Hydraulics Report_Alley Spring.pdf
PDF 1 MB Posted
- Attached to
- Ozark National Scenic Riverways Federal contract opportunity
- Solicitation number
- 693C73-21-B-000002
About this file
This document contains a hydraulic and scour analysis memo and a related federal contract opportunity solicitation. The analysis memo details hydraulic modeling and scour calculations performed for the replacement of the Alley Springs Trail pedestrian foot bridge in Ozark National Scenic Riverways, Missouri. Peak flow estimates were generated using USGS stream gauge data and the rational method. Hydraulic modeling of bridge alternatives found over one foot of freeboard above the five-year flood elevation. Scour analysis for the 10, 25, and 50-year storms recommended a total scour depth of one foot below the channel be addressed with Class 3 riprap.
The related solicitation seeks sealed bids from certified Small Business Concerns only for the Ozark National Scenic Riverways Project involving replacement of two pedestrian bridges and reconstruction of various sites. The work includes asphalt paving, drainage improvements, trail repair, parking lot reconstruction, and other miscellaneous tasks split into multiple schedules with a total expected cost between $1-5 million. Bid documents will be issued on or around October 15, 2020 with the bid due date and location specified in the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3) .pdf | ||
| Amendment 0002 - MO ERFO NPS OZAR 2017 - 1(1) and 1(3)pdf.pdf | ||
| Amendment 0001 - MO ERFO NPS OZAR 2017 - 1(1) and 1(3).pdf | ||
| Consultation Correspondence.zip | ZIP file | |
| Hydraulics Report_Jacks Fork.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| Plans - MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3).pdf | ||
| Geotech Report.pdf | ||
| Bridge Insp Report_ Structure 6640-003T.pdf | ||
| IFB -MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3) .pdf | ||
| NEPA CE.pdf | ||
| VETS-4212 Form.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FHWA: C.Seymore:1595:VD: M:\PROJECTS\ozar\MO_ERFO_NPS_OZAR_2017-1(1)\Techserv \Hydra\Correspondence\MO_ERFO_NPS_OZAR_2017-1(1)_Alley Springs Bridge_Memo.pdf CC: Hydraulics, Geotech, Env, HD Engineer, TS Engineer, Bridge
Form FHWA-201 U.S. DEPARTMENT OF TRANSPORTATION (Rev. 11-87) FEDERAL HIGHWAY ADMINISTRATION
MINUTE - MEMO
Use this form in lieu of transmittal slips within Dept. of Trans. when message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA-121 for informal correspondence.
SUBJECT: MO ERFO NPS OZAR 2017-1(1), Alley Springs Pedestrian Bridge Hydraulic and Scour Memo
TO MESSAGE/COMMENT FROM/DATE
Katerina Roman Project Manager
Alazar Feleke Highway Design Manager
We have completed the hydraulic and scour analysis for the Alley Springs pedestrian foot bridge located in the Ozark National Scenic Riverways in Shannon County, Missouri. Hydrology is based on a combination of the rational method with peak flows generated using the Hydraulic Toolbox Version 4.4 and USGS stream gage data. The USGS Stream Gage No.
07065500 provides an average daily stream flow of 133.668 cfs based on data collected from 1928 to 1980. The flow from the rational method is much lower than the average flow and does not account for the flow originating from the spring. The peak flows from the rational method were added to the average daily flow from the USGS stream gage to obtain an estimate of peak flows for various return periods. Hydraulic modeling was performed using SMS Version 13.0.8’s two-dimensional model, Sedimentation and River Hydraulics – Two Dimensional (SRH-2D), to obtain the water surface elevations, average velocities, and hydraulic depths used in calculating scour for the structure. Chapter 7 of the PDDM does not have any design storms listed for the design of pedestrian bridges. Per design practices used by Federal Lands, pedestrian bridge designs are expected to pass the 5-year peak flow with a freeboard of 1 foot. Alley Spring is not in FEMA mapped floodplains. Table 1 summarizes water surface elevations (WSELs) and freeboard for various storm event flow rates.
Alley Springs Pedestrian Bridge:
The Alley Springs Trail pedestrian/foot bridge is being replaced due to the existing structure being washed away during the recent 500-year storm event in April 2017. The existing structure was a two-span bridge with an unknown low steel elevation (LSEL). The proposed structure is a 60.25 ft.
one span glulam timber bridge. This bridge structure was analyzed with a super elevation of 0 % and a low steel elevation (LSEL) of 672.23 ft for Option 1 and 670.65 ft for Option 2. Analysis of the alternatives provides more than 1 ft of freeboard above the 5 year WSEL of 666.89 ft (See attachment 2). Therefore, these alternatives meet the Federal Lands design standards of pedestrian bridges. There is no backwater rise for the proposed bridge.
Canisha Seymore Civil Engineer
THROUGH
Abhishek Kapoor Hydraulics Team Leader
06/06/2019
CC: Hydraulics, Geotech, Env, HD Engineer, TS Engineer, Bridge
Table 1: Alley Springs Pedestrian Foot Bridge Hydraulics
Option 1 Proposed
(LSEL = 672.23’)
Option 2 Proposed
(LSEL = 670.25’)
Storm Event
Flow (cfs)
WSEL
(ft)
Freeboard (ft)
WSEL
(ft)
Freeboard (ft)
5 year 145 666.89 5.34 666.89 3.36
10 year 147 666.90 5.33 666.90 3.35
25 year 149 666.91 5.32 666.91 3.34
50 year 151 666.93 5.30 666.93 3.32
Scour Analysis:
We have completed the scour analysis for the subject project. Scour analysis was performed using the equations for abutment scour, which incorporated contraction scour, as described in Chapter 8 of the Hydraulic Engineering Circular (HEC) 18. Scour depths were computed for the 10, 25 and 50-year storm events (per Federal Lands standard actions for the design of pedestrian bridges), using Hydraulic Toolbox Version 4.4.
The average D50 of 0.0025 feet (0.75 mm) was obtained from boring samples and subsequent particle size analysis performed for this location. Table 2 shows the scour depths and the resulting elevations that should be considered when designing the bridge foundations. Local abutment scour results are zero. Information on long-term degradation of the channel around the site location is minimal (≈0.78 ft at a site 1,150ft downstream of the proposed bridge site);
therefore, it is assumed to be 1 foot (included in the tabulated depths). The scour elevations for the abutments for the bridge was calculated from the bottom of the channels. The elevation for the bottom of the channel for the bridge is 663 ft.
CC: Hydraulics, Geotech, Env, HD Engineer, TS Engineer, Bridge
Table 2: Alley Springs Pedestrian Foot Bridge - Recommended Scour Elevations
Event Scour Type
Scour Depth of Abutments
(ft)
Scour Elevation for Abutments
(ft) year
Long Term 1.0
Local 0.0
TOTAL 1.0 662
year
Long Term 1.0
Local 0.0
TOTAL 1.0 662
year
Long Term 1.0
Local 0.0
TOTAL 1.0 662
Scour Recommendations:
The scour analysis resulted in a total scour of 1 ft. below the channel thalweg. Scour countermeasure was designed per Hydraulic Engineering Circular (HEC) 23. As a scour countermeasure, we recommend placing Class 3 riprap at a slope of 2H:1V or flatter as to match existing channel slopes to the maximum extent possible, with a minimum keyed-in depth of 2 ft, and in accordance with Attachment 1. The riprap should be placed along the full length and width of the proposed abutments, and extend a minimum of 2 ft beyond the length of the abutments.
Please contact us if you should have any questions or concerns.
Attachments:
1. Abutment Riprap Typical Section (Source – Hydraulic Engineering Circular (HEC) 23 Volume 2, Figure 14.8):
M:\PROJECTS\ozar\MO_ERFO_NPS_OZAR_2017- 1(1)\Techserv\Hydra\Correspondence\AlleySpring\Attachment1_Riprap_Typ_Section.pdf
2. Proposed Bridge 5-year WSEL Cross Section:
M:\PROJECTS\ozar\MO_ERFO_NPS_OZAR_2017- 1(1)\Techserv\Hydra\Correspondence\AlleySpring\Attachment2_5yr_WSEL_X-Section.pdf file://fhfl15fileserve.flhd.fhwa.dot.gov/data/PROJECTS/ozar/MO_ERFO_NPS_OZAR_2017-1(1)/Techserv/Hydra/Correspondence/AlleySpring/Attachment1_Riprap_Typ_Section.pdf file://fhfl15fileserve.flhd.fhwa.dot.gov/data/PROJECTS/ozar/MO_ERFO_NPS_OZAR_2017-1(1)/Techserv/Hydra/Correspondence/AlleySpring/Attachment1_Riprap_Typ_Section.pdf file://fhfl15fileserve.flhd.fhwa.dot.gov/data/PROJECTS/ozar/MO_ERFO_NPS_OZAR_2017-1(1)/Techserv/Hydra/Correspondence/AlleySpring/Attachment2_5yr_WSEL_X-Section.pdf file://fhfl15fileserve.flhd.fhwa.dot.gov/data/PROJECTS/ozar/MO_ERFO_NPS_OZAR_2017-1(1)/Techserv/Hydra/Correspondence/AlleySpring/Attachment2_5yr_WSEL_X-Section.pdf
| ) "�����)#��$%�� | )&)��'�'�)��)����) | |
| ���!��)�*�+�)#,��$�()$�� | ) | �$ |
| )� | )�� |
| )�� | ��� (�) |
)�)��0)��)��� ��)����)$�����(1)
| ��)��0�)��)�)������)%�,) | ��!(�) �)$�� | �������)23)45676)897:7);97)5<=;>73;)7?;73@6)A3;B);97)>5A3)495337C)53@)@=37D;EF7)<7@)GB:>6)>5E)<7)F:7673;H)A;)A6)6;:B3ICE):74B>>73@7@);95;)B3CE)5)I7B;7?;AC7)GAC;7:)<7)4B36A@7:7@)GB:);97):AF:5F)F:B;74;AB3�)JKLK) MNO2PQ)NRSTUVN)WXY)Y2UYSU)SZ)[Y2MPN)S[\ZTNQZO)"�����)� | ) |
| �) �) | �]��)���)��)� ! |
| ���) ������)#��) �����)� | )�'�)� | |
| )��̂+���)��)(���1)�� | ) | ��((_ |
�a��) ��)��((�0���) ��)�������)ba�� ��%)c����� ) ��+d)�) �(�0)��� �)��e�$�� )f) 1̀̀��)$� ) ��+��)�dg ) �� $�����)��)(�� )�a�� ��%)�) ��d�')� �) '̀)��) �(�0)����)��)(�� )�a�� ��%)h�����()c����� ) ��̂�)�) �(�0)��� �)��)����)$�����()f) �'1'��)$� ) �̀�)�dg ) �� $�����)��)����)$�����()�) �1̂̀ )̀��) +*)��) �(�0)����)�)���)$�����()O;7F)J�)��������)��)ij")��_�$%)� ��$�)�a���),)��)�a����)$�����()�(�0)�����)� *��))��')ij")k) k)�d��)�̂̀)
Attachment #1
Attachment #2 canisha.seymore Callout Existing Historic Pier to Remain canisha.seymore Callout Existing Historic Abutment to Remain canisha.seymore Callout Average WSEL 666.89 ft canisha.seymore Callout Existing Ground
| WSEL |
| WSEL |
| Flow |
| Storm Event |
| (ft) |
| (ft) |
| (ft) |
| (ft) |
| (cfs) |
| 3.36 |
| 666.89 |
| 5.34 |
| 666.89 |
| 145 |
| 5 year |
| 147 |
| 10 year |
| 3.34 |
| 666.91 |
| 5.32 |
| 666.91 |
| 149 |
| 25 year |
| 3.32 |
| Event |
| 666.93 |
| 5.30 |
| 666.93 |
| 151 |
| 50 year |
| Scour Type |
| 1.0 |
| Long Term |
| 10 year |
| 0.0 |
| Local |
| 662.005 |
| 1.0 |
| TOTAL |
| 1.0 |
| Long Term |
| 25 year |
| 0.0 |
| Local |
| 662.005 |
| 1.0 |
| TOTAL |
| 1.0 |
| Long Term |
| 50 year |
| 0.0 |
| Local |
| 662.005 |
| 1.0 |
| TOTAL |
| 2019-06-06T08:30:16-0400 | |
| CANISHA PATRICE SEYMORE |
| 2019-06-06T09:06:30-0400 | |
| ABHISHEK KAPOOR |