Amendment 0001 - MO ERFO NPS OZAR 2017 - 1(1) and 1(3).pdf
PDF 4 MB Posted
- Attached to
- Ozark National Scenic Riverways Federal contract opportunity
- Solicitation number
- 693C73-21-B-000002
About this file
This solicitation is for a construction project located in Shannon, Carter, and Dent Counties, Missouri. The project consists of replacing two bridges and reconstructing various sites throughout Ozark National Scenic Riverways. Work includes asphalt paving, drainage improvements, trail repair, parking lot reconstruction, and other miscellaneous tasks. The project will be split into multiple schedules and contract options, with the total cost expected to fall between $1,000,000 to $5,000,000. The solicitation is open only to certified small business concerns. The bid due date will be specified on the SF1442 included with the solicitation documents. Interested vendors must register at beta.sam.gov to receive email notifications and access solicitation documents, which will no longer be mailed. Questions should be sent to eflhd.contracts@dot.gov and must include the solicitation number, project name and number, requester information, and point of contact.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3) .pdf | ||
| Amendment 0002 - MO ERFO NPS OZAR 2017 - 1(1) and 1(3)pdf.pdf | ||
| Consultation Correspondence.zip | ZIP file | |
| Hydraulics Report_Jacks Fork.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| Plans - MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3).pdf | ||
| Hydraulics Report_Alley Spring.pdf | ||
| Geotech Report.pdf | ||
| Bridge Insp Report_ Structure 6640-003T.pdf | ||
| IFB -MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3) .pdf | ||
| NEPA CE.pdf | ||
| VETS-4212 Form.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7321B000002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Ashburn VA 20147
693C73
Suite E2-3-300 Quantum Park, 22001 Loudoun County Pkwy Eastern Federal Lands Highway Division Federal Highway Administration
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1410/30/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/16/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to change pay item from 55706-1000
(Structural Timber and Lumber, Untreated (Log Fascia)) to 55706-2000 (Structural
Timber and Lumber, Treated (Log Fascia)).
2) Revise the Plans to change pay item from 55706-1000 (Structural Timber and Lumber, Untreated (Log Fascia)) to 55706-2000 (Structural Timber and Lumber, Treated (Log
Fascia)).
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) Provide Design Drawings of the previous Jacks Fork Pedestrian Bridge to potential
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 34
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7321B000002/0001 bidders.
5) Update the Instructions to Bidders document (Section E) to revise the site visit point of contact information.
6) The Bid Opening date remains November 17, 2020, at 2:00 p.m. EST.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0001
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)
Ozark National Scenic Riverways Reconstruction and rehabilitation of damaged areas due to extensive flooding in April 2017
Solicitation: 693C73- 21-B-000002
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to change pay item from 55706-1000 (Structural Timber and Lumber, Untreated (Log Fascia)) to 55706-2000 (Structural Timber and Lumber, Treated (Log Fascia)).
2) Revise the Plans to change pay item from 55706-1000 (Structural Timber and Lumber, Untreated (Log Fascia)) to 55706-2000 (Structural Timber and Lumber, Treated (Log Fascia)).
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) Provide Design Drawings of the previous Jacks Fork Pedestrian Bridge to potential bidders.
5) Update the Instructions to Bidders document Section 52.236-27(b) contact information to the following:
Name: Richard Halbert, Chief of Maintenance Address: Ozark National Scenic Riverways 404 Watercress Drive Van Buren, MO 63965 Telephone: (573) 323-4913 Email: Richard_Balbert@nps.gov
6) The Bid Opening due date remains November 17, 2020, at 2:00 p.m. EST.
Solicitation B Pages changes
Delete the Bid Schedule Instructions (B Pages), pages 1 through 3 and B-1 through B-16, and substitute the amended Bid Schedule Instructions, pages 1 through 3 and B-1 through B-17.
Changed pay item 55706-1000 (Structural Timber and Lumber, Untreated (Log Fascia)) paid by LPSM to 55706-2000 (Structural Timber and Lumber, Treated (Log Fascia)) paid by
LPSM.
Info Page 2 of 2
Plan Sheet changes
1. Delete Plan Sheet C01 and substitute the amended Plan Sheet C01.
a) Sheet C01 (Tabulation of Quantities) updated to change pay item 55706-1000 (Structural Timber and Lumber, Untreated (Log Fascia)) paid by LPSM to 55706-2000 (Structural Timber and Lumber, Treated (Log Fascia)) paid by LPSM.
2. Delete Plan Sheet R26 and substitute the amended Plan Sheet R26.
a) Sheet R26 (Alley Spring Trail Foot Bridge Typical Section) updated to add a third note to the plan sheet.
BID SCHEDULE INSTRUCTIONS
PROJECT: MO ERFO NPS OZAR 2017-1(1) &
MO ERFO NPS OZAR 2017-1(3)
BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to Bidders. While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total for each specific individual Schedule of Work by adding the amounts of the listed items, and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Bid Total(s) for each individual Schedule of Work as directed on the Bid Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page.
The amount in Block 17 of the SF 1442 should be completed as follows:
Schedule A - $ .
Schedule B - $ .
Schedule C - $ .
Schedule D - $ .
Schedule E - $ .
Schedule F - $ .
Schedule G - $ .
Schedule H - $ .
SCHEDULES OF WORK
The Bid Schedule is comprised of the following separate schedules and options of work:
Schedule A (Base Contract) - Pages B-1 thru B-3 Schedule B (Government Option 1) - Pages B-4 thru B-6
Schedule C (Government Option 2) - Pages B-7 thru B-8 Schedule D (Government Option 3) - Page B-9 Schedule E (Government Option 4) - Page B-10 Schedule F (Government Option 5) - Pages B-11 thru B-12 Schedule G (Government Option 6) - Pages B-13 thru B-14 Schedule H (Government Option 7) - Pages B-15 thru B-16
The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B, C, D, E, F, G and H (Government Options 1, 2, 3, 4, 5, 6, and 7); see FAR Clauses 52.217-4 and 52.217-5.
The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of programmed funds and upon receipt of any additional funds required to award the contract. If complete funding is in place at the time of award of Schedule A (Base Contract), the Government may award Schedules B or C+D+E+F+G+H (Government Options 1 or 2) at that time.
Schedule B (Government Option 1): Must be awarded on the same schedule as Schedule A (Base Contract).
If additional funding is required for the award of Schedules C, D, E, F, G or H (Government Option 2, 3, 4, 5, 6, or 7) and is received after the award of Schedule A (Base Contract), the Government has the right to exercise Schedules C, D, E, F, G, and H (Government Option 2, 3, 4, 5, 6, and 7) at the unit prices bid according to the following schedule:
Schedules C, D, E, F, G, and H (Government Option 2, 3, 4, 5, 6, and 7): No later than 260 calendar days after the Effective Notice to Proceed for Schedule A (Base Contract) and Schedule B (Government Option 1).
COMPLETION OF WORK
If the Government awards the contract as Schedules A + B + C +D + E + F + G + H all at the same time, the performance period to complete all contract work will be 425 calendar days.
If the Government awards the contract as Schedule A plus a combination of one or more of the Government Options, the performance period of the contract will be the total time of the individual performance periods of each awarded schedule as specified below. For example, if Schedules A + B are awarded, the performance period of the contract will be 425 calendar days (A + B).
Schedule A: 295 calendar days Schedule B: 130 calendar days Schedule C+D+E+F+G+H: 165 calendar days
If any of the remaining Government Options are exercised after the award of the original contract, the number of calendar days specified above will become the performance period for that Government Option and will be added to the performance period of the original contract.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s).
Bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-
15) may result in the start of construction activities to be no earlier than January 2021. See Subsection 108.01 of the SCR’s for additional details.
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Schedule C (Government Option 2) Bid Total + Schedule D (Government Option 3) Bid Total + Schedule E (Government Option 4) Bid Total + Schedule F (Government Option 5) Bid Total + Schedule G (Government Option 6) Bid Total + Schedule H (Government Option 7) Bid Total.
B - 1
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0080 15702-4000 SOIL EROSION CONTROL, FILTER BAG
ALL LPSM $___LPSM_____ $____________
A0100 15705-0100 SOIL EROSION CONTROL, SILT FENCE
285 LNFT $____________ $____________
A0120 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN
525 LNFT $____________ $____________
A0140 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
2 EACH $____________ $____________
A0160 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A0180 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (JACKS FORK
ABUTMENTS)
ALL LPSM $___LPSM_____ $____________
A0200 20403-0000 UNCLASSIFIED BORROW
250 CUYD $____________ $____________
A0220 20801-0000 STRUCTURE EXCAVATION
100 CUYD $____________ $____________
A0240 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
2,450 CUYD $____________ $____________
A0260 30202-1000 ROADWAY AGGREGATE, METHOD 1
50 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 2
A0280 31302-0200 AGGREGATE-TOPSOIL COURSE, 2-INCH DEPTH
650 SQYD $____________ $____________
A0300 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
43 CUYD $____________ $____________
A0320 55401-1000 REINFORCING STEEL
15,200 LB $____________ $____________
A0340 55504-0000 PRE-FABRICATED STEEL BRIDGE
ALL LPSM $___LPSM_____ $____________
A0360 56501-0400 DRILLED SHAFT, 36-INCH DIAMETER
84 LNFT $____________ $____________
A0380 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER
93 LNFT $____________ $____________
A0400 62502-0000 TURF ESTABLISHMENT
650 SQYD $____________ $____________
A0420 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
150 SQYD $____________ $____________
A0440 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
15 EACH $____________ $____________
A0460 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
60 LNFT $____________ $____________
A0480 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
165 SQFT $____________ $____________
A0500 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
385 HOUR $____________ $____________
A0520 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 3
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 4
B0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE
50 LNFT $____________ $____________
B0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
30 LNFT $____________ $____________
B0120 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
1 EACH $____________ $____________
B0140 20103-0000 CLEARING AND GRUBBING
140 SQYD $____________ $____________
B0160 20403-0000 UNCLASSIFIED BORROW
26 CUYD $____________ $____________
B0180 20421-0000 ROCK EXCAVATION
14 CUYD $____________ $____________
B0200 20801-0000 STRUCTURE EXCAVATION
64 CUYD $____________ $____________
B0220 20811-0000 SHORING AND BRACING
80 SQFT $____________ $____________
B0240 30202-1000 ROADWAY AGGREGATE, METHOD 1
10 TON $____________ $____________
B0260 30210-0000 BEDDING AND BACKFILL AGGREGATE (#57 STONE)
13 CUYD $____________ $____________
B0280 31302-0200 AGGREGATE-TOPSOIL COURSE, 2-INCH DEPTH
55 SQYD $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 5
B0300 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
32 CUYD $____________ $____________
B0320 55235-0000 EXPANSION JOINTS
7 LNFT $____________ $____________
B0340 55401-2000 REINFORCING STEEL, EPOXY COATED
3,900 LB $____________ $____________
B0360 55502-0000 STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED
10,400 LB $____________ $____________
B0380 55601-1300 BRIDGE RAILING, TIMBER
140 LNFT $____________ $____________
B0400 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED
2 MFBM $____________ $____________
001 B0420 55706-1000 STRUCTURAL TIMBER AND LUMBER, UNTREATED (LOG FASCIA)
ALL LPSM $___LPSM_____ $____________
001 B0421 55706-2000 STRUCTURAL TIMBER AND LUMBER, TREATED (LOG FASCIA)
ALL LPSM $___LPSM_____ $____________
B0440 56401-1000 BEARING DEVICE, ELASTOMERIC
4 EACH $____________ $____________
B0460 62502-0000 TURF ESTABLISHMENT
55 SQYD $____________ $____________
B0480 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
60 LNFT $____________ $____________
B0500 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
125 SQFT $____________ $____________
B0520 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 6
Bid Schedule Schedule:B Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 7
C0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
C0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0080 20301-3400 REMOVAL OF WHEELSTOP
4 EACH $____________ $____________
C0100 20303-2000 REMOVAL OF PAVEMENT, ASPHALT, 4-INCH DEPTH
100 SQYD $____________ $____________
C0120 20401-0000 ROADWAY EXCAVATION
20 CUYD $____________ $____________
C0140 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
100 SQYD $____________ $____________
C0160 30201-2000 ROADWAY AGGREGATE, METHOD 2
35 CUYD $____________ $____________
C0180 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
25 TON $____________ $____________
C0200 60915-1000 WHEELSTOP, CONCRETE
4 EACH $____________ $____________
C0220 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID
110 LNFT $____________ $____________
C0240 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
25 LNFT $____________ $____________
C0260 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
45 SQFT $____________ $____________
C0280 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 8
Bid Schedule Schedule:C Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 9
D0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
D0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
D0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
D0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
120 LNFT $____________ $____________
D0100 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (GABIONS)
50 SQYD $____________ $____________
D0120 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
110 SQYD $____________ $____________
D0140 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED
30 CUYD $____________ $____________
D0160 30202-1000 ROADWAY AGGREGATE, METHOD 1
17 TON $____________ $____________
D0180 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
15 LNFT $____________ $____________
D0200 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
20 SQFT $____________ $____________
D0220 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:D Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 10
E0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
E0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
E0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
E0080 20101-0000 CLEARING AND GRUBBING
0.8 ACRE $____________ $____________
E0100 30202-1000 ROADWAY AGGREGATE, METHOD 1
1,000 TON $____________ $____________
E0120 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
40 LNFT $____________ $____________
E0140 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
65 SQFT $____________ $____________
E0160 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:E Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 11
F0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
F0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
F0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
F0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE
45 LNFT $____________ $____________
F0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
160 LNFT $____________ $____________
F0120 20401-0000 ROADWAY EXCAVATION
90 CUYD $____________ $____________
F0140 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
320 SQYD $____________ $____________
F0160 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
8 CUYD $____________ $____________
F0180 30201-2000 ROADWAY AGGREGATE, METHOD 2
100 CUYD $____________ $____________
F0200 30302-1000 DITCH RECONDITIONING
850 LNFT $____________ $____________
F0220 30302-2000 SHOULDER RECONDITIONING
270 LNFT $____________ $____________
F0240 31302-0400 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH
330 SQYD $____________ $____________
F0260 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
70 TON $____________ $____________
F0280 62502-0000 TURF ESTABLISHMENT
155 SQYD $____________ $____________
Bid Schedule Schedule:F Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 12
F0300 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID
200 LNFT $____________ $____________
F0320 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
40 EACH $____________ $____________
F0340 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
75 LNFT $____________ $____________
F0360 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
275 SQFT $____________ $____________
F0380 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
150 HOUR $____________ $____________
F0400 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:F Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 13
G0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
G0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
G0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
G0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
220 LNFT $____________ $____________
G0100 20401-0000 ROADWAY EXCAVATION
230 CUYD $____________ $____________
G0120 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
800 SQYD $____________ $____________
G0140 30201-2000 ROADWAY AGGREGATE, METHOD 2
285 CUYD $____________ $____________
G0160 30302-2000 SHOULDER RECONDITIONING
75 LNFT $____________ $____________
G0180 31302-0400 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH
45 SQYD $____________ $____________
G0200 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
185 TON $____________ $____________
G0220 62502-0000 TURF ESTABLISHMENT
45 SQYD $____________ $____________
G0240 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
15 EACH $____________ $____________
G0260 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
75 LNFT $____________ $____________
G0280 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
140 SQFT $____________ $____________
Bid Schedule Schedule:G Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 14
G0300 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:G Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 15
H0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
H0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
H0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
H0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
800 LNFT $____________ $____________
H0100 20401-0000 ROADWAY EXCAVATION
250 CUYD $____________ $____________
H0120 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
925 SQYD $____________ $____________
H0140 30202-1000 ROADWAY AGGREGATE, METHOD 1
265 TON $____________ $____________
H0160 31302-0400 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH
300 SQYD $____________ $____________
H0180 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
150 TON $____________ $____________
H0200 55220-0000 REPAIR CONCRETE
15 SQYD $____________ $____________
H0220 60101-0000 CONCRETE (CCS)
10 CUYD $____________ $____________
H0240 62502-0000 TURF ESTABLISHMENT
300 SQYD $____________ $____________
H0260 62903-0000 CELLULAR CONFINEMENT SYSTEM
550 SQYD $____________ $____________
H0280 62910-1000 CELLULAR CONFINEMENT SYSTEM BACKFILL, GRANULAR (#57 STONE)
1,300 CUYD $____________ $____________
Bid Schedule Schedule:H Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 16
H0300 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
20 LNFT $____________ $____________
H0320 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
10 SQFT $____________ $____________
H0340 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:H Schedule Type:Options
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 17
BID SUMMARY
Project NP-GRSM 14(3), 112(1), ETC.
