1512ABE_-_Project_Manual_Book_IV_of_V.pdf
PDF 6 MB Posted
- Solicitation number
- 0000040277
About this file
This is a Project Manual for a state and local construction contract involving the State of California Department of General Services, Real Estate Services Division, and the California Department of Forestry and Fire Protection (CALFire). The project concerns the replacement of communication facilities in Phase V, Group A, at three mountain locations: Pratt Mountain, Bunchgrass Mountain, and Mt. Pierce, located in Humboldt and Shasta Counties, California. The project is being managed by Courtney Wetsell of the Department of General Services, with GHD, Inc. serving as the consultant under project manager Matt Weber. The project manual consists of five books containing specifications, drawings, and technical requirements for tower foundation demolition, vault construction, electrical systems, mechanical systems, and antenna installations at each site. The manual includes comprehensive Division sections covering concrete work, masonry, structural steel, electrical systems, HVAC, plumbing, and site preparation across all three increments, with detailed specifications for materials, execution standards, and quality assurance requirements aligned with 2019 California Building Code standards and various ASTM and industry standards.
The contract specifications establish detailed requirements for concrete mix designs with minimum compressive strengths of 4,500 psi at 28 days, water-to-cement ratios not exceeding 0.45, and specific air entrainment and slump requirements. Materials procurement emphasizes sourcing from consistent suppliers, with all concrete and masonry materials requiring certification and testing documentation. The work includes low-lift and high-lift grouting procedures for masonry with maximum pour heights of 12 feet for 8-inch walls and 16 feet for 12-inch walls, conducted within single working days. Quality control protocols mandate testing by independent laboratories with minimum three concrete test cylinders for every 75 cubic yards placed, along with field samples and shop drawing submittals. The contractor assumes full responsibility for compliance with Federal, State, and local regulations regarding demolition, disposal of materials, worker safety in accordance with ANSI A10.6, and coordination with utility companies for electrical service removal. The project manual does not specify final contract award dates, pricing terms, or funding sources within the provided excerpt.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
PROJECT MANUAL – Book I
INTRODUCTORY INFORMATION
SPECIFICATIONS
FOR:
PHASE V COMMUNICATION FACILITIES
REPLACEMENT – GROUP A
1512E – MT. PIERCE
DEPARTMENT OF FORESTRY AND FIRE
PROTECTION (CALFIRE)
HUMBOLDT & SHASTA COUNTIES, CALIFORNIA
Courtney Wetsell, Project Director Telephone Number 279.799.4650 West Sacramento, California Consultants: GHD, Inc.
08/14/2026
E STATE FIRE MARSHAL
APPROVED FIRE AND PANIC ONLY
01/09/26
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans shall be available on the project site at all times.
22-5732
Project Number: 1512E
PROJECT TITLE PAGE
RESDMSTR: 02/03/2014v1 00 01 01 - 1 01512A, B, E
DOCUMENT 00 01 01
PROJECT TITLE PAGE
Title: REPLACE COMMUNICATION FACILITIES, PHASE V – GROUP A:
1. PRATT MOUNTAIN
2. BUNCHGRASS MOUNTAIN
3. MT. PIERCE
Client Agency: DEPARTMENT OF FORESTRY AND FIRE
PROTECTION (CALFIRE)
Location: PRATT MOUNTAIN/ BUNCHGRASS
MOUNTAIN/ MT.PIERCE
HUMBOLDT & SHASTA COUNTIES,
CALIFORNIA
Project Number: 1512A, 1512B, 1512E
Project Director: Courtney Wetsell State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: 279.799.
Email: Courtney.Wetsell@dgs.ca.gov
Consultant: GHD, Inc.
Matt Weber, Project Manager 943 Reserve Drive Roseville, CA 95678 Telephone Number: (916) 296-3222 Email: Matt.Weber@ghd.com
CERTIFICATIONS PAGE
RESDMSTR: 02/03/2014v1 00 01 05 - 1 001512A, B, E
DOCUMENT 00 01 05
CERTIFICATIONS PAGE
PROJECT TITLE:
1. PRATT MOUNTAIN
2. BUNCHGRASS MOUNTAIN
3. MT. PIERCE
CLIENT AGENCY :
LOCATION:
PROJECT NUMBER :
OWNER :
PROJECT DIRECTOR :
CONSULTANT
REPLACE COMMUNICATION FACILITIES, PHASE V –
GROUP A:
DEPARTMENT OF FORESTRY AND FIRE PROTECTION
(CALFIRE)
A - PRATT MOUNTAIN
(Coordinates: 41°29'56.58"N, 124° 3'36.30"W)
B - BUNCHGRASS MTN.
(Coordinates: 41°29'56.58"N, 124° 3'36.30"W)
E - MT. PIERCE
(Coordinates: 41°29'56.58"N, 124° 3'36.30"W)
HUMBOLDT & SHASTA COUNTIES, CALIFORNIA
1512A, 1512B, 1512E
STATE OF CALIFORNIA
Courtney Wetsell Department of General Services Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: 279.799.4650 Email: Courtney.Wetsell@dgs.ca.gov
GHD, Inc. Matt.Weber@ghd.com
RESDMSTR: 02/03/2014v1 00 01 05 - 2 001512A, B, E
REGULATORY REVIEWS:
RESDMSTR: 02/03/2014v1 00 01 05 - 3 001512A, B, E
See Site Books 2, 3, & 4 for site Specific Regulatory Stamps
See Site Books 2, 3, & 4 for site Specific Regulatory Stamps
DSA ACCESS COMPLIANCE SFM
TABLE OF CONTENTS
RESDMSTR: 6/20/2025 00 01 10 - 1 1512A, B, E
DOCUMENT 00 01 10
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
BOOK I
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
Pages Document 00 01 01 Project Title Page .......................................................................... 1 only 00 01 05 Certifications Page ........................................................................ 1 through 3 00 01 10 Table of Contents .......................................................................... 1 through 9 00 01 15 List of Drawings ............................................................................. 1 through 8
BIDDING REQUIREMENTS
Document 00 11 00 Invitation for Bids ........................................................................... 1 through 4 00 21 00 Instructions to Bidders ................................................................... 1 through 8 Appendix 00 21 00.01 Request for Bidding Interpretation ................................................. 1 only Document 00 22 00 Supplementary Instructions to Bidders .......................................... 1 only 00 22 10 DVBE Participation Program Requirements ................................... 1 through 3 00 41 00 Bid Form (Sample) ........................................................................ 1 through 10 00 43 13 Bidder’s Bond (Sample) ................................................................. 1 only 00 43 16 Certified Small Business Subcontractor(s) Summary (Sample) ..... 1 through 2 00 45 46 Payee Data Record (Sample) ........................................................ 1 through 2 00 91 13 Addendum (Sample)……………………………………………………1 through 3
CONTRACTING REQUIREMENTS
