Plans_Approved_1512A.pdf
PDF 46 MB Posted
- Solicitation number
- 0000040277
About this file
This document is a set of approved construction plans prepared by GHD, Inc. for the California Department of General Services (DGS) and the California Department of Forestry and Fire Protection (Cal Fire). The project involves the phased demolition and reconstruction of a Cal Fire remote radio communications site located on Pratt Mountain in Humboldt County, California (Phase V, DGS Project 00000000001512A, OSFM Project No. 22-N-5730). The scope includes removal of existing facilities, site preparation and improvements, installation of a new communication tower with foundation and vault, construction of a new large vault (24'-8" x 30'-8") and generator vault, installation of a propane tank with concrete pad, and construction of a new 6-foot chain-link fence with barbed wire and slide gate. Work will be performed under a single general contractor in phases to allow continuous operations of communications. The plans were approved by the Division of the State Architect (DSA) and the Office of the State Fire Marshal on January 27, 2026, with an issue date of August 24, 2026. Project team leadership includes Aubree French as Project Director for DGS, Terry Wong as Mechanical Engineer, and Chris Richards as Electrical Engineer from GHD, Inc.
The project design is based on geotechnical investigation and foundation criteria recommendations, with allowable bearing pressure of 3,000 PSF for dead loads and 4,500 PSF for combined dead and live loads. Seismic design parameters classify the site as Seismic Design Category F with a risk category IV occupancy, reflecting its essential communications function. The project must comply with Title 24 of the California Code of Regulations, including the California Building Code (CBC), California Fire Code (CFC), California Electrical Code (CEC), and applicable NFPA standards. Construction includes concrete mat foundations, 8-inch concrete masonry unit (CMU) walls grouted solid, concrete roof systems, HVAC and mechanical systems, electrical infrastructure including single-line diagrams and interconnect schematics for communications equipment, and comprehensive site grading with erosion and sediment control measures. The work includes 88 total drawing sheets (49 GHD sheets and 39 Western Utility Telecom structural sheets) detailing architectural, structural, mechanical, electrical, and civil components necessary for the essential communications facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
PM-G001
AP XX
TAB TAB
AS SHOWN
PROJECT
AREA
PROJECT
AREA
PROJECT
AREA
N
AREA MAP LOCATION MAP
N
AREA
PROJECT
AREA
PROJECT
AREA
SCOPE OF PROJECT
PROJECT CODE INFORMATION
STATEMENT
THIS PROJECT CONSISTS OF THE PHASED DEMOLITION AND
RECONSTRUCTION OF A CALIFORNIA DEPARTMENT OF FORESTRY
REMOTE RADIO SITE. TYPICAL WORK INCLUDES REMOVAL OF
EXISTING FACILITIES, SITE PREPARATION AND IMPROVEMENTS, AND
INSTALLATION OF NEW TOWER AND VAULT. THE WORK WILL BE
PERFORMED UNDER A SINGLE GENERAL CONTRACTOR IN PHASES TO
ALLOW FOR THE CONTINUOUS OPERATION OF COMMUNICATIONS.
PROJECT MAPS
CAL FIRE
TOWERS AND VAULTS
REPLACEMENT PROJECT
PRATT MOUNTAIN - PHASE V
DGS PROJECT 00000000001512A
GHD PROJECT 11136839
OSFM PROJECT NO. 22-N-5730
PROJECT TEAM
DEPARTMENT OF GENERAL SERVICES
Aubree French, Project Director
(916)375-4230
GHD, INC.
Terry Wong, Mechanical Engineer
(707)303-4854
Chris Richards, Electrical Engineer
(707)540-9619
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2025 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:7 November 2025 - 10:15 AM N:\US\Cameron Park\Projects\111\11136839\06-CAD\Pratt Mountain\Sheets\0001 PMG001 Cover Sheet.dwgPlotted By: Becca Keating
M. WEBER
11136839
GHD Inc.
943 Reserve Drive Roseville California 95678 USA T 1 916 782 8688 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CAL FIRE
TOWERS AND VAULTS
REPLACEMENT PROJECT
PRATT MOUNTAIN - PHASE V
REV V3
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
DSA REVIEW
· GEOTECHNICAL AND GEOHAZARD STUDIES
· DESIGN CRITERIA
· SITE IMPROVEMENTS
· COMMUNICATION TOWER INCLUDING CABLE BRIDGE AND FOUNDATIONS
DEFERRED SUBMITTALS
· NONE
STATEMENT OF GENERAL CONFORMANCE
PROJECT LOCATION
THIS PACKAGE CONTAINS SITE SPECIFIC DRAWINGS.
LAT N 040 ° 07' 10.95"
LONG W 123° 41' 35.23"
1. APPLICABLE CODES AND STANDARDS
TITLE 19 CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS
TITLE 24 CCR, PART 1 - 2022 CALIFORNIA ADMINISTRATIVE CODE (CAC)
TITLE 24 CCR, PART 2 - CALIFORNIA BUILDING CODE, VOL 1 & 2 (CBC)
TITLE 24 CCR, PART 3 - CALIFORNIA ELECTRICAL CODE (CEC)
TITLE 24 CCR, PART 4 - 2019 CALIFORNIA MECHANICAL CODE (CMC)
TITLE 24 CCR, PART 5 - 2019 CALIFORNIA PLUMBING CODE (CPC)
TITLE 24 CCR, PART 6 - 2019 CALIFORNIA ENERGY CODE
TITLE 24 CCR, PART 9 - 2019 CALIFORNIA FIRE CODE (CFC)
TITLE 24 CCR, PART 11 - 2019 CALIFORNIA GREEN BUILDING STDS CODE
TITLE 24 CCR, PART 12 - 2019 CALIFORNIA REFERENCED STANDARDS
2016 NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER
2017 EDITION NFPA 58 LIQUEFIED PETROLEUM GAS CODE
2. BASIC SIGNAGE REQUIREMENTS FOR FIRE AND LIFE SAFETY
BUILDING ADDRESS AND STREET SIGNAGE, PER CFC 505.1 & 2
BATTERY/EQUIPMENT ROOMS: SIGNAGE PER CFC 604.3.1
ELECTRICAL ROOMS: SIGNAGE PER 604.3.1
NO SMOKING SIGNAGE FOR LPG
PORTABLE FIRE EXTINGUISHERS, PER CFC 906 AND TITLE 19
NFPA 704 SIGNAGE
3. UTILITY REQUIREMENTS / COORDINATION
UNDERGROUND AND OVERHEAD UTILITY SERVICES SHALL MEET THE
REQUIREMENTS OF THE UTILITY PROVIDER. COMPLY WITH UTILITY
PROVIDER STANDARD DETAILS AND SPECIFICATIONS FOR JOINT TRENCH,
TRANSITIONS AND TERMINATIONS AND ABOVE GROUND REQUIREMENTS.
NV5
Chuck Kull, Geotechnical Engineer
(530)478-1305
FOR ARCHITECTS/ENGINEERS WHO UTILIZE PLANS,
INCLUDING BUT NOT LIMITED TO SHOP DRAWINGS, PREPARED BY OTHER LICENSED
DESIGN PROFESSIONALS AND/OR CONSULTANTS
(Application No. _______________________ File No. _______________ )
The drawings or sheets listed on the cover or index sheet This drawing, page of specifications/calculations
Have been prepared by other design professionals or consultants who are licensed and/or authorized to prepare such drawings in this state. it has been examined by me for:
1) Design intent and appears to meet the appropriate requirements of Title 24, California Code of Regulations And the project specifications prepared by me, and
2) Coordination with my plans and specifications and is acceptable for incorporation into the construction of this project.
The statement of general Conformance "shall not be construed as relieving me of my rights, duties, and responsibilities under sections 17302 and 81138 of the education code and Sections 4-336, 4-341 and 4-344" of Title 24, Part 1. (Title 24, Part 1, Section 4-317 [b])
I find that: All drawings or sheets listed on the cover or index sheet This drawing or page is/are in general conformance with the project design intent, and has/have been coordinated with the project plans and specifications.
Signature Date
Architect or Engineer designated to be in general responsible charge
Print Name
License Number Expiration Date
01-120635 34-CDF
7/11/2025
Jessica E. Napier
6/30/26S5476
Matt Weber, Project Director
(916)296-3222
Jessica Napier, Structural Engineer
(805)858-3474
Matt Weber, Civil Engineer
(916)296-3222
Scott Groff, Project Manager, Tower Design
(971)345-2041
WESTERN UTILITY/ TELECOM INC.