(1) Schedule A (Base Contract) Bid Total (from Page B-1 thru B-3) = (1) $________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-4 thru B-6) = (2) $________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-7 thru B-8) = (3) $________________
(4) Schedule D (Government Option 3) Bid Total (Page B-9) = (4) $________________
(5) Schedule E (Government Option 4) Bid Total (Page B-10) = (5) $________________
(6) Schedule F (Government Option 5) Bid Total (from Page B-11 thru B-12) = (6) $________________
(7) Schedule G (Government Option 6) Bid Total (from Page B-13 thru B-14) = (7) $_______________
(8) Schedule H (Government Option 7) Bid Total (from Page B-15 thru B-16) = (8) $_______________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1)+(2)+(3)+(4)+(5)+(6)+(7)+(8) $________________
Maximum Time Allowed for the Contract if all Schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B + C + D + E + F + G + H, the performance period to complete all contract work will be 425 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 295 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedules B (Government Option 1) is exercised with the award of the original contract, the performance period to complete all Schedules A + B work will be 425 calendar days and will start on the effective date of Schedules A’s Notice to Proceed.
If Schedules C, D, E, F, G, or H (Government Options 2, 3, 4, 5, 6, or 7) are exercised after the award of the original contract, the performance period to complete all Schedules C, D, E, F, G, and H work will be 165 calendar days and will start on the effective date of Schedules C through H’s Notice to Proceed.
R26
M
P R
O J E
C T
S o z a r M
O E
R F
O
N P
S
O Z
A R -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s A m e n d m e n t 1\ P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-O c t-
:3
P
M
TYPICAL SECTION
6'-0"
6'-8"
CL Boardwalk
Log fascia
TYPICAL SECTION
(Typ.)
Diaphragm
C15 x 40
(Typ.)
W21 x 73
" = 1'-0"2
(Typ.)
head lag bolt
" Hex 2 1"x22
Notes:
2"
" Ø hole16
2"
A
A
B B
DETAIL A VIEW A-A
Detail A
VIEW B-B
"2 screws " Deck2 s c r e w s
D e c k
(Typ.)
Angle2 1L3x2x rail cap (Typ.)
2"x 8" Timber timbers (Typ.)
2" x 2" Diagonal rail (Typ.)
2" x 4" Timber post (Typ.)
4" x 4" Timber pickets (Typ.)
2" x 2"Timber curb (Typ.)
4" x 6" Timber nailer (Typ.)
3" x 10" Timber deck
3" x 6" Timber
(Typ.)
Timber blocking
4" x 16" timber deck
Top of 3" x 6" nailer (Typ.)
3" x 10" Timber
(Typ.)
Scupper block
4" x 6" nailer
3" x 10" Timber deck
3" x 6" Timber timber deck
Top of 3" x 6" nailer (Typ.)
3" x 10" Timber recessed head (Typ.)
nut and washer with
1"Ø x 16" carriage bolt, according to Section 555
Waterproofing membrane inch.2 1the bottom of the beam more than fascia to completely cover the beam, and not extend below segments with the gap at the steel web stiffener. Install log
-inch maximum gap between segments. Do not install 8 1a
Install log fascia over a minimum of three sets of bolts, with branches trimmed to within 1 inch of the trunk for log fascia.
structural grade, with the bark removed, and protruding
Furnish pressure treated Southern Yellow Pine, of any 3.
length between beam stiffeners.
Timber blocking between beam and log fascia to run full 2.
and on 2-foot maximum spacing along beam.
Install two L3x2x1/2 hold down angles at each end of beam, 1.
1 10/28/20 CWN Added notes for log fascia
A C
T U
A L F I L E A
M E
N D
R M
O E
R F
O N
P S O
Z A
R
T
Y P X
S .D
G
N NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
80108 MO
OZAR 2017-1(1)
MO ERFO NPS
310826
250992
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
RE CV
DRAWN BY
Christopher NegleyJEG of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128634
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
OZARK NATIONAL SCENIC RIVERWAYS
ALLEY SPRING TRAIL FOOT BRIDGE
June 2020
Questions / Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. Clarification regarding the specified Color Treatment per 725.19 is needed. It is our understanding that the bridges would need to be galvanized, then sent to Natina in Arizona for coating, and then shipped back to our facility for installation of the decking? If so, we’re wondering if you’d like an alternate price for weathered steel or painted.
Response: Natina color treatment is required, weathering steel or painted steel will not be accepted.
2. Would it be acceptable to construct the drilled piers or drilled shafts in accordance with MoDOT standard design which is compatible to the geographic features of the area? Will it be acceptable to install oversized (app. 6” larger than rock socket) casing to rock in order to allow rock removal tooling to access the rock socket? Will it be acceptable to use permanent casing to an elevation above mean water level? If not, will it be acceptable to utilize oversized permanent casing to ground level?
Response: Provide bids based on the project as currently advertised, changes may be considered on a case-by-case basis after award.
3. Bridge plan sheet 1 of 34 for the Jacks Fork Pedestrian Bridge General Notes under Construction states that “The remaining portion of the concrete stub abutments and the H-pile foundation may require removal prior to construction the proposed drilled shaft foundations.”
The Bridge Inspection Report does not show any details for these abutments. What does the concrete portion of the abutments look like? How much concrete and reinforcing steel may have to be removed? How many H-piles are under the abutments? What size are the piling? How long are the piling? Are these pilings founded in rock? Without more information, it is impossible for a contractor to give a firm estimate of the cost of the removals which “may have to be done”. Please furnish this information.
Response: Design drawings of the previous Jacks Fork Pedestrian Bridge are provided as part of Amendment 1.
4. Bid Item No. B0420 Structural Timber and Lumber, Untreated is to meet Specification
716.01. This Specification states “Furnish an inspection certification from an Agency accredited by the American Lumber Standards Committee for the species and grade.” No species or grade is given anywhere I have found. The details appear to show a ½ section of tree trunk. If this is correct, it appears that more detail is needed. What species, what grade, can the segment be trimmed to fit the space between the beam flanges. Trees are not constant diameter so what tolerances for width variation are allowable? Is the bark to be left on the segment? How closely trimmed do any protruding branches need to be? If this segment is actually a ½ sawn tree trunk, I am not sure that this lumber can be obtained with the required inspection and grade.
Response: Bid item updated, and information covering species, grade, fitting, bark, trimming are provided on sheet R26 of Amendment 1.
5. On Plan sheet 26 of 34 Typical Section of the Alley Spring Trail Foot Bridge is the 4”x16” Blocking continuous or only at bolt locations? What is the allowable gap between the fascia sections? Is there a maximum and or minimum length for the fascia segments? I assume there should be some allowance made for deflections that will occur during erection.
Response: The 4”x16” blocking is full length of the bridge as stated on Note 2 of sheet R26.
Information on log fascia is provided on sheet R26 of Amendment 1.
robert.b.ellena Text Box
FOR INFORMATION ONLY
robert.b.ellena Text Box
NOTES:
1. A previous project removed the original stairs and replaced them with an addition span and a stub abutment at the north end.
2. The superstructure, piers and pier foundations have recently been removed. The abutments have been removed to approximately 24" below ground.
FOR INFORMATION ONLY
robert.b.ellena Text Box
NOTES:
1. Abutment No. 2 expected to be similar to Abutment No. 1.
FOR INFORMATION ONLY
E-1
FEDERAL ACQUISITION REGULATION &
TRANSPORTATION ACQUISITION REGULATION PROVISIONS
INSTRUCTIONS TO BIDDERS
(Updated through FAC 2021-01)
52.211-4 AVAILABILITY FOR EXAMINATION OF
SPECIFICATIONS NOT LISTED IN THE GSA
INDEX OF FEDERAL SPECIFICATIONS,
STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS (Jun 1988) The specifications cited in this solicitation are not available for distribution. However, they may be examined at the following location(s):
All documents are available for direct download from the following website: https://beta.sam.gov/.
(End of Provision)
52.216-1 TYPE OF CONTRACT (Apr 1984)
The Government contemplates award of a firm-fixed-price contract resulting from this solicitation.
52.228-1 -- Bid Guarantee (Sep 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds --
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference. (End of Provision)
52.233-2 SERVICE OF PROTEST (Sep 2006)
a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government
Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK
22001 LOUDOUN COUNTY PARKWAY
SUITE E2-3-300
ASHBURN, VA 20147
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the
GAO.
(End of Provision)
52.236-27 Site Visit (Construction) (Feb 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Richard Halbert, Chief of Maintenance
Address: Ozark National Scenic Riverways 404 Watercress Drive
Van Buren, MO 63965
Telephone: (573) 323-4913 Email: Richard_Balbert@nps.gov
Site visit point of contact is not available for answering any questions.
Please send all questions concerning construction projects to eflhd.contracts@dot.gov. Include the solicitation number, project name, number, requesting firm, address, a point of contact and telephone number.
(End of Section E) https://beta.sam.gov/ mailto:eflhd.contracts@dot.gov
| Plans_Amendment 0001.pdf |
| Plans_Amendment 001 |
| Plans2_Amendment 001 |
| BK E Pages - Amended FAC 2021-01.pdf |
| 52.228-1 -- Bid Guarantee (Sep 1996) |