Document 00 52 00 Agreement (Sample) ..................................................................... 1 only 00 61 13 Performance Bond (Sample) ......................................................... 1 only 00 61 14 Payment Bond to Accompany Construction Contract (Sample) ..... 1 only 00 63 63 Construction Contract Change Order (Sample) ............................. 1 only 00 72 00 General Conditions of the Contract for Construction ...................... 1 through 31 00 73 00 Supplementary Conditions ............................................................. 1 through 13
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 Summary ....................................................................................... 1 through 8 01 21 00 Allowances .................................................................................... 1 through 2 01 25 00 Substitution Procedures ................................................................. 1 through 2
RESDMSTR: 6/20/2025 00 01 10 - 2 1512A, B, E
01 29 00 Payment Procedures ..................................................................... 1 through 4 01 31 00 Project Management and Coordination .......................................... 1 through 6 01 32 00 Construction Progress Documentation .......................................... 1 through 7 01 32 33 Photographic Documentation ........................................................ 1 through 3 01 33 00 Submittal Procedures .................................................................... 1 through 8 01 33 29.08 Buy Clean California Act Requirements ......................................... 1 through 2 01 40 00 Quality Requirements .................................................................... 1 through 6 01 50 00 Temporary Facilities and Controls ................................................. 1 through 7 01 56 39 Temporary Tree and Plant Protection ............................................ 1 through 5 01 57 23 Temporary Storm Water Pollution Control ..................................... 1 through 4 01 60 00 Product Requirements ................................................................... 1 through 5 01 64 00 Owner-furnished Products ............................................................. 1 through 3 01 73 00 Execution ...................................................................................... 1 through 7 01 74 19 Construction Waste Management and Disposal ............................ 1 through 5 Form 01 74 19.01 Construction Waste Estimate (A,B,& E) ......................................... 1 only 01 74 19.02 Waste Management Report (A, B & E) .......................................... 1 through 2 Section 01 74 20 Recycled Content Certification (A, B & E) ...................................... 1 through 3 Form 01 74 20.01 Recycled Content Certification Worksheet (Example) .................... 1 through 2 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary (Example) (A, B & E) ...................................................................................... 1 through 2 Section 01 75 00 Starting and Adjusting ................................................................... 1 through 3 01 77 00 Closeout Procedures ..................................................................... 1 through 12 Form STD 817 Prime Contractor’s Certifications – DVBE Subcontractor Report ... 1 through 5 01 77 00.01 Contractor’s Certification of Small Business Participation .............. 1 only 01 77 00.02 Contractor’ Certification of Small Business Participation ................ 1 only Section 01 79 00 Demonstration and Training .......................................................... 1 through 4
BOOK II - PRATT MTN.
DIVISION 02 – EXISTING CONDITIONS
Section 02 4000 Demolition ..................................................................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................. 1 through 3
DIVISION 03 – CONCRETE
Section 03 10 00 Concrete Forming and Accessories ............................................... 1 through 5 03 20 00 Concrete Reinforcing ..................................................................... 1 through 3 03 30 00 Cast-In-Place Concrete ................................................................. 1 through 8
DIVISION 04 – MASONRY
Section 04 22 00 Concrete Unit Masonry .................................................................. 1 through 9
DIVISION 05 – METALS
Section 05 05 23 Metal Fastenings ........................................................................... 1 through 9 05 12 00 Structural Steel Framing ................................................................ 1 through 3 05 30 00 Metal Decking ................................................................................ 1 through 3 05 41 00 Steel Studs .................................................................................... 1 through 4
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
RESDMSTR: 6/20/2025 00 01 10 - 3 1512A, B, E
Section 06 10 00 Rough Carpentry ........................................................................... 1 through 2
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 21 00 Thermal Insulation ......................................................................... 1 through 2 07 92 00 Joint Sealants ................................................................................ 1 through 4
DIVISION 08 – OPENINGS
Section 08 11 13 Standard Hollow Metal Doors ........................................................ 1 through 2 08 12 13 Hollow Metal Frames ..................................................................... 1 through 2 08 71 00 Door Hardware .............................................................................. 1 through 3
DIVISION 09 – FINISHES
Section 09 20 00 Plaster and Gypsum Board ............................................................ 1 through 2 09 54 53 Fiberglass Reinforced Panel .......................................................... 1 through 2 09 67 16 Epoxy Flooring .............................................................................. 1 through 3 09 91 00 Painting ......................................................................................... 1 through 7
DIVISION 13 – SPECIAL CONSTRUCTION
Section 13 36 13.13 Self-Supporting Steel Communications Tower ............................... 1 through 8 13 50 00 Antennas ....................................................................................... 1 through 17
DIVISION 15 – RESERVED (NOT USED)
DIVISION 16 – RESERVED (NOT USED)
DIVISION 17 – RESERVED (NOT USED)
DIVISION 18 – RESERVED (NOT USED)
DIVISION 19 – RESERVED (NOT USED)
FACILITY SERVICES SUBGROUP
DIVISION 20 – RESERVED (NOT USED)
DIVISION 22 – PLUMBING
Section 22 00 00 Plumbing ....................................................................................... 1 through 15
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
Section 23 00 00 Heating, Ventilating and Air Conditioning ....................................... 1 through 17 23 05 00 General Requirements for Mechanical Work ................................. 1 through 15
DIVISION 24 – RESERVED (NOT USED)
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
RESDMSTR: 6/20/2025 00 01 10 - 4 1512A, B, E
Section 26 01 00 Basic Electrical Requirements ....................................................... 1 through 9 26 01 26 Electrical Testing ........................................................................... 1 through 9 26 05 19 Low-Voltage Power Conductors and Cables .................................. 1 through 10 26 05 26 Grounding and Bonding ................................................................. 1 through 16 26 05 29 Electrical Hangers and Supports ................................................... 1 through 5 26 05 33.13 Conduit .......................................................................................... 1 through 10 26 05 33.16 Electrical Boxes ............................................................................. 1 through 3 26 05 36 Interior Cable Tray ......................................................................... 1 through 3 26 05 43 Underground Ducts and Structures ............................................... 1 through 6 26 05 48 Seismic Restraint for Electrical Equipment .................................... 1 only 26 05 53 Electrical Identification ................................................................... 1 through 7 26 24 16 Panelboards .................................................................................. 1 through 8 26 27 26 Wiring Devices .............................................................................. 1 through 7 26 27 26.10 Miscellaneous Electrical Devices ................................................... 1 through 4 26 28 16 Overcurrent Protection Devices ..................................................... 1 through 7 26 32 13 Standby System Generator Set ..................................................... 1 through 14 26 36 23 Automatic Transfer Switches ......................................................... 1 through 10 26 51 13 Interior Lighting .............................................................................. 1 through 9
DIVISION 27 – COMMUNICATIONS
Section 27 53 19 Internal Cellular, Paging and Antenna Systems ............................. 1 only
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)
DIVISION 29 – RESERVED (NOT USED)
SITE AND INFRASTRUCTURE SUBGROUP
DIVISION 30 – RESERVED (NOT USED)
DIVISION 31 – EARTHWORK
Section 31 01 50 Maintenance of Excavation Support and Protection ....................... 1 through 2 31 10 00 Site Preparation (Clearing and Grubbing) ...................................... 1 only 31 20 00 Earth Moving ................................................................................. 1 through 11 31 23 13 Subgrade Preparation ................................................................... 1 through 8 31 23 16.26 Rock Removal ............................................................................... 1 through 2 31 23 33 Trenching and Backfill ................................................................... 1 through 7 31 25 00 Erosion and Sedimentation Control ............................................... 1 through 5 31 25 13 Storm Water Pollution Prevention Plan .......................................... 1 through 2
DIVISION 32 – EXTERIOR IMPROVEMENTS
Section 32 11 23 Aggregate Base Courses ............................................................... 1 only 32 31 13 Chain Link Fence ........................................................................... 1 through 4
DIVISION 33 – UTILITIES (NOT USED)
DIVISION 34 – TRANSPORTATION (NOT USED)
RESDMSTR: 6/20/2025 00 01 10 - 5 1512A, B, E
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION (NOT USED)
DIVISION 36 – RESERVED (NOT USED)
DIVISION 37 – RESERVED (NOT USED)
DIVISION 38 – RESERVED (NOT USED)
DIVISION 39 – RESERVED (NOT USED)
PROCESS EQUIPMENT SUBGROUP (NOT USED)
BOOK III – BUNCHGRASS MTN
DIVISION 02 – EXISTING CONDITIONS
Section 02 40 00 Demolition ..................................................................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................. 1 through 3
DIVISION 03 – CONCRETE
Section 03 10 00 Concrete Forming and Accessories ............................................... 1 through 5 03 20 00 Concrete Reinforcing ..................................................................... 1 through 3 03 30 00 Cast-In-Place Concrete ................................................................. 1 through 8
DIVISION 04 – MASONRY
Section 04 22 00 Concrete Masonry Unit .................................................................. 1 through 9
DIVISION 05 – METALS
Section 05 05 23 Metal Fastenings ........................................................................... 1 through 9 05 12 00 Structural Steel Framing ................................................................ 1 through 3 05 30 00 Metal Decking ................................................................................ 1 through 3 05 41 00 Steel Studs .................................................................................... 1 through 4
DIVISION 06 – WOOD
Section 06 10 00 Rough Carpentry ........................................................................... 1 through 2
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 21 00 Thermal Insulation ......................................................................... 1 through 2 07 92 00 Joint Sealants ................................................................................ 1 through 4
DIVISION 08 – WINDOWS AND DOORS
Section 08 11 13.13 Standard Hollow Metal Doors ........................................................ 1 through 2 08 12 13 Hollow Metal Frames ..................................................................... 1 through 2 08 71 00 Door Hardware .............................................................................. 1 through 3
DIVISION 09 – FINISHES
Section 09 20 00 Plaster Gypsum Board................................................................... 1 through 2
RESDMSTR: 6/20/2025 00 01 10 - 6 1512A, B, E
09 54 53 Fiberglass Reinforced Panel .......................................................... 1 through 2 09 67 16 Epoxy Flooring .............................................................................. 1 through 3 09 91 00 Painting ......................................................................................... 1 through 7
DIVISION 13 – SPECIAL CONSTRUCTION
Section 13 36 13.13 Self-Supporting Steel Communications Tower ............................... 1 through 8 13 50 00 Antennas ....................................................................................... 1 through 17
DIVISION 22 – PLUMBING
Section 22 00 00 Plumbing ....................................................................................... 1 through 14
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING
Section 23 00 00 Heating, Ventilating and Air Conditioning ....................................... 1 through 17 23 05 00 General Requirements for Mechanical Work ................................. 1 through 15
DIVISION 26 – ELECTRICAL
Section 26 01 00 Basic Electrical Requirements ....................................................... 1 through 9 26 01 26 Electrical Testing ........................................................................... 1 through 9 26 05 19 Low-Voltage Power Conductors and Cables .................................. 1 through 10 26 05 26 Grounding and Bonding ................................................................. 1 through 16 26 05 29 Electrical Hangers and Supports ................................................... 1 through 4 26 05 33.13 Conduit .......................................................................................... 1 through 10 26 05 33.16 Electrical Boxes ............................................................................. 1 through 3 26 05 36 Interior Cable Tray ......................................................................... 1 through 3 26 05 43 Underground Ducts and Structures ............................................... 1 through 6 26 05 48 Seismic Restraint for Electrical Equipment .................................... 1 only 26 05 53 Electrical Identification ................................................................... 1 through 7 26 24 16 Panelboards .................................................................................. 1 through 8 26 27 26 Wiring Devises .............................................................................. 1 through 7 26 27 26.10 Miscellaneous Electrical Devices ................................................... 1 through 4 26 28 16 Overcurrent Protection Devices ..................................................... 1 through 7 26 32 13 Stanby System Generator Set ....................................................... 1 through 15 26 36 23 Automatic Transfer Switches ......................................................... 1 through 10 26 51 13 Interior Lighting .............................................................................. 1 through 9
DIVISION 27 – COMMUNICATIONS
Section 27 53 19 Internal Cellular, Paging and Antenna Systems ............................. 1 only
DIVISION 31 – EARTHWORK
Section 31 01 50 Maintenance of Excavation Support and Protection ....................... 1 through 2 31 10 00 Site Preparation (Clearing and Grubbing) ...................................... 1 only 31 20 00 Earth Moving ................................................................................. 1 through 11 31 23 13 Subgrade Preparation ................................................................... 1 through 8 31 23 16.26 Rock Removal ............................................................................... 1 through 2 31 23 33 Trenching and Backfill ................................................................... 1 through 7 31 25 00 Erosion and Sedimentation Control ............................................... 1 through 5 31 25 13 Strom Water Pollution Prevention Plan .......................................... 1 through 2
RESDMSTR: 6/20/2025 00 01 10 - 7 1512A, B, E
DIVISION 32 – EXTERIOR IMPROVEMENTS
Section 32 11 23 Aggregate Base Courses ............................................................... 1 only 32 31 13 Chain Link Fence ........................................................................... 1 through 4
BOOK IV - MT. PIERCE
DIVISION 02 – EXISTING CONDITIONS
Section 02 40 00 Demolition ..................................................................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................. 1 through 3
DIVISION 03 – CONCRETE
Section 03 10 00 Concrete Forming and Accessories ............................................... 1 through 5 03 20 00 Concrete Reinforcing ..................................................................... 1 through 3 03 30 00 Cast-In-Place Concrete ................................................................. 1 through 8
DIVISION 04 – MASONRY
Section 04 22 00 Concrete Masonry Units ................................................................ 1 through 9
DIVISION 05 – METALS
Section 05 05 23 Metal Fastenings ........................................................................... 1 through 9 05 12 00 Structural Steel Framing ................................................................ 1 through 3 05 30 00 Metal Decking ................................................................................ 1 through 3 05 41 00 Steel Studs .................................................................................... 1 through 4
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
Section 06 10 00 Rough Carpentry ........................................................................... 1 through 2
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 21 00 Thermal Insulation ......................................................................... 1 through 2 07 92 00 Joint Sealants ................................................................................ 1 through 4
DIVISION 08 – OPENINGS
Section 08 11 13.13 Standard Hollow Metal Doors ........................................................ 1 through 2 08 12 13 Hollow Metal Frames ..................................................................... 1 through 2 08 71 00 Door Hardware .............................................................................. 1 through 3
DIVISION 9 – FINISHES
Section 09 20 00 Plaster Gypsum Board................................................................... 1 through 2 09 54 53 Fiberglass Reinforced Panel .......................................................... 1 through 2 09 67 16 Epoxy Flooring .............................................................................. 1 through 3 09 91 00 Painting ......................................................................................... 1 through 7
DIVISIOIN 13 – SPECIAL CONSTRUCTION
Section 13 36 13.13 Self-Supporting Steel Communications Tower ............................... 1 through 8
RESDMSTR: 6/20/2025 00 01 10 - 8 1512A, B, E
13 50 00 Antennas ....................................................................................... 1 through 18
DIVISION 22 – PLUMBING
Section 22 00 00 Plumbing ....................................................................................... 1 through 14
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING
Section 23 00 00 Heating, Ventilating and Air Conditioning ....................................... 1 through 17 23 05 00 General Requirements for Mechanical Work ................................. 1 through 15
DIVISION 26 – ELECTRICAL
