This solicitation is for the Ozark National Scenic Riverways Project MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3). The project consists of replacement of two pedestrian bridges and reconstruction of various sites, including asphalt paving, drainage improvements, trail repair, and parking lot work. The cost is expected to be between $1-5 million. The project will be split into multiple schedules and contract options. Sealed bids from certified Small Business Concerns will be accepted under Solicitation Number 693C73-21-B-000002 by the specified due date. Annual Representations and Certifications must be completed online at SAM.gov, along with Vets-4212. Questions should be sent to eflhd.contracts@dot.gov. Prospective contractors must register in SAM for payment. Visitors must show valid photo ID and be escorted at the facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3) .pdf | ||
| Amendment 0001 - MO ERFO NPS OZAR 2017 - 1(1) and 1(3).pdf | ||
| Consultation Correspondence.zip | ZIP file | |
| Hydraulics Report_Jacks Fork.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| NEPA CE.pdf | ||
| VETS-4212 Form.pdf | ||
| Hydraulics Report_Alley Spring.pdf | ||
| Geotech Report.pdf | ||
| Bridge Insp Report_ Structure 6640-003T.pdf | ||
| IFB -MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3) .pdf | ||
| FP14_Eng.pdf | ||
| Plans - MO ERFO NPS OZAR 2017-1(1) and MO ERFO NPS OZAR 2017-1(3).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7321B000002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Ashburn VA 20147
693C73
Suite E2-3-300 Quantum Park, 22001 Loudoun County Pkwy Eastern Federal Lands Highway Division Federal Highway Administration
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1411/10/20200002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/16/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to revise the quantity of pay item
62910-1000 (Cellular Confinement System Backfill, Granular (#57 Stone)).
2) Revise the Plans to revise the quantity of pay item 62910-1000 (Cellular Confinement System Backfill, Granular (#57 Stone)).
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) The Bid Opening due date remains November 17, 2020, at 2:00 p.m. EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002
MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)
Ozark National Scenic Riverways Reconstruction and rehabilitation of damaged areas due to extensive flooding in April 2017
Solicitation: 693C73- 21-B-000002
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to revise the quantity of pay item 62910- 1000 (Cellular Confinement System Backfill, Granular (#57 Stone)).
2) Revise the Plans to revise the quantity of pay item 62910-1000 (Cellular Confinement System Backfill, Granular (#57 Stone)).
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) The Bid Opening due date remains November 17, 2020, at 2:00 p.m. EST.
Solicitation B Pages changes
Delete the Bid Schedule Instructions (B Pages), pages B-15 and B-17, and substitute the amended Bid Schedule Instructions, pages B-15 through B-17.
Revised the quantity of pay item 62910-1000 (Cellular Confinement System Backfill, Granular (#57 Stone)) in Schedule H.
Plan Sheet changes
1. Delete Plan Sheet C03 and substitute the amended Plan Sheet C03.
a) Sheet C03 (Tabulation of Quantities) updated to revise the quantity of pay item 62910- 1000 (Cellular Confinement System Backfill, Granular (#57 Stone)) in Schedule H.
BID SCHEDULE INSTRUCTIONS
PROJECT: MO ERFO NPS OZAR 2017-1(1) &
MO ERFO NPS OZAR 2017-1(3)
BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to Bidders. While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total for each specific individual Schedule of Work by adding the amounts of the listed items, and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Bid Total(s) for each individual Schedule of Work as directed on the Bid Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page.
The amount in Block 17 of the SF 1442 should be completed as follows:
Schedule A - $ .
Schedule B - $ .
Schedule C - $ .
Schedule D - $ .
Schedule E - $ .
Schedule F - $ .
Schedule G - $ .
Schedule H - $ .
SCHEDULES OF WORK
The Bid Schedule is comprised of the following separate schedules and options of work:
Schedule A (Base Contract) - Pages B-1 thru B-3 Schedule B (Government Option 1) - Pages B-4 thru B-6
Schedule C (Government Option 2) - Pages B-7 thru B-8 Schedule D (Government Option 3) - Page B-9 Schedule E (Government Option 4) - Page B-10 Schedule F (Government Option 5) - Pages B-11 thru B-12 Schedule G (Government Option 6) - Pages B-13 thru B-14 Schedule H (Government Option 7) - Pages B-15 thru B-16
The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B, C, D, E, F, G and H (Government Options 1, 2, 3, 4, 5, 6, and 7); see FAR Clauses 52.217-4 and 52.217-5.
The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of programmed funds and upon receipt of any additional funds required to award the contract. If complete funding is in place at the time of award of Schedule A (Base Contract), the Government may award Schedules B or C+D+E+F+G+H (Government Options 1 or 2) at that time.
Schedule B (Government Option 1): Must be awarded on the same schedule as Schedule A (Base Contract).
If additional funding is required for the award of Schedules C, D, E, F, G or H (Government Option 2, 3, 4, 5, 6, or 7) and is received after the award of Schedule A (Base Contract), the Government has the right to exercise Schedules C, D, E, F, G, and H (Government Option 2, 3, 4, 5, 6, and 7) at the unit prices bid according to the following schedule:
Schedules C, D, E, F, G, and H (Government Option 2, 3, 4, 5, 6, and 7): No later than 260 calendar days after the Effective Notice to Proceed for Schedule A (Base Contract) and Schedule B (Government Option 1).
COMPLETION OF WORK
If the Government awards the contract as Schedules A + B + C +D + E + F + G + H all at the same time, the performance period to complete all contract work will be 425 calendar days.
If the Government awards the contract as Schedule A plus a combination of one or more of the Government Options, the performance period of the contract will be the total time of the individual performance periods of each awarded schedule as specified below. For example, if Schedules A + B are awarded, the performance period of the contract will be 425 calendar days (A + B).
Schedule A: 295 calendar days Schedule B: 130 calendar days Schedule C+D+E+F+G+H: 165 calendar days
If any of the remaining Government Options are exercised after the award of the original contract, the number of calendar days specified above will become the performance period for that Government Option and will be added to the performance period of the original contract.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s).
Bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-
15) may result in the start of construction activities to be no earlier than January 2021. See Subsection 108.01 of the SCR’s for additional details.
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Schedule C (Government Option 2) Bid Total + Schedule D (Government Option 3) Bid Total + Schedule E (Government Option 4) Bid Total + Schedule F (Government Option 5) Bid Total + Schedule G (Government Option 6) Bid Total + Schedule H (Government Option 7) Bid Total.
B - 15
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
002 H0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
002 H0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
002 H0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
H0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
800 LNFT $____________ $____________
H0100 20401-0000 ROADWAY EXCAVATION
250 CUYD $____________ $____________
H0120 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
925 SQYD $____________ $____________
H0140 30202-1000 ROADWAY AGGREGATE, METHOD 1
265 TON $____________ $____________
H0160 31302-0400 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH
300 SQYD $____________ $____________
H0180 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
150 TON $____________ $____________
H0200 55220-0000 REPAIR CONCRETE
15 SQYD $____________ $____________
H0220 60101-0000 CONCRETE (CCS)
10 CUYD $____________ $____________
H0240 62502-0000 TURF ESTABLISHMENT
300 SQYD $____________ $____________
H0260 62903-0000 CELLULAR CONFINEMENT SYSTEM
550 SQYD $____________ $____________
002 H0280 62910-1000 CELLULAR CONFINEMENT SYSTEM BACKFILL, GRANULAR (#57 STONE)
70 CUYD $____________ $____________
Bid Schedule Schedule:H Schedule Type:Options
Project No:MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 16
H0300 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
20 LNFT $____________ $____________
H0320 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
10 SQFT $____________ $____________
H0340 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:H Schedule Type:Options
Project No:MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)
Project Name:Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April 2017
B - 17
BID SUMMARY
Project NP-GRSM 14(3), 112(1), ETC.
(1) Schedule A (Base Contract) Bid Total (from Page B-1 thru B-3) = (1) $________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-4 thru B-6) = (2) $________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-7 thru B-8) = (3) $________________
(4) Schedule D (Government Option 3) Bid Total (Page B-9) = (4) $________________
(5) Schedule E (Government Option 4) Bid Total (Page B-10) = (5) $________________
(6) Schedule F (Government Option 5) Bid Total (from Page B-11 thru B-12) = (6) $________________
(7) Schedule G (Government Option 6) Bid Total (from Page B-13 thru B-14) = (7) $_______________
(8) Schedule H (Government Option 7) Bid Total (from Page B-15 thru B-16) = (8) $_______________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1)+(2)+(3)+(4)+(5)+(6)+(7)+(8) $________________
Maximum Time Allowed for the Contract if all Schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B + C + D + E + F + G + H, the performance period to complete all contract work will be 425 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 295 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedules B (Government Option 1) is exercised with the award of the original contract, the performance period to complete all Schedules A + B work will be 425 calendar days and will start on the effective date of Schedules A’s Notice to Proceed.
If Schedules C, D, E, F, G, or H (Government Options 2, 3, 4, 5, 6, or 7) are exercised after the award of the original contract, the performance period to complete all Schedules C, D, E, F, G, and H work will be 165 calendar days and will start on the effective date of Schedules C through H’s Notice to Proceed.
Amendment No. 0002
Questions / Clarifications
Questions / Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. Reference Spec 153.02 Quality Control Manager – Will a full time, on-site QCM be required for this project?
Response: Yes, a Quality Control Manager will be required as stated on Subsection 153.02.
2. Reference Bid Item(s) H02060 and H0280 - The quantity of Cellular Confinement System is 550 SY. The Quantity of Cellular Confinement System Backfill is 1,300 CY. Calculation of thickness yields 7.09’ thickness. Spec section 629.03 refers to Section 713.07 for Cellular Confinement Systems. Section 713.07 refers to table 713-2 for the depth specified. In Table 713-2 the maximum thickness given is 8”.
Response: Quantity of bid item 62910-1000 (Cellular Confinement System Backfill, Granular (#57 Stone)) in Schedule H updated in Amendment 2.
| SF30_Amend 0002_MO ERFO NPS OZAR.pdf |
| SF30_Amend 0001 Title |
| Amendment 1 Info |
| Bid Schedule A_Amendment 001 |
| Questions-Clarification_Amendement 1 |
| Amendment 1 Info.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Amendment 1 Info.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Plans_Amendment 0001.pdf |
| Plans_Amendment 001 |
| Plans2_Amendment 001 |
File details come from the government source that posted it. Updated .