Bid Tabulation NM FTBL 2004(2) Wild Rivers Road LK.pdf
PDF 715 KB Posted
- Attached to
- NM FTBL 2004(2) Wild Rivers Road
- Solicitation number
- 6982AF24B000005
About this file
This document is a Bid Tabulation for the Wild Rivers Road project (NM FTBL 2004(2)) detailing three contractor bids for a road rehabilitation and reconstruction project. The project involves reconstructing 3.21 miles of road, including widening the paved surface to 34 feet with two 11-foot lanes and two 6-foot shoulders. Three contractors submitted bids: West Point Contractors, Inc. ($8,823,429.00), McKenzie Construction and Site Development, LLC ($9,837,793.94), and Steve Manning Construction Inc ($10,324,477.00), with an Engineer's Estimate of $7,387,700.00.
The bid tabulation covers two schedules: Schedule A for base road work and Schedule X for optional work, with detailed line-item pricing for various construction activities including mobilization, survey and staking, erosion control, embankment construction, asphalt pavement, signage, traffic control, and other road reconstruction elements. The project is located in the Wild Rivers Recreation Area near Cerro, NM, within the Rio Grande del Norte National Monument, and is being solicited by the Department of Transportation Federal Highway Administration under Solicitation Number 6982AF24B000005.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 05/14/25
1 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Contractor Responsive?
Engineer's Estimate
McKenzie Construction and Site Development, LLC
Steve Manning Construction Inc
West Point Contractors, Inc.
Base Schedule A
$7,387,700.00
$9,837,793.94
$10,324,477.00
$8,823,428.99
Option: X
$2,734,407.50
$3,747,800.78
$4,356,448.00
$2,438,262.98
Contractor Responsive?
Engineer's Estimate
McKenzie Construction and Site Development, LLC
Steve Manning Construction Inc
West Point Contractors, Inc.
Total Base Schedule A and Option(s): X
$10,122,107.50
$13,585,594.72
$14,680,925.00
$11,261,691.97
2 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF24B000005
Division: Central Federal Lands
State: NM County: Taos
Federal Land: BLM Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 05/01/25
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
West Point Contractors, Inc. $8,823,429.00 2915 E. Wieding Rd.
Tucson, AZ 85706
McKenzie Construction and Site Development, LLC $9,837,793.94 2301 Calvert Street NW Washington, DC 20008
Steve Manning Construction Inc $10,324,477.00 5211 Churn Creek Road Redding, CA 96002
Engineer's Estimate $7,387,700.00
Contracting Officer
05.14.25
3 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1000 15101-0000 MOBILIZATION
West Point Contractors, Inc. Lump Sum $150,710.17 McKenzie Construction and Site Development, LLC Lump Sum $1,369,756.13 Steve Manning Construction Inc Lump Sum $900,000.00 Engineer's Estimate ALL LPSM Lump Sum $875,789.00
A1010 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
West Point Contractors, Inc. $769.23 $9,999.99 McKenzie Construction and Site Development, LLC $1,591.54 $20,690.02 Steve Manning Construction Inc $3,300.00 $42,900.00 Engineer's Estimate 13 EACH $2,250.00 $29,250.00
A1020 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
West Point Contractors, Inc. $19,559.04 $110,000.04 McKenzie Construction and Site Development, LLC $7,356.72 $41,374.19 Steve Manning Construction Inc $20,000.00 $112,480.00 Engineer's Estimate 5.624 MILE $10,000.00 $56,240.00
A1030 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
West Point Contractors, Inc. $44,452.35 $125,000.01 McKenzie Construction and Site Development, LLC $7,355.57 $20,683.86 Steve Manning Construction Inc $20,000.00 $56,240.00 Engineer's Estimate 2.812 MILE $8,500.00 $23,902.00
A1040 15301-0000 CONTRACTOR QUALITY CONTROL
West Point Contractors, Inc. Lump Sum $80,000.00 McKenzie Construction and Site Development, LLC Lump Sum $250,601.94 Steve Manning Construction Inc Lump Sum $270,000.00 Engineer's Estimate ALL LPSM Lump Sum $240,000.00