Section 26 01 00 Basic Electrical Requirements ....................................................... 1 through 9 26 01 26 Electrical Testing ........................................................................... 1 through 9 26 05 19 Low-Voltage Power Conductors and Cables .................................. 1 through 10 26 05 26 Grounding and Bonding ................................................................. 1 through 16 26 05 29 Electrical Hangers and Supports ................................................... 1 through 4 26 05 33.13 Conduit .......................................................................................... 1 through 10 26 05 33.16 Electrical Boxes ............................................................................. 1 through 3 26 05 36 Interior Cable Tray ......................................................................... 1 through 3 26 05 43 Underground Ducts and Structures ............................................... 1 through 6 26 05 48 Seismic Restraint for Electrical Equipment .................................... 1 only 26 05 53 Electrical Identification ................................................................... 1 through 7 26 24 16 Panelboards .................................................................................. 1 through 8 26 27 26 Wiring Devices .............................................................................. 1 through 7 26 27 26.10 Miscellaneous Electrical Devices ................................................... 1 through 4 26 28 16 Overcurrent Protection Devices ..................................................... 1 through 7 26 32 13 Standby System Generator Set ..................................................... 1 through 14 26 36 23 Automatic Transfer Switches ......................................................... 1 through 10 26 51 13 Interior Lighting .............................................................................. 1 through 9
DIVISION 27 – COMMUNICATIONS
Section 27 53 19 Internal Cellular, Paging and Antenna System ............................... 1 only
DIVISION 31 – EARTHWORK
Section 31 01 50 Maintenance of Excavation Support and Protection ....................... 1 through 2 31 10 00 Site Preparation (Clearing and Grubbing) ...................................... 1 only 31 20 00 Earth Moving ................................................................................. 1 through 11 31 23 13 Subgrade Preparation ................................................................... 1 through 8 31 23 16.26 Rock Removal ............................................................................... 1 through 2 31 23 33 Trenching and Backfill ................................................................... 1 through 7 31 25 00 Erosion and Sedimentation Control ............................................... 1 through 5 31 25 13 Strom Water Pollution Prevention Plan .......................................... 1 through 2
DIVISION 32 – EXTERIOR IMPROVEMENTS
Section 32 11 23 Aggregate Base Courses ............................................................... 1 only 32 31 13 Chain Link Fence ........................................................................... 1 through 4
RESDMSTR: 6/20/2025 00 01 10 - 9 1512A, B, E
BOOK V - APPENDICES
A. Geotechnical Investigations:
A Pratt Final Geotechnical
Investigation 1 through 37
B Bunchgrass Final Geotechnical Investigation
1 through 39
E Pierce Final Geotechnical Investigation
1 through 52
B. Environmental Commitment Tables
A Pratt EC Table 1 through 6 B Bunchgrass EC Table 1 through 6 E Mt. Pierce EC Table 1 through 5
C. Miscellaneous Tower Equipment Information
1 Antenna Testing &
Analysis 1 through 11
2 Antenna Wrapping Procedure
1 through 5
3 Cal OES PSC & General Contractor Inspection and Acceptance Criteria
1 through 4
4 Grounding Requirement for Vault and Tower
1 through 13
5 Tower Install Coax - Waveguide
1 through 3
END OF DOCUMENT
LIST OF DRAWINGS
RESDMSTR: 02/03/2014 00 01 15 - 1 01512A, B, E
DOCUMENT 00 01 15
PRATT MTN. – INCREMENT 1
Sheet Number Description
GENERAL
PM -G001 COVER SHEET
PM -G002 DRAWING INDEX, DESIGN CRITERIA AND SITE ORIENTATION
PM -G003 ABBREVIATIONS AND SYMBOLS
CIVIL
PM -C101 EXISTING SITE DEMOLITION AND CONSTRUCTION
SEQUENCING PLAN
PM -C102 SITE AND GRADING PLAN
PM -C501 CIVIL SECTIONS AND DETAILS
PM-C502 COMMON SITE DETAILS
ARCHITECTURAL
PM -A101 VAULT FLOOR PLAN, ROOF PLAN AND BUILDING
ELEVATIONS
PM -A102 GENERATOR VAULT PLANS, ELEVATIONS AND SECTION
PM -A501 ARCHITECTURAL DETAILS
PM -A502 ARCHITECTURAL DETAILS
STRUCTURAL
PM -S001 STRUCTURAL NOTES
PM -S101 VAULT FOUNDATION AND ROOF FRAMING PLAN AND
SECTION
PM -S102 TOWER FOUNDATION PLAN AND ELEVATION
PM -S501 COMMON STRUCTURAL DETAILS
PM -S502 STRUCTURAL DETAILS
PM -S503 STRUCTURAL DETAILS
PM -S701 FEEDLINE BRIDGE
PM -S702 FEEDLINE BRIDGE
MECHANICAL
PM -M001 MECHANICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND
GENERAL NOTES
PM -M101 LARGE VAULT – HVAC
PM -M102 GENERATOR VAULT – HVAC
PM -M501 MECHANICAL DETAILS
PM -M601 MECHANICAL SCHEDULES
RESDMSTR: 02/03/2014 00 01 15 - 2 01512A, B, E
ELECTRICAL
PM -E001 ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS AND
GENERAL NOTES
PM -E101 ELECTRICAL SITE PLAN
PM -E102 LARGE VAULT – LIGHTING, POWER, EQUIPMENT AND
GROUNDING
PM -E103 GENERATOR VAULT LIGHTING, POWER, EQUIPMENT AND
GROUNDING
PM -E104 LARGE VAULT INTERIOR ELEVATIONS – 1
PM -E105 LARGE VAULT INTERIOR ELECATIONS – 2
PM -E501 ELECTRICAL DETAILS – 1
PM -E502 ELECTRICAL DETAILS – 2
PM -E503 ELECTRICAL DETAILS – 3
PM -E504 ELECTRICAL DETAILS – 4
PM -E505 ELECTRICAL DETAILS – 5
PM -E506 ELECTRICAL DETAILS – 6
PM -E601 SINGLE LINE DIAGRAM AND LOAD CALCULATION
PM -E602 ELECTRICAL SCHEDULES – 1
PM -E603 ELECTRICAL SCHEDULES – 2
PM -E604 ALARM STATUS REPORTING SCHEMATICS
PM -E605 ALARM POINT DESCRIPTIONS
PM -E606 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 1
PM -E607 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 2
PM -E608 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 3
PM -E609 SITE ANTENNA LAYOUT AND PRESSURIZATION
EQUIPMENT – 1
PM -E610 SITE ANTENNA LAYOUT AND PRESSURIZATION
EQUIPMENT – 2
PM-E611 -48VDC CRIS OES INTERCONNECT DIAGRAM
PM-E612 -48VDC MW OES INTERCONNECT DIAGRAM
PM-E613 +12VDC OES INTERCONNECT DIAGRAM
TOWER STRUCTURAL DRAWINGS
T-1 COVER SHEET & DRAWING INDEX
S-1 ELEVATION VIEW/NOTES
S-1.1 SST SECTION ALLOWABLE MEMBER FORCES
S-1.2 MONOPOLE SECTIONS ALLOWABLE FORCES
S-2 UPPER POLE
S-3 LOWER POLE
S-4 TOWER SECTION 13V - NESTED POLE
RESDMSTR: 02/03/2014 00 01 15 - 3 01512A, B, E
S-5 TOWER SECTION 13V
S-6 TOWER SECTION 15ST
S-6.1 TOWER SECTION 15ST CONT.
S-7 TOWER SECTION 17ST
S-7.1 TOWER SECTION 17ST CONT.
S-8 TOWER SECTION 19ST
S-9 TYPICAL GRATING/BRACING
S-10 TYPICAL HANDRAIL/DIAGONAL PIPE LIGHTING ROD
EXTENTSION, & SAFETY CLIMB KITS
S-11 CENTER MAST
S-12 COAX CAGE / CLIMBING LADDER, ANTI-CLIMB, & BUS BAR
S-13 ANTENNA LOCATION ELEVATION VIEWS
S-13.1 ANTENNA LOCATION PLAN VIEWS
S-14 FULLY LOADED FACE MOUNTED MICROWAVES
S-14.1 FULLY LOADED LEG MOUNTED MICROWAVES
S-14.2 FULLY LOADED VHF/UHF ANTENNA LOCATIONS
S-15 MW ICE BRIDGE DETAILS
S-15.1 MW ANTENNA ICE SHIELD DETAILS
S-16 MICROWAVE MOUNT KITS
S-17 UHF / VHF ANTENNA MOUNT KITS
S-18 LEG – ELEVATION ID PLATES
S-19 TOWER FOUNDATION SLAB/PIERS
RADIO AND MICROWAVE ANTENNA MOUNTING BRACKETS DRAWINGS
CO-TA1 COVER SHEET AND INDEX
CO-TA1.1 DSA 103
CO-TA2 TOWER STRUCTURAL NOTES
CO-TA3 SITE PRO BRACKET DETAILS
CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
CO-TA6 TOWER ANTENNA MOUNTING DETAILS
(ANDREW/COMMSCOPE)
CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)
CO-TA10 TOWER ANTENNA MOUNTING DETAILS
(COMMSCOPE/RFS/SINCLAIR)
CO-TA12 TOWER ANTENNA MOUNTING DETAILS (SCALA)
CO-TA18.1 TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
BUNCHGRASS MTN. – INCREMENT 2
GENERAL
BG-G001 COVER SHEET
BG-G002 DRAWING INDEX, DESIGN CRITERIA AND SITE ORIENTATION
BG-G003 ABBREVIATIONS AND SYMBOLS
CIVIL
BG-C101 EXISTING SITE DEMOLITION AND CONSTRUCTION
RESDMSTR: 02/03/2014 00 01 15 - 4 01512A, B, E
SEQUENCING PLAN
BG-C102 SITE AND GRADING PLAN
BG-C501 COMMON SITE DETAILS
BG-C502 COMMON SITE DETAILS
ARCHITECTURAL
BG-A101 VAULT FLOOR PLAN AND ROOF PLAN AND BUILDING
ELEVATIONS
BG-A501 ARCHITECTURAL DETAILS
BG-A502 ARCHITECTURAL DETAILS
STRUCTURAL
BG-S001 STRUCTURAL NOTES
BG-S101 VAULT FOUNDATION, ROOF FRAMING PLAN AND
SECTION
BG-S102 TOWER FOUNDATION PLAN AND ELEVATION
BG-S501 COMMON STRUCTURAL DETAILS
BG-S502 STRUCTURAL DETAILS
BG-S503 STRUCTURAL DETAILS
BG-S701 FEEDLINE BRIDGE
BG-S702 FEEDLINE BRIDGE
MECHANICAL
BG-M001 MECHANICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND
GENERAL NOTES
BG-M101 MEDIUM VAULT – HVAC
BG-M501 MECHANICAL DETAILS
BG-M601 MECHANICAL SCHEDULES
ELECTRICAL
BG-E001 ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS AND
GENERAL NOTES
BG-E101 ELECTRICAL SITE PLAN
BG-E102 MEDIUM VAULT – LIGHTING, POWER, EQUIPMENT AND
GROUNDING
BG-E103 MEDIUM VAULT INTERIOR ELEVATIONS
BG-E501 ELECTRICAL DETAILS – 1
BG-E502 ELECTRICAL DETAILS – 2
BG-E503 ELECTRICAL DETAILS – 3
BG-E504 ELECTRICAL DETAILS – 4
BG-E505 ELECTRICAL DETAILS – 5
BG-E506 ELECTRICAL DETAILS – 6
BG-E601 SINGLE LINE DIAGRAM AND LOAD CALCULATION
BG-E602 ELECTRICAL SCHEDULES – 1
BG-E603 ELECTRICAL SCHEDULES – 2
BG-E604 ALARM STATUS REPORTING SCHEMATICS
BG-E605 ALARM POINT DESCRIPTIONS
BG-E606 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 1
RESDMSTR: 02/03/2014 00 01 15 - 5 01512A, B, E
BG-E607 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 2
BG-E608 SITE ANTENNA LAYOUT AND PRESSURIZATION
EQUIPMENT – 1
BG-E609 SITE ANTENNA LAYOUT AND PRESSURIZATION
EQUIPMENT – 2
BG-E610 -48VDC CRIS OES INTERCONNECT DIAGRAM
BG-E611 -48VDC MW OES INTERCONNECT DIAGRAM
BG-E612 +12VDC OES INTERCONNECT DIAGRAM
WESTERN UTILITY TELECOM, INC. DRAWING INDEX
T-1 COVER SHEET & DRAWING INDEX
S-1 ELEVATION VIEW/NOTES
S-1.1 SST SECTION ALLOWABLE MEMBER FORCES
S-1.2 MONOPOLE SECTION ALLOWABLE MEMBER FORCES
S-2 UPPER POLE
S-3 LOWER POLE
S-4 TOWER SECTION 13V NESTED POLE
S-5 TOWER SECTION 13V
S-6 TOWER SECTION 15ST
S-6.1 TOWER SECTION 15ST CONT.
S-7 TOWER SECTION 17ST
S-7.1 TOWER SECTION 17ST CONT.
S-8 TOWER SECTION 19ST
S-9 TYPICAL GRATING/BRACING
S-10 TYPICAL HAND RAIL/DIAGNOL PIPE LIGHTING ROD
EXTENSION, SAFETY & SAFETYCLIMB KITS
S-11 CENTER MAST
S-12 COAX CAGE/CLIMBING LADDER, ANTI-CLIMB, & BUS BAR
S-13 ANTENNA LOCATION ELEVATION VIEWS
S-13.1 ANTENNA LOCATION PLAN VIEWS
S-14 FULLY LOADED FACE MOUNTED MICROWAVES
S-14.1 FULLY LOADED LEG MOUNTED MICROWAVES
S-14.2 FULLY LOADED VHF/UHF ANTENNA LOCATIONS
S-15 MW ICE BRIDGE DETAILS
S-15.1 MW ANTENNA ICE SHIELD DETAILS
S-16 MICROWAVE MOUNT KITS
S-17 UHF/VHF ANTENNA MOUNT KITS
S-18 LEG/ELEVATION ID PLATES
S-19 TOWER FOUNDATION SLAB/PIERS
SATE OF CALIFORNIA
CO-TA1 COVER SHEET AND INDEX
CO-TA1.1 DSA 103
CO-TA2 TOWER STRUCTURAL NOTES
CO-TA3 SITE PRO BRACKET DETAILS
CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
CO-TA6 TOWER ANTENNA MOUNTING DETAILS
(ANDREW/COMMSCOPE)
CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
RESDMSTR: 02/03/2014 00 01 15 - 6 01512A, B, E
CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)
CO-TA10 TOWER ANTENNA MOUNTING DETAILS
(COMMSCOPE/RFS/SINCLAIR)
CO-TA10.1 TOWER ANTENNA MOUNTING DETAILS (RFS/SINCLAIR)
CO-TA14.1 TOWER ANTENNA MOUNTING DETAILS (SCALA)
CO-TA18 TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
MT. PIERCE – INCREMENT 3
GENERAL
MP-G001 COVER SHEET
MP-G002 DRAWING INDEX, DESIGN CRITERIA AND SITE ORIENTATION
MP-G003 ABBREVIATIONS AND SYMBOLS
CIVIL
MP-C101 EXISTING SITE DEMOLITION AND CONSTRUCTION
SEQUENCING
MP-C102 SITE AND GRADING PLAN
MP-C501 CIVIL SECTIONS AND DETAILS
MP-C502 COMMON SITE DETAILS
ARCHITECTURAL
MP-A101 VAULT FLOOR PLAN, ROOF PLAN AND BUILDING
ELEVATIONS
MP-A102 GENERATOR VAULT PLANS, ELEVATIONS AND SECTION
MP-A501 ARCHITECTURAL DETAILS
MP-A502 ARCHITECTURAL DETAILS
CIVIL
MP-S001 STRUCTURAL NOTES
MP-S101 VAULT FOUNDATION AND ROOF FRAMING PLAN AND
SECTION
MP-S102 TOWER FOUNDATION PLAN AND ELEVATION
MP-S501 COMMON STRUCTURAL DETAILS
MP-S502 STRUCTURAL DETAILS
MP-S503 STRUCTURAL DETAILS
MP-S701 FEEDLINE BRIDGE
MP-S702 FEEDLINE BRIDGE
MECHANICAL
MP-M001 MECHANICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND
GENERAL NOTES
MP-M101 LARGE VAULT – HVAC
MP-M102 GENERATOR VAULT – HVAC
RESDMSTR: 02/03/2014 00 01 15 - 7 01512A, B, E
MP-M501 MECHANICAL DETAILS
MP-M601 MECHANICAL SCHEDULES
ELECTRICAL
MP-E001 ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS AND
GENERAL NOTES
MP-E101 ELECTRICAL SITE PLAN
MP-E102 LARGE VAULT – LIGHTING, POWER, EQUIPMENT AND
GROUNDING
MP-E103 GENERATOR VAULT – LIGHTING, POWER, EQUIPMENT AND
GROUNDING
MP-E104 LARGE VAULT – INTERIOR ELEVATIONS – 1
MP-E105 LARGE VAULT – INTERIOR ELEVATIONS – 2
MP-E501 ELECTRICAL DETAILS – 1
MP-E502 ELECTRICAL DETAILS – 2
MP-E503 ELECTRICAL DETAILS – 3
MP-E504 ELECTRICAL DETAILS – 4
MP-E505 ELECTRICAL DETAILS – 5
MP-E506 ELECTRICAL DETAILS – 6
MP-E601 SINGLE LINE DIAGRAM AND LOAD CALCULATION
MP-E602 ELECTRICAL SCHEDULES – 1
MP-E603 ELECTRICAL SCHEDULES – 2
MP-E604 ALARM STATUS REPORTING SCHEMATICS
MP-E605 ALARM POINT DESCRIPTIONS
MP-E606 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 1
MP-E607 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 2
MP-E608 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 3
MP-E609 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 4
MP-E610 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF
CABLING – 5
MP-E611 SITE ANTENNA LAYOUT AND PRESSURIZATION
EQUIPMENT – 1
MP-E612 SITE ANTENNA LAYOUT AND PRESSURIZATION
EQUIPMENT – 2
PM-E613 -48VDC CRIS OES INTERCONNECT DIAGRAM
PM-E614 -48VDC MW OES INTERCONNECT DIAGRAM
PM-E615 +12VDC OES INTERCONNECT DIAGRAM
TOWER STRUCTURAL SHEETS
T-1 COVER SHEET/DRAWING INDEX
S-1 ELEVATION VIEW/NOTES
S-1.1 SST SECTION ALLOWABLE MEMBER FORCES
S-1.2 MONOPOLE SECTION ALLOWABLE MEMBER FORCES
S-2 UPPER POLE
S-3 LOWER POLE
S-4 TOWER SECTION 13V – NESTED POLE
RESDMSTR: 02/03/2014 00 01 15 - 8 01512A, B, E
S-5 TOWER SECTION 13V
S-6 TOWER SECTION 15ST
S-6.1 TOWER SECTION 15ST CONT.
S-7 TOWER SECTION 17ST
S-7.1 TOWER SECTION 17ST CONT.
S-8 TOWER SECTION 19ST
S-9 TYPICAL GRATING/BRACING
S-10 TYPICAL HAND RAIL/DIAGANOL PIPE, LIGHTING ROD
EXTENSION, & SAFETY CLIMB KITS
S-11 CENTER MAST
S-12 COAX CAGE/CLIMBING LADDER, ANTI-CLIMB, & BUS BAR
S-13 ANETNNA LOCATION ELEVATION VIEWS
S-13.1 ANTENNA LOCATION PLAN VIEWS
S-14 FULLY LOADED FACE MOUNTED MICROWAVES
S-14.1 FULLY LOADED LEG MOUNTED MICROWAVES
S-14.2 FULLY LOADED VHF/UHF ANTENNA LOCATIONS
S-15 MW ICE BRIDGE DETAILS
S-15.1 MW ANTENNA ICE SHIELD DETAILS
S-16 MICROWAVE MOUNT KITS
S-17 UHF/VHF ANTENNA MOUNT KITS
S-18 LEG/ELEVATION ID PLATES
S-19 TOWER FOUNDATION SLAB/PIERS
STRUCTURAL DETAILS FOR RADIO AND MICROWAVE ANTENNA MOUNTING
BRACKETS
CO-TA1 COVER SHEET AND INDEX
CO-TA1.1 DSA 103
CO-TA2 TOWER STRUCTURAL NOTES
CO-TA3 SITE PRO BRACKET DETAILS
CO-TA4 TOWER ANTENNA MOUNTING DETAILS (ANDREW)
CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)
CO-TA6 TOWER ANTENNA MOUNTING DETAILS
(ANDREW/COMMSCOPE)
CO-TA6.1 TOWER ANTENNA MOUNTING DETAILS
(ANDREW/COMMSCOPE)
CO-TA7 TOWER ANTENNA MOUNTING DETAILS (HUSTLER/ANTENNA
EXPERT/DIAMOND)
CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)
CO-TA10 TOWER ANTENNA MOUNTING DETAILS
(COMMSCOPE/RFS/SINCLAIR)
CO-TA11.2 TOWER ANTENNA MOUNTING DETAILS (DB SPECTRA/SCALA)
CO-TA13 TOWER ANTENNA MOUNTING DETAILS (SCALA)
CO-TA14 TOWER ANTENNA MOUNTING DETAILS (SCALA)
CO-TA14.1 TOWER ANTENNA MOUNTING DETAILS (SCALA)
CO-TA15 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
CO-TA17 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)
CO-TA18 TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)
END OF DOCUMENT
CALFIRE REPLACE TELECOM DEMOLITION
PHASE V – MOUNT PIERCE 02 40 00 - 1 DGS PROJECT 1512
12/06/22 GHD: REV. 1
SECTION 02 40 00
DEMOLITION
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Furnish labor, materials, and equipment necessary for demolition, dismantling, and removal of existing tower foundation, and miscellaneous items or debris as indicated, specified, and required for completion of the Contract.
1.02 RELATED SECTIONS
A. Division 01: General Requirements.
B. Section 31 10 00: Site Preparation (Clearing and Grubbing).
C. Section 31 23 16.26: Rock Removal.
D. Section 31 23 33: Trenching and Backfill.
E. Section 32 11 23: Aggregate Base Courses.
1.03 REFERENCES
A. Perform work in accordance with requirements of the General Condition, Supplementary Conditions, and Division 1, General Requirements.
B. American National Standards Institute (ANSI), latest edition:
1. ANSI A10.6 American National Standard Safety Requirements for Demolition.
1.04 TIMING AND SCHEDULING OF WORK
A. Timing: No demolition or removal of work shall commence until the State has been notified at least 48 hours in advance of proposed start of removal and such times have been approved.
1.05 REGULATORY REQUIREMENTS
A. Contractor Responsibility: Contractor shall assume full responsibility and liability for compliance with applicable Federal, State, and local regulations pertaining to work practices, hauling, disposal of demolished materials, and protection of workers and other persons at the site and persons occupying areas adjacent to site.
PART 2 - PRODUCTS
2.01 GENERAL REQUIREMENTS
A. Materials resulting from the demolition shall become Contractor’s property and Contractor shall be responsible for their removal and proper disposal.
CALFIRE REPLACE TELECOM DEMOLITION
PHASE V – MOUNT PIERCE 02 40 00 - 2 DGS PROJECT 1512
12/06/22 GHD: REV. 1
PART 3 - EXECUTION
3.01 EXAMINATION
A. Examine existing structures and appurtenances to determine full extent of demolition required for completed work.
B. Contractor shall coordinate with local utility companies, before the demolition of any building or structure, for the removal of existing electrical services. See plans for utility company contacts.