BUILDING ANALYSIS
A. OCCUPANCY CLASSIFICATION AND USE
B. BUILDING CONSTRUCTION TYPE
C. NUMBER OF STORIES
D. ACTUAL BUILDING HEIGHT
E. BUILDING AREA IN SQUARE FEET
F. AREA OF THE PROJECT IN SQUARE FEET (I.E., TENANT IMPROVEMENTS)
G. SEPARATE OR NON-SEPARATED USE
H. ALLOWABLE AREA PER C.B.C.
I. AREA INCREASE
J. HEIGHT INCREASE
K. INCREASE
L. FIRE SPRINKLERS (YES OR NO) TYPE: WET, DRY, PREACTION, OR DELUGE
M. FIRE ALARM: (YES OR NO) TYPE: (MANUAL, AUTOMATIC, ETC)
N. SMOKE CONTROL SYSTEM (YES OR NO)
O. OCCUPANT LOAD FOR THE ENTIRE BUILDING AND EACH FLOOR
P. THE YEAR BUILDING WAS CONSTRUCTED
Q. IS THE BUILDING IN A HIGH FIRE SEVERITY ZONE (YES OR NO)
R. SEISMIC JOINTS (YES OR NO). IF YES, PROVIDE LOCATION.
S. EMERGENCY RESPONDER RADIO COVERAGE (YES OR NO)
T. OTHER FIRE PROTECTION SYSTEM, IF ANY (YES OR NO)
GROUP U OCCUPANCY
TYPE V-B
11'-4" N/A
SEPARATE
5,500
NO
NO
NO
NO
NO
NO
UNOCCUPIED - GROUP U OCCUPANCY
NEW CONSTRUCTION
YES
NO
YES, RADIO ANTENNA FOR OSFM
NO
SUBSTITUTIONS AFFECTING DSA-REGULATED ITEMS SHALL BE CONSIDERED
AS CONSTRUCTION CHANGE DOCUMENTS (CCD'S) AND SHALL BE APPROVED
BY DSA PRIOR TO FABRICATION AND INSTALLATION PER DSA IR A-6 AND
SECTION 338(C) PART 1, TITLE 24 CCR.
1 SFM RESUBMITTAL AO MKW 07/11/25
V3
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/19/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
22-5730
DSA
D E P A R T M E N T O F G E N E R A L S E R V I C E S
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS
APPROVED
DIV. OF THE STATE ARCHITECT
DATE:
01-120635
✔ FLS ACS
01/27/2026
11-07-2025
ISSUE DATE: AUGUST 24, 2026
http://www.ghd.com/ Desiree Jones Tue Nov 11 04:20:17 2025: V2
3875.55
TRUE NORTH
LEG 1
LEG 2LEG 3
LEG 4
90°0'0"
0°
0' 0"
270°0'0'"
0° 0' 0"
0°
0' 0"
DRAWING INDEX,
DESIGN CRITERIA
AND SITE ORIENTATION
PM-G002
AS SHOWN
TOWER ORIENTATION PLAN
NTS
SITE ORIENTATION PLAN
1" = 30'
NOTES:
1. THE DIFFERENCE BETWEEN GRID NORTH AND TRUE NORTH IS EXAGGERATED ABOVE
FOR DEPICTION PURPOSES.
2. GRID NORTH IS BASED ON THE CALIFORNIA STATE PLANE COORDINATE SYSTEM, ZONE 1
(NAD83) AND THE BEARINGS SHOWN IN THE TOPOGRAPHIC SURVEY AND GRADING
PLANS ARE ON GRID NORTH.
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2025 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:7 November 2025 - 10:16 AM N:\US\Cameron Park\Projects\111\11136839\06-CAD\Pratt Mountain\Sheets\0002 PMG002 Dwg Index Dsgn Criteria.dwgPlotted By: Becca Keating
M.WEBER
11136839
GHD Inc.
943 Reserve Drive Roseville California 95678 USA T 1 916 782 8688 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CAL FIRE
TOWERS AND VAULTS
REPLACEMENT PROJECT
PRATT MOUNTAIN - PHASE V
REV V3
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
14.12°
1° 06' 25"
T R U E N
O R T H
G R
ID
N O R T H
N O A A M
O D E L W
M M (2
4-
D A
TA
Q U E R
IE
D O
C T 6, N (D
A
TA
IS
0.
C H A N G
IN
G B
Y .1 1°
W P
E R
Y E A R
FOUNDATION DESIGN CRITERIA: (INCLUDES TOWER AND VAULTS)
FOUNDATION DESIGN IS BASED ON CRITERIA AND RECOMMENDATIONS
IN THE REPORT TITLED GEOTECHNICAL INVESTIGATION REPORT
#11136839.70 BY GHD, INC. DATED JULY 2019 AND THE CODE UPDATE
MEMORANDUM DATED JULY 23, 2021.
1. BEARING PRESSURE:
BASED ON FOOTINGS BEARING ON FIRM NATIVE SOILS
ENGINEERED FILLS.
DEAD LOAD = 3000 PSF (TOWER)
= 3000 PSF (VAULT)
DEAD AND LIVE LOAD
COMBINED = 4500 PSF (TOWER)
= 4500 PSF (VAULT)
ALLOWABLE BEARING CAN BE INCREASED BY 1/3 FOR WIND &
SEISMIC LOADS IN BASIC LOAD CASES OF CBC 1605A.3.2.
2. LATERAL RESISTANCE:
ALLOWABLE PASSIVE RESISTANCE AT FOOTING SHALL BE 500 PCF
EQUIVALENT FLUID PRESSURE. COEFFICIENT OF FRICTION SHALL
BE 0.5. FRICTION AND PASSIVE RESISTANCE MAY BE COMBINED
PROVIDED THE UPPER FOOT OF PASSIVE PRESSURE IS IGNORED
AND STRUCTURE IS POURED AGAINST NEATLY EXCAVATED FORMS.
3. ALL FOOTINGS SHALL BEAR THE MINIMUM DEPTH BELOW THE
LOWEST ADJACENT GRADE SPECIFIED IN THE GEOTECHNICAL
REPORT, BUT NOT LESS THAN 36".
4. SOIL SUBGRADE MODULUS: = 300 PCI
SNOW LOAD:
GROUND SNOW LOAD PG = 30 PSF PER HUMBOLDT COUNTY
PG = 57 PSF PER RWDI ICING AND SNOW LOADING
REPORT DATED JANUARY 25, 2021
FLAT ROOF SNOW LOAD (VAULT ONLY) PF = 27.2 PSF (HUMBOLDT)
PF = 51.7 PSF (RWDI REPORT)
SNOW EXPOSURE FACTOR CE = 0.9 (VAULT)
CE = 0.7 (TOWER)
SNOW LOAD IMPORTANCE FACTOR IS = 1.2
THERMAL FACTOR CT = 1.2
ICE LOADING:
ICE THICKNESS = 1.3 INCHES PER RWDI ICING AND SNOW LOADING
REPORT DATED JANUARY 25, 2021
WIND LOADING W/ ICE = 30 MPH
ICE THICKNESS IMPORTANCE FACTOR II = 1.25
WIND IMPORTANCE FACTOR IW = 1.0
WIND DESIGN DATA:
ULTIMATE WIND VELOCITY Vult = 105 MPH SERVICE WIND VELOCITY Vasd = 82 MPH
RISK CATEGORY = IV
Kzt = 2.32 @ 10' AGL
= 2.17 @ 140' AGL
EARTHQUAKE DESIGN DATA:
SEISMIC IMPORTANCE
FACTOR IE = 1.5
OCCUPANCY CATEGORY = IV (PER TABLE 1604.5)
SITE CLASS = C
SPECTRAL RESPONSE SS = 1.592g COEFFICIENTS S1 = 0.807g SPECTRAL RESPONSE SDS = 0.309g COEFFICIENTS SD1 = 0.753g
SEISMIC DESIGN CATEGORY = F
Fa = 1.2 Fv = 1.4 RESPONSE MODIFICATION FACTOR R = 5.0 SPECIAL REINFORCED MASONRY SHEAR WALLS (VAULT)
R = 3.0 LATTICE SELF-SUPPORTING STRUCTURES (TOWER)
ANALYSIS PROCEDURE USED = EQUIVALENT LATERAL FORCE PROCEDURE (VAULT), SEE WESTERN TOWER DESIGN FOR TOWER ANALYSIS DESIGN BASE SHEAR V = 0.382W (VAULT ONLY), SEE WESTERN TOWER DESIGN DRAWINGS FOR TOWER DESIGN BASE SHEAR
DESIGN CRITERIA
PROPOSED TOWER LOCATION
T-1COVER SHEET & DRAWING INDEX
S-1ELEVATION VIEW / NOTES
S-2UPPER POLE
S-3LOWER POLE
S-4TOWER SECTION 13V - NESTED POLE
S-5TOWER SECTION 13V
S-6TOWER SECTION 15ST
S-7TOWER SECTION 17ST
S-8TOWER SECTION 19ST
S-9TYPICAL GRATING / BRACING
S-10TYPICAL HAND RAIL / DIAGNOL PIPE LIGHTNING ROD
EXTENSION, & SAFETY CLIMB KITS
S-11CENTER MAST
S-12COAX CAGE / CLIMBING LADDER, ANTI-CLIMB, & BUS BAR
S-13ANTENNA LOCATION ELEVATION VIEWS
S-14FULLY LOADED FACE MOUNTED MICROWAVES
S-15
S-15.1
MW ICE BRIDGE DETAILS
S-16MICROWAVE MOUNT KITS
S-17
S-18LEG/ELEVATION ID PLATES
WESTERN UTILITY TELECOM, INC. DRAWING INDEX
S-1.1SST SECTION ALLOWABLE MEMBER FORCES
S-1.2MONOPOLE SECTION ALLOWABLE MEMBER FORCES
S-6.1TOWER SECTION 15ST CONT.
S-7.1TOWER SECTION 17ST CONT.
MW ANTENNA ICE SHIELD DETAILS
UHF/VHF ANTENNA MOUNT KITS
S-19TOWER FOUNDATION SLAB / PIERS
CO-TA1
CO-TA1.1
CO-TA2
CO-TA3
CO-TA4
CO-TA5
CO-TA5.1
CO-TA5.2
CO-TA5.3
CO-TA6
CO-TA6.1
CO-TA6.2
CO-TA6.3
CO-TA6.4
CO-TA6.5
CO-TA6.6
CO-TA6.7
CO-TA6.8
CO-TA7
CO-TA7.2
COVER SHEET AND INDEX
DSA 103
TOWER STRUCTURAL NOTES
SITE PRO BRACKET DETAILS
TOWER ANTENNA MOUNTING DETAILS (ANDREW)
TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL/ANDREW)
TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
TOWER ANTENNA MOUNTING DETAILS (ANDREW/COMMSCOPE)
TOWER ANTENNA MOUNTING DETAILS (ANDREW/COMMSCOPE)
TOWER ANTENNA MOUNTING DETAILS (PRODELIN/GABRIEL)
TOWER ANTENNA MOUNTING DETAILS (ANDREW)
TOWER ANTENNA MOUNTING DETAILS (MIKRO TIK/mWAVE)
TOWER ANTENNA MOUNTING DETAILS (UBIQUITI, GABRIEL)
TOWER ANTENNA MOUNTING DETAILS (COMMSCOPE/RADIOWAVES)
TOWER ANTENNA MOUNTING DETAILS (COMMSCOPE)
TOWER ANTENNA MOUNTING DETAILS (RADWIN, SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS
(HUSTLER/ANTENNA EXPERT/DIAMOND)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
CO-TA8
CO-TA9
CO-TA10
CO-TA10.1
CO-TA11
CO-TA11.1
CO-TA11.2
CO-TA12
CO-TA13
CO-TA14
CO-TA14.1
CO-TA15
CO-TA16
CO-TA17
CO-TA17.1
CO-TA17.2
CO-TA18
CO-TA18.1
CO-TA19
TOWER ANTENNA MOUNTING DETAILS (COMPROD)
TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)
TOWER ANTENNA MOUNTING DETAILS (COMMSCOPE/RFS/SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (RFS/SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS
(DB SPECTRA/RFI MOTOROLA/SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (DB SPECTRA/SCALA)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS (SCALA)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
TOWER ANTENNA MOUNTING DETAILS (HASKALL DENKE)
PROPOSED VAULT LOCATION
PROPOSED GENERATOR VAULT LOCATION
SUBTOTAL NO. SHEETS: 28
SUBTOTAL NO. SHEETS: 11
TOTAL NO. SHEETS: 88
STANTEC
SHEET NO.
SHEET NUMBER DRAWING NUMBERSHEET TITLE
STRUCTURAL DETAILS FOR RADIO AND MICROWAVE ANTENNA MOUNTING BRACKETS
DSA APPLICATION NUMBER: 02-117441-A
STATE OF CALIFORNIA
SHEET NUMBER DRAWING NUMBERSHEET TITLE
OCCUPANCY: GROUP U
CONSTRUCTION: TYPE II-B
S-13.1ANTENNA LOCATION PLAN VIEWS
S-14.1FULLY LOADED LEG MOUNTED MICROWAVES
S-14.2FULLY LOADED VHF/UHF ANTENNA LOCATIONS
N
ALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER THE DETAILS ON THE DSA-APPROVED CONSTRUCTION DOCUMENTS. THE FOLLOWING COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2019 CBC SECTIONS 1617A.1.18 THROUGH 1617A.1.26 AND ASCE 7-16 CHAPTERS 13, 26, AND 30:
1. ALL PERMANENT EQUIPMENT AND COMPONENTS.
2. TEMPORARY, MOVABLE OR MOBILE EQUIPMENT THAT IS PERMANENTLY ATTACHED (E.G. HARD WIRED) TO THE BUILDING UTILITY SERVICES SUCH AS ELECTRICITY, GAS OR WATER. “PERMANENTLY ATTACHED” SHALL
INCLUDE ALL ELECTRICAL CONNECTIONS EXCEPT PLUGS FOR 110/220 VOLT RECEPTACLES HAVING A FLEXIBLE CABLE.
3. TEMPORARY, MOVABLE OR MOBILE EQUIPMENT WHICH IS HEAVIER THAN 400 POUNDS OR HAS A CENTER OF MASS LOCATED 4 FEET OR MORE ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT
THE COMPONENT IS REQUIRED TO BE RESTRAINED IN A MANNER APPROVED BY DSA.
THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE BUT NEED NOT DEMONSTRATE DESIGN COMPLIANCE WITH THE REFERENCES NOTED ABOVE. THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT. FLEXIBLE CONNECTIONS MUST ALLOW MOVEMENT IN BOTH
TRANSVERSE AND LONGITUDINAL DIRECTIONS:
A. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVING A CENTER OF MASS LOCATED 4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT.
B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN THE CASE OF DISTRIBUTED SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL.
THE ANCHORAGE OF ALL MECHANICAL, ELECTRICAL AND PLUMBING COMPONENTS SHALL BE SUBJECT TO THE APPROVAL OF THE DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE OR STRUCTURAL ENGINEER DELEGATED RESPONSIBILITY AND ACCEPTANCE BY DSA. THE PROJECT INSPECTOR WILL VERIFY THAT ALL COMPONENTS AND EQUIPMENT HAVE BEEN ANCHORED IN ACCORDANCE WITH THE ABOVE REQUIREMENTS.
MEP COMPONENT ANCHORAGE NOTE
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE
PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCES AND DISPLACEMENTS PRESCRIBED IN ASCE 7-16 SECTION 13.3 AS DEFINED IN ASCE 7-16 SECTIONS 13.6.5, 13.6.6, 13.6.7, 13.6.8; AND 2019 CBC, SECTIONS 1617A.1.24, 1617A.1.25 AND 1617A.1.26.
THE METHOD OF SHOWING BRACING AND ATTACHMENTS TO THE STRUCTURE FOR THE IDENTIFIED DISTRIBUTION SYSTEM ARE AS NOTED BELOW. WHEN BRACING AND ATTACHMENTS ARE BASED ON A PREAPPROVED INSTALLATION GUIDE (E.G., OSHPD OPM FOR 2013 CBC OR LATER), COPIES OF THE BRACING SYSTEM INSTALLATION GUIDE OR MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO THE START OF AND DURING THE HANGING AND BRACING OF THE DISTRIBUTION SYSTEMS. THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS.
MECHANICAL PIPING (MP), MECHANICAL DUCTS (MD), PLUMBING PIPING (PP), ELECTRICAL DISTRIBUTION SYSTEMS (E):
MP MD PP E OPTION 1: DETAILED ON THE APPROVED DRAWINGS WITH PROJECT SPECIFIC NOTES AND
DETAILS.
MP MD PP E OPTION 2: SHALL COMPLY WITH THE APPLICABLE OSHPD PRE-APPROVAL (OPM #)
PM-G002
PM-G003
PM-C101
PM-C501
PM-S101
PM-S501
PM-S502
PM-S701
PM-S702
PM-E001
PM-E101
PM-E102
PM-E501
PM-E502
PM-E602
PM-E603
PM-E604
PM-G001
PM-C102
PM-S102
PM-S503
PM-E103
PM-E104
PM-E105
PM-E503
PM-E504
PM-E505
PM-M001
PM-M101
PM-M102
PM-M501
PM-M601
PM-A101
PM-A102
PM-A501
PM-A502
PM-E506
PM-E605
PM-E606
PM-E607
PM-E608
PM-E609
PM-E610
GHD DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
DRAWING
NUMBER
1 COVER SHEET
2 DRAWING INDEX, DESIGN CRITERIA AND SITE ORIENTATION
3 ABBREVIATIONS AND SYMBOLS
4 EXISTING SITE DEMOLITION AND CONSTRUCTION SEQUENCING PLAN
5 SITE AND GRADING PLAN
6 CIVIL SECTIONS AND DETAILS
7 COMMON SITE DETAILS
8 VAULT FLOOR PLAN, ROOF PLAN AND BUILDING ELEVATIONS
9 GENERATOR VAULT PLANS, ELEVATIONS AND SECTION
10 ARCHITECTURAL DETAILS
11 ARCHITECTURAL DETAILS
12 STRUCTURAL NOTES
13 VAULT FOUNDATON AND ROOF FRAMING PLAN AND SECTION
14 TOWER FOUNDATION PLAN AND ELEVATION
15 COMMON STRUCTURAL DETAILS
16 STRUCTURAL DETAILS
17 STRUCTURAL DETAILS
18 FEEDLINE BRIDGE
19 FEEDLINE BRIDGE
20 MECHANICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND GENERAL NOTES
21 LARGE VAULT - HVAC
22 GENERATOR VAULT - HVAC
23 MECHANICAL DETAILS
24 MECHANICAL SCHEDULES
25 ELECTRICAL SYMBOLS, LEGEND, ABBREVIATIONS AND GENERAL NOTES
26 ELECTRICAL SITE PLAN
27 LARGE VAULT - LIGHTING, POWER, EQUIPMENT AND GROUNDING
28 GENERATOR VAULT - LIGHTING, POWER, EQUIPMENT AND GROUNDING
29 LARGE VAULT INTERIOR ELEVATIONS - 1
30 LARGE VAULT INTERIOR ELEVATIONS - 2
31 ELECTRICAL DETAILS - 1
32 ELECTRICAL DETAILS - 2
33 ELECTRICAL DETAILS - 3
34 ELECTRICAL DETAILS - 4
35 ELECTRICAL DETAILS - 5
36 ELECTRICAL DETAILS - 6
37 SINGLE LINE DIAGRAM AND LOAD CALCULATION
38 ELECTRICAL SCHEDULES - 1
39 ELECTRICAL SCHEDULES - 2
40 ALARM STATUS REPORTING SCHEMATICS
41 ALARM POINT DESCRIPTIONS
42 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF CABLING - 1
43 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF CABLING - 2
44 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF CABLING - 3
45 SITE ANTENNA LAYOUT AND PRESSURIZATION EQUIPMENT - 1
46 SITE ANTENNA LAYOUT AND PRESSURIZATION EQUIPMENT - 2
PM-E601
PM-S001
PM-C502
SUBTOTAL NO. SHEETS: 49
PM-E611
PM-E612
PM-E613
47 -48VDC CRIS OES INTERCONNECT DIAGRAM
48 -48VDC MW OES INTERCONNECT DIAGRAM
49 +12VDC OES INTERCONNECT DIAGRAM
V3
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/19/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
22-5730
1 SFM RESUBMITTAL AO MKW 07/11/25
DSA
D E P A R T M E N T O F G E N E R A L S E R V I C E S
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS
APPROVED
DIV. OF THE STATE ARCHITECT
DATE:
01-120635
✔ FLS ACS
01/27/2026
11-07-2025
ISSUE DATE: AUGUST 24, 2026
ABBREVIATIONS
AND SYMBOLS
PM-G003
AP XX
TAB TAB
NTS
PM-A501
B
PM-A501
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2025 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:7 November 2025 - 10:17 AM N:\US\Cameron Park\Projects\111\11136839\06-CAD\Pratt Mountain\Sheets\0003 PMG003 Abbreviations and Sym.dwgPlotted By: Becca Keating
M.WEBER
11136839
GHD Inc.
943 Reserve Drive Roseville California 95678 USA T 1 916 782 8688 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CAL FIRE
TOWERS AND VAULTS
REPLACEMENT PROJECT
PRATT MOUNTAIN - PHASE V
REV V3
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
S Y M B O L SA B B R E V I A T I O N S
NEW CONTOURS
EXISTING SPOT ELEVATION
EXISTING STRUCTURE TO BE DEMOLISHED
EXISTING STRUCTURE TO REMAIN
999.8
EXISTING GUY ANCHOR AND WIRE
NEW BUILDING
EXISTING SURVEY MONUMENT
NEW SURVEY MONUMENT
FINISH PAD ELEVATION FP=1000.0
FINISH SLAB ELEVATION FS=1001.0
FF=1002.0FINISH FLOOR ELEVATION
NEW GROUND ELEVATION
NEW SLOPE BANK
PLACE 4" GRAVEL
EXISTING POLE
EXISTING POWER POLE
1000EXISTING CONTOURS
PROPOSED DRAINAGE FLOW DIRECTION
STRUCTURE TO BE DEMOLISHED (D) ANTENNA TOWER
CONCRETE PAD WITH
EXISTING SURVEY INFORMATION
40' TALL ANTENNA
NEW PERMANENT BOLLARD
NEW PROPANE TANK(S) WITH CONCRETE PAD
ON SHEET PM-A501
BUILDING SECTION B
SEE DETAIL 5 ON SHEET PM-A501
REVISION CLOUD AND NUMBER
CONTROL POINT
CENTERLINE
OBJECT HIDDEN FROM VIEW
STUD WALL
PLYWOOD
METAL
INSULATION
GYPSUM WALLBOARD
GRAVEL
RIGID INSULATION
EARTH
CONTINUOUS
BLOCKING
CONCRETE
MASONRY UNIT
CONCRETE
CEMENT PLASTER
BLOCKING
ASPHALT
DISTANCE BETWEEN OBJECTS
NOTE: DISTANCE FROM EXISTING
TREE IS RELATIVE TO THE
DISTANCE FROM THE CENTER OF
THE EXISTING TREE
19'-6"
NEW STRUCTURE ELEVATION
NEW GROUND ELEVATION @ SWALE FLOWLINE
FINISH GRAVEL ELEVATION FG=997.80
UNO TO BE (DD)
995.5
TOP OF STOOP
EL=995.52
980.0
SWALE
MASONRY UNITMU
MTD MOUNTED
STAINLESS STEEL
WH WATER HEATER
WI WROUGHT IRON
W/O WITHOUT
WG WIRE GLASS
UNLESS NOTEDUNO
TYPICALTYP
THRU THROUGH
TOW TOP OF WALL
THRESHOLDTHR
SYM SYMMETRICAL
SUSPENDEDSUSP
STRUCT STRUCTURAL
SC SOLID CORE
SD STORM DRAIN
SECTIONSECT
SCHED SCHEDULE
REQ'D REQUIRED
ROOF DRAIN RD
WATER OR WEATHERWP
VERTICALVERT
WITHW/
WESTW
OR CONCRETE
TOP OF CURBTC
TOP & BOTTOMT&B
STANDARDSTD
STEELSTL
SS
SQUARESQ
SHEET METALSM
SIMILARSIM
SHEETSHT
SOUTHS
ROCK SLOPE PROTECTION RSP
REINFORCEREINF
REGISTER REG
RETURN AIR RA
GAUGE
GALVANIZED IRON
GLASS OR GLAZING
GYPSUM
HT HEIGHT
KPL KICKPLATE
MB MACHINE BOLT
MECH MECHANICAL
MEMB MEMBRANE
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
(N) NEW
OPP OPPOSITE
PL PLATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PVC POLYVINYL CHLORIDE
GALVANIZED
GRADE
HOLLOW CORE
HM HOLLOW METAL
HEADERHDR
HOSE BIBB
LAG BOLTLB
LT LIGHT
MAXIMUMMAX
MTL METAL
MINIMUMMIN
MANUFACTURERMFR
MISC MISCELLANEOUS
NOT TO SCALENTS
OPENINGOPNG
OUTSIDE DIAMETEROD
ON CENTEROC
FRP FIBERGLAS REINFORCED
FOOT OR FEET
FTG FOOTING
FUR FURRING
EXH EXHAUST
EXIST EXISTING (SEE (E))
EXP EXPANSION
EQUIP EQUIPMENT
EASTE
(E) EXISTING
DOWNSPOUTDS
DR DOOR
DWG DRAWING(S)
DIMENSIONDIM
DOUBLE
CONTINUOUSCONT
CONST CONSTRUCTION
BLKG BLOCKING
BTM BOTTOM
BUILT UP ROOFINGBUR
BM BEAM
ASPH ASPHALT
ALUMINUM
FACE OF MASONRYFOM
FACE OF FINISHFOF
FACE OF CONC.FOC
FLOORFLR
FINISH
FIRE EXTINGUISHER
FOUNDATION
FLOOR DRAIN
FLAT BAR
EXPANSION JOINT
EQUAL
ELECTRICAL (AL)ELEC
ELEVATION
EACHEA
DIAGONALDIAG
DIAMETERDIA
DETAILDTL
COMPOSITIONCOMP
CONCRETECONC
COMMUNICATIONCOMM
CONC MASONRY UNITCMU
CAULKINGCLKG
CEILINGCLG
CONTROL JOINTCJ
CEMENTCEM
BLOCKBLK
BUILDINGBLDG
ARCHITECTURALARCH
ARCHITECT/ENGINEERA/E
ANCHOR BOLTAB
JOINTJT
JOISTJST
INCH OR INCHES
INSIDE DIAMETER
OVERO/
FOS FACE OF STUD
DELAYED DEMOLITION
DBL
PANEL
PROOF
BOW BOTTOM OF WALL
UG UNDERGROUND
SW SOUTHWEST
SE SOUTHEAST
NE NORTHEAST
NW NORTHWEST
DD
EQ
EL
EJ
FIN
FE
FDN
FD
FB
FT
HC
HB
GYP
GR
GL
GI
GALV
HDR
GA
IN
ID
ROUGH OPENINGRO
AL
LIQUIFIED PETROLEUMLPG
RAIN WATER LEADER RWL
TOS TOP OF STEEL
TO TOP OF
BO BOTTOM OF
CAL FIRECDF
TOC TOP OF CONCRETE
ABOVE GRADE LEVELAGL
UNLESS OTHERWISEUON
GAS
NOTED
OTHERWISE
COLUMNCOL
1 SFM RESUBMITTAL AO MKW 07/11/25
V3
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/19/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
22-5730
DSA
D E P A R T M E N T O F G E N E R A L S E R V I C E S
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS
APPROVED
DIV. OF THE STATE ARCHITECT
DATE:
01-120635
✔ FLS ACS
01/27/2026
11-07-2025
WATER TANK
O H
H
OH
OH OHOHOH OH
OH
OH
O H
O H
O H
OH
D
IR
T RO
A D
OH
OH
OH
+0
+0
(E)TOWER
(E)WOODEN BARRACKS
(TO REMAIN)
(E)RADIO VAULT
(E)TOWER TO
BE REMOVED
(E)GENERATOR BLDG
(E)CONC SLAB
C/L 40-FOOT ROAD
EASEMENT PER
2007-22701-6 H.C.O.R.
& DEED 563-546(E)
BUCK MTN RANCH
ACCESS EASEMENT
WIDTH CHANGES FROM
20' TO 40' HERE
C/L 20-FOOT ROAD
EASEMENT PER
2007-22701-6 H.C.O.R.
2007-22701-6 H.C.O.R.
GRANT OF EASEMENT FROM
JOHANNESEN TO STATE OF
CALIF.
LEASE BOUNDARY LINE
(E) DIRT ROAD
(E) D
IR
T R
O
AD
3 9
(E)WOODEN DEBRIS
AND HARDWARE TO BE
REMOVED
(E)TOWER
FOUNDATIONS
(E)NON-STATE FACILITIES OUTSIDE
THE PROJECT LEASE BOUNDARY
LINE SHALL BE PROTECTED, TYP
OCCUPANCY: GROUP U
CONSTRUCTION : TYP II-B
REMOVE TREES AND VEGETATION FROM
WITHIN LIMITS OF LEASE BOUNDARY LINE
EXISTING SITE
DEMOLITION AND CONSTRUCTION
SEQUENCING PLAN
PM-C101
PEM PEM
AAQ AAQ
1" = 20'
N
0 40'20'10'
(E) EXISTING
EXISTING PROPANE TANK
RADIO TOWER SIZE VARIES
(P)EDGE OF CONCRETE
(P)BARBWIRE FENCE
BOUNDARY LINE
EXISTING OVERHEAD POWER OR COMM LINES
EXISTING STRUCTURE TO BE REMOVED
EXISTING POWER POLE
CONCRETE
NTS NOT TO SCALE
(P) PROPOSED
EDGE OF GRAVEL ROAD
DEMOLITION/CONSTRUCTION SEQUENCE
LEGEND
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2025 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:7 November 2025 - 10:17 AM N:\US\Cameron Park\Projects\111\11136839\06-CAD\Pratt Mountain\Sheets\0004 PMC101 Site Demo.dwgPlotted By: Becca Keating
M.WEBER
11136839
GHD Inc.
943 Reserve Drive
Roseville California 95678 USA T 1 916 782 8688 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CAL FIRE
TOWERS AND VAULTS
REPLACEMENT PROJECT
PRATT MOUNTAIN - PHASE V
REV V3
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
EXISTING TREE AND VEGETATION
SEE SHEET PM-C102 FOR PROPOSED IMPROVEMENTS.
1. DEMOLISH AND REMOVE (E) CONCRETE SLAB AND TWO EXISTING WOOD UTILITY POLES WITH
STEEL CHANNEL EXTENDING ABOUT 6FT. ABOVE GRADE AND EMBEDDED IN CONCRETE
FOUNDATION.
2. CONSTRUCT NEW GENERATOR VAULT AND NEW RADIO VAULT PER PLAN (REFERENCE SHEET
PM-C102).
3. CONSTRUCT TEMPORARY MONOPOLE FOR PRATT MOUNTAIN MW LINK. REMOVE (E) POLES.
4. TRANSITION UTILITY POWER AND COMMUNICATION CONNECTIONS FROM (E) GENERATOR AND
RADIO VAULTS TO NEW VAULTS. INCLUDE TEMPORARY FEED LINE BRIDGE BETWEEN NEW
VAULT AND (E) TOWER.
5. DEMOLISH (E) RADIO VAULT AND (E) GENERATOR VAULT. SAWCUT AND REMOVE FOUNDATION.
BACKFILL TO SUBGRADE WITH ENGINEERED FILL AND COMPACT TO 95% RELATIVE
COMPACTION.
6. CONSTRUCT NEW TOWER PER PLAN (REFERENCE SHEET PM-C102) AND CONSTRUCT
PERMANENT FEED LINE BRIDGE FROM NEW VAULT TO TOWER.
7. COORDINATE WITH CALOES/PSC TO TRANSITION COMMUNICATIONS FROM EXISTING TOWER TO
NEW TOWER FROM NEW VAULT.
8. DEMOLISH (E) TOWER AND RELATED (E) CONCRETE FOUNDATIONS. BACKFILL TO SUBGRADE
WITH ENGINEERED FILL AND COMPACT TO 90% RELATIVE COMPACTION.
9. REMOVE TEMPORARY MONOPOLE.
10. CONSTRUCT FOUNDATION AND INSTALL NEW PROPANE TANK (REFERENCE SHEET PM-C102).
11. PROVIDE NEW GAS FEED FROM NEW PROPANE TANK TO NEW VAULT.
12. DEMOLISH, CLEAR, GRUB, BACKFILL, COMPACT, AND GRADE AREA TO RECEIVE AGGREGATE
BASE PER SHEET PM-C102.
13. CONSTRUCT NEW 6 FOOT FENCE WITH BARBED WIRE AND DRIVE THROUGH SLIDE GATE PER
PLAN.
14. PLACE AGGREGATE BASE FOR DRIVEWAY AND SITE ACCESS PER LIMITS SHOWN ON PLANS
15. ALL STRUCTURES AND ITEMS OUTSIDE OF THE LEASE BOUNDARY LINE TO REMAIN.
16. RELOCATED GUY WIRE SUPPORT POLE AND GUY WIRE PER PG&E REQUIREMENTS.
COORDINATE RELOCATION WITH PG&E.
IN ADDITION TO ALL OTHER REQUIREMENTS IN THE PROJECT PLANS
AND SPECIFICATIONS, DEMOLITION WORK SHALL ADHERE TO THE
REQUIREMENTS IN THE 2019 CALIFORNIA CODE CHAPTER 33.
V3
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/19/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
22-5730
DSA
D E P A R T M E N T O F G E N E R A L S E R V I C E S
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS
APPROVED
DIV. OF THE STATE ARCHITECT
DATE:
01-120635
✔ FLS ACS
01/27/2026
11-07-2025
O H
O H
OH OH OH
OH
OH
OH
2007-22701-6 H.C.O.R.
GRANT OF EASEMENT FROM
JOHANNESEN TO STATE OF
CALIF.
PIERCE MTN. 312°
C A H T O P
E A K 168°
N=1931468.06 E=6088189.58
LAT N040° 07' 10.95"
LONG W123° 41' 35.23"
(E) D
IR
T R O A D
5'
ACCESS EASEMENT
WIDTH CHANGES FROM
20' TO 40' HERE
C/L 20-FOOT ROAD
EASEMENT PER
2007-22701-6 H.C.O.R.
BOUNDARY LINE/ASSUMED PROPERTY LINE
PROPOSED (N) TOWER
LOCATION
PROPOSED (N)
PROPANE TANK
10' PROPANE TANK SETBACK LINE
PROPOSED FENCE
PROPOSED (N) LARGE VAULT
LOCATION (24'-8" x 30'-8")
PROPOSED (N)
TEMPORARY
MONOPOLE
5'
(E) DIRT ROAD
5'
5'
5'
5'
PROPOSED (N) FENCE
SLIDE GATE
PROPOSED (N) BOLLARD
(TYP) QNTY=6
ROAD EASEMENT FOR STATE OF CALIF.
(25 ) JOHANNESEN PTR - DOC. 2007-22701-6
UTILITY EASEMENT FOR STATE OF CALIF.
(26) JOHANNESEN PTR - DOC 2007-22702-4
(E) TANK ON CONC PAD
(E) BARRACKS
(TO REMAIN)
5.19
LIMITS OF
EXCAVATION
PROPOSED CONCRETE
MAT FOUNDATION
3894.92 FS
3894.84 FG
3894.98 FG
3893.35 FG
3894.04 FG
3894.74 FG
2%
3894.10 FG
3895.39 FG
FF = 3895.0
S
LA
B
4.
2%
2%
2%
3895.12 FG
3894.10 FG
3893.14 FG
3894.58 FS
3894.50 FG
3894.35 FG
3894.35 FG
3894.20 FG
3894.20 FG
3894.10 FG
3894.10 FG2%
3894.10 FG
3892.50 FG
3895.66 FG
3895.09 FG
3894.74 FG
3895.06 FG
3894.79 FG
2%
2%
(N) GENERATORVAULTFF = 3895.34
PROPOSED (N) FENCE LINE
MATCH (EX)
FG (3896.0 +/-)
MATCH (EX)
FG (3895.1 +/-)
B
P M -C
3894.25 FG
3893.52 FG
3893.00 FG
3893.37 FG
3894.37 FG
3893.25 FG
3894.70 FG
3894.98 FG
3894.20 FG
3894.98 FG
4 3
A
PM-C501
2:1
2:1 2:
2:
2:1
2:1
3895.23 FG
19 38
25 26
28 29
23 5'
15.8'
4'
15' x 8' PAD
4' T Y P
3894.35 FG
3894.45 FG
4.
