This is a construction drawing set for Harbor Repairs and Upgrades at Port Austin State Harbor in Port Austin, Michigan, involving the Michigan Department of Natural Resources (DNR) and the U.S. Army Corps of Engineers (USACE). The project consists of a breakwater extension and harbor entrance enlargement, with Contract 1 specifically addressing the breakwater extension construction. The scope of work includes dredging approximately 150 cubic yards from the harbor entrance to a depth of LWD minus 12 feet (elevation 565.5'), placing an estimated 9,450 tons of armor stone, 2,300 tons of subarmor stone, and 3,000 tons of core stone to extend the existing outer stone breakwater, and relocating an existing navigation marker support structure from an existing sheet pile cell to a new 12-inch steel pile foundation on the breakwater extension. The project is located at 8774 Lake Street, Port Austin, Michigan 48467, and is funded through the Federal Aid in Sport Fish Restoration Program. Active permits include EGLE Water Resources Protection (WRP034736 v.1, effective through September 26, 2027) and USACE permit (LRE-2007-00842-16-S21, effective through December 31, 2028).
The contractor is responsible for all materials, equipment, and labor necessary to complete the work, with stone materials required to be staged on water-based barges only. The work must be coordinated with the facility owner's representative to minimize disruption to active marine traffic, and the contractor must maintain continuous ingress and egress within the USACE navigation channel throughout construction. A turbidity curtain must enclose the dredge area to prevent off-site siltation, and all dredge spoils become the contractor's responsibility for legal disposal at an upland, non-wetland location. The contractor is required to provide pre- and post-dredge surveys and verify all existing utility locations, with test pits and associated reporting included in the general conditions pricing. The project documents include general notes specifying contractor responsibilities for site safety, utility protection, staging area coordination, MISS DIG notification, survey services, and restoration of any damaged existing conditions or site amenities.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDGEWATER RESOURCES, LLC
518 BROAD ST.
ST. JOSEPH, MI 49085
CONTACT:
COLIN HASSENGER, P.E., PROJECT MANAGER
(269) 625 - 4869
PERMIT INFORMATION
AGENCY PERMIT NO DATE AUTHORIZED EXPIRATION DATE
EGLE WRP034736 v.1 SEP. 26, 2022 SEP. 26, 2027
USACE LRE-2007-00842-16-S21 APRIL 27, 2023 DEC. 31, 2028
PORT AUSTIN STATE HARBOR
HARBOR REPAIRS AND UPGRADES
8774 LAKE ST, PORT AUSTIN, MI 48467
DRAWING SET FOR BID
HA
RB
OR
R
EP
AI
RS
A
ND
U
PG
RA
DE
S
DA
TE
: 05
/1 2/
ED
GE
W
AT
ER
R
ES
OU
RC
ES
P
RO
JE
CT
-0
P:\2020\20-040 PADR\CAD\SHEETS\SET 1 CONTRACT A\G-X.XX - SET 1 CONTRACT A.DWG
MISS DIG
CALL AT LEAST 3 FULL WORKING DAYS (72 HRS)
BEFORE YOU DIG
STATE OF MICHIGAN
DEPARTMENT OF NATURAL RESOURCES
DANIEL EICHINGER, DIRECTOR
CONTACT:
BRUCE WATKINS, P.E.
(517) 252-7882
THE FEDERAL AID IN SPORT FISH RESTORATION PROGRAM IS FUNDING
THIS CONSTRUCTION THANKS TO YOUR PURCHASE OF FISHING
EQUIPMENT AND MOTORBOAT FUELS.
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
CIVIL ENGINEER
I CERTIFY THAT THESE DRAWINGS WERE PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION AND CONTROL.
SEAL NAME: DATE:
Colin D Hassenger, PE 5/12/2023
751/20154.BDWR2
HURON COUNTY, MICHIGAN
W SPRING ST. (M-25)
BAY ST.
RAILROAD ST.
BIRD CREEK
ACORN DR.
FARRAR ST.
CE
NT
ER
S
T.
VI
NE
S T.
PR
OS
PE
CT
S T.
OM
EL
IA
S
T.
AR
CH
S T.
LIN
E
ST
NO
RT
H
ST
BR
ID
GE
S
T.
MC
MA
HO
N
DR
LO
NG
S
T.LAKEVIEW ST.
LA
KE
S T.
UNION ST.
PORT A
USTIN
BREAKWATE
R
* PROJECT LOCATION
BREAKWATER EXTENSION - CONTRACT 1
Sheet List Table
Sheet Number Sheet Title
G-1.01 COVER SHEET
G-1.02 GENERAL NOTES
V-1.01 OVERALL EXISTING SITE PLAN
V-1.02 HARBOR ENTRANCE EXISTING CONDITIONS
V-1.03 RECORD SOIL BORINGS
CM-1.01 OVERALL PROPOSED SITE PLAN CONTRACT A
CM-1.02 PROPOSED HARBOR ENTRANCE
CM-3.01 BREAKWATER EXTENSION ENLARGEMENT
CM-4.01 BREAKWATER EXTENSION CROSS-SECTIONS
CM-5.01 NAVAGATIONAL AID SUPPORT PILE
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
1. ATTENTION IS DIRECTED TO THE FACT THAT THE WORK ASSOCIATED WITH THIS CONTRACT WILL OCCUR AT AN
ACTIVE AND FUNCTIONAL FACILITY. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER'S
REPRESENTATIVE AND PROJECT MANAGER TO MINIMIZE DISRUPTION TO THE OPERATIONS OF THE FACILITY INCLUDING MARINE TRAFFIC. THE CONTRACTOR IS SOLELY RESPONSIBLE TO PROVIDE A SAFE WORK SITE AND TO PROTECT THE PUBLIC, VISITORS AND EMPLOYEES OF THE FACILITY, FROM HARM AS A RESULT OF HIS
CONSTRUCTION ACTIVITIES.
2. THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING ABOVE GROUND AND BELOW GROUND UTILITIES, STRUCTURES, AND APPURTENANCES SHOWN ON THE PLANS ARE APPROXIMATE AND ARE NOT GUARANTEED.
THE CONTRACTOR ALONE SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES, STRUCTURES, AND APPURTENANCES IN THE PATH OF, AND ADJACENT TO, THE
PROPOSED WORK.
3. EXISTING CONDITIONS ARE TAKEN FROM FIELD OBSERVATIONS AND PRIOR CONSTRUCTION DOCUMENTS WHEN AVAILABLE AND ARE NOT GUARANTEED. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO ALLOWANCE WILL BE MADE FOR ADDITIONAL COST DUE TO CONTRACTORS FAILURE TO VERIFY EXISTING
CONDITIONS AND DIMENSIONS.
4. PRIOR TO THE START OF MEANINGFUL CONSTRUCTION, THE CONTRACTOR SHALL DETERMINE PRECISE LOCATIONS AND DEPTH OF ANY UNDERGROUND UTILITY IN QUESTION AND IMPACTED BY THE WORK.
IMMEDIATELY REPORT RESULTS TO THE ARCHITECT/ENGINEER OF ANY SIGNIFICANT DISCREPANCIES BETWEEN THE PLANS AND ACTUAL LOCATIONS OF SAID STRUCTURES. TEST PITS AND ASSOCIATED REPORTING SHALL BE
INCLUDED IN THE PRICE BID AS PART OF GENERAL CONDITIONS.
5. WHEN EXISTING CONSTRUCTION, WHICH IS TO REMAIN, IS DAMAGED DURING THE COURSE OF CONSTRUCTION AS A RESULT OF CONTRACTORS WORK, IT SHALL BE REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS AS MUCH AS POSSIBLE, SUBJECT TO OWNERS APPROVAL AND AT NO ADDITIONAL COST TO OWNER.
6. ANY AND ALL PROPERTY LINES AND RIGHTS-OF-WAY LINES SHOWN ARE APPROXIMATE AND INTENDED FOR GENERAL INFORMATION. NO WARRANTY IS PROPOSED OR IMPLIED AS TO THE ACCURACY OF SAID LINES.
7. THE OWNERS OF THE VARIOUS UTILITIES WITHIN THE RIGHTS-OF-WAY OR ADJACENT EASEMENTS, IF ANY, WILL FIELD LOCATE AND MARK THE LOCATION OF THEIR FACILITIES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITY OWNERS IN AMPLE TIME FOR THEM TO LOCATE THEIR FACILITIES.
8. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
9. THE CONTRACTOR IS RESPONSIBLE FOR SUPPLYING ALL MATERIALS, TOOLS AND EQUIPMENT, INCLUDING ANY SPECIAL CUTTING DEVICES, NECESSARY TO PERFORM THE WORK CONTAINED IN THIS CONTRACT.
10. CONTRACTOR STAGING AREAS AND CONSTRUCTION ENTRANCE LOCATIONS SHALL BE COORDINATED WITH THE OWNERS DESIGNATED REPRESENTATIVE PRIOR TO START OF CONSTRUCTION, AS REQUIRED, AND RESTORE ALL DISTURBED AREAS. PROPER SIGNAGE, FENCING AND BARRICADES SHALL BE PROVIDED TO LIMIT PEDESTRIAN ACCESS TO THE CONSTRUCTION SITE INCLUDING SITE ACCESS AREAS AND STAGING AREAS. ALL STONE MATERIALS MUT BE STAGED ON WATER-BASED BARGES AND EQUIPMENT, NO STONE STAGING ON LAND
WILL BE PERMITTED.
11. PROTECT ALL EXISTING SITE AMENITIES NOT DESIGNATED FOR REMOVAL. ANY SITE AMENITY, UTILITY, STREET APPURTENANCE, OR OTHER ITEM WHICH BECOMES DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED IN-KIND BY THE CONTRACTOR AS DETERMINED BY THE OWNER'S DESIGNATED REPRESENTATIVE OR ARCHITECT/ENGINEER AND AT NO ADDITIONAL COST TO THE
OWNER.
12. PRIOR TO THE START OF CONSTRUCTION, NOTIFY MISS DIG THREE (3) FULL WORK DAYS (NOT COUNTING THE DAY OF THE CALL, WEEKENDS, OR HOLIDAYS) AT 811 TO REQUEST UTILITY STAKEOUT OF ALL PUBLIC UTILITIES
WITHIN THE PROJECT AREA.
13. PROVIDE PROTECTION FOR ALL SITE AMENITIES, SCHEDULED TO REMAIN, WITHIN THE IMMEDIATE PROJECT PROJECT FOR THE DURATION OF THE PROJECT TO MINIMIZE ANY DAMAGE AS A RESULT OF CONSTRUCTION ACTIVITIES. PLACE PROTECTION BEFORE WORK IS STARTED, PROTECTION IS TO BE IN THE FORM OF FLUORESCENT ORANGE SNOW FENCING OR WOOD RAIL AND POSTS PLACED AROUND EACH SITE AMENITY.
14. NOTIFY PROPERTY OWNERS PRIOR TO ANY REMOVAL OR RECONSTRUCTION WORK EITHER ON THEIR
PROPERTY OF ALONG THE RIGHT-OF-WAY IN FRONT OF THEIR PROPERTY.
15. MAINTAIN SAFE AND CONTINUOUS ACCESS TO ALL ACTIVE FIRE HYDRANTS THROUGHOUT THE PERIOD OF
CONSTRUCTION.
16. MAINTAIN SAFE AND CONTINUOUS THROUGH TRAFFIC AND INGRESS AND EGRESS FOR ADJACENT PRIVATE DRIVEWAYS, SERVICE ROADS, PARKING AREAS AND PUBLIC STREETS THROUGHOUT THE PERIOD OF CONSTRUCTION. IF, BY AN AGREEMENT WITH THE OWNER'S REPRESENTATIVE AND JURISDICTION AGENCY, A STREET, ROAD, DRIVE OR PARKING WILL REQUIRE TEMPORARY CLOSING DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY IN WRITING THE LOCAL AND STATE POLICE, AND LOCAL FIRE DEPARTMENT
REGARDING THE CLOSING.
17. MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO THE EXISTING BUILDINGS FOR THE DURATION OF THE
CONTRACT.
18. MAINTAIN THE CONSTRUCTION SITE IN A SAFE AND ORDERLY FASHION THROUGHOUT THE PERIOD OF CONSTRUCTION WITH MINIMAL DISRUPTION OF THROUGH TRAFFIC AND INGRESS AND EGRESS FOR PRIVATE
DRIVEWAYS, PUBLIC STREETS AND MARINE TRAFFIC.
19. CONFORM TO THE CONDITIONS OF ALL EASEMENTS. RESTORATION OF INDIVIDUAL EASEMENT AREAS IS
SUBJECT TO APPROVALS OF THE PROPERTY OWNERS.
20. PROTECT AND PRESERVE ALL RIGHTS-OF-WAY MONUMENTS AND PROPERTY CORNER MARKERS DISTRIBUTED BY THE CONTRACTOR SHALL BE REPLACED BY A LICENSED SURVEYOR AT THE CONTRACTOR'S EXPENSE.
21. PROVIDE ADEQUATE TEMPORARY SANITARY FACILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT MANAGER FOR USE OF TEMPORARY ON-SITE UTILITIES SUCH AS WATER AND ELECTRICITY. THE CONTRACTOR SHALL BE RESPONSIBLE TO REIMBURSE THE OWNER FOR USE OF SUCH
FACILITIES.
22. RESEARCH, SECURE, COMPLY WITH ALL PERMIT REQUIREMENTS, AND PAY FOR ALL PERMITS AND FEES..
GENERAL NOTES:
1. TAKE ALL PRECAUTIONS NECESSARY TO PRESERVE THE INTEGRITY OF EXISTING UTILITIES TO REMAIN AND PROVIDE UNINTERRUPTED SERVICE TO ALL USERS OF THE EXISTING UTILITIES, EXISTING UTILITIES (TO REMAIN) ENCOUNTERED IN TRENCH OR PAVEMENT EXCAVATIONS SHALL BE SUPPORTED AS ORDERED BY THE ENGINEER IN CHARGE OR AS DIRECTED BY THE UTILITY COMPANY, THE COST FOR SUPPORTING UTILITIES
SHALL BE INCLUDED IN THE PRICE BID FOR EXCAVATION.
2. EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN PLOTTED FROM FIELD SURVEYS AND RECORD MAPS AND ARE NOT CERTIFIED AS TO THE ACCURACY OF THEIR LOCATOR OR COMPLETENESS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION AND DEPTHS OF ALL UTILITIES AND STRUCTURES IN THE PATH OF, CLOSELY PARALLEL TO, OR UNDER THE PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND DELAYS OR DAMAGES OCCURRING AS A RESULT OF INCORRECTLY LOCATED UTILITIES, NO EXTENSIONS OF CONTRACT TIME AND NO MONETARY DAMAGE CLAIMS SHALL BE ALLOWED AS A RESULT OF REVISED DESIGN LOCATIONS OR TIME ALLOWED TO DO SAME WHICH WOULD RESULT FROM EXISTING UTILITIES BEING FOUND IN DIFFERENT LOCATIONS OTHER THAN SHOWN ON THESE DRAWINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITY OWNERS IN
AMPLE TIME FOR THEM TO LOCATE AND MARK THEIR FACILITIES.
UTILITY NOTES:
MARINA GENERAL NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL MARINA CONSTRUCTION ADHERES TO PROJECT
SPECIFICATIONS, PROJECT DOCUMENTS, PROJECT DRAWINGS, PERMITS, APPLICABLE LOCAL, STATE, AND
FEDERAL CODES.
2. ALL PROPOSED MATERIALS WILL BE CONFINED TO AN OWNER APPROVED STAGING AREA CONFIRMED PRIOR TO CONSTRUCTION. ANY CONTRACTOR TRAILERS OR EQUIPMENT WILL ALSO BE LOCATED IN THIS AREA. ALL
STONE MATERIALS TO BARGES WILL BE STAGED ON WATER-BASED PLANTS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING TEMPORARY UTILITY SERVICES, AS NEEDED FOR
CONSTRUCTION.
4. CONTRACTOR TO CO-ORDINATE AND SCHEDULE MEETINGS BETWEEN ALL OTHER CONTRACTORS WORKING
ONSITE TO ENSURE COORDINATION.
SURVEY NOTES:
1. VERTICAL DATUM IS INTERNATIONAL GREAT LAKES DATUM OF 1985 (IGLD85). IGLD'85 = NAVD88 - 0.07'.
2. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANES, SOUTH ZONE, INTERNATIONAL FOOT.
3. SURVEY PERFORMED BY EDGEWATER RESOURCES ON 10/13/2020 & 10/14/2020.
4. AVERAGE WATER LEVEL ON 10/13/2020 WAS 581.20' IGLD85.
5. BENCHMARK #1 (NORTHING, EASTING) = 932089.00, 13484233.00
6. BENCHMARK #2 (NORTHING, EASTING) = 932826.00, 13483861.00
7. CONTRACTOR IS RESPONSIBLE FOR ALL CHECK AND FINAL AS-BUILT SURVEYS PER SPECIFICATIONS
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
NORTH
SCALE:
G
EN
ER
AL
N O
TE
S
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
G-1.02
JC
RL
CH
20-040
5/12/23
NONE
751/20154.BDWR2
BID
CONTRACT 1
SESC NOTES:
1. CONTRACTOR MUST COORDINATE ANY SOIL EROSION AND SEDIMENT CONTROL (SESC) PERMT REQUIREMENTS
WITH THE MIGHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT, AND BUDGET (DTMB). CONTRACTOR IS
RESPONSIBLE FOR COORDINATION WITH CHRISTOPHER MCGARRY: MCGARRYC@MICHIGAN.GOV
BORING: 1-93
BORING #2
BORING #1
BORING #3
BORING: 2-93
BORING: PA-1-88BORING: PA-2-88
BORING: 4-93
BORING: 3-93
EXISTING OUTER HARBOR
DETACHED STONE BREAKWATER
EXISTING INNER HARBOR
STEEL CELL BREAKWATER
VILLAGE OF PORT AUSTIN
TAX ID 02 30 405 006
HURON COUNTY
TAX ID 02 30 298 001
SHEET NOTES:
1. SURVEY PERFORMED ON OCTOBER 13 & 14, 2020.
2. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, SOUTH ZONE, INTERNATIONAL FOOT.
3. VERTICAL DATUM IS IGLD85. ALL ELEVATIONS ARE IN REFERENCE TO IGLD85.
4. WATER LEVEL ON DATE OF SURVEY: 581.2' (IGLD85)
PRIMARY HARBOR ENTRANCE
1'
5'
1390'-0"
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
NORTH
200'100'0
SCALE: 1" = (AT 24"x36")
EXISTING USACE NAVIGATION CHANNEL LIMITS (TYP.)
HARBOR ENTRANCE ENLARGEMENT - V-1.02
EXISTING MARINA FACILITY - NOT IN CONTRACT
LAKE HURON
BIRD CREEK
O
VE
R
AL
L
EX
IS
TI
N G
S
IT
E
PL
AN
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
V-1.01
JC
RL
CH
20-040
5/12/23
100'
751/20154.BDWR2
BID
CONTRACT 1
EXISTING STEEL
PEDESTRIAN CATWALK
EXISTING STONE
BREAKWATER
BM2
BM1
BORING POINTS
BENCHMARK POINTS
POINT NORTHING EASTING ELEVATION DESCRIPTION
BM1 932,087.72 13,484,235.63 583.64' BRASS DISC: END OF EAST
SERVICE PIER
BM2 932,928.29 13,483,947.11 587.44' BRASS DISC: 214' AFTER BEND
IN WEST PIER
BORING: PA-1-88
BORING: PA-2-88
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
NORTH
80'40'0
SCALE: 1" = (AT 24"x36")
EXISTING USACE NAVIGATION CHANNEL LIMITS (TYP.)
EXISTING OUTER HARBOR
DETACHED STONE BREAKWATER
EXISTING INNER HARBOR
STEEL CELL BREAKWATER
LAKE HURON
310'-9"
101'-0"
118'-7"
H
AR
BO
R
E N
TR
AN
C E
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
V-1.02
JC
RL
CH
20-040
5/12/23
40'
751/20154.BDWR2
BID
CONTRACT 1
EXISTING USACE NAVIGATION CHANNEL LIMITS (TYP.)
EXISTING NAVIGATION MARKER
EXISTING STEEL SHEET PILE CELLS
SHEET NOTES:
1. SURVEY PERFORMED ON OCTOBER 13 & 14, 2020.
2. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, SOUTH ZONE, INTERNATIONAL FOOT.
3. VERTICAL DATUM IS IGLD85. ALL ELEVATIONS ARE IN REFERENCE TO IGLD85.
4. WATER LEVEL ON DATE OF SURVEY: 581.2' (IGLD85)
3'-
0"
3'-
9"
320'
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
NORTH
80'40'0
SCALE: 1" = (AT 24"x36")
V- 1.
R
EC
O R
D S
O
IL
B O
R
IN
G S
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
V-1.03
JC
RL
CH
20-040
5/12/23
40'
751/20154.BDWR2
BID
CONTRACT 1
PA-1-88
(1988)
GRAY SANDSTONE,
SAME AS ABOVE
EXCEPT MODERATELY
FRACTURED.
GRAY SILTY CLAY, LITTLE
COARSE TO FINE SAND,
TRACE FINE GRAVEL,
MOIST
COBBLE AT SURFACE,
GRAY SILTY CLAY,
LITTLE FINE SAND,
MOIST
GRAY SANDSTONE
WITH INTERBEDDED
CLAYEY SHALE
LENSES. MEDIUM
GRAINED, LOW TO
MODERATE HARDNESS
(SANDSTONE)
SLIGHTLY WEATHERED
(SANDSTONE),
INTENSELY TO
CLOSELY FRACTURED.
MODERATE TO DEEPLY
WEATHERED (SILTY
CLAY) FROM 3' TO 4.8'
DEPTH
GRAY SILTY CLAY AND
CLAYEY SILT, LITTLE
COARSE TO FINE
GRAVEL, TRACE
COARSE TO FINE
SAND, MOIST
GRAY CONGLOMERITIC
SANDSTONE (MED. TO
VERY COARSE GRAINED)
GRAY HIGHLY
WEATHERED ROCK
(CLAYEY)
GRAY INTERBEDDED
SANDSTONE AND
SHALE; MEDIUM TO FINE
GRAINED, LOW TO
MODERATE HARDNESS,
SLIGHTLY WEATHERED
CLOSELY FRACTURED.
GRAY SANDSTONE WITH
LESS INTERBEDDED
SHALE
PA-2-88
(1988)
BORING NO.1
(1993)
BORING NO. 2
(1993)
BORING NO.3
(1993)
S&S 1-93 (1993)
S&S 2-93 (1993)
S&S 4-93 (1993)
S&S 1-98 (1998)
S&S 2-98 (1998)
S&S 3-98 (1998)
S&S 4-98 (1998)
WATER WATER
WATER
WATER WATER
WATER
WATER WATER
LOOSE FINE TO
MEDIUM BROWN
SAND
HARD GRAY SHALE
AND CLAY
CORE DRILLED
GRAY SANDSTONE
THIN SHALE SEAMS,
CONGLOMERATE
SEAM
LOOSE FINE TO
COARSE BROWN
SAND, TRACE OF SILT
HARD GRAY SHALE
CLAY
VERY HARD GRAY
SHALE CLAY
CORE DRILLED GRAY
SANDSTONE SHALE
SEAMS
CONGLOMERATE
SEAMS
FIRM FINE TO COARSE
BROWN SAND, SOME
GRAVEL
VERY HARD GRAY
SHALE CLAY THIN
SANDSTONE SEAMS
CORE DRILLED
GRAY SANDSTONE
SHALE SEAMS,
CONGLOMERATE
SEAMS
HARD GRAY SHALE
CLAY
CLAY - SOFT ORGANIC
W/ PIECES OF SHALE
CLAY - EXT. STIFF GRAY
W/ SHALE
SHALE - HARD GRAY
ROCK
SAND/SANDSTONE -
HARD LT. GRAY
COARSE W/ STONE
AND GRAVEL
CLAY - STIFF GRAY
SHALE - HARD GRAY
SAND - COMPACT
BROWN FINE
SHALE - EXTREMELY
STIFF GRAY WITH
CLAY AND SILT
SEAMS
SAND - COMPACT
BROWN FINE TO
MEDIUM
SHALE - VERY
STIFF GRAY
SAND - COMPACT
BROWN FINE
SAND - VERY COMPACT
BROWN TO MEDIUM
WITH A TRACE OF
GRAVEL
CLAY - STIFF GRAY
SILT
SAND - EXTREMELY
COMPACT BROWN FINE
TO COARSE
SAND - COMPACT
BROWN FINE
SAND - EXTREMELY
COMPACT BROWN FINE TO
MEDIUM W/ A TRACE OF
GRAVEL
SAND - EXTREMELY
COMPACT DARK BROWN
FINE TO COARSE
"N"
(BPF)
"N"
(BPF)
RUN 1
RUN 2
RUN 1
RUN 2
100/6
100+
100+
NOTES:
1. VERTICAL DATUM IS IGLD85. ALL ELEVATIONS ARE
IN REFERENCE TO IGLD85.
2. SEE SHEET V-1.01 FOR BORING LOCATIONS. NOTE:
BORINGS S&S 1-98, 2-98, 3-98, AND 4-98 ARE UPLAND
AND OUTSIDE THE LIMITS OF THE SITE PLAN.
3. INFORMATION SHOWN HEREON IS FOR REFERENCE
ONLY. SEE DCSPES SECTION 00200 FOR RECORD
BORING LEGS
"N"
(BPF)
"N"
(BPF)
"N"
(BPF)
"N"
(BPF)
"N"
(BPF)
"N"
(BPF)
"N"
(BPF)
"N"
(BPF)
"N"
(BPF)
"N"(BPF)
587'
582'
577'
572'
567'
562'
557'
552'
547'
579.5' 579.5'
576.8'
573.8'
576.8' 576.8'
575.5'
573.0'
577.5' 577.5' 577.5' 577.1'
571.8'
574.3'
582.7' 583.2'
586.7'
589.7'
567 56
57356
4 56
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
240'120'0
NORTH
SCALE: 1" = (AT 24"x36")
P:\2020\20-040 PADR\CAD\SHEETS\SET 1 CONTRACT A\CM-X.XX - SET 1 CONTRACT A.DWG
CONTRACT 2 LIMITS - NOT IN CONTRACT
CONTRACT 1 LIMITS - SEE CM-1.02
O
VE
R
AL
L
PR
O
PO
SE
D
S
IT
E
PL
AN
C
O N
TR
AC
T A
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
CM-1.01
JC
RL
CH
20-040
5/12/23
120'
751/20154.BDWR2
BID
CONTRACT 1
4 56
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
100'50'0
NORTH
SCALE: 1" = (AT 24"x36")
P:\2020\20-040 PADR\CAD\SHEETS\SET 1 CONTRACT A\CM-X.XX - SET 1 CONTRACT A.DWG
BREAKWATER EXTENSION ENLARGEMENT - CM-3.01
PR
O
PO
SE
D H
AR
BO
R E
N
TR
AN
C
E
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
CM-1.02
JC
RL
CH
20-040
5/12/23
50'
751/20154.BDWR2
BID
CONTRACT 1
150'-0"
862'-2"
PROPOSED DREDGE AREA
DREDGE TO LWD - 12' (565.5')
EXISTING USACE NAVIGATION
CHANNEL LIMITS (TYP.)
PROPOSED USACE NAVIGATION
CHANNEL LIMITS (TYP.)
SHEET NOTES:
1. SURVEY PERFORMED ON OCTOBER 13 & 14, 2020.
2. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, SOUTH ZONE, INTERNATIONAL FOOT.
3. VERTICAL DATUM IS IGLD85. ALL ELEVATIONS ARE IN REFERENCE TO IGLD85.
4. WATER LEVEL ON DATE OF SURVEY: 581.2' (IGLD85)
5. REQUIRED DREDGE DEPTH IS LWD-12' (565.5').
6. ESTIMATED DREDGE VOLUME IS 150 CY. CONTRACTOR IS RESPONSIBLE FOR PRE- & POST-DREDGE SURVEY OF DREDGE AREA AND ADJACENT NAVIGATION CHANNEL AREAS
PER SPECIFICATIONS. DREDGING TO OCCUR AND BE CONFIRMED BY USACE PRIOR TO STONE PLACEMENT PER PERMIT REQUIREMENTS.
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL MATERIAL WITHIN DREDGE AREA TO ACHIEVE REQUIRED MINIMUM DEPTH AND SIDE SLOPES.
8. PRIOR TO THE START OF ANY DREDGING, DREDGE AREA SHALL BE ENCLOSED WITH A TURBIDITY CURTAIN PER PERMIT REQUIREMENTS.
9. ALL DREDGE SPOILS SHALL BECOME PROPERTY OF THE CONTRACTOR AND THE CONTRACTOR IS RESPONSIBLE FOR LEGAL DISPOSAL OF MATERIAL OFFSITE IN AN UPLAND, NON-WETLAND LOCATION PER PERMIT REQUIREMENTS.
10. CONTRACTOR MUST MAINTAIN INGRESS AND EGRESS OF MARINE TRAFFIC WITHIN NAVIGATION CHANNEL AT ALL TIMES.
'-0
PRIOR TO COMMENCEMENT OF ANY
DREDGING, THE ENTIRE DREDGED AREA
SHALL BE ENCLOSED WITH A TURBIDITY
CURTAIN TO PREVENT OFF-SITE SILTATION.
THE TURBIDITY CURTAIN SHALL BE
INSTALLED TO EXTEND FROM THE BED OF
THE WATERBODY TO A POINT ABOVE THE
EXISTING WATER'S SURFACE. THE TURBIDITY
CURTAIN SHALL BE MAINTAINED FOR THE
DURATION OF THE PROJECT AND SHALL BE
LEFT IN PLACE AFTER COMPLETION OF
DREDGING UNTIL ALL DISTURBED SEDIMENTS
HAVE SETTLED. (C-1)
S61
LIMITS OF TURBIDITY
CURTAIN DURING DREDGE WORK
PROPOSED BREAKWATER
EXTENSION
EXISTING BREAKWATER
STRUCTURE
CONTROL POINTS
POINT NORTHING EASTING
CP1 933,548.1718 13,483,901.4312
CP2 933,516.1675 13,484,319.0142
CP 1
CP 2
CM-5.01
CM-5.01
EXISTING USACE NAVIGATION
CHANNEL LIMITS (TYP.)
PROPOSED USACE NAVIGATION
CHANNEL LIMITS (TYP.)
BORING: PA-1-88
DATE:
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
30'15'0
NORTH
SCALE: 1" = (AT 24"x36")
P:\2020\20-040 PADR\CAD\SHEETS\SET 1 CONTRACT A\CM-X.XX - SET 1 CONTRACT A.DWG
'-0
161'-2"
113'-3"
70'-4"
CM-4.01
CM
-4.
APPROXIMATE LOCATION OF
TOE OF BREAKWATER EXTENSION
WATER LINE ON STRUCTURE AT LWD (577.5')
BR
EA
KW
AT
ER
E
XT
EN
SI
O
N E
N
LA
R G
EM
EN
T
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
CM-3.01
JC
RL
CH
20-040
5/12/23
15'
751/20154.BDWR2
BID
CONTRACT 1
EXISTING STONE BREAKWATER
RELOCATE EXISTING NAVIGATION MARKER TO NEW
LOCATION ON EXTENSION, ABANDON EXISTING MOUNT
7'-0"
40'-0"
NEW 12" STEEL PILE SUPPORT FOR
RELOCATED NAVIGATION MARKERCM-5.01
EXISTING STEEL SHEET PILE CELLS WITH STONE FILL
SHEET NOTES:
1. SURVEY PERFORMED ON OCTOBER 13 & 14, 2020.
2. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANE COORDINATES, SOUTH ZONE, INTERNATIONAL FOOT.
3. VERTICAL DATUM IS IGLD85. ALL ELEVATIONS ARE IN REFERENCE TO IGLD85.
4. WATER LEVEL ON DATE OF SURVEY: 581.2' (IGLD85)
82'-0"
'-6
CP 3
CP 4
CONTROL POINTS
POINT NORTHING EASTING
CP3 933,814.20 13,484,258.70
CP4 933,797.60 13,484,379.40
CM-4.01
Estimate Breakwater Extension Stone Type Quantities
Armor Stone 9,450 TON
Subarmor 2,300 TON
Core Stone 3,000 TON
LACE NEW ARMOR STONE
INTO EXISTING STONE
EXISTING USACE NAVIGATION
CHANNEL LIMITS (TYP.)
PROPOSED USACE NAVIGATION
CHANNEL LIMITS (TYP.)
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
60'30'0
NORTH
SCALE: 1" = (AT 24"x36")
P:\2020\20-040 PADR\CAD\SHEETS\SET 1 CONTRACT A\CM-X.XX - SET 1 CONTRACT A.DWG
BR
EA
KW
AT
ER
E
XT
EN
SI
O
N C
R O
SS
-S
EC
TI
O N
S
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
CM-4.01
JC
RL
CH
20-040
5/12/23
10'
751/20154.BDWR2
BID
CONTRACT 1
1 EXISTING BREAKWATER SECTION
SCALE: 1"=10'
3 TYPICAL BREAKWATER PROFILE
SCALE: 1"=10'
2 TYPICAL BREAKWATER SECTION
SCALE: 1"=10'
EXISTING SHEET PILE CELL (TYP.)
LACE NEW ARMOR STONE INTO
EXISTING STONE AT INTERFACE (TYP.)
VARIES 80'-95'
14'
EXISTING CELL ELEVATION: +9.5' (587.0')
LWD: +0' (577.5')
EXISTING GRADE APPROX. 563'
1.5
9'-5"
4'
CREST ELEVATION: +12.5' (590.0')
LWD: +0' (577.5')
EXISTING GRADE APPROX. 563'
1.5
CREST ELEVATION: +12.5' (590.0')
EXISTING CELL ELEVATION: +9.5' (587.0')
LWD: +0' (577.5')
EXISTING GRADE APPROX. 563'
ARMOR STONE, 2 LAYERS
(4'-5' DIA. STONE)
SUBARMOR STONE LAYER
(1.5'-2' DIA. STONE)
CORE STONE
(2"-4" DIA. STONE)
40' 27'22'
EXISTING OUTER STEEL
SHEETING CELL
9'- 5"
4'- 0"
TOP OF CORE ELEVATION: -0.9' (576.6')
TOP OF SUBARMOR ELEVATION: +3.1' (576.6')
0' 10' 20' 30' 40' 50' 60' 70' 80' 90' 100' 110' 120' 130' 140' 150'
0' 10' 20' 30' 40' 50' 60' 70' 80' 90' 100' 110' 120' 130' 140' 150'
0' 10' 20' 30' 40' 50' 60' 70' 80' 90' 100' 110' 120' 130' 140' 150' 160' 170' 180' 190' 200'
'-0
.5'
TOP OF STONE: +3.5' (581.0')
0'
10'
20'
30'
40'
0'
10'
20'
30'
40'
0'
10'
20'
30'
40'
SHEET NOTES:
1. ALL ARMOR STONES TO BE INDIVIDUALLY PLACED AND TIGHTLY KNIT PER SPECIFICATIONS.
2. CONTRACTOR TO PROVIDE TEST SECTION AND PROGRESS SURVEYS PER SPECIFICATIONS.
ARMOR STONE, 2 LAYERS
(4'-5' DIA. STONE)
SUBARMOR STONE LAYER
(1.5'-2' DIA. STONE)
CORE STONE
(2"-4" DIA. STONE)
DESIGNED BY:
DRAWN BY:
REVIEWED BY:
SHEET NUMBER:
THE REPRODUCTION, COPYING OR
OTHER USE OF THIS DRAWING WITHOUT
WRITTEN CONSENT IS PROHIBITED.
© 2022 EDGEWATER RESOURCES, LLC.
ISSUED FOR:
DATE REVISION
PR
O
JE
C
T
TI
TL
E:
SH
EE
T
TI
TL
E:
518 Broad Street, Suite 200 Saint Joseph, MI 49085
P: 269.932.4502 edgewaterresources.com
PROJ NO.:
NORTH
P:\2020\20-040 PADR\CAD\SHEETS\SET 1 CONTRACT A\CM-X.XX - SET 1 CONTRACT A.DWG
N
AV
AG
AT
IO
N
AL
A
ID
S
U
PP
O R
T
PI
LE
PO
R
T
AU
ST
IN
, M I
H
AR
BO
R
R
EP
AI
R
S
AN
D U
PG
R
AD
ES
PO
R
T A
U
ST
IN
S
TA
TE
H A
R B
O R
CM-5.01
JC
NC
CH
20-040
5/12/23
751/20154.BDWR2
BID
CONTRACT 1
SCALE:
NAVIGATIONAL AID SUPPORT PILE
1/4"=1'-0"
TOP OF BREAKWATER: 590.0'
TOP OF CAP: 591.0'
PILE TIP: 555.0'
APPROX. EXISTING GRADE: 563.0'
AP
PR
OX
. 8
'-0
ENLARGEMENT
SCALE: 1/2"=1'-0"
THROUGH-BOLT NEW HDG HARDWARE,
MATCH SIZES & TYPE OF EXISTING
HARDWARE
48"x48"x1" SQUARE A36 STEEL PLATE, TRIM EXCESS STEEL IN THE FIELD AFTER
INSTALLATION OF NAVIGATIONAL AID
RELOCATE EXISTING NAVIGATIONAL AID TOWER TO
NEW PILE CAP LOCATION AT THE SAME ORIENTATION
RELATIVE TO BREAKWATER. ABANDON EXISTING
SUPPORT PILE IN EXISTING SHEET PILE CELL.
COORDINATE REINSTALLATION OF DAYMARK WITH
U.S.C.G. PER SPECIFICATIONS. NAV. AID IS SHOWN
SCHEMATICALLY AND NOT NECESSARILY TO SCALE
LACE NEW BREAKWATER ARMOR STONES IN
TIGHTLY AROUND NEW PILE
A252 GR. 3 STEEL PIPE PILE 12.750x0.375, LENGTH OF 35'
20" DRILLED SHAFT WITH 4000 PSI CONCRETE
OR GROUT BACKFILL
EXISTING SANDSTONE, ELEVATION VARIES
NOTE: ALL WELDS TO BE E70XX
12"x12"x 38" A36 STEEL GUSSET PLATES (4), ALIGN
OFFSET FROM NAV. AID MOUNTING BOLTS
316"
SEE ENLARGEMENT
AROUND PILE
TO PLATE
316"
316"GUSSET PLATE
TO PILE, TYP.
316"
316" GUSSET PLATE TO
PLATE, TYP.
SCALE:
TURBIDITY CURTAIN
1/16"=1'-0"
FLOW
ST
RE
AM
B
AN
K
ST
RE
AM
BA
NK
W
OR
K
AR
EA
CURTAIN
MATERIAL
ANCHOR
OR
STAKES
FLOTATION
DEVICE
WATER
SURFACE
FLOTATION
5/8" POLYPROPYLENE
ROPE*
NYLON REINFORCED
VINYL 1/4" CHAIN
DEPTH
ACCORDING TO
NEED
* ANCHORS & JOINTS VARY
DEPENDING ON TYPE OF
WATERBODY AND
VELOCITY OF
WATERFLOW.
NOTES:
TYPE OF TURBIDITY CURTAIN TO
BE DETERMINED BY A QUALIFIED
ENGINEER OR CPESC.
PROFILEPLAN VIEW
PROFILE - CURTAIN DETAIL
VA
RI
ES
VA
RI
ES
SCALE:
TYPICAL DREDGE TEMPLATE
N.T.S. DT-DREDGE TEMPLATE
USACE NAVIGATION CHANNEL AREA
MAX. DREDGE DEPTH (565.0')
REQUIRED DREDGE DEPTH, LWD-12' (565.5')
NO DREDGING
ALLOWABLE OVERDREDGE AREA
REQUIRED DREDGE AREA
EXISTING GRADE (VARIES)
USACE CHANNEL LIMITS
MIN. SIDE SLOPE
| Sheets and Views |
| G-1.01 COVER SHEET |
| G-1.02 GENERAL NOTES |
| V-1.01 OVERALL EXISTING SITE PLAN |
| V-1.02 HARBOR ENTRANCE EXISTING CONDITIONS |
| V-1.03 - RECORD SOIL BORINGS |
| RECORD BORINGS |
| CM-1.01 OVERALL PROPOSED SITE PLAN CONTRACT A |
| CM-1.02 PROPOSED HARBOR ENTRANCE |
| CM-3.01 BREAKWATER EXTENSION ENLARGEMENT |
| CM-4.01 BREAKWATER EXTENSION CROSS-SECTIONS |
| CM-5.01 NAVAGATIONAL AID SUPPORT PILE |
File details come from the government source that posted it. Updated .