3.02 DEMOLITION
A. Perform demolition work in accordance with ANSI A10.6 and the Contract Documents.
B. Remove items designated for demolition within the limits of work indicated and as required to perform Work of this Contract.
C. Foundations for tower structure shall be demolished and removed from site or chipped as necessary to be below new foundation grade.
D. After demolition, backfill holes with spoils excavated from that site per Section 31 23 16.26, Rock
Removal; fill materials per Section 31 23 33, Trenching and Backfill; or gravel per Section 32 11 23, Aggregate Base Courses. Rough grade to smooth out differences.
3.03 REMOVAL, DISPOSAL AND CLEAN-UP
A. Remove demolished structures and materials from site to approved disposal sites.
B. Nothing to be demolished or removed from site shall be burned on site.
3.04 FIELD QUALITY CONTROL
A. Perform demolition work using workers skilled in demolition of buildings, using appropriate tools and equipment, under supervision of a competent foreman at all times.
END OF SECTION
CALFIRE REPLACE TELECOM GROUNDWORK FOR STRUCTURES
PHASE V – MOUNT PIERCE 02 41 16 - 1 DGS PROJECT 1512
SECTION 02 41 16
GROUNDWORK FOR STRUCTURES
1.01 SECTION INCLUDES
A. Excavation and backfilling for tower foundation.
1.02 QUALITY ASSURANCE
A. Perform groundwork for structures in accordance with Geotechnical Investigation Reports located in Book II of the Project Manual.
2.01 FILL MATERIAL
A. Provide suitable imported material consisting of soil, mineral aggregates or blend thereof, or suitable excavated material may be used. Fill material shall be approved for use by State. Materials shall compact to hard unyielding surface and thereafter remain stable. Remove stones, bricks or other objects that may puncture waterproofing membranes; also remove wood and rubbish throughout material.
2.02 EXCESS EXCAVATION AND WASTE
A. Remove from site, dispose of off premises unless otherwise indicated.
3.01 EXCAVATION
A. General: Excavate for foundation, to lines and levels indicated or required. Finish bottom of excavations to true, level surface with steps and offsets in foundation located as required. Exercise care when excavating for lower foundation so as to not disturb soil under higher adjacent foundation.
B. Make excavation of sufficient size to provide ample room for construction of forms and shoring.
C. Hand digging will be required if excavating near existing ducts or other utilities that are to remain.
D. Soft, Spongy, or Unsuitable Bearing Material: Remove soft, spongy, or unsuitable bearing material down to solid bearing. See General Conditions.
E. Existing Utilities: Exercise extreme care when excavating near utility lines to avoid damage thereto. Notify the State when utilities not shown on plans are encountered; do not proceed with work in such areas until written instructions are received from the State.
F. Changes in the Work: Pursuant to provisions of the General Conditions, changes in work required by conditions encountered during excavation and comprehensive grading operations and payment, therefore, will be made in accordance with applicable provisions of the General Conditions.
PHASE V – MOUNT PIERCE 02 41 16 - 2 DGS PROJECT 1512
12/06/22 GHD: REV. 1
G. Shoring: Provide as required, in conformity with Sections 1540 through 1547, Subchapter 4, Article 6, Construction Safety Orders, Title 8, Industrial Relations.
3.02 PLACING FILL AND BACKFILL
A. Remove vegetation, large stones, soft spots, and objectionable material from existing ground surface. Excavate or fill to required subgrade. Fill and compact soft spots. Prior to placing fill material, thoroughly disc and bond plow entire areas to depth of 8 inches. Thoroughly re-compact scarified subgrade to relative compaction of 90 percent as determined by ASTM Test Method No.
D 1557.
B. Remove wood, rocks, and other rubbish from excavations before placing material. Do not place material against concrete until concrete has reached its 28-day strength. Place material in horizontal layers 3 inches or less in depth before compaction, and thoroughly tamp, roll, or otherwise compact. Place material to limits and grades designated on plans, or if not designated, to original natural ground level.
C. Refer to Geotechnical Investigation Report for Engineered Fill located in Book II of the Project
Manual.
3.03 GENERAL SITE GRADING
A. General site grading is included hereunder. Grade areas within grading limits indicated, to new contours, cross sections and finish grades shown. Except as otherwise indicated, remove vegetation, wood, and other rubbish from areas to be graded.
B. Rough grade areas and treat subsoil in excavated areas and areas requiring 12 inches of fill or less by chiseling to minimum depth of 12 inches.
C. Use chiseling equipment having teeth spaced 12 inches apart maximum. Construct swales to provide drainage from all areas to drainage outfalls (new or existing). Compact by rolling with grading equipment or by other means to produce required results.
D. Grade finish surfaces smooth and even, finish flush with surfaced areas, sidewalks, concrete pads, tops of curbs, manholes, drains, valve boxes, etc., unless otherwise indicated. Adjust tops of existing pull boxes as required to meet finish grades. Finish surfaces shall be clean, free from undesirable vegetation, stones, wood, etc., and suitable for subsequent landscape work.
3.04 ROCK EXCAVATION
A. This item of work shall consist of removing rock, boulder outcroppings, and rock masses if encountered during excavation/trenching operations.
B. The use of explosives for rock disintegration is not approved.
C. The Contractor shall personally verify site conditions of rock removal and note irregularities affecting work of this item.
D. The Contractor by beginning this work item means acceptance of existing conditions.
E. The Contractor shall coordinate the removal and disposal of excavated material from site with State's representative's permission and coordination.
PHASE V – MOUNT PIERCE 02 41 16 - 3 DGS PROJECT 1512
12/06/22 GHD: REV. 1
F. When rock is uncovered that cannot be removed by mechanical means, the Contractor shall notify the State's representative for a determination of method of rock removal.
CALFIRE REPLACE TELECOM CONCRETE FORMING AND ACCESSORIES
PHASE V – MOUNT PIERCE 03 10 00 - 1 DGS PROJECT 1512
SECTION 03 10 00
CONCRETE FORMING AND ACCESSORIES
1.01 DESCRIPTION
A. Work Included:
1. Formwork for cast-in-place concrete, with shoring, bracing, and anchorage.
2. Openings for other affected work.
3. Form accessories.
4. Stripping forms.
B. Work Installed but Specified Elsewhere:
1. Section 05 12 00: Structural Steel Framing.
C. Related Sections:
1. Section 03 20 00: Concrete Reinforcing.
2. Section 03 30 00: Cast-In-Place Concrete.
D. System Description:
1. Design, engineer, and construct formwork, shoring, and bracing to meet design and code requirements, so that resultant concrete conforms to required shapes, lines, and dimensions.
A. Source Quality Control:
1. Construct and erect concrete formwork and shoring in accordance with ACI 301 "Specifications for…