P ro je c t_
W o rk S e ts
\N Y
-F L
A P
D
O T
-1
\d g n \M
-M
N Y
-F L
A P
D
O T
-1
E
S
.d g n
SCHEDULE B
CIN 116888 - STA. 247+17
CONTROL PLAN
EROSION AND SEDIMENT
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) M06
2%
3%
4%
5%
33'
22'
16'
13'
INLET PROTECTION
set under drain inlet.
Non-woven filter fabricFl ow
FlowFlow
Fl ow
F lo w
F lo w
PLAN VIEW
Area
Undisturbed
Flow
Flow
** Adjust spacing as approved based on site conditions
* Do not install check dams on grades below 2%
50'
33'
25'
20'
PLAN VIEW
FIBER ROLL CHECK DAM
20 ft
15 ft
10 ft1V:2H or Steeper
1V:4H - 1V:2H downslope stakes equidistant between
Upslope stake, place
Flow
8' max
Flow
4' max
Contour line (typ.)
E157-04 height of roll2 1to
Wood mulch or compost
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
See Note 11 ends and 36" o.c. (typ.)
Gravel bag weights at
See Note 6
Wood stake (typ.)
FIBER ROLL CHECK DAM CROSS SECTIONS
V-DITCH TRAPEZOIDAL DITCH
ENTRENCHED INSTALLATION
FIBER ROLL ISOMETRIC VIEW
requirements of Subsection 713.13.
Provide gravel bag weights meeting the inlet protection detail.
use gravel bags to support them as shown on the
When fiber rolls are required on paved surfaces, months after installation.
installation and photodegradable fiber rolls 12
Replace biodegradable fiber rolls 6 months after one-half the height of the exposed fiber roll.
Remove sediment deposits when accumulation is ends 12 inches minimum and stake.
When more than one fiber roll is needed, overlap
Subsection 713.08(a).
Furnish wood stakes meeting the requirements of ground and 3 inches protruding above the roll.
length to attain a minimum of 12 inches into the section of 2-inch x 2-inch and of sufficient
Use wood stakes with a minimum nominal cross alignment.
least 8 feet upslope at 45 degrees to the main contours. Extend both ends of the fiber roll at
Place fiber rolls on level grade and parallel to along the fiber roll.
mulch or compost on uphill side of the slope
For untrenched installation, blow or hand place the fiber roll.
1-inch that may interfere with proper function of including rocks, clods, and debris greater than
Prior to installation, clear all obstructions a minimum 12-inch diameter.
For drain inlet protection, use fiber rolls with
Use fiber rolls with a minimum 8-inch diameter.
Subsection 713.12.
Provide fiber rolls meeting the requirements of
NOTES:
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
UNTRENCHED INSTALLATION
SLOPE MAX INTERVAL
1V:4H or Flatter
LENGTH ABOVE FIBER ROLLS
MAXIMUM ALLOWABLE SLOPE
SPACING TABLE
FIBER ROLL CHECK DAM
*GRADE
DITCH SPACING (S)
CHECK DAM
8" HIGH 12" HIGH
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, the diameter of the roll (max.)
1Trench into ground
1' (min.)
12" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 2' (max.)
(typ.)
Fiber roll
FIBER ROLL OVERLAP
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
FIBER ROLL
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2016
:4 a r c h
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\S td
-D e t\
S
-s t1 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) S01
EFLHD DETAIL
Existing abutment or pier
Limit of work zone
Limit of work zone
Existing ground
Concrete barrier
4'- 6"
Concrete barrier
Existing ground
Concrete barrier
Existing ground
Waterproof membrane
Existing ground at time of contsruction
Diverted water level at time of construction
Diverted water level at time of construction Diverted water level water surface elevation
Min. Top of berm elevation water surface elevation water surface elevation water surface elevation
OPTION C
OPTION D
OPTION B
OPTION A
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
NOTES:
barrier.
when deposits reach half the height of the sandbag events or as directed by the CO. Remove sediment diversion berm daily. Repair as needed after rainfall
While in use, inspect and maintain the temporary given time.
Place a maximum of one diversion in the stream at any joints in lower rows.
course. Upper rows of sandbags should overlap the numbers of rows on the bottom as there are vertical
Place sandbags to form a pyramid by laying equal
157.10.
Construct temporary diversion according to Subsection prior to installation.
for temporary stream diversion to the CO for approval elevation with 6-inch minimum freeboard. Submit plans with a minimum height equivalent to the water surface
As a minimum, provide a temporary diversion berm prefabricated or portable diversion berms, dams, etc.).
diverting the stream (including any approved
The Contractor may choose an alternate means of diverting the stream during construction operations.
The options shown are suggested configurations for
Limit of work zone
Sandbag (typ.)
5.
4.
3.
2.
1.
m in m in m in m in elevation
Min. Top of berm elevation
Min. Top of berm at time of construction
Diverted water level
(anchoring method to be approved by the CO)
Waterproof membrane
(anchoring method to be approved by the CO)
Waterproof membrane
(anchoring method to be approved by the CO)
Waterproof membrane
E157-08
NO SCALE
DIVERSION BERM METHODS
TEMPORARY IN-STREAM
DETAIL APPROVED FOR USE
REVISED: MARCH 2021
APPROVED: MARCH 2015
:4 a r c h
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\S td
-D e t\
S
-s t1 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) S02
AREA
VEGETATED
WELL
AREA
VEGETATED
WELL
AREA
VEGETATED
WELL
Sewn in spout
Pump discharge hose
Pump discharge hose
Well vegetated area
Clamp
Pump
Intake hose
SIDE VIEW
TOP VIEW
AREA
VEGETATED
WELL
(typ.)
FLOW
Filter bag
Filter bag
Clamp
PumpClamp
Clamp
Intake hose
NOTES:
and securely fasten it with metal clamps
Insert hose as specified by manufacturer and securely fasten it with metal clamps
Insert hose as specified by manufacturer
FILTER BAG
See Note 1 placing aggregate only when leveling is required
Place Geotextile, Class 2, Type A prior to
6.
5.
4.
3.
2.
1.
See Note 1 aggregate only when leveling is required
Place 6" minimum depth AASHTO No. 57 coarse
Heavy duty lifting straps area according to Subsection 157.15.
Do not cut or empty filter bags on site. Restore the
Discharge onto stable and erosion resistant areas.
back into work or access areas of the project.
Do not permit discharge from the filter bags to drain site for replacement.
when there is a failure. Have spare filter bags on
50% of the sediment capacity has been reached or
Inspect filter bags daily. Replace filter bags when any given time.
Insert a maximum of one hose in each filter bag at for maintenance and removal.
Locate filter bags in areas accessible by equipment level the filter bags.
available, place geotextile and coarse aggregate to or as approved by the CO. When level areas are not
Locate filter bags in level areas (less than 5% grade)
NO SCALE
E157-10
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: FEBRUARY 2013
:4 a r c h
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\S td
-D e t\
S
-s t1 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) S03
E253-A
WILDLIFE BENCH
NO SCALE
WILDLIFE BENCHES - SECTION IN STRUCTURE
WILDLIFE BENCHES - PLAN
Sided Concrete Structure 19' x 7' Precast Three
Piles
Concrete Footers (typ.)
Material Native Stream Bed with Gabions.
Benched at 12" intervals
Undercut for benches (typ.)
Geotextile, Class 1, Type D (typ.)
Separation-Stabilization
Benches Keyed Into Slope (typ.)
Wildlife Benches (typ.)
Roadway Centerline
Culvert Centerline ty p ty p
24" (typ.)
:4 a r c h
E
A
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\S td
-D e t\
S
-E
-A
-N Y
S D
O T
W
B -0
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) S04
K VALUE TABLE (ft/in)
30 35 40 45 50 55 60 65 70 75
30 32.5 35 37.5 40 42.5 45 47.5 50 52.5
* Use a K Value of 30 for speeds less than 30 MPH.
K
(MPH) *
POSTED SPEED
NOTE:
2 inches x 42.5 ft./in. = 85 feet.
Then the minimum transition length =
Effective overlay thickness = 2 inches
If the posted speed is 55 MPH
Example :
(Minimum transition length=30 feet) applies), to obtain the transition length.
Use K*[e1-e2]=T, or K*[d1-d2]=T (whichever the posted speed of the roadway.
elevations) by the K value from the Table for
(difference between the existing and overlaid the effective overlay thickness in inches less than the value obtained by multiplying
Provide a transition length in feet that is not
E401-01
NO SCALE
Existing asphalt pavement
Existing base course
New asphalt pavement
New base course
Existing asphalt pavement
Existing base course
Remove pavement (mill)
NEW PAVEMENT
(Final course)
Asphalt overlay
(Depth equals overlay thickness)
Saw cut
Existing elevation (e2)
Overlaid elevation (e1)
(Full depth of existing asphalt pavement Saw cut
K Transition length variable (See table)
(for table e - e = effective overlay thickness)
OVERLAY
d
Existing asphalt pavement
Existing base course d1
OVERLAY - DEPTH TRANSITIONS
(depth 2)
Asphalt overlay
(depth 1)
Asphalt overlay
K Transition length (Variable, see Table)
(for Table, d - d = effective overlay thickness)
1 PAVEMENT TRANSITIONS
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: FEBRUARY 2013
:4 a r c h
S h e
P R
O J E
C T
S
A C
C E
S S
\N Y
\P ro je c ts
\N Y
N
Y F
L A
P D
O T
(1
P ro j_ D e v
\C A
D D
\S td
-D e t\
S
-s t4 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
NY NY FLAP DOT 63(1) S05
TWO-RAIL
THREE-RAIL CURBLESS AND
STEEL BRIDGE RAILING
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .