Plans-NMFTBL2004(2)WildRiver-250304-Sealed Flat.pdf
PDF 12 MB Posted
- Attached to
- NM FTBL 2004(2) Wild Rivers Road Federal contract opportunity
- Solicitation number
- 6982AF24B000005
About this file
This document is a comprehensive set of engineering plans for the NM FTBL 2004(2) Wild Rivers Road project, prepared by the U.S. Department of Transportation Federal Highway Administration. The project involves rehabilitating and reconstructing 3.21 miles of the Wild Rivers Road located in the Wild Rivers Recreation Area near Cerro, New Mexico. The scope includes widening the paved surface to 34 feet with two 11-foot lanes and two 6-foot shoulders, utilizing a 3-inch asphalt pavement over 8 inches of aggregate base.
The project is divided into two primary sections: Schedule A covers 2.81 miles of road with safety edge and shouldering improvements, while Option X addresses 0.4 miles of full reconstruction at Ice Hill, involving reverse curves and road realignment. The estimated project cost ranges between $5,000,000 and $10,000,000. The roadway serves multiple recreational purposes, including access for biking, sightseeing, camping, fishing, hiking, and educational services within the Wild Rivers Recreation Area, which is part of the Rio Grande del Norte National Monument.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabulation NM FTBL 2004(2) Wild Rivers Road LK.pdf | ||
| Bid Opening Summary NM FTBL 2004(2) Wild Rivers Road.pdf | ||
| QnA 04.24.25 Wild Rivers.pdf | ||
| QnA 04.23.25 Wild Rivers.pdf | ||
| A001 04.11.2025 Wild Rivers.pdf | ||
| FINAL-HYDReport-NMFTBL2004(2)(3)WildRiver.pdf | ||
| ARPA_218-8152-25-1 TB.pdf | ||
| 6982AF24B000005 NM FTBL 2004(2) Wild Rivers Road.pdf | ||
| XS-NMFTBL2004(2)WildRiver-Sealed Flat.pdf | ||
| FINAL-PVMNTReport-NMFTBL2004(2)WildRiver.pdf | ||
| FP-14_Eng.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2025.02.28 08:22:37 -07'00'
2025.02.26 20:44:13-07'00'
20:44:28-07'00'
31JAN24
31JAN24
20:44:50-07'00'
20:45:12-07'00'
2025.03.04 08:51:00-07'00'
08:51:19-07'00'
08:51:48-07'00'
08:52:10-07'00'
08:52:26-07'00'
08:52:58-07'00'
08:53:14-07'00' of material.
08:53:29-07'00'
Ice Hill Full Reconstruction Area Ice Hill Full Reconstruction Area
08:53:50-07'00'
Douglas P. Stewart, PE
12:26:23-07'00'
2025.02.26 12:20:11-07'00'
08:54:17-07'00'
08:54:31-07'00'
08:54:46-07'00'
08:55:05-07'00'
Overhead utility line crossing
08:55:23-07'00'
08:55:39-07'00'
08:55:55-07'00'
08:56:11-07'00'
08:56:25-07'00'
08:56:41-07'00'
08:56:56-07'00'
08:57:11-07'00'
08:57:31-07'00'
08:57:45-07'00'
08:58:00-07'00'
08:58:13-07'00'
08:58:27-07'00'
08:58:43-07'00'
09:00:31-07'00'
09:00:50-07'00'
09:01:08-07'00'
09:01:22-07'00'
12:28:23-07'00'
2025.02.26 12:29:07-07'00'
09:01:42-07'00'
12:46:25-07'00'
12:42:09-07'00'
12:55:36-07'00'
2025.02.26 12:50:06-07'00'
2025.02.26 12:59:52-07'00'
13:03:37-07'00'
09:02:16-07'00'
09:02:31-07'00'
09:02:48-07'00'
09:03:04-07'00'
09:03:20-07'00'
09:03:37-07'00'
09:03:52-07'00'
09:04:11-07'00'
09:04:28-07'00'
09:04:42-07'00'
09:04:57-07'00'
09:05:10-07'00'
09:05:25-07'00'
09:05:42-07'00'
09:05:57-07'00'
File details come from the government source that posted it. Updated .