A1050 15401-0000 CONTRACTOR TESTING
West Point Contractors, Inc. Lump Sum $99,000.00 McKenzie Construction and Site Development, LLC Lump Sum $326,066.59 Steve Manning Construction Inc Lump Sum $240,000.00 Engineer's Estimate ALL LPSM Lump Sum $255,000.00
4 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1060 15501-0000 CONSTRUCTION SCHEDULE
West Point Contractors, Inc. Lump Sum $5,000.00 McKenzie Construction and Site Development, LLC Lump Sum $28,728.21 Steve Manning Construction Inc Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
A1070 15701-0000 SOIL EROSION CONTROL
West Point Contractors, Inc. Lump Sum $32,000.00 McKenzie Construction and Site Development, LLC Lump Sum $202,039.77 Steve Manning Construction Inc Lump Sum $190,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
A1080 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
West Point Contractors, Inc. Lump Sum $10,000.00 McKenzie Construction and Site Development, LLC Lump Sum $7,814.07 Steve Manning Construction Inc Lump Sum $35,000.00 Engineer's Estimate ALL LPSM Lump Sum $16,000.00
A1090 15802-0000 WATERING FOR DUST CONTROL
West Point Contractors, Inc. Lump Sum $55,000.00 McKenzie Construction and Site Development, LLC Lump Sum $166,623.63 Steve Manning Construction Inc Lump Sum $195,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A1100 20101-0000 CLEARING AND GRUBBING
West Point Contractors, Inc. $12,183.91 $212,000.03 McKenzie Construction and Site Development, LLC $13,789.54 $239,938.00 Steve Manning Construction Inc $24,000.00 $417,600.00 Engineer's Estimate 17.4 ACRE $7,500.00 $130,500.00
A1110 20220-1000 REMOVAL, INDIVIDUAL TREE
West Point Contractors, Inc. $2,000.00 $20,000.00 McKenzie Construction and Site Development, LLC $689.47 $6,894.70 Steve Manning Construction Inc $7,500.00 $75,000.00 Engineer's Estimate 10 EACH $1,000.00 $10,000.00
5 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1120 20301-1900 REMOVAL OF PIPE CULVERT
West Point Contractors, Inc. $714.29 $5,000.03 McKenzie Construction and Site Development, LLC $1,723.69 $12,065.83 Steve Manning Construction Inc $3,200.00 $22,400.00 Engineer's Estimate 7 EACH $2,500.00 $17,500.00
A1130 20301-2000 REMOVAL OF PIPE END SECTION
West Point Contractors, Inc. $333.33 $3,999.96 McKenzie Construction and Site Development, LLC $1,149.12 $13,789.44 Steve Manning Construction Inc $800.00 $9,600.00 Engineer's Estimate 12 EACH $1,000.00 $12,000.00
A1140 20301-2300 REMOVAL OF SIGN/MARKER
West Point Contractors, Inc. $100.00 $1,300.00 McKenzie Construction and Site Development, LLC $229.82 $2,987.66 Steve Manning Construction Inc $200.00 $2,600.00 Engineer's Estimate 13 EACH $190.00 $2,470.00
A1150 20402-0000 SUBEXCAVATION
West Point Contractors, Inc. $40.00 $40,000.00 McKenzie Construction and Site Development, LLC $201.09 $201,090.00 Steve Manning Construction Inc $331.00 $331,000.00 Engineer's Estimate 1,000 CUYD $110.00 $110,000.00
A1160 20420-0000 EMBANKMENT CONSTRUCTION
West Point Contractors, Inc. $50.00 $400,000.00 McKenzie Construction and Site Development, LLC $127.55 $1,020,400.00 Steve Manning Construction Inc $148.00 $1,184,000.00 Engineer's Estimate 8,000 CUYD $70.00 $560,000.00
A1170 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
West Point Contractors, Inc. $431.04 $125,001.60 McKenzie Construction and Site Development, LLC $358.52 $103,970.80 Steve Manning Construction Inc $418.00 $121,220.00 Engineer's Estimate 290 CUYD $325.00 $94,250.00
6 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1180 30101-0000 AGGREGATE BASE
West Point Contractors, Inc. $122.55 $1,500,012.00 McKenzie Construction and Site Development, LLC $71.82 $879,076.80 Steve Manning Construction Inc $97.00 $1,187,280.00 Engineer's Estimate 12,240 TON $65.00 $795,600.00
A1200 30302-1000 DITCH RECONDITIONING
West Point Contractors, Inc. $81.82 $9,000.20 McKenzie Construction and Site Development, LLC $34.47 $3,791.70 Steve Manning Construction Inc $50.00 $5,500.00 Engineer's Estimate 110 LNFT $45.00 $4,950.00
A1210 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
West Point Contractors, Inc. $407,656.86 $1,150,000.00 McKenzie Construction and Site Development, LLC $114,912.84 $324,169.12 Steve Manning Construction Inc $210,000.00 $592,410.00 Engineer's Estimate 2.821 MILE $100,000.00 $282,100.00
A1230 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
West Point Contractors, Inc. $319.59 $3,100,023.00 McKenzie Construction and Site Development, LLC $296.47 $2,875,759.00 Steve Manning Construction Inc $260.00 $2,522,000.00 Engineer's Estimate 9,700 TON $220.00 $2,134,000.00
A1240 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
West Point Contractors, Inc. $175.26 $17,000.22 McKenzie Construction and Site Development, LLC $919.30 $89,172.10 Steve Manning Construction Inc $700.00 $67,900.00 Engineer's Estimate 97 TON $500.00 $48,500.00
A1260 40601-0000 FOG SEAL
West Point Contractors, Inc. $1,461.54 $19,000.02 McKenzie Construction and Site Development, LLC $3,447.38 $44,815.94 Steve Manning Construction Inc $1,900.00 $24,700.00 Engineer's Estimate 13 TON $1,230.00 $15,990.00
7 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1270 41102-1000 PRIME COAT, METHOD 1
West Point Contractors, Inc. $0.29 $17,104.20 McKenzie Construction and Site Development, LLC $2.29 $135,064.20 Steve Manning Construction Inc $1.50 $88,470.00 Engineer's Estimate 58,980 SQYD $2.50 $147,450.00
A1280 41105-0000 BLOTTER
West Point Contractors, Inc. $367.82 $32,000.34 McKenzie Construction and Site Development, LLC $114.91 $9,997.17 Steve Manning Construction Inc $135.00 $11,745.00 Engineer's Estimate 87 TON $120.00 $10,440.00
A1290 41201-0000 TACK COAT
West Point Contractors, Inc. $730.77 $19,000.02 McKenzie Construction and Site Development, LLC $3,447.38 $89,631.88 Steve Manning Construction Inc $1,900.00 $49,400.00 Engineer's Estimate 26 TON $1,770.00 $46,020.00
A1300 60201-0800 24-INCH PIPE CULVERT
West Point Contractors, Inc. $142.86 $30,000.60 McKenzie Construction and Site Development, LLC $210.29 $44,160.90 Steve Manning Construction Inc $580.00 $121,800.00 Engineer's Estimate 210 LNFT $320.00 $67,200.00
A1310 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
West Point Contractors, Inc. $125.00 $85,000.00 McKenzie Construction and Site Development, LLC $184.43 $125,412.40 Steve Manning Construction Inc $580.00 $394,400.00 Engineer's Estimate 680 LNFT $335.00 $227,800.00
A1320 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
West Point Contractors, Inc. $1,500.00 $9,000.00 McKenzie Construction and Site Development, LLC $2,554.51 $15,327.06 Steve Manning Construction Inc $1,800.00 $10,800.00 Engineer's Estimate 6 EACH $1,320.00 $7,920.00
8 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1330 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
West Point Contractors, Inc. $1,200.00 $24,000.00 McKenzie Construction and Site Development, LLC $2,555.66 $51,113.20 Steve Manning Construction Inc $1,800.00 $36,000.00 Engineer's Estimate 20 EACH $2,500.00 $50,000.00
A1340 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
West Point Contractors, Inc. $300.00 $12,000.00 McKenzie Construction and Site Development, LLC $298.77 $11,950.80 Steve Manning Construction Inc $210.00 $8,400.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
A1350 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
West Point Contractors, Inc. $220.00 $8,800.00 McKenzie Construction and Site Development, LLC $402.19 $16,087.60 Steve Manning Construction Inc $250.00 $10,000.00 Engineer's Estimate 40 HOUR $180.00 $7,200.00
A1360 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
West Point Contractors, Inc. $400.00 $16,000.00 McKenzie Construction and Site Development, LLC $459.65 $18,386.00 Steve Manning Construction Inc $310.00 $12,400.00 Engineer's Estimate 40 HOUR $240.00 $9,600.00
A1370 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
West Point Contractors, Inc. $500.00 $20,000.00 McKenzie Construction and Site Development, LLC $459.65 $18,386.00 Steve Manning Construction Inc $270.00 $10,800.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00
A1380 62301-0000 GENERAL LABOR
West Point Contractors, Inc. $150.00 $6,000.00 McKenzie Construction and Site Development, LLC $172.36 $6,894.40 Steve Manning Construction Inc $110.00 $4,400.00 Engineer's Estimate 40 HOUR $70.00 $2,800.00
9 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1390 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
West Point Contractors, Inc. $200.00 $8,000.00 McKenzie Construction and Site Development, LLC $172.36 $6,894.40 Steve Manning Construction Inc $320.00 $12,800.00 Engineer's Estimate 40 HOUR $225.00 $9,000.00
A1400 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
West Point Contractors, Inc. $200.00 $4,000.00 McKenzie Construction and Site Development, LLC $344.73 $6,894.60 Steve Manning Construction Inc $400.00 $8,000.00 Engineer's Estimate 20 HOUR $260.00 $5,200.00
A1410 62405-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
West Point Contractors, Inc. $1.20 $44,940.00 McKenzie Construction and Site Development, LLC $6.43 $240,803.50 Steve Manning Construction Inc $6.40 $239,680.00 Engineer's Estimate 37,450 SQYD $4.00 $149,800.00
A1420 62510-1000 SEEDING, DRY METHOD
West Point Contractors, Inc. $9,000.00 $99,000.00 McKenzie Construction and Site Development, LLC $1,269.78 $13,967.58 Steve Manning Construction Inc $900.00 $9,900.00 Engineer's Estimate 11.0 ACRE $2,000.00 $22,000.00
A1430 62515-1000 MULCHING, DRY METHOD
West Point Contractors, Inc. $30,272.73 $333,000.03 McKenzie Construction and Site Development, LLC $2,229.30 $24,522.30 Steve Manning Construction Inc $1,700.00 $18,700.00 Engineer's Estimate 11.0 ACRE $3,125.00 $34,375.00
A1440 62901-0700 ROLLED EROSION CONTROL PRODUCT, TYPE 2.C
West Point Contractors, Inc. $36.15 $30,004.50 McKenzie Construction and Site Development, LLC $4.76 $3,950.80 Steve Manning Construction Inc $5.00 $4,150.00 Engineer's Estimate 830 SQYD $7.00 $5,810.00
10 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1450 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4
West Point Contractors, Inc. $32.18 $510,053.00 McKenzie Construction and Site Development, LLC $4.76 $75,446.00 Steve Manning Construction Inc $7.00 $110,950.00 Engineer's Estimate 15,850 SQYD $10.00 $158,500.00
A1460 62901-1200 ROLLED EROSION CONTROL PRODUCT, TYPE 5.A
West Point Contractors, Inc. $34.15 $42,004.50 McKenzie Construction and Site Development, LLC $8.15 $10,024.50 Steve Manning Construction Inc $9.00 $11,070.00 Engineer's Estimate 1,230 SQYD $10.00 $12,300.00
A1470 63301-0000 SIGN SYSTEM
West Point Contractors, Inc. $677.78 $6,100.02 McKenzie Construction and Site Development, LLC $861.84 $7,756.56 Steve Manning Construction Inc $1,200.00 $10,800.00 Engineer's Estimate 9 EACH $700.00 $6,300.00
A1480 63308-0000 OBJECT MARKER
West Point Contractors, Inc. $46.16 $1,200.16 McKenzie Construction and Site Development, LLC $109.16 $2,838.16 Steve Manning Construction Inc $180.00 $4,680.00 Engineer's Estimate 26 EACH $300.00 $7,800.00
A1490 63309-0000 DELINEATOR
West Point Contractors, Inc. $33.33 $4,999.50 McKenzie Construction and Site Development, LLC $86.18 $12,927.00 Steve Manning Construction Inc $180.00 $27,000.00 Engineer's Estimate 150 EACH $140.00 $21,000.00
A1500 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
West Point Contractors, Inc. $0.17 $10,517.90 McKenzie Construction and Site Development, LLC $2.29 $141,682.30 Steve Manning Construction Inc $0.40 $24,748.00 Engineer's Estimate 61,870 LNFT $1.30 $80,431.00
11 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1510 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
West Point Contractors, Inc. $0.17 $10,456.70 McKenzie Construction and Site Development, LLC $2.29 $140,857.90 Steve Manning Construction Inc $0.40 $24,604.00 Engineer's Estimate 61,510 LNFT $1.30 $79,963.00
A1520 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
West Point Contractors, Inc. $150.00 $1,200.00 McKenzie Construction and Site Development, LLC $574.56 $4,596.48 Steve Manning Construction Inc $650.00 $5,200.00 Engineer's Estimate 8 EACH $500.00 $4,000.00
A1530 63501-0000 TEMPORARY TRAFFIC CONTROL
West Point Contractors, Inc. Lump Sum $100,000.00 McKenzie Construction and Site Development, LLC Lump Sum $254,830.73 Steve Manning Construction Inc Lump Sum $391,000.00 Engineer's Estimate ALL LPSM Lump Sum $300,000.00
A1540 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (Protective fence)
West Point Contractors, Inc. $90.91 $25,000.25 McKenzie Construction and Site Development, LLC $11.49 $3,159.75 Steve Manning Construction Inc $10.00 $2,750.00 Engineer's Estimate 275 LNFT $10.00 $2,750.00
A1550 63701-0000 FIELD OFFICE (Government furnished)
West Point Contractors, Inc. $35,000.00 $35,000.00 McKenzie Construction and Site Development, LLC $91,930.27 $91,930.27 Steve Manning Construction Inc $15,000.00 $15,000.00 Engineer's Estimate 1 EACH $15,000.00 $15,000.00
Total Schedule - All Items
West Point Contractors, Inc. $8,823,429.00 McKenzie Construction and Site Development, LLC $9,837,793.94 Steve Manning Construction Inc $10,324,477.00 Engineer's Estimate $7,387,700.00
12 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF24B000005
Division: Central Federal Lands
State: NM County: Taos
Federal Land: BLM Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 05/01/25
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
West Point Contractors, Inc. $2,438,262.98 2915 E. Wieding Rd.
Tucson, AZ 85706
McKenzie Construction and Site Development, LLC $3,747,800.77 2301 Calvert Street NW Washington, DC 20008
Steve Manning Construction Inc $4,356,448.00 5211 Churn Creek Road Redding, CA 96002
Engineer's Estimate $2,734,407.50
13 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1000 15101-0000 MOBILIZATION
West Point Contractors, Inc. Lump Sum $141,575.55 McKenzie Construction and Site Development, LLC Lump Sum $386,795.01 Steve Manning Construction Inc Lump Sum $400,000.00 Engineer's Estimate ALL LPSM Lump Sum $329,143.00
X1010 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
West Point Contractors, Inc. $769.23 $1,538.46 McKenzie Construction and Site Development, LLC $2,872.32 $5,744.64 Steve Manning Construction Inc $3,300.00 $6,600.00 Engineer's Estimate 2 EACH $2,250.00 $4,500.00
X1020 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
West Point Contractors, Inc. $19,559.04 $18,248.58 McKenzie Construction and Site Development, LLC $12,315.36 $11,490.23 Steve Manning Construction Inc $25,000.00 $23,325.00 Engineer's Estimate 0.933 MILE $10,000.00 $9,330.00
X1030 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
West Point Contractors, Inc. $44,452.35 $20,759.25 McKenzie Construction and Site Development, LLC $12,301.58 $5,744.84 Steve Manning Construction Inc $25,000.00 $11,675.00 Engineer's Estimate 0.467 MILE $8,500.00 $3,969.50
X1040 15301-0000 CONTRACTOR QUALITY CONTROL
West Point Contractors, Inc. Lump Sum $40,000.00 McKenzie Construction and Site Development, LLC Lump Sum $250,558.42 Steve Manning Construction Inc Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $89,000.00
X1050 15401-0000 CONTRACTOR TESTING
West Point Contractors, Inc. Lump Sum $60,000.00 McKenzie Construction and Site Development, LLC Lump Sum $326,009.97 Steve Manning Construction Inc Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $94,000.00
14 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1060 15501-0000 CONSTRUCTION SCHEDULE
West Point Contractors, Inc. Lump Sum $5,000.00 McKenzie Construction and Site Development, LLC Lump Sum $11,489.28 Steve Manning Construction Inc Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
X1070 15701-0000 SOIL EROSION CONTROL
West Point Contractors, Inc. Lump Sum $20,000.00 McKenzie Construction and Site Development, LLC Lump Sum $29,826.19 Steve Manning Construction Inc Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
X1080 15802-0000 WATERING FOR DUST CONTROL
West Point Contractors, Inc. Lump Sum $40,000.00 McKenzie Construction and Site Development, LLC Lump Sum $109,148.25 Steve Manning Construction Inc Lump Sum $101,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
X1090 20101-0000 CLEARING AND GRUBBING
West Point Contractors, Inc. $12,183.91 $46,298.86 McKenzie Construction and Site Development, LLC $13,787.14 $52,391.13 Steve Manning Construction Inc $24,000.00 $91,200.00 Engineer's Estimate 3.8 ACRE $7,500.00 $28,500.00
X1100 20220-1000 REMOVAL, INDIVIDUAL TREE
West Point Contractors, Inc. $2,000.00 $10,000.00 McKenzie Construction and Site Development, LLC $689.35 $3,446.75 Steve Manning Construction Inc $7,500.00 $37,500.00 Engineer's Estimate 5 EACH $1,000.00 $5,000.00
X1110 20301-1900 REMOVAL OF PIPE CULVERT
West Point Contractors, Inc. $714.29 $1,428.58 McKenzie Construction and Site Development, LLC $1,723.39 $3,446.78 Steve Manning Construction Inc $3,200.00 $6,400.00 Engineer's Estimate 2 EACH $2,500.00 $5,000.00
15 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1120 20301-2000 REMOVAL OF PIPE END SECTION
West Point Contractors, Inc. $333.33 $1,333.32 McKenzie Construction and Site Development, LLC $1,148.92 $4,595.68 Steve Manning Construction Inc $800.00 $3,200.00 Engineer's Estimate 4 EACH $1,000.00 $4,000.00
X1130 20301-2300 REMOVAL OF SIGN/MARKER
West Point Contractors, Inc. $100.00 $700.00 McKenzie Construction and Site Development, LLC $2,297.85 $16,084.95 Steve Manning Construction Inc $200.00 $1,400.00 Engineer's Estimate 7 EACH $190.00 $1,330.00
X1140 20420-0000 EMBANKMENT CONSTRUCTION
West Point Contractors, Inc. $50.00 $671,000.00 McKenzie Construction and Site Development, LLC $85.02 $1,140,968.40 Steve Manning Construction Inc $148.00 $1,986,160.00 Engineer's Estimate 13,420 CUYD $70.00 $939,400.00
X1150 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
West Point Contractors, Inc. $431.04 $10,776.00 McKenzie Construction and Site Development, LLC $358.46 $8,961.50 Steve Manning Construction Inc $418.00 $10,450.00 Engineer's Estimate 25 CUYD $325.00 $8,125.00
X1160 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
West Point Contractors, Inc. $431.04 $40,948.80 McKenzie Construction and Site Development, LLC $384.89 $36,564.55 Steve Manning Construction Inc $418.00 $39,710.00 Engineer's Estimate 95 CUYD $170.00 $16,150.00
X1170 30101-0000 AGGREGATE BASE
West Point Contractors, Inc. $75.45 $356,878.50 McKenzie Construction and Site Development, LLC $71.80 $339,614.00 Steve Manning Construction Inc $97.00 $458,810.00 Engineer's Estimate 4,730 TON $65.00 $307,450.00
16 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1190 30302-1000 DITCH RECONDITIONING
West Point Contractors, Inc. $81.82 $9,000.20 McKenzie Construction and Site Development, LLC $34.46 $3,790.60 Steve Manning Construction Inc $50.00 $5,500.00 Engineer's Estimate 110 LNFT $45.00 $4,950.00
X1200 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
West Point Contractors, Inc. $319.59 $527,323.50 McKenzie Construction and Site Development, LLC $296.42 $489,093.00 Steve Manning Construction Inc $260.00 $429,000.00 Engineer's Estimate 1,650 TON $220.00 $363,000.00
X1220 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
West Point Contractors, Inc. $175.26 $2,979.42 McKenzie Construction and Site Development, LLC $919.14 $15,625.38 Steve Manning Construction Inc $700.00 $11,900.00 Engineer's Estimate 17 TON $500.00 $8,500.00
X1240 40601-0000 FOG SEAL
West Point Contractors, Inc. $1,461.54 $4,384.62 McKenzie Construction and Site Development, LLC $3,446.78 $10,340.34 Steve Manning Construction Inc $1,900.00 $5,700.00 Engineer's Estimate 3 TON $1,230.00 $3,690.00
X1250 41102-1000 PRIME COAT, METHOD 1
West Point Contractors, Inc. $0.29 $2,856.50 McKenzie Construction and Site Development, LLC $2.29 $22,556.50 Steve Manning Construction Inc $1.50 $14,775.00 Engineer's Estimate 9,850 SQYD $2.50 $24,625.00
X1260 41105-0000 BLOTTER
West Point Contractors, Inc. $367.82 $4,781.66 McKenzie Construction and Site Development, LLC $114.89 $1,493.57 Steve Manning Construction Inc $135.00 $1,755.00 Engineer's Estimate 13 TON $120.00 $1,560.00
17 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1270 41201-0000 TACK COAT
West Point Contractors, Inc. $730.77 $3,653.85 McKenzie Construction and Site Development, LLC $3,446.78 $17,233.90 Steve Manning Construction Inc $1,900.00 $9,500.00 Engineer's Estimate 5 TON $1,770.00 $8,850.00
X1280 60201-0800 24-INCH PIPE CULVERT
West Point Contractors, Inc. $250.00 $35,000.00 McKenzie Construction and Site Development, LLC $416.48 $58,307.20 Steve Manning Construction Inc $580.00 $81,200.00 Engineer's Estimate 140 LNFT $320.00 $44,800.00
X1290 60201-1200 48-INCH PIPE CULVERT
West Point Contractors, Inc. $300.00 $30,000.00 McKenzie Construction and Site Development, LLC $666.37 $66,637.00 Steve Manning Construction Inc $900.00 $90,000.00 Engineer's Estimate 100 LNFT $600.00 $60,000.00
X1300 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
West Point Contractors, Inc. $1,500.00 $3,000.00 McKenzie Construction and Site Development, LLC $1,968.11 $3,936.22 Steve Manning Construction Inc $1,800.00 $3,600.00 Engineer's Estimate 2 EACH $1,320.00 $2,640.00
X1310 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT
West Point Contractors, Inc. $1,500.00 $3,000.00 McKenzie Construction and Site Development, LLC $11,075.67 $22,151.34 Steve Manning Construction Inc $3,800.00 $7,600.00 Engineer's Estimate 2 EACH $4,300.00 $8,600.00
X1320 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
West Point Contractors, Inc. $300.00 $3,000.00 McKenzie Construction and Site Development, LLC $459.57 $4,595.70 Steve Manning Construction Inc $210.00 $2,100.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00
18 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1330 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
West Point Contractors, Inc. $220.00 $2,200.00 McKenzie Construction and Site Development, LLC $413.61 $4,136.10 Steve Manning Construction Inc $250.00 $2,500.00 Engineer's Estimate 10 HOUR $180.00 $1,800.00
X1340 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
West Point Contractors, Inc. $400.00 $4,000.00 McKenzie Construction and Site Development, LLC $574.46 $5,744.60 Steve Manning Construction Inc $310.00 $3,100.00 Engineer's Estimate 10 HOUR $240.00 $2,400.00
X1350 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
West Point Contractors, Inc. $500.00 $5,000.00 McKenzie Construction and Site Development, LLC $517.02 $5,170.20 Steve Manning Construction Inc $270.00 $2,700.00 Engineer's Estimate 10 HOUR $250.00 $2,500.00
X1360 62301-0000 GENERAL LABOR
West Point Contractors, Inc. $150.00 $1,500.00 McKenzie Construction and Site Development, LLC $287.23 $2,872.30 Steve Manning Construction Inc $110.00 $1,100.00 Engineer's Estimate 10 HOUR $70.00 $700.00
X1370 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
West Point Contractors, Inc. $200.00 $4,000.00 McKenzie Construction and Site Development, LLC $172.33 $3,446.60 Steve Manning Construction Inc $320.00 $6,400.00 Engineer's Estimate 20 HOUR $225.00 $4,500.00
X1380 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
West Point Contractors, Inc. $200.00 $4,000.00 McKenzie Construction and Site Development, LLC $344.67 $6,893.40 Steve Manning Construction Inc $400.00 $8,000.00 Engineer's Estimate 20 HOUR $260.00 $5,200.00
19 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1390 62405-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH
West Point Contractors, Inc. $1.20 $12,924.00 McKenzie Construction and Site Development, LLC $6.43 $69,251.10 Steve Manning Construction Inc $6.40 $68,928.00 Engineer's Estimate 10,770 SQYD $4.00 $43,080.00
X1400 62510-1000 SEEDING, DRY METHOD
West Point Contractors, Inc. $9,000.00 $25,200.00 McKenzie Construction and Site Development, LLC $1,269.56 $3,554.77 Steve Manning Construction Inc $900.00 $2,520.00 Engineer's Estimate 2.8 ACRE $2,000.00 $5,600.00
X1410 62515-1000 MULCHING, DRY METHOD
West Point Contractors, Inc. $30,272.73 $84,763.64 McKenzie Construction and Site Development, LLC $2,228.92 $6,240.98 Steve Manning Construction Inc $1,700.00 $4,760.00 Engineer's Estimate 2.8 ACRE $3,125.00 $8,750.00
X1420 62901-0700 ROLLED EROSION CONTROL PRODUCT, TYPE 2.C
West Point Contractors, Inc. $36.15 $20,967.00 McKenzie Construction and Site Development, LLC $4.76 $2,760.80 Steve Manning Construction Inc $5.00 $2,900.00 Engineer's Estimate 580 SQYD $7.00 $4,060.00
X1430 62901-1200 ROLLED EROSION CONTROL PRODUCT, TYPE 5.A
West Point Contractors, Inc. $36.15 $75,915.00 McKenzie Construction and Site Development, LLC $8.15 $17,115.00 Steve Manning Construction Inc $7.00 $14,700.00 Engineer's Estimate 2,100 SQYD $10.00 $21,000.00
X1440 63301-0000 SIGN SYSTEM
West Point Contractors, Inc. $677.78 $5,422.24 McKenzie Construction and Site Development, LLC $2,010.62 $16,084.96 Steve Manning Construction Inc $1,200.00 $9,600.00 Engineer's Estimate 8 EACH $700.00 $5,600.00
20 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1450 63308-0000 OBJECT MARKER
West Point Contractors, Inc. $46.16 $184.64 McKenzie Construction and Site Development, LLC $109.14 $436.56 Steve Manning Construction Inc $180.00 $720.00 Engineer's Estimate 4 EACH $300.00 $1,200.00
X1460 63309-0000 DELINEATOR
West Point Contractors, Inc. $33.33 $899.91 McKenzie Construction and Site Development, LLC $86.16 $2,326.32 Steve Manning Construction Inc $180.00 $4,860.00 Engineer's Estimate 27 EACH $140.00 $3,780.00
X1470 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
West Point Contractors, Inc. $0.17 $1,538.50 McKenzie Construction and Site Development, LLC $2.29 $20,724.50 Steve Manning Construction Inc $0.40 $3,620.00 Engineer's Estimate 9,050 LNFT $1.30 $11,765.00
X1480 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
West Point Contractors, Inc. $0.17 $1,564.00 McKenzie Construction and Site Development, LLC $2.29 $21,068.00 Steve Manning Construction Inc $0.40 $3,680.00 Engineer's Estimate 9,200 LNFT $1.30 $11,960.00
X1490 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
West Point Contractors, Inc. $150.00 $900.00 McKenzie Construction and Site Development, LLC $574.46 $3,446.76 Steve Manning Construction Inc $650.00 $3,900.00 Engineer's Estimate 6 EACH $500.00 $3,000.00
X1500 63501-0000 TEMPORARY TRAFFIC CONTROL
West Point Contractors, Inc. Lump Sum $50,000.00 McKenzie Construction and Site Development, LLC Lump Sum $95,131.31 Steve Manning Construction Inc Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $142,000.00
21 out of 21
Project No: NM FTBL 2004(2)
Project Name: Wild Rivers Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1510 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (Protective fence)
West Point Contractors, Inc. $90.91 $21,818.40 McKenzie Construction and Site Development, LLC $11.48 $2,755.20 Steve Manning Construction Inc $10.00 $2,400.00 Engineer's Estimate 240 LNFT $10.00 $2,400.00
Total Schedule - All Items
West Point Contractors, Inc. $2,438,262.98 McKenzie Construction and Site Development, LLC $3,747,800.77 Steve Manning Construction Inc $4,356,448.00 Engineer's Estimate $2,734,407.50
| 2025-05-14T16:35:04-0600 | |
| LESLIE N KARSTEN |
File details come from the government source that posted it. Updated .