3893.77
TOP OF COLUMN
(TYP)
63 LF OF GAS LINE, SEE DETAIL
4/PM-C502 FOR TRENCHING DETAIL
10.2'
9'
3.5'
30" X 48" WINDOW
TRUE NORTH
LEG 1
LEG 2LEG 3
LEG 4
90°0'0"
0°
0' 0"
270°0'0'"
0° 0' 0"
0°
0' 0"
POINT TABLE
POINT #
EASTINGS
6088202.23
6088229.08
6088206.28
6088216.33
6088198.48
6088211.44
6088214.64
6088224.93
6088238.88
6088235.15
6088221.21
6088216.46
6088218.04
6088222.79
6088255.86
6088259.07
6088249.55
NORTHINGS
1931556.73
1931541.43
1931545.23
1931536.89
1931521.35
1931522.38
1931516.08
1931512.72
1931508.16
1931496.76
1931501.31
1931502.86
1931507.69
1931506.14
1931489.99
1931483.69
1931454.54
POINT TABLE
POINT #
EASTINGS
6088243.24
6088229.53
6088227.97
6088205.59
6088173.59
6088173.59
6088205.59
6088180.09
6088199.09
6088189.58
6088180.09
6088199.10
6088221.35
6088225.95
6088221.20
6088222.90
6088227.66
NORTHINGS
1931451.34
1931455.81
1931456.06
1931452.03
1931452.02
1931484.03
1931484.03
1931477.56
1931477.56
1931468.06
1931458.56
1931458.55
1931463.74
1931477.85
1931479.40
1931484.63
1931483.07
POINT TABLE
POINT #
EASTINGS
6088230.86
6088254.31
6088244.80
6088218.84
6088177.34
6088177.83
6088183.97
6088190.27
6088192.18
6088188.72
6088194.98
6088188.80
6088182.54
6088213.56
6088211.12
6088227.81
6088225.33
NORTHINGS
1931492.90
1931485.24
1931456.09
1931456.06
1931495.30
1931496.77
1931515.57
1931518.77
1931518.15
1931514.02
1931511.98
1931492.96
1931495.00
1931499.34
1931491.72
1931494.68
1931487.08
SITE AND GRADING PLAN
PM-C102
PEM PEM
AAQ AAQ
1" = 10'
TOWER ORIENTATION PLAN
NTS
0 20'10'
N
THE BASIS OF BEARINGS FOR THE SURVEY IS CCS83 ZONE 1 BASED ON AN OPUS
SOLUTION OF GPS OBSERVATIONS.
BENCH MARK
THE VERTICAL DATUM IS NAVD 88 BASED ON AN OPUS SOLUTION OF GPS OBSERVATIONS.
AB
BOW
(E) E
FG
FL
FS
AGGREGATE BASE
BOTTOM OF WALL
EXISTING
EASTING
FINISHED GRADE
FLOWLINE
FINISHED SURFACE
ABBREVIATIONS
BASIS OF BEARING
SHEET KEYNOTES
1. PROPOSED CONCRETE MAT FOUNDATION FOR TOWER (SEE STRUCTURAL SHEETS).
TOP OF FOUNDATION ELEVATION = 3890.77
BOTTOM OF FOUNDATION ELEVATION = 3887.77
2. PLACE 4" AB OVER COMPACTED SUBGRADE
3. PROPOSED COMMUNICATIONS EQUIPEMENT VAULT BUILDING. SEE ARCHITECTURAL
AND STRUCTURAL SHEETS
4. PLACE 6" CLASS 2 AB OVER GEOSYNTHETIC FABRIC (MIRAFI HP270 OR APPROVED
EQUAL)
5. CONSTRUCT 8'x15' CONCRETE PAD FOR TEMPORARY MOBILE OPTIONAL STANDBY
GENERATOR PER DETAIL 1/PM-S503. ELEVATION TO BE FLUSH WITH ADJACENT
GRADE.
6. CONSTRUCT PROPANE TANK PER DETAIL 1/PM-M501 AND DETAIL 5/PM-E505 FOR
GROUNDING AT PROPANE TANK PAD
7. CONSTRUCT BOLLARD PER DETAIL 3/PM-C501
8. CONSTRUCT SLIDING GATE PER DETAIL 2/PM-C502. SEE SHEET PM-E606 FOR
GROUNDING
9. PROPOSED GENERATOR VAULT BUILDING FOR OPTIONAL STANDBY GENERATOR. SEE
ARCHITECTURAL PLANS
EXISTINGPROPOSED
GROUND ELEVATION
TOP OF SLOPE
GROUND CONTOUR
CONCRETE
STRAW WATTLE
DITCH FLOWLINE
7839.1± EG
LEGEND
HORIZONTAL/ VERTICAL
SITE CONTROL
SHEET GENERAL NOTES
1. ALL CONSTRUCTION NOTED AS (N) IS NEW "ESSENTIAL" FACILITY CONSTRUCTION
PER THE 1986 ESSENTIAL SERVICES ACT.
2. ELEMENTS IDENTIFIED AS (E) OR (E) TO REMAIN, ARE NOT "ESSENTIAL" AND ARE NOT
PART OF THE COMMUNICATIONS FACILITY.
3. EXCESS EXCAVATION SOIL CAN BE SPREAD ONSITE AT SPECIFIED SPOIL AREA.
CONTRACTOR TO VERIFY LOCATION WITH DGS PRIOR TO SPREADING.
4. THE CONTRACTOR SHALL REPAIR ALL ACCESS ROAD SURFACES TO THE
SATISFACTION OF THE DGS PROJECT DIRECTOR UPON COMPLETION OF THE
PROJECT.
5. EXISTING UTILITY LOCATION NOTE: PROJECT CONTRACTOR TO VERIFY DEPTH AND
LOCATION OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. PROJECT
CONTRACTOR TO CONTACT UNDERGROUND SERVICE ALERT (USA) 811 “CALL
BEFORE YOU DIG” PROGRAM AND COORDINATE LOCATING EXISTING UTILITIES VIA A
PRIVATE UNDERGROUND UTILITY LOCATOR CONTRACTOR THAT UTILIZES
ELECTROMAGNETIC LOCATION DETECTION AND/OR GROUND PENETRATING RADAR.
4" AB
GB
LAT
LONG
(N) N
TF
TW
GRADE BREAK
LATITUDE
LONGITUDE
NEW
NORTHING
TOP OF FOOTING
TOP OF WALL
6" CLASS 2 AB OVER
GEOSYNTHETIC FABRIC
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2025 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:10 November 2025 - 9:20 AM N:\US\Cameron Park\Projects\111\11136839\06-CAD\Pratt Mountain\Sheets\0005 PMC102 Site Grading Plan.dwgPlotted By: Becca Keating
M.WEBER
11136839
GHD Inc.
943 Reserve Drive Roseville California 95678 USA T 1 916 782 8688 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CAL FIRE
TOWERS AND VAULTS
REPLACEMENT PROJECT
PRATT MOUNTAIN - PHASE V
REV V3
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
1 SFM RESUBMITTAL RK CR 06/30/25
V3
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/19/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
22-5730
DSA
D E P A R T M E N T O F G E N E R A L S E R V I C E S
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS
APPROVED
DIV. OF THE STATE ARCHITECT
DATE:
01-120635
✔ FLS ACS
01/27/2026
11-07-2025
TOC=3890.77
1' OVER EXCAVATE
32'
1' OVER EXCAVATE
TOC=3893.77
4" AB OVER
COMPACTED
SUBGRADE
SEE STRUCTURAL
SHEETS FOR
FOUNDATION DESIGN
PROPOSED (N) VAULT BUILDING
PROPOSED (N) FENCE
LEASE BOUNDARY LINE
PROPOSED (N) FENCE
LEASE BOUNDARY LINE
TOC=3893.77
2:1
(E) GROUND
SEE STRUCTURAL
SHEETS FOR VAULT
FOUNDATION DESIGN
6" AB OVER
GEOSYNTHETIC FABRIC
6" AB OVER
GEOSYNTHETIC
FABRIC
2:1
4" AB OVER
COMPACTED
SUBGRADE
TOC=3893.77
TOC=3890.77
4" AB OVER
COMPACTED
SUBGRADE
TOC=3894.50
PROPOSED
PROPANE
TANK PAD
SEE STRUCTURAL
SHEETS FOR PAD DESIGN
PROPOSED (N) FENCE
LEASE BOUNDARY LINE
4" AB OVER
COMPACTED
SUBGRADE
6" AB OVER
GEOSYNTHETIC FABRIC
6" AB OVER
GEOSYNTHETIC FABRIC
2:1
2:1
(E) GROUND
1' OVER EXCAVATE
32'
1' OVER EXCAVATESEE STRUCTURAL
SHEETS FOR
FOUNDATION DESIGN
CONCRETE PIER
NOTES:
CONCRETE FILLED 6" DIAMETER STEEL PIPE EXTENDED 48" ABOVE AND 36"
BELOW GRADE OR SLAB. SHEATH WITH YELLOW BUMPER POST SLEEVES
MANUFACTURED IDEALSTEEL AND BUILDER SUPPLIES, INC.
1/2" ISOLATION JOINT
6" PIPE OVER FILLED W/
CONCRETE & PROVIDE DOME TOP.
FINISH GRADE
CIVIL SECTIONS AND DETAILS
PM-C501
PEM PEM
AAQ AAQ
AS SHOWN
3/4"x3/4"x24" WOOD STAKE AT START, FLOW
NOTES:
3"-5"
M
IN
OVERLAP STRAW WATTLES
12" MIN AT ENDS
EVERY 48" OC AND AT END
FLOW
3'-4'
ON BENCH
30' OR MID HEIGHT
SLOPE STEEPNESS
ON SOIL TYPE AND
SPACING DEPENDS
TIGHTLY ABUT
ADJACENT ROLLS SHALL
1. STRAW WATTLES SHALL BE MANUFACTURED FROM RICE
STRAW AND BE WRAPPED IN A TUBULAR BLACK PLASTIC
NETTING. THE NETTING SHALL HAVE A STRAND THICKNESS OF
0.30 INCH, AND A KNOT THICKNESS OF 0.055 AND A WEIGHT OF
0.35 OUNCE PER FOOT (EACH ± 10%) AND SHALL BE MADE FROM
85% HIGH DENSITY POLYETHYLENE, 14% ETHYL VINYL ACETATE
AND 1% COLOR FOR UV INHIBITION. STRAW WATTLE SHALL BE
TWENTY-FIVE FEET LONG (± 6") AND WEIGH APPROXIMATELY 30
POUNDS (± 3LBS)
2. FIBER ROLL INSTALLATION REQUIRES THE PLACEMENT AND
SECURE STAKING OF THE ROLL IN A TRENCH, 3"-5" (75-125mm)
DEEP, DUG ON CONTOUR. RUNOFF MUST NOT BE ALLOWED TO
RUN UNDER OR AROUND ROLL.
STRAW WATTLES MUST BE PLACED ALONG
SLOPE CONTOURS
SEDIMENT, ORGANIC MATTER, AND
NATIVE SEEDS ARE CAPTURED BEHIND
THE ROLLS
8"-10" DIAMETER RICE
STRAW WATTLE
A
SECTION A-A
SCALE: 1"=5'
B
SECTION B-B
SCALE: 1"=5'
STRAW WATTLE
SCALE: NTS
EROSION AND SEDIMENT CONTROL NOTES
1. THE PRACTICE OF EROSION AND SEDIMENT CONTROL IS A DYNAMIC ACTIVITY WHICH REQUIRES FLEXIBILITY AND COMMITMENT BY THE CONTRACTOR TO SUCCESSFULLY IMPLEMENT. THE EROSION AND SEDIMENT CONTROL DETAILS ARE INTENDED TO PROVIDE GUIDANCE TO THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PREVENT DISCHARGE OF SEDIMENT FROM THE SITE TO ANY WATERCOURSE, DRAINAGE SYSTEM, OR ADJACENT PROPERTY AND TO PROTECT WATERCOURSES AND ADJACENT PROPERTIES FROM
DAMAGE BY EROSION OR DEPOSITION WHICH MAY RESULT FROM THE PERMITTED GRADING.
2. THE CONTRACTOR SHALL COMPLY WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (N.P.D.E.S.) GENERAL PERMIT, WASTE DISCHARGE REQUIREMENTS AND ALL FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS RELATING TO DISCHARGES OF STORM WATER RUNOFF ASSOCIATED WITH CONSTRUCTION
ACTIVITY.
3. THE LOCATION AND TYPE OF THE EROSION AND SEDIMENT CONTROL PRACTICES SHOWN ON THIS PLAN ARE GUIDELINES ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE PRACTICES IN SUCH A MANNER AS TO COMPLY WITH THE N.P.D.E.S. PERMIT. THE CONTRACTOR SHALL ADJUST MODIFY AND MAINTAIN THE EROSION AND SEDIMENT CONTROL MEASURES TO FIT THE PARTICULAR SITE CONDITIONS AND PHASE OF
CONSTRUCTION OR AS DIRECTED BY THE CONTRACTING OFFICER.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION UNTIL SUCH TIME THAT THE ENTIRE PROJECT HAS BEEN STABILIZED AND
ACCEPTED BY THE STATE.
5. THE CONTRACTOR SHALL CONDUCT INSPECTIONS OF THE SITE PRIOR TO ANTICIPATED STORM EVENTS, AND AFTER ACTUAL EVENTS TO IDENTIFY AREAS CONTRIBUTING TO DISCHARGE OF STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY AND TO EVALUATE WHETHER CONTROL PRACTICES TO REDUCE POLLUTANT LOADINGS ARE ADEQUATE AND PROPERLY IMPLEMENTED IN ACCORDANCE WITH THE TERMS OF THE N.P.D.E.S. GENERAL
PERMIT OR WHETHER ADDITIONAL CONTROL PRACTICES ARE NEEDED.
6. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES MUST BE IN PLACE OR BE CAPABLE OF BEING IN
PLACE WITHIN 24 HOURS.
7. STRAW WATTLES SHALL BE INSTALLED FOLLOWING THE CONTOUR TO PROTECT AREAS FROM SEDIMENTATION
CAUSED BY SHEET AND RILL EROSION.
8. ALL EROSION AND SEDIMENT CONTROL FEATURES SHALL BE MONITORED BY THE CONTRACTOR DURING AND AFTER ALL STORMS TO ENSURE CONTROL FEATURES ARE WORKING PROPERLY. ALTERNATIVE MEASURES MUST
BE INSTALLED IF ORIGINAL MEASURES FAIL.
9. CONTRACTOR IS RESPONSIBLE FOR THE PREPARATION OF THE SWPPP PER SPECIFICATION SECTION 31 25 13.
Sheet of
This document shall not be used for construction unless signed and sealed for construction.
DesignerDrawn
Scale
Date
Drafting Check
Design Check
Project Manager
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2025 GHD
0 1"
Bar is one inch on original size sheet
Original Size
Arch D
Project No.
Sheet No.
IssueNo. Drawn Approved Date
Title
Client
Project
Plot Date: Filename:7 November 2025 - 10:19 AM N:\US\Cameron Park\Projects\111\11136839\06-CAD\Pratt Mountain\Sheets\0006 PMC501 Civil Sections and Dets.dwgPlotted By: Becca Keating
M.WEBER
11136839
GHD Inc.
943 Reserve Drive Roseville California 95678 USA T 1 916 782 8688 W www.ghd.com
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
CAL FIRE
TOWERS AND VAULTS
REPLACEMENT PROJECT
PRATT MOUNTAIN - PHASE V
REV V3
REVIEWER:
REVIEWER SIGNATURE:
DATE REVIEWER:
PSC OPERATIONS PLAN REVIEW
NO EXCEPTIONS TAKEN
BOLLARD TYPICAL DETAIL
SCALE: NTS
V3
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
12/19/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
22-5730
DSA
D E P A R T M E N T O F G E N E R A L S E R V I C E S
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
DSA
DIVISION OF THE STATE ARCHITECT
APP: INC:
REVIEWED FOR
SS
APPROVED
DIV. OF THE STATE ARCHITECT
DATE:
01-120635
✔ FLS ACS
01/27/2026
11-07-2025
18" 4'-0"
2' -0
" DRAINROCK
GEOTEXTILE
FILTER FABRIC
PERFORTED PIPE
10'-0"
EXISTING GROUND SURFACE
BEFORE GRADING
ENGINEERED FILL
FINISHED SLOPE
2(h): 1(v) TYP
KEYWAY EXCAVATION
3' -0
TOE DRAIN
EXISTING GROUND SURFACE
CONCRETE-LINE V-DITCH
BENCHES (TYP)
SEEPAGE FLOW
EQUAL TO
KEYWAY DEPTH
TRENCH DRAIN
MIN.
M
IN
MIN
MIN
M
IN
NOTES:
1. EXCAVATIONS FOR BENCHES AND KEYWAY SHALL REMOVE ALL LOOSE, SOFT, AND/OR DISTURBED ROCK, AS WELL AS ANY ORGANIC MATERIAL OR VEGETATION.
2. KEYWAY DEPTH INDICATED ABOVE IS A MINIMUM. ACTUAL DEPTH MAY VARY DEPENDING ON FIELD CONDITIONS. KEYWAY DEPTH MAY BE REDUCED TO LESS THAN 3 FEET IF HARD ROCK IS ENCOUNTERED.
3. IN GENERAL, CUT SLOPES BETWEEN BENCHES SHOULD BE NO STEEPER THAN 3/4(h): 1(v) OR FLATTER DEPENDING ON THE MATERIALS ENCOUNTERED AND SHOULD MEET ALL FEDERAL AND STATE OSHA REQUIREMENTS. THE MAXIMUM VERTICAL OFFSET BETWEEN ADJACENT BENCHES SHOULD BE LESS THAN 5 FEET. ALL BENCHES SHOULD EXTEND AT LEAST 2 FEET (HORIZONTALLY) INTO THE SLOPE.
4. THE BOTTOM OF THE KEYWAY SHOULD BE SLOPED DOWNWARD AT LEAST 2 PERCENT AND TOWARDS THE TOE DRAIN INDICATED ABOVE.
5. A TOE DRAIN SHOULD BE PLACED AT THE BOTTOM OF THE KEYWAY AT THE LOCATION INDICATED ABOVE. THIS DRAIN SHOULD EXTEND THE ENTIRE LENGTH OF THE KEYWAY AND BE CONSTRUCTED IN ACCORDANCE WITH DETAIL ABOVE AND
REQUIREMENTS PROVIDED BELOW.
6. IF WATER, FRACTURED ROCK, PERVIOUS SOILS, OR OTHER SUBSURFACE CONDITIONS ARE EXPOSED DURING GRADING WHICH WOULD INDICATE THE POTENTIAL FOR FUTURE WATER SEEPAGE INTO THE FILL, TRENCH DRAINS SHOULD BE INSTALLED AT THESE LOCATIONS IN ACCORDANCE WITH THE DETAIL ABOVE AND REQUIREMENTS PROVIDED BELOW.
A. DRAIN TRENCH DEPTH(S) WILL VARY DEPENDING ON THE SUBSURFACE CONDITIONS ENCOUNTERED DURING CONSTRUCTION. AS A MINIMUM, TRENCH DEPTH(S) SHOULD BE AT LEAST AS GREAT AS THE HEIGHT OF THE ADJOINING, DOWNSLOPE CUT; ACTUAL DEPTH(S) SHOULD BE DETERMINED IN THE FIELD BY THE PROJECT GEOTECHNICAL ENGINEER. THE TRENCH WALL SHOULD BE FREE OF OBSTRUCTIONS WHICH MIGHT PUNCTURE OR OTHERWISE HARM THE GEOTEXTILE FILTER FABRIC.
B. GEOTEXTILE FILTER FABRIC SHOULD BE STORED, HANDLED, AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
C. PERFORATED PIPE SHOULD BE AT LEAST 4 INCHES IN DIAMETER (FOR DRAINS LESS THAN 200 FEET IN LENGTH), OR 6 INCHES IN DIAMETER FOR DRAINS IN EXCESS OF 200 FEET IN LENGTH. PIPE ATTACHED WITHIN A WELL-DEFINED TRENCH (SUCH AS THE "TOE-DRAIN" INDICATED ABOVE) SHOULD CONSIST OF PERFORATED OR SLOTTED HIGH STRENGTH PLASTIC OR OTHER SIMILAR MATERIAL CAPABLE OF SUSTAINING THE INDUCED OVERBURDEN PRESSURE WITHOUT NOTICEABLE DEFORMATIONS. THE BOTTOM OF ALL PERFORATED PIPES SHOULD BE PLACED WITHIN 1 TO 3 INCHES OF THE TRENCH BOTTOM. ALL PERFORATED PIPES SHOULD BE CENTERED (HORIZONTALLY) WITHIN THE TRENCH.
D. WATER COLLECTED BY THE PERFORATED PIPE(S) SHOULD BE DIRECTED BY SOLID CONDUIT (OF SIMILAR TYPE TO PERFORATED) TO A SUMP, DITCH, STORM DRAIN, OR OTHER SUITABLE LOCATION FOR DISPOSAL.
E. ALL HDPE SECTIONS (IF USED) SHOULD BE JOINED USING SPLIT FITTINGS, SECURED USING NYLON WIRE TIES (TWO PER JOINT) AND POLYETHYLENE TAPE.
F. DRAINROCK SHOULD CONSIST OF POORLY-GRADED DURABLE STONE, SIZED SUCH THAT 100 PERCENT PASSES THE 1-INCH SIEVE AND LESS THAN 5 PERCENT PASSES THE NO. 4 SIEVE.
G. PERFORATED PIPE AND ANY SOLID CONDUIT COLLECTOR PIPES SHOULD BE SLOPED A MINIMUM OF ONE PERCENT (1%) TO DRAIN.
H. DRAIN LINE CLEANOUTS SHOULD BE PROVIDED AT 200-FOOT INTERVALS (MIN.). THE DESIGN AND LOCATION OF CLEANOUTS SHOULD BE PROVIDED BY THE PROJECT CIVIL ENGINEER. ALL CLEANOUTS SHOULD BE SECURED TO PREVENT VANDALISM
OR TAMPERING.
TYPICAL KEY AND BENCH DETAIL
SCALE:NTS
TRENCH SECTIONS
SCALE:NTS
TOE DRAIN DETAIL TRENCH DRAIN DETAIL
EROSION CONTROL BLANKET
SCALE:NTS
6' -0
(3) STRANDS
BARB WIRE
12"
3' -0
10' MAX SPACING
TENSION BAR
TENSION WIRE W/ TIES
2" M
IN
DIA
MIN
2"
CHAIN-LINK FENCE
SCALE:NTS
CHAIN-LINK FENCE / GATE
SCALE:NTS
GATE
SEE NOTE 9
BARBED SELVAGE
FABRIC DETAIL
BOTTOM CORNER
TRUSS ROD
AND HINGE
GATE POST
GATE POST
TOP GATE HINGE
POST
BRACE ROD
8" GATE POST
POST DETAIL
TENSION BAR
TENSION BAND
TRUSS ROD
BRACE END
TURNBUCKLE
REINFORCING WIRE
PULLED TAUT
TENSION BAR
TENSION BAND
PIPE BRACE
BAND LINK
HOG RING
@ 12"OC
NO. 9 GAUGE
LINE POST
BRACE END
BRACE BAND
WIRE, WEAVE INTO
NO. 6 REINFORCING
FABRIC
LINE POST
FENCE ACCESSORIES
& BOTTOM MEMBERS
2" MAX. CLEAR TOP
8'-0"
GATE OPENING PER PLAN
6' -0
TOP TENSION WIRE
W
D
6"
GATE FOOTING TABLE:
GATE POST (8.62"O.D.)
D=48"
W=32"Ø
(TYPICAL ALL 3)
STRETCHER
BAR & BANDS
3/8" DIA
TRUSS ROD
2" OD PIPE
(TYP)
TRUSS RODS WELDED AT
UPPER CORNERS
WELDED PLATE
WITH HOLE FOR
TRUSS ROD
6" THK x 12" WIDE
FIBERMESH CONC
2 1/2" OD PIPE
(TYP)
STEEL WHEEL
GATE POST
SEE NOTE 9.
STOP CURB PRIOR TO FENCE POST
AND FENCE POST FOOTING TYP
BOTH OF THE DRIVEWAY
X X X X X X X
X X X X X X
X X X X X X X
X X X X X
X X X X X
X X X X X
X X X X X X X X X
X X X X X X X X X
X X X X X X X X X
FITTINGS AND HARDWARE NOTES
1. ALL FERROUS METAL SHALL BE HOT DIPPED GALVANIZED PER ASTM A-153.
2. FENCE AND GATES SHALL BE FURNISHED COMPLETE WITH ALL NECESSARY FITTINGS.
3. FOR GATES-SIZES OF PIPES, SAG RODS, AND TURN BUCKLES SHALL BE MANUFACTURER'S
STANDARD MEETING REQUIREMENTS OF THIS DRAWING.
4. ALL POSTS AND STRUCTURAL SUPPORTS SHALL BE LOCATED ON INNER SIDE OF THE FENCING.
5. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI AT 28 DAYS
WITH 3" SLUMP AND 3/4" MAX. SIZE OF AGGREGATE.
6. FENCE FABRIC TO BE 96" UNLESS OTHERWISE SPECIFIED, AND GALVANIZED CONFORMING TO
ASTM-A392, CLASS 2 (2.0 OZ. PER S.Q. FOOT OF SURFACE AREA)
7. ALL HARDWARE SHALL BE PEENED OE WELDED IN SUCH A MANNER TO ALLOW PROPER
OPERATION OF COMPONENTS, BUT PREVENT DISASSEMBLY OF FENCING OR GATES.
8. MAINTAIN CONTINUITY OF BARBED WIRE WHEN TRANSITION FROM HIGH TO LOW FENCE.
9. FENCE MATERIAL SIZES.
LINE POST 2" O.D.
CORNER POST 3" O.D.
GATE POST 4" O.D.
GATE POST 13'-18' WIDE 6.62" O.D.
GATE POST 18'-OVER 8.62" O.D.
TOP RAIL 1-5/8" O.D.
BRACE RAIL 1-5/8" O.D.
FENCE FABRIC GAGE #9
TENSION ROD 3/8" DIAMETER
SECTION A-A
GATE POST SEE
NOTE 9
A
A
PROPANE GAS PIPE
12"
4"
SELECT PIPE BEDDING
SCARE TAPE
2" SAND
NATIVE SOIL
ELECTRIC POWER
12"
4"
SELECT PIPE BEDDING
SCARE TAPE
2" SAND
NATIVE SOIL
UNDERGROUND PROPANE GAS UNDERGROUND ELECTRIC POWER
FINISH GRADE
FINISH GRADE
2"-5"
20"
10"
2"-5"
3.3'
10"
3.75 SPIKES PER SQ YD
(4.8 SPIKES PER SQ M)
FOR BLANKETS WITH THE NORTH AMERICAN
GREEN DOT SYSTEM PLACE SPIKES AS SHOWN
SPIKES IN THE BOTTOM
OF THE TRENCH PLACED
APPROXIMATELY 12"
APART.
4'
12"
BERM
12"
SPACE SPIKES AT APPROX. 12" OC
(TOP, BOTTOM, AND BOTH SIDES)
SL
O
PE
V
AR
IE
S
SE
E
G R
AD
IN
G P
LA
N
NOTES:
1. SEED & FERTILIZE WITH USFS - APPROVED MIX PRIOR TO PLACING EROSION CONTROL CONTROL
BLANKET.
2. MATERIAL:
SLOPES GREATER THAN 1.5:1 - LAY NORTH AMERICAN GREEN VMAX C350 BLANKETS LOOSELY AND
SPIKE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH.
3. SLOPES LESS THAN OR EQUAL TO 1.5:1 - LAY TYPE C JUTE NETTING.
4. USE SPIKE PATTERN "E" (YELLOW DOTS). APPLY PERMANENT SEEDING AND FERTILIZER BEFORE
PLACING BLANKETS.
5. TERMINAL END EDGE TUCKED 6" INTO EXCAVATED 6" WIDE TRENCH AND SPIKED AT
APPROXIMATELY 12" SPACING. BACKFILL AND COMPACT TRENCH AFTER STAPLING, THEN SEED, FERTILIZER AND STRAW. INSTALL SECOND ROW OF SPIKES, ABOVE TRENCH, 12" OC = (2) ROWS
SPIKES AT BOTTOM 12" OC EACH WAY.
12"
ALT ANCHOR TRENCH
ANCHOR TRENCH
SPIKE PATTERN (E)
TE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .