Plans - MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3).pdf

PDF 33 MB Posted

Attached to
Ozark National Scenic Riverways Federal contract opportunity
Solicitation number
693C73-21-B-000002
Issued by
Department of Transportation Federal Highway Administration

About this file

This solicitation seeks sealed bids for construction projects at the Ozark National Scenic Riverways located in Shannon, Carter, and Dent Counties, Missouri. The work includes replacement of two pedestrian bridges, reconstruction of various sites, asphalt paving, drainage improvements, trail repair, and parking lot reconstruction. The project will be split into multiple schedules with a total expected cost between $1,000,000 to $5,000,000. Bids are due on a date specified in the solicitation to be issued on or about October 15, 2020. The solicitation is set aside for certified small business concerns and is issued by the Department of Transportation Federal Highway Administration. Bidders must register in the System for Award Management database and complete annual Representations and Certifications in order to receive payment if awarded the contract.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R01

-J u n -2

:4

P

M M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n th

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

GENERAL NOTES AND INDEX

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

G

N .D

G N

Dead Load:

Concrete: 150 pcf

DESIGN LOADS:

Provide 2-inch cover for reinforcing steel unless otherwise noted.

Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.

Reinforcing Steel:

No Scale

Concrete:

- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete

Furnish Class A concrete for drilled shafts conforming to Section 552 with f'c = 6 ksi at 28 days.

Furnish Class A(AE) concrete for abutments and piers with f'c = 4.5 ksi at 28 days.

MATERIALS:

Pedestrian live load: 90 psf

Live Loads:

INDEX OF BRIDGE PLAN SHEETS

Boring Log

Pier Column Bar List

Pier Bar List

Wingwall Bar List

Abutment Bar List

Miscellaneous Details

Typical Section

Pier Drilled Shaft Details

Pier Details

Pier Layout

Abutment Drilled Shaft Details

Abutment Details

Abutment Layout

Foundation Layout

Plan and Elevation

Site Plan

General Notes and Index

SHEET NO. SHEET TITLE

Install decking according to Section 557.

Submit composite decking samples to the CO for approval prior to construction.

Furnish boards with a flat, non-grooved texture at the bottom face.

Composite Timber Decking:

The contractor is responsible for the stability of the structure during all phases of construction.

Galvanize all fasteners according to AASHTO M 232.

Galvanize all structural steel according to AASHTO M 111.

Structural Steel:

Apply Natina color treatment to all structural steel and all exposed faces of fasteners per manufacturer's recommendations.

Steel Color Treatment:

GENERAL NOTES:

Design:

Architectural Barriers Act (ABA) Standards, 2015.

ADA Standards for Accessible Design, 2010.

LRFD Guide Specifications for the Design of Pedestrian Bridges, 2009 with 2015 Revisions.

AASHTO LRFD Bridge Design Specifications, 8 Edition, 2017.

SPECIFICATIONS:

Field verify all dimensions.

removal prior to constructing the proposed drilled shaft foundations.

grade. The remaining portion of the concrete stub abutments and the H-pile foundation may require completely removed. The existing abutments have been removed to approximately two feet below

The existing pedestrian bridge superstructure, piers, pier footings and pier piles have been

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Construction:

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

JACKS FORK PEDESTRIAN BRIDGE

June 2020

R02

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

" = 1'-0"16

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

S I T

E P

L A

N .D

G N

SITE PLAN

100+00 101+00 102+00 103+00 104+00

Begin Bridge

Elev. 678.62

Sta. 104+69.15

End Bridge

C Pier 1CL C Pier 2CL C Pier 3CL

CLC Structure

Elev. 681.67

Sta. 100+19.23

NBridge length: 447'-9"

Existing roadway bridge

J a c k s F o r k

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

JACKS FORK PEDESTRIAN BRIDGE

June 2020

R03

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

" = 1'-0"16

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

P

E .D

G N

PLAN AND ELEVATION

0%0%0%

63'-0"131'-8"121'-5"131'-8"

4.75%

Existing roadway bridge C MO Route 106CL

Begin Bridge

Elev. 681.67

Sta. 100+19.23

Pier 1

Elev. 681.67

Sta. 101+51.98

Pier 2

Elev. 681.67

Sta. 102+73.40

Pier 3

Elev. 681.67

Sta. 104+05.10

End Bridge

Elev. 678.62

Sta. 104+69.15

PLAN

ELEVATION

N

OHWL: 662.27

Fix FixFix Exp.Fix Exp.Exp.

Exp.

CLC Structure

Bridge length: 447'-9"

Notes:

information on existing abutments.

as-built drawings and Bridge Inspection Report for prior to constructing abutment drilled shaft foundations. See abutments and their pile foundations will require removal

24" below ground surface. The remaining part of the

The existing abutments have been removed to approximately 1.

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R04

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

F

L .D

G N

Begin Bridge Pier 1 Pier 2 Pier 3 End Bridge

Sta. 101+51.98Sta. 100+19.23 Sta. 102+73.40 Sta. 104+05.10 Sta. 104+69.15

2'-1" 2'-1"

C Pier 1CL

C Pier 2CL C Pier 3CL

1'-0" 2'-2" 1'-0"2'-2"

1'-7"1'-7"

CLC Abutment 1 cap

1'-7"1'-7"

CLC Abutment 2 cap

FOUNDATION LAYOUT

PLAN

2'-1"2'-1"

2'-1"2'-1"

1" = 1'-0"

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R05

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

Notes:

-J u n -2

:4

P

M

4'-0" 4'-3" 4'-0"4'-3"

8'-6"

"3

ELEVATION

CLSymm. about C abutment

CLSymm. about C structure

1"

" = 1'-0"4

SECTION A-A

PLAN

A

A

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T L

A Y

O U

T .D

G N

Elev. A

Elev. C

L im it o f d r il le d s h a ft

L im it o f

C la s s A C o n c r e te

Elev.

681.67 678.72

679.52 676.57

676.52 673.57

A

B

C

Abut. 1 Abut. 2

Elev. B

ABUTMENT LAYOUT

Match profile slope

4" Ø Weephole (Typ.)

(Typ.)

2'-6"

Elev. A

OF BACKWALL

AT FRONT FACE

ELEVATIONS

3'-0"

(Typ.)

4'-0"

T y p

T y p

N o te

S e e six inches above grade.

Adjust weephole location as needed for the outlet to be least 3.

reinforcing steel.

needed to avoid conflicts between the weephole and the

Slightly adjust weephole and reinforcing steel locations as 2.

between elevations B and C.

bridge structure shop drawing. Do not modify the difference

Adjust elevations as needed to accommodate the approved 1.

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R06

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

Notes:

-J u n -2

:4

P

M

ELEVATION

CLSymm. about C structure

" = 1'-0"4

A

A

SECTION A-A

B

B

SECTION B-B

PLAN

3"

W

S p a

S p a

S p a

A e .f

4"

#7A1 (Top), #7A2 (Bot.)

5 Spa. @ 6" = 2'-6"

W

6"

Symm. about C abutmentCL

3"

#6A3

7 Spa. @ 6" = 3'-6" e m b e d

" #5W5 (varies)

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T D

E T

A I L S .D

G N profile.

reinforcement locations as needed to accommodate sloped

Backwall section shown with zero profile slope. Adjust 1.

Match profile slope Level

Min. lap

2'-0"

ABUTMENT DETAILS

#6AE3

#5W5 (varies)

" = 3'-6"2 14 Spa. @ 10

#5A4

4 Spa. @ 1'-0" = 4'-0"

#5A6

#7A2 #7A1

#5A5

#5W3

#5W2

#5W4

#5A6 e .f

A

#5A5 #5A4

#5W2

#5W3

#5W4

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R07

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

Notes:

-J u n -2

:4

P

M

ELEVATION

#10S1

2 - #10S1

10 sets of paired

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T D

R I L L E

D S

H A

F T .D

G N

Top of Drilled Shaft

Abut 2: Elev. 676.52

Abut 1: Elev. 676.52

Top of Bedrock

ABUTMENT DRILLED SHAFT

SECTION

3'-0"

" = 1'-0"1 e m b e d tube (Typ.)

logging (CSL)

Crosshole sonic

Abut 2: Elev. 635

Abut 1: Elev. 635

#4S2 (#4 Spiral, 6" pitch)

#4S2 (#4 Spiral, 6" pitch) bedrock.

Socket 3 foot diameter drilled shaft a minimum of 15 feet into 2.

casing.

Construct the drilled shafts without the use of a permanent 1.

Estimated Bottom of Drilled Shaft (See Note 2.)

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R08

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

PIER LAYOUT

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

Notes:

-J u n -2

:4

P

M

4'-3"4'-3"

8'-6"

CL

CL

4'-2"

PLAN

ELEVATION SIDE VIEW

ELEVATION TABLE

Elev. Pier 1 Pier 2 Pier 3

1"

4'-0"

Symm. about C Structure

Symm. about C Pier

1" = 1'-0"

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

P I E

R L

A Y

O U

T .D

G N

CLSymm. about C Pier

Elev. D

Elev. E

679.52 679.52679.52

676.52 676.52676.52

D

E between elevations D and E.

bridge structure shop drawing. Do not modify the difference

Adjust elevations as needed to accommodate the approved 1.

657.00 669.00657.00F

Approx. ground line

2'-0" (Typ.)

3" (Typ.)

L im it o f d r il le d s h a ft

L im it o f

C la s s A C o n c r e te

Elev. F

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R09

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

PIER DETAILS

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

P I E

R D

E T

A I L S .D

G N

CL

CL

PLAN

ELEVATION

Symm. about C Structure

Symm. about C Pier

1" = 1'-0"

4"

6" 6"6"

#5P10

#7P2 e.f.

#7P2 e.f.

#7P3 e.f.

#5P10

SECTION A-A

A

A 4"6"= 1'-6"

3 Spa. @ 6" = 1'-6"

3 Spa. @ 6"

2'-3"

4'-0"

2 - #10C1

16 sets of paired

SECTION B-B

e m b e d

BB B B

L im it o f d r il le d s h a ft

L im it o f

C la s s A C o n c r e te

(paired)

#5P5-#5P8 #5P9 (paired)

7 Spa. @ 6" = 3'-6"

(paired)

#5P8-#5P5

#7P2

#7P1

#7P4

#7P3

#10C1 (paired)

#7P1 (Top), #7P4 (Bot.)

7 Spa. @ 6" = 3'-6" similar)

#5P8

(#5P5 -

#5P9

#6C2

#6C2 (#6 Spiral, 3" pitch)

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R10

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

Notes:

-J u n -2

:4

P

M

ELEVATION

1" = 1'-0"

4'-0"

2 - #10S1

16 sets of paired

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

P I E

R D

R I L L E

D S

H A

F T .D

G N

Top of Drilled Shaft

Top of Bedrock

Pier 3: Elev. 669

Pier 2: Elev. 657

Pier 1: Elev. 657

PIER DRILLED SHAFTS

Approx. ground line tube (Typ.)

logging (CSL)

Crosshole sonic

Pier 3: Elev. 630

Pier 2: Elev. 630

Pier 1: Elev. 630

AA

SECTION A-A

S e e N o te

L a p w it h c o lu m n r e in fo r c e m e n t

#10S1 (paired)

Estimated Bottom of Drilled Shaft (See Note 4.)

#6S2

#6S2 (#6 Spiral, 3" pitch) bedrock.

Socket 4 foot diameter drilled shaft a minimum of 20 feet into 4.

Minimum splice length is 4'-6".

each bundle separately at least 4'-6" from each other.

with the pier column reinforcement. Splice individual bars of

Provide column reinforcement either continuous or lap spliced 3.

splice is 72 bar diameters.

splice with pier column spiral reinforcement. Minimum lap

Continue spiral reinforcement into pier column, and lap or 2.

casing.

Construct the drilled shafts without the use of a permanent 1.

See Note 2

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R11

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

Notes:

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

T

Y P X

S .D

G N

TYPICAL SECTION

6'-0"

Top chord

Bottom chord

Floorbeam

Stringer

ADA-compliant handrail (Typ.)

Composite timber toe kick (Typ.)

Diagonal bracing s a m e f o r a ll s p a n s

T r u s s d e p th

(See Note 3) timber deck plank

2 x 6 Composite See Note 3

Max. spacing

"X"-pattern (Typ.)

Diagonal truss member, m a x

Not to Scale

Steel vertical picket (Typ.)

See "MISCELLANEOUS DETAILS" sheet for additional details.5.

Natina steel color treatment on all structural steel.

Furnish galvanized steel conforming to Section 717. Apply 4.

specifications.

557. Install decking according to manufacturer's

Furnish composite timber deck planks according to Section 3.

of trusses to the CO for approval.

Submit design calculations and details for erection sequence 2.

railing to the CO for approval.

trusses, decking, bearing devices, expansion joints, and

Submit design calculaions and detailed shop drawings for 1.

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R12

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

M

I S

C D

E T

A I L S .D

G N

MISCELLANEOUS DETAILS

bolt (Typ.)

" Ø Anchor 2 bolt (Typ.)

" Ø Anchor 2 m in m in

BEARING ELEVATION

AT ABUTMENT AT PIER

Not to Scale

AT ABUTMENT AT PIER

EXPANSION JOINT ELEVATION

spaced at 9"

" Countersunk screws 4

5"

" Steel plate4 spaced at 9"

" Countersunk screws 4

5" spaced at 1'-0"

" Ø x 6" Stud 2

1X2

1L6X3

3"3"

Notes:

TEMPERATURE SETTING TABLE

Temp. (°F) Abut. 1 Pier 1 Pier 2 Pier 3 Abut 2

Dimension "A"

0 "4 32 "8

See Note 3

" Steel plate4

20 "2 12 "4

40 "4 12 "8

80 "4

"2 11100

2"

2"

2"

2"

2"

2"

1"

"8

"4

2"

"4

"2

"4

"4

"2

2"

10"10"

"4

"2

"4

1"

"4

"2 inch.4 1exceed

Change in level due to expansion joint plate cover must not 3.

approval.

Submit detail and design of the bearing to the CO for 2.

The sketch of the truss bearing is for illustration only.1.

A A

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R13

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T B

A R L I S

T .D

G N

ABUTMENT BAR LIST

Not to Scale

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

JACKS FORK PEDESTRIAN BRIDGE

REINFORCING STEEL SCHEDULE DIMENSION TABLE

BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R

ABUTMENT BAR CHART

V or N

2 5…"#7A1 7

STR#7A2 7

T2 4•"#6A3 6

STR#5A4 5

STR#5A5 5

17 3ƒ"#5A6 5

B

STR

TYPE 2

A G

B

B

C

D

OPTIONAL LEG

TYPE 17

A

G B

EC

D

TYPE T2

LBSSUBTOTAL

R14

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

W

I N

G W

A L L B

A R L I S

T .D

G N

WINGWALL BAR LIST

Not to Scale

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

JACKS FORK PEDESTRIAN BRIDGE

WINGWALL BAR LIST

V or N

STR#5W1 5

STR#5W2 5

STR#5W3 5

52 3ƒ"#5W4 5

STR#5W5 5

B

STR

D

C

B

A

TYPE 52

R15

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

P I E

R B

A R L I S

T .D

G N

PIER CAP BAR LIST

Not to Scale

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

JACKS FORK PEDESTRIAN BRIDGE

PIER CAP BAR LIST

V or N

2 5…"#7P1 7

STR#7P2 7

STR#7P3 7

247 5…"#7P4 7

T2 2•"#5P5 5

T2 2•"#5P6 5

T2 2•"#5P7 5

T2 2•"#5P8 5

T2 2•"#5P9 5

17 3ƒ"#5P10 5

B

STR

TYPE 2

A G

B

B

C

D

OPTIONAL LEG

TYPE 17

A

G B

EC

D

TYPE T2

A

E G

B

D F

C

R16

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

C

O L

U M

N B

A R L I S

T .D

G N

PIER COLUMN BAR LIST

Not to Scale

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

PIER 1 COLUMN BAR LIST

V or N

STR#10C1 10

PIER 2 COLUMN BAR LIST

V or N

STR#10C1 10

PIER 3 COLUMN BAR LIST

V or N

STR#10C1 10

LBSSUBTOTAL

B

STR

TYPE 77

C

A

B

E = Total Turns

D = Extra Turns (half t&b)#6C2

#6C2

#6C2

R17

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

PLAN

ELEVATION

N

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

B

O R I N

G L

O G .D

G N

BH 19-01

BH 19-03

BH 19-02

As Shown

Not to Scale

19 1.3

9 0.7

5 0.7

6 1.4

14 1.3

20 1.5

14 1.1

15 0.9

15 0.7

13 0.8

34.4

64.8

1.7

0.95

2.3

2.8

2.7

1.95

18.8 19.1

24.1

29.1

34.1

39.1

Rec.N

Rec.N

15 0.1

6 0.7

9 0.9

24 1.1

8 0.9

38 0.9 0.1

0.1

4.15

3.45

4.6

Scale: 1:20

34.1

N Rec.

0.77

1.09

0.14

1.416

0.813

0.913

0.711

0.921

0.225

34.3

44.3

49.3

54.3

39.3

3.8

0.3

0.1

1.0

5.0

0.922

BH 19-01

BH 19-03

BH 19-02

RQD

RQD

RQD

LEGEND

N

Groundwater depth encountered during drilling.

Rec.

Rock Quality Designation (%)

Recovery (ft)

RQD

Standard Penetration Test

Resistance in Blows per Foot FILL GM SP LIMESTONE SW

THE BORING LOGS ON THIS SHEET REPRESENT THE SUBSURFACE CONDITIONS ENCOUNTERED

AT THE BORING LOCATIONS SHOWN. SUBSURFACE CONDITIONS MAY VARY BETWEEN THESE LOCATIONS.

50/4"

50/2"

50/3"

50/1"

Depth (ft)

Depth (ft)

Depth (ft)

BORING LOG

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC CV

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

Structure Number 6640-003T

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

JACKS FORK PEDESTRIAN BRIDGE

June 2020

R18

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

GENERAL NOTES AND INDEX

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

G

N .D

G N th

Field verify all dimensions.

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Construction:

Dead Load:

Concrete: 150 pcf

DESIGN LOADS:

Provide 2-inch cover for reinforcing steel unless otherwise noted.

Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.

Reinforcing Steel:

No Scale

Pedestrian live load: 90 psf

Live Loads:

Concrete:

- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete

Furnish Class A(AE) concrete with f'c = 4.5 ksi at 28 days.

MATERIALS:

All timber dimensions are nominal.

Lumber.

Bridge Design Specifications, Table 8.4.1.1.4-1 - Reference Design Values for Visually Graded Sawn

Furnish S4S Southern Yellow Pine No. 1 or better that conforms to the design values from AASHTO LRFD compounds. Obtain all timber from a single approved source.

timber. Use a waterborne copper-based solution that does not contain arsenic and/or chromium

Pressure treat all timber in accordance with the latest AWPA Standard U1. Furnish use category UC3B

Timber:

GENERAL NOTES:

Design:

Architectural Barriers Act (ABA) Standards, 2015.

ADA Standards for Accessible Design, 2010.

National Design Specifications for Wood Construction, American Wood Council, 2018.

LRFD Guide Specifications for the Design of Pedestrian Bridges, 2009 with 2015 revisions.

AASHTO LRFD Bridge Design Specifications, 8 Edition, 2018.

SPECIFICATIONS:

Fillet welds - Visual - 100%

Perform non-destructive testing of welds as follows:

shielded manual arc welding (SMAW) using low hydrogen electrodes classified E7028.

Perform all welding in accordance with the current AASHTO/AWS D1.5 Bridge Welding Code. Perform

Welding:

Furnish Type 304 or 316 stainless steel for all timber bolts and fasteners.

Galvanize bolts for girder to diaphragm connections and anchor bolts according to AASHTO M232.

Touch up paint on site as specified by the manufacturer.

Furnish the top coat with gloss finish to match Federal Standard 595C, Color No. 20059 (brown).

Provide a 3 coat, Type 2 paint system on all structural steel. Paint structural steel at the fabrication shop.

Furnish AASHTO M270, Grade 50 steel for all structural steel shapes.

Structural Steel:

INDEX OF BRIDGE PLAN SHEETS

Reinforcing Bar List - 1

Boring Subsurface Profile

Boring Location Plan

Rail Details-2

Rail Details-1

Bearing Details

Beam Details

Framing Plan

Typical Section

Abutment 2 Reinforcement

Abutment 2 Plan and Elevation

Abutment 1 Reinforcement - 2

Abutment 1 Reinforcement - 1

Abutment 1 Plan and Elevation

Foundation Layout

Plan and Elevation

General Notes and Index

SHEET NO. SHEET TITLE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

ALLEY SPRING TRAIL FOOT BRIDGE

R19

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

Begin Bridge

Elev. 674.31

Sta. 100+99.00

101+00

2.00%

OHWL = 667.5

(to remain)

Existing abutment with log fascia

Steel girder line existing ground

Approximate

L StructureC

PLAN AND ELEVATION

Elev. 673.03

Sta. 100+35

5.00%

PLAN

No Scale

N

End Bridge

ELEVATION

A

L L E

Y B

R A

N C

H

FIX

EXP.

grade profile

Proposed

(to remain)

Existing pier

C lr

M in

Proposed ground line

5.00%

64'-0"

T y p a n d r a il

C u r b

W a lk w a y

P e d e s tr ia n

Proposed ground line

Elev. 670.86

Low chord

Edge of water line Edge of water line

62'-6" Span

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

P

E R

E V I S

E D R

A I L S

H P

O .D

G

N NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

ALLEY SPRING TRAIL FOOT BRIDGE

S83°53'39"E

R20

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

101+00

L StructureC

FOUNDATION LAYOUT

" = 1'-0''2

B e g in B r id g e

E n d B r id g e"

"8 11'-9

'-7

"8

'-9

"8 11'-9

'-0

N

4'-0"

S ta

Limits of footing

FOOTING PLAN

Limits of footing

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

F

L .D

G N

S ta

3'-0" 3'-0"

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R21

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T P

E .D

G N

ABUTMENT 1 PLAN AND ELEVATION

PLAN

ELEVATION

6'-11"

(Typ.)

6'-11"

Elev. 670.56

8'-11"

7'-9"

" = 1'-0"2 1Scale:

" = 1'-0"2 1Scale:

" = 1'-0"4 3Scale:

2'-0"

SECTION A-A

3'-0" 3'-0" 2'-0"

1'-0"

2'-0"

V a r ie s

" = 1'-0"4 3Scale:

SECTION B-B

As Shown

A

A

B

B

A

A

Footing

Backwall (Typ.)

Wingwall

Beam seat

Wingwall

Footing seat

Beam

Footing

Backwall Elev. 673.03

Wingwall

Elev. 672.50

Wingwall

Beam seat

Elev. 664.00

Top of footing

(T y p

1'-0" 1'-3"

C BearingL

Elev. 672.45

Cheekwall

Wingwall AWingwall B seat

Beam

(Typ.)

Cheekwall

1'-0"

8'-0"

5'-0"

S to n e

N o

2'-0"

Stone

No. 57

1'-0"

Stone

No. 57

1'-0"

Top of backwall

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R22

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

PLAN

S p a '-0

'-0

6 Spa. 1'-0" = 6'-0" "2

S p a

6 Spa. @ 1'-0" = 6'-0"

S p a

S p a

S p a

S p a

" = 1'-0"4

6 Spa. @ 1'-0" = 6'-0" "2 1 3

#5A2, #5A3 (f.f.), 5A4 (n.f)

#5A1, 5A5 (n.f)

"2

#5A6 (Typ.)

#5A1

#5A7

#5A2

A e .f

A f.

f.

#5A4 f.f. n.f.

n.f.

#5A6

#5A3

"2

A (e .f.) #

A e .f

1'-3"

(min. lap)

(Typ.)

#5A2

(Typ.)

(Typ.)

#5A9 (Typ.)

#5A4

(Typ.)

#5A5

#5A9 (e.f.)

A e .f

A

A

SECTION A-A

A

A

B

B

A

A

A

A

B

B

#5A9 (e.f.)

A e .f

#5A1

"2 1 3

ELEVATION

(Typ.)

#5A2 (Typ.)

#5A3

(Typ.)

#5A5

#5A7

#5A6

SECTION B-B

#5A9 e .f

A

A e .f

1'-0"

(Typ.)

"2 11'-

ABUTMENT 1 REINFORCEMENT - 1

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T R

E I N

F .D

G N

T y p

T y p

#5A1,#5A2,#5A3 (f.f.),5A4 (n.f.),#5A5 (n.f.)

S p a

A f.

f.

A T y p

"4 39 "4

#5A5

#5A1

#5A5

#5A1

(Typ.)

#5A3 (f.f.)

5A4 (n.f)

(Typ.)

(Typ.)

#5A1

#5A11

#5A10 (e.f.)

(Typ.)

#5A3

(Typ.)

#5A11

#5A7

(Typ.)

#5A1

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R23

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

" = 1'-0"4

B

B

A

A

A

A

S p a '-0

'-0

S p a

2" 2"6 Spa. @ 1'-0" = 6'-0"

S p a '-0

'-0

S p a

4 Spa. @ 1'-0" = 4'-0"

5 Spa. @ 1'-0" = 5'-0"

ELEVATION

1'-0" 1'-0" 4"4"

(Top & Bott.)

#5A14

(Typ.)

(Top & Bott.)

#5A13

A

T o p B o tt

4"1'-0" 1'-0"

#5A15 (Top & Bott.)

#5A14

(Top & Bott.)

4"4"

#5A16 (Top & Bott.)

#5A17

A (T o p B o tt.)

A T o p B o tt

(Typ.)

(Top & Bott.)

#5A16

(Typ.)

(Top & Bott.)

#5A16

A (T o p B o tt.)

A T o p B o tt

PLAN

SECTION A-A

SECTION B-B

#5A16 (Top & Bott.) #5A16 (Top & Bott.) #5A16 (Top & Bott.)

(Top & Bott.)

#5A13 (Top & Bott.)

#5A13

#5A9 (e.f.) #5A3 (e.f.) #5A9 (e.f.)

#5A5 (f.f.)

#5A9

#5A9

ABUTMENT 1 REINFORCEMENT - 2

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T R

E I N

F .D

G N

4"

#5A12 or #5A13

#5A12 (Top & Bott.)

#5A16

(Top & Bott.)

(Typ.)

#5A11

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R24

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T P

E .D

G N

ABUTMENT 2 PLAN AND ELVATION

PLAN

6'-11"

8'-11"

6'-0"

3'-0" 3'-0"

ELEVATION

8'-11"

1'-0" 6'-11" 1'-0"

Elev. 673.73Elev. 673.73

Elev. 671.82

Elev. 668.46

Elev. 666.46

" = 1'-0''4

Beam seat A

A

A

A

Backwall/Cheekwall

Beam seat

Top of footing

Bottom of footing

SECTION A-A

Backwall top step

Elev. 671.82

1'-3"

C BearingL seat

Beam

6'-11" 1'-0"1'-0"

Footing

Beam seat

1'-0"2'-0"

Elev. 668.46

Top of footing

No. 57 Stone

1'-0"

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R25

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

PLAN

ELEVATION

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

A

B U

T R

E I N

F .D

G N

" = 1'-0"4 3Scale:

" = 1'-0"4 3Scale:

Scale: 1" = 1'-0"

As shown

8 Spa. @ 1'-0" = 8'-0"

A e .f

#5A3

#5A1

#5A1

#5A5

5 Spa. @ 1'-0" = 5'-0"

#5A6 (Top & Bott.)

#5A7

(Typ.)

#5A6

2"

#5A7 (Top & Bott.)

2"

"2

2"

"2

A

T o p B o tt

S p a

6 Spa. @ 1'-0" = 6'-0"

#5A2, #5A3, #5A4 & #5A5

#5A3

(Typ.)

(Typ.)

#5A2

(Typ.)

#5A5

6 Spa. @ 1'-0" = 6'-0"2"

(Typ.)

#5A3

(Typ.)

#5A2

8 Spa. @ 1'-0" = 8'-0"

#5A7 (Top & Bott.)

2"2" "2

13 "2

(Typ.)

#5A7

(Typ.)

#5A7

(Typ.)

(e.f.)

#5A5

(Typ.)

#5A5

#5A6

ABUTMENT 2 REINFORCEMENT

A

8" "2 17 2"8""2

#5A2, #5A3, & #5A5 (e.f.)

"2 178"2" "2

17 8" 2"

"4 13 "4 la p

S p a e .f

A

SETION A-A

B

BA

A

Scale: 1" = 1'-0"

SETION B-B

" = 1'-0"4 3Scale:

FOOTING PLAN

2"

"4 13 "4

#5A6 (Top & Bott.)

5 Spa. @ 1'-0" = 5'-0"

(Typ.)

#5A6

S p a

A e .f

#5A1

#5A6

#5A1 or

E q u a l s p a c e s

A e .f

T y p

(Typ.)

#5A2

(Typ.)

#5A4

#5A2

S p a

#5A4

#5A2

(Typ.)

#5A6

#5A7 e .f

A

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R26

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

TYPICAL SECTION

6'-0"

6'-8"

CL Boardwalk

Log fascia

TYPICAL SECTION

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

T

Y P X

S .D

G N

(Typ.)

Diaphragm

C15 x 40

(Typ.)

W21 x 73

" = 1'-0"2

(Typ.)

head lag bolt

" Hex 2 1"x22

Notes:

2"

" Ø hole16

2"

A

A

B B

DETAIL A VIEW A-A

Detail A

VIEW B-B

"2 screws " Deck2 s c r e w s

D e c k

(Typ.)

Angle2 1L3x2x length between beam stiffeners.

Timber blocking between beam and log fascia to run full 2.

and on 2-foot maximum spacing along beam.

Install two L3x2x1/2 hold down angles at each end of beam, 1.

rail cap (Typ.)

2"x 8" Timber timbers (Typ.)

2" x 2" Diagonal rail (Typ.)

2" x 4" Timber post (Typ.)

4" x 4" Timber pickets (Typ.)

2" x 2"Timber curb (Typ.)

4" x 6" Timber nailer (Typ.)

3" x 10" Timber deck

3" x 6" Timber

(Typ.)

Timber blocking

4" x 16" timber deck

Top of 3" x 6" nailer (Typ.)

3" x 10" Timber

(Typ.)

Scupper block

4" x 6" nailer

3" x 10" Timber deck

3" x 6" Timber timber deck

Top of 3" x 6" nailer (Typ.)

3" x 10" Timber recessed head (Typ.)

nut and washer with

1"Ø x 16" carriage bolt, according to Section 555

Waterproofing membrane

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R27

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

FRAMING PLAN

63'-8"

12'-6" 12'-6" 12'-6"

L StructureC

CL Beam 2

CL Beam 1

C

FRAMING PLAN

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

F

P .D

G N

" = 1'-0"8

12'-6"0'-7" 12'-6" 0'-7" diaphragm (Typ.)

L C 15 x 40

(Typ.)

W21 x 68 connection plate (Typ.)

1/2" Bearing stiffener and and connection plate (Typ.)

1/2" Intermediate stiffener

STIFFENER-CONNECTION PLATE-DIAPHRAGM DETAIL

CL

(Typ.)

"4

5 Detail A

Detail A

Detail A

T y p

Beam

T y p

S p a

T y p

T y p

S p a

T y p

4 2"x 4"x 1 " stiffener

4 2" x 4" 1 "

Connection plate

"16 93'-11

Ø h o le s

T y p

Notes:

" Ø high strength steel.8 7All bolts 1.

2"

2"

DETAIL A

CL Girder

Scale: 3" = 1'-0"

" 4

" = 1'-0"8 3Scale:

(Typ.)

No weld

(Typ.)

No weld

T y p

N o w e ld

" 4

C 15x40 Diaphragm b o lt s

T y p

Ø h o le s f o r

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R28

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

BEAM DETAILS

" = 1'-0"8 3Scale:

W21 x 73

0.1 L 0.2 L 0.3 L 0.4 L 0.5 L 0.7 L 0.8 L 0.9 L0.6 L of Bearings

G I R

D E

R S

CAMBER TABLE

I STEEL D.L. (in.)

CL

Reference line

Span L

Total camber

0.8L 0.9L0.7L0.1L 0.2L 0.3L 0.4L 0.5L 0.6LPoint No.

cambered girder

Top of web fully

CL

Bearings

Abutment 2 &

CL

CL

Bearings

Abutment 1 &

CL

CAMBER DIAGRAM

II TIMBER D.L. (in.)

III PEDESTRIAN L.L. (in)

TOTAL = I+II+III (in.)

''16

''16

"8

"8

"8

"8

"2

"16

"16

"16

"8

"16

"8

"8

"16

"8

"16

"2

"16

"16

"8 5 1

"8

"8

"16

"16

"16

"8

"8

No scale deflected girder

Top of web fully

DL Deflection

GIRDER ELEVATIONA

C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

B

E A

M D

E T

A I L S .D

G N

As Shown

0'-7" 0'-7"

2'-1" 14 Spa @ 4'-3" = 59'-6"

63'-8"

5 Spa @ 12'-6" = 62'-6"

1 1/16" Diameter holes for log fascia bolt connection

1/2" Connection plate-inside face, 1/2" stiffener-outside face

1/2" Connection plate-inside face (Typ.)

1/2" Bearing stiffener-outside face

" 16 15 1" "16

"16 31 ''8

51 2"

"8 12 "8

2'-1"

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R29

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

BEARING DETAILS

EXPANSION ELASTOMERIC BEARING

CL Beam bearing

Elastomeric

"4

BearingCL

"8 53 "8

"2

(Typ.)

FIXED ELASTOMERIC BEARING

CL Beam bearing

Elastomeric

"4

BearingCL

"8 53 "8

"4

"8 53 "8

CL Girder

CL Bearing

A A

BEARING PLAN

" Interior layer2

" Top & bottom layer4

"4 securely to pad

" Steel shim moulded8

"4 1 "4

SECTION A-A

(4 elastomeric pads total)

CL Beam

Beam concrete

Top of

"8 75 "8 bearing

Elastomeric

Anchor bolt " Sole plate2

1 1

Hex nut (Galv.)

Cut washer (Galv.)

Anchor bolt (Galv.)

1"

Top of concrete

CL

(Typ.)

1" Dia. anchor bolt

ELEVATION VIEW

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

B

E A

R I N

G D

E T

A I L S .D

G N

3" = 1'-0"

ANCHOR BOLT

" 4 1" x 7" x 1'-22

Sole plate

" 4 1" x 7" x 1'-22

Sole plate

3" x 1

"4 31'-2

"4 33"4

33 "4 33"4

"2

(Typ.)

"4 31'-2

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R30

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

L PostC

RAIL ELEVATION

Scale: 12" = 1'-0"

SECTION A-A

Scale: 11 2" = 1'-0"

A

A long (Typ.)

#5 Rebar 10'' footing Concrete

Vertical post pressure treated, (Typ.)

POST FOOTING DETAIL

Scale: 1'' = 1'-0''

As Shown

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

R

A I L D

E T

A I L S .D

G N

DETAIL A

Scale: 3" = 1'-0"

Rail Post Connection

"DETAIL A"

DETAIL C

Scale: 1" = 1'-0"

Curb-Scupper Block-Deck Connection

B

B

3" 6" 6" 6" 3"

Scale: 1" = 1'-0"

SECTION B-B

Notes:

DETAIL D

C

C

Scale: 2" = 1'-0"

Scale: 2" = 1'-0"

SECTION C-C

2" x 8" Timber rail cap 2" x 4" Timber rail

4" x 6" x 24" Scupper block (Typ.)

4" x 6" Timber curb

2" x 2"

Timber

2" x 4" Timber rail

4" x 4" Timber post (Typ.)

4" x 6" Timber curb

4" x 6" x 24" Scupper block

4" x 6" Timber blocking

RAIL DETAILS-1

14 Spa. @ 4'-0" = 56'-0"1'-8"

Details-2 sheet

See Rail

Front face backwall

Sta 100+35

End of beam

End of deck between posts

2" Gap

Front face backwall

Sta 100+99

End of beam

End of deck

2"

ABUTMENT 2 DETAIL

3" x 6" Timber plank

3" x 8" Timber plank ripped to

7" wide

Front face of backwall

End of beam

ABUTMENT 1 DETAIL

3" x 6" Timber plank

Front face of backwall

End of beam

Compression seal

2"

2"

"DETAIL C"

"DETAIL D"

e a c h p o s t

C a r r ia g e b o lt s x

"4 32"4

"4 13'-8 "4

13'-8 "2 11'-5

"8 17 Spa. @ 5

"8 17 Spa. @ 5"16

34 "8 1@ 5

2 Spa.

"16

"8 1@ 5

2 Spa.

(Typ.)

"16

(Typ.)

"16

"8 53"8

"4

'' = 1'-0''2 1Scale: 1

'' = 1'-0''2 1Scale: 1

L

1'-0"

D

D

Scale: 2" = 1'-0"

SECTION D-D

L

L

Timber deck

Rail post

Curb

Scupper block

Deck

Blocking

(Typ.)

Carriage bolt

"Ø x 15" 4

Rail post

(Typ.)

Lap joint

"8 5" x 14

4" x 6" Timber curb

4" x 6" x 24" Scupper block

4" x 6" Blocking block (Typ.)

2" x 4" Spacer

C Post(Typ.)

bracing cross Timber 2" x 2"

2" x 4" Spacer block

C Post

C Bracing joint

"8 17 Spa. @ 5 bracing and spacer block.

" stainless steel screw. Pre-drill cross 2 1with one #12 x 4

Fasten cross bracing joint at centerline6.

timber when fasteners are at the ends of board.

Pre-drill 2 inch x2 inch, 2 inch x4 inch, and 2 inch x8 inch 5.

" stainless steel screw at each end.2 1#10 x 2

Fasten 2 inch x2 inch vertical and diagonal boards with one 4.

steel screws over continuous section.

steel screws at each end of board and two #10 x 3" stainless

Fasten rail cap and rails to posts with two #10 x 3" stainless 3.

rails.

Stagger joints of 2 inch x8 inch rail cap and 2 inch x4 inch continuous over a minimum of three 4 inch x4 inch posts.

2 inch x8 inch rail cap and 2 inch x4 inch rails to be 2.

inch, 2 inch x8 inch and 3 inch x6 inch timber connections.

Provide stainless steel screws for all 2 inch x2 inch, 2 inch x4 1.

Cross bracing (See Note 6)

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R31

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

No Scale

N

A

A

PLAN

Scale: 1'' = 1'-0''

VIEW A-A

L

RAIL DETAILS-2

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

R

A I L D

E T

A I L S .D

G N

Scale: 4'' = 1'-0'' concrete

Cast-in-place

Rail post

4" x 4"

4'-0"

"16 16"16

16 "8 17 Spa. @ 5 and front face of backwall

Begin Bridge @ C structure

"8 11'-8

Wingwall A

Wingwall B

(Typ.)

" Stainless plate4

See Post Connection Details

See Post Connection Details

POST CONNECTION DETAILS

FRONT VIEW SIDE VIEW

e m b e d m e n t th r e a d e d r o d

Ø S ta in le s s

"16 carriage bolt (Typ.)

" Ø x 5" Stainless2

Scale: 1'' = 1'-0''

Wingwall A opposite hand

"4

"8 plate in base

1"Ø Hole

" Ø hole16 9washer with

" Square 4

" Lock washer2

TOP VIEWS

assembly

Full at front face of wingwall

Proposed ground line

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R32

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

BORING LOCATION PLAN

N

BH 19-04

B eg in B ri dg e

S ta

PLAN

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

B

O R I N

G L

O C

A T I O

N P

L A

N .D

G N

1" = 10'-0"

A

LL

E Y

B R A N C H

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R33

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

BORING SUBSURFACE PROFILE

E le v a ti o n ft

E le v a ti o n ft

0.9

1.2

0.8

0.3

1.1

12.4

Depth (ft) N

BH 19-04

Rec.

LEGEND

N

Groundwater depth encountered during drilling.

Rec.

Rock Quality Designation (%)

Recovery (ft)

RQD

Standard Penetration Test

Resistance in Blows per Foot

Groundwater depth at boring completion.

FILL SP

THE BORING LOGS ON THIS SHEET REPRESENT THE SUBSURFACE CONDITIONS ENCOUNTERED

AT THE BORING LOCATIONS SHOWN. SUBSURFACE CONDITIONS MAY VARY BETWEEN THESE LOCATIONS.

Groundwater depth monitored after boring completion.

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

B

O R I N

G S

U B

S U

R F

A C

E P

R O

F I L E .D

G N

Not to Scale

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

R34

M

P R

O J E

C T

S o z a r M

O E

R F

O

N P

S

O Z

A R -1 (1

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REINFORCING BAR LIST - 1

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-J u n -2

:4

P

M

A C

T U

A L F I L E R M

O E

R F

O N

P S O

Z A

R

B

A R L I S

T .D

G N

Not to Scale

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

80108 MO

OZAR 2017-1(1)

MO ERFO NPS

310826

250992

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

RE CV

DRAWN BY

Christopher NegleyJEG of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-128634

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

OZARK NATIONAL SCENIC RIVERWAYS

ALLEY SPRING TRAIL FOOT BRIDGE

ABUTMENT - 1 REINFORCEMENT

V or N

2 2•"#5A1 5 Horiz.

2 2•"#5A2 5 Vert.

17 3ƒ"#5A3 5 Vert. f.f.

STR#5A4 5 Vert. n.f.

17 3ƒ"#5A5 5 Vert. n.f.

STR#5A6 5 Horiz. n.f.

247 3ƒ"#5A7 5 Horiz.

52 3ƒ"#5A8 5 Horiz. e.f.

17 3ƒ"#5A9 5 Vert. e.f.

STR#5A10 5 Horiz. e.f.

17 3ƒ"#5A11 5 Vert. e.f.

STR#5A12 5 Horiz. top & bot.

STR#5A13 5 Horiz. top & bot.

STR#5A14 5 Horiz. top & bot.

STR#5A15 5 Horiz. top & bot.

STR#5A16 5 Horiz. top & bot.

STR#5A17 5 Horiz. top & bot.

SUBTOTAL

B

STR

TYPE 2

A G

B

B

C

D

OPTIONAL LEG

TYPE 17

A

E G

B

D F

C

D

C

B

A

TYPE 52

ABUTMENT - 2 REINFORCEMENT

V or N

STR#5A1 5 Horiz. e.f.

17 3ƒ"#5A2 5 Horiz.

17 3ƒ"#5A3 5 Vert. U-bar

17 3ƒ"#5A4 5 Vert. e.f.

17 3ƒ"#5A5 5 Vert. e.f.

STR#5A6 5 Horiz. top & bot.

STR#5A7 5 Horiz. top & bot.

SUBTOTAL

A01-A04
A05-A12
A13-A21
B01-B05
C01-C07
D01-D05
D06
D07-D08
D08
D09
D10-D14
M01-M12
N01-N09
R01-R34
S01-S20
S01-S08
S09-S15
S16-S20

File details come from the government source that posted it. Updated .