00210 IFB Attachments (Contract1)_Part3.pdf
PDF 6 MB Posted
- Solicitation number
- RFQ 171 230000000484 4
- Issued by
- Huron County, Michigan
About this file
This file contains electrical requirements specifications and a Michigan Department of Environment, Great Lakes, and Energy (EGLE) Water Resources Division general permit authorization for a marina dock replacement project in Port Austin, Huron County, Michigan. The permit was issued to Scott Cook of the Michigan Department of Natural Resources - Parks and Recreation Division and authorizes the replacement of floating dock structures measuring 545 feet long by 108 feet wide by 2.5 feet deep, the reinforcement of dock anchoring through installation of 15 new 16-inch diameter steel pipe piles, placement of 14,400 cubic yards of stone to extend the existing breakwater by 160 linear feet, and dredging of a 150-foot by 50-foot by 1-foot deep area to remove approximately 250 cubic yards of spoils. The permit, issued September 26, 2022, and revised March 27, 2023, is valid for five years, expiring September 26, 2027. The electrical specifications detail marina pedestal requirements across multiple boat slips, including dual receptacles on starboard and port sides, lighting systems with photocell-controlled LED lights with amber lenses, water service with ball valves and hose bibs, and various feeder wire sizes and voltage drop calculations across designated slip clusters.
The permit is subject to standard conditions including contractor notification requirements, compliance with soil erosion and sedimentation control regulations, maintenance of the permit placard at the work site, and completion of work during dry periods with equipment mats if necessary. All dredged and excavated materials must be disposed of in upland sites outside floodplains and wetlands. The permittee must notify EGLE within one week of activity completion and obtain all necessary federal approvals, including those related to the navigation channel. The project must comply with Part 91 of the Natural Resources and Environmental Protection Act regarding soil erosion control and may require additional permits from the County Enforcing Agent. No extensions of the permit will be granted, and any project modifications require written EGLE approval prior to implementation. The permit does not convey property rights and does not authorize injury to private property or waive the requirement for other local, state, or federal approvals.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TYPE ELECTRICAL REQUIREMENTS OTHER REQUIREMENTS
STARBOARD SIDE RECEPT. PORT SIDE RECEPT BUS AMPS LIGHT METER NOTE #5 TVSS WATER (NOTE#4) HOSE HANGER DOOR
MP1 TWO 30A (120V) TWO 30A (120V) 500 NOTE #1 TWO YES TWO/BOAT SIDE YES/BOTH DOCK & BOAT SIDES NOTE #2
MP2 ONE 30A(120V)/ONE 50A(120/240V) 500 NOTE #1 TWO YES TWO/BOAT SIDE YES/BOTH DOCK & BOAT SIDES NOTE #2
MP3 NOT USED
MP4 500 NOTE #1 ONE YES TWO/BOAT SIDE YES/BOTH DOCK & BOAT SIDES NOTE #2
NOTES:
1. PHOTOCELL CONTROLLED LED LIGHT WITH AMBER LENS
2. LOCKABLE WEATHERPROOF DOOR WHICH PROTECTS THE RECEPTACLES WHILE IN USE
3. NOT USED.
4. 1/4 TURN BALL VALVE WITH 3/4" HOSE BIB AND STAINLESS STEEL HANDLE
5. WIRELESS REMOTE ELECTRIC METERING
MARINE PEDESTAL TYPES (BASED ON EATON "LIGHTHOUSE" MODEL)
ONE 30A(120V)/ ONE
50A(120/240V)
ONE 30A(120V)/ ONE
50A(120/240V)
ONE 30A(120V)/ ONE
50A(120/240V)
FEEDER NUMBER LENGTH Vd IN % TOTAL Vd %(2)
150 0.7
SLIPS 15-17 170 1.2 1.9
250 1.8 2.5
SLIPS 36-38 170 1.2 1.9
SLIPS 39-42 250 1.8 2.5
SLIPS 22 AND 23 290 2.0 2.7
SLIPS 24 AND 25 325 2.3 3.0
150 0.7
SLIPS 43 AND 44 290 2.0 2.7
SLIPS 45 AND 46 325 2.3 3.0
SLIPS 26 AND 27 370 2.6 3.3
SLIPS 28 AND 29 410 2.9 3.6
SLIPS 47 AND 48 370 2.6 3.3
SLIPS 49 AND 50 410 2.9 3.6
150 1.1
SLIPS 30 AND 31 375 2.6 3.7
SLIPS 32 AND 33 555 3.9 5.0
SLIPS 51-56 515 3.5 4.6
SLIPS 57-62 615 3.5 4.6
SLIP 34 610 3.8 4.9
SLIP 35 615 3.8 4.9
SLIP 63 635 3.9 5.0
NOTES:
(1) CALCULATION OF FEEDER LOAD BASED ON NEC TABLE 555.12 AND IT'S NOTES #1 AND #2
(2) BRANCH LOADS ARE WITHIN 10 FOOT OF PANEL, SO 3% FOR FEEDER Vd AND 2% FOR BRANCH CIRCUIT EQUALS 5% TOTAL ALLOWED PER NEC
(3) CALCULATED USING RATIO OF FEEDERS AND TABLE 8 IN CHAPTER 9 OF NEC
(4) OVERSIZED FEEDER DUE TO VOLTAGE DROP
#3 (3)
SLIPS 30-35 & 51-62
#4
#4 (3)
#3 (3)
#3 (3)
SLIPS 15-17 AND 18-21, 36-
38, 39-42, 22-25
SLIPS 43-50 & 26-29
#6
#2
#4
#4
13 90 #2/0 AWG (4)
12N 90 #2/0 AWG (4)
12S 90 #2/0 AWG (4)
11S 159 #4/0 AWG (4)
11N 130 #4/0 AWG (4)
10N 162 #4/0 AWG
6(SERVES 10S,
10N, 11S, 11N, 12S
& 12N )
2 RUNS OF
#250KCM
10S 162 #4/0 AWG
6N
9N 130 #3/0
5S
5N
6S
9S
8S
8N
#4
#4
#4/0 AWG
#4/0 AWG
5(SERVES 7S, 7N,
8S, 8N, 9S & 9N)
7S
7N
2 RUNS OF
#500KCM
#4/0 AWG
#4/0 AWG162
#4
#4
#4
#4
#3
#4
#4
#4/0 AWG162
2 RUNS OF
#500KCM
#4/0 AWG
#4/0 AWG
#4/0 AWG
#4/0 AWG
#4/0 AWG162
FEEDER VOLTAGE DROP SCHEDULE
4 (SERVES 4S, 4N,
5S, 5N, 6S & 6N)
4S
4N
LOAD DESCRIPTION
#4/0 AWG
#3
#4
#4
#4
FEEDER AMPS (1) WIRE SIZE GROUND
SLIPS 18-21 162
MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY
WATER RESOURCES DIVISION
GENERAL PERMIT AUTHORIZATION
Issued To:
Scott Cook, Michigan Department of Natural Resources - Parks and Recreation Division 8717 N. Roscommon Rd.
Roscommon, MI 48653
Permit No.: WRP034736 v.1 Submission No.: HPR-YGNQ-71Q6W Site Name: 32-Port Austin, Huron County Issued: September 26, 2022 Revised: March 27, 2023 Expires: September 26, 2027
This permit is being issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); specifically:
Part 301, Inland Lakes and Streams Part 323, Shorelands Protection and Management
Part 303, Wetlands Protection Part 325, Great Lakes Submerged Lands Part 315, Dam Safety Part 353, Sand Dunes Protection and
Management Part 31, Water Resources Protection (Floodplain Regulatory Authority)
EGLE certifies that the activities authorized under this permit are in compliance with the State Coastal Zone Management Program and certifies without conditions under the Federal Clean Water Act, Section 401 that the discharge from the activities authorized under this permit will comply with Michigan’s water quality requirements in Part 31, Water Resources Protection, of the NREPA and associated administrative rules, where applicable.
Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:
Authorized Activity:
To replace the floating dock structures measuring 545 feet long by 108 feet wide by 2.5 feet deep, reinforcing the anchoring of the docks by installing 15 new 16-inch diameter steel pipe piles.
To place 14400 cubic yards of various sized stone on the bottomlands to create EGLE WRP034736 v1.1
Approved Issued On:09/26/2022
Expires On:09/26/2027
Scott Cook 2 HPR-YGNQ-71Q6W a 160 linear feet extension to the existing breakwater.
To dredge an area 150 feet long by 50 feet wide by 1 food deep, removing a total of 250 cubic yards of spoils
All work is to be done in accordance with authorized plans and as specified in this permit.
Before commencement of the permitted activity, the permittee must obtain all federal approvals necessary, including any approvals relating to the navigation channel.
Authorized Under General Permit Category: O. Minor Permit Revisions and Transfers Waterbody Affected: Lake Huron Property Location: Huron County, Port Austin Township, T19N/R13E/S30
Authority granted by this permit is subject to the following limitations:
A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.
B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31 of the NREPA.
C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.
D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.
E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.
F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with 2013 PA 174 (Act 174) and comply with each of the requirements of Act 174.
G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.
H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.
I. Permittee shall notify EGLE within one week after the completion of the activity authorized by this permit, by completing and forwarding the attached preaddressed postcard to the office addressed thereon.
J. This permit shall not be assigned or transferred without the written approval of EGLE.
K. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.
L. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31 of the NREPA, and wetlands).
M. In issuing this permit, EGLE has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, EGLE may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.
EGLE
WRP034736 v1.1
Approved
Scott Cook 3 HPR-YGNQ-71Q6W
N. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee's obligation to indemnify the State of Michigan applies only if the state: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the state, and (2) consents to the permittee's participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act, 1969 PA 306, as amended, challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.
O. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, EGLE may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.
P. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from EGLE. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification. Proposed modifications must be approved, in writing, by EGLE prior to being implemented.
Q. This permit may be transferred to another person upon written approval of EGLE. The permittee must submit a written request to EGLE to transfer the permit to the new owner. The new owner must also submit a written request to EGLE to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties that includes all the above information may be provided to EGLE. EGLE will review the request and, if approved, will provide written notification to the new owner.
R. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.
S. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.
T. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA).
U. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.
V. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.
W. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the water body are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.
EGLE
WRP034736 v1.1
Approved
Scott Cook 4 HPR-YGNQ-71Q6W
X. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the Michigan Department of Natural Resources, Fisheries Division.
Y. Work to be done under authority of this permit is further subject to the following special instructions and specifications:
1. Authority granted by this permit does not waive permit or program requirements under Part
91 of the NREPA or the need to acquire applicable permits from the CEA. To locate the Soil Erosion Program Administrator for your county, visit https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview and select “Soil Erosion and Sedimentation Control Agencies”.
2. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state, or federal approval or authorization necessary to conduct the activity.
3. No fill, excess soil, or other material shall be placed in any wetland, floodplain, or surface water area not specifically authorized by this permit, its plans, and specifications.
4. This permit does not authorize or sanction work that has been completed in violation of applicable federal, state, or local statutes.
5. The permit placard shall be kept posted at the work site in a prominent location at all times for the duration of the project or until permit expiration.
6. This permit is being issued for the maximum time allowed and no extensions of this permit will be granted. Initiation of the construction work authorized by this permit indicates the permittee's acceptance of this condition. The permit, when signed by EGLE, will be for a five-year period beginning on the date of issuance. If the project is not completed by the expiration date, a new permit must be sought.
Issued By:
Randy Evilsizer Bay City District Office Water Resources Division 989-280-1658
EGLE
WRP034736 v1.1
Approved Issued On:09/26/2022
Expires On:09/26/2027 https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview
Scott Cook 5 HPR-YGNQ-71Q6W
THIS GENERAL PERMIT AUTHORIZATION MUST BE SIGNED BY THE PERMITTEE TO BE
VALID.
I hereby assure that I have read, am familiar with, and agree to adhere to the terms and conditions of this authorization.
Permittee Signature Date cc: Port Austin Township Clerk Huron County Drain Commissioner Huron County
USACE
Samuel Henley, Edgewater Resources
EGLE
WRP034736 v1.1
Approved Issued On:09/26/2022
4/7/2023
SCALE: NOT TO SCALE
MICHIGAN
WISCONSIN
MICHIGAN
LAKE HURON
LAKE ERIE
LAKE
ILLINOIS
INDIANA OHIO
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
518 BROAD STREET, SUITE 200
ST. JOSEPH, MI 49085
P: 269.932.4502 SHEET: OF 11
10/01/21 (REV. 2/14/23)
IGLD85
HURON
PORT AUSTIN, MI
LAKE HURON
MDNR PARKS AND RECREATION
edgewaterresources.com
LOCATION MAP
W SPRING ST. (M-25)
BAY ST.
RAILROAD ST.
BIRD CREEK
ACORN DR.
FARRAR ST.
CE
NT
ER
S
T.
VI
NE
S T.
PR
OS
PE
CT
S T.
OM
EL
IA
S
T.
AR
CH
S T.
LIN
E
ST
NO
RT
H
ST
BR
ID
GE
S
T.
MC
MA
HO
N
DR
LO
NG
S
T.LAKEVIEW ST.
LA
KE
S T.
UNION ST.
PORT A
USTIN
BREAKWATE
R
PROJECT LOCATION
EGLE
WRP034736 v1.1
Approved
570570
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
.9
.4
SH
EE
T:
O
F
/0
1/
(R
EV
. 2 /1
4/
IG
LD
H U
R O
N
PO
R T
AU
ST
IN
, M
I
LA
KE
H
U R
O N
M D
N R
P
AR
KS
A
N D
R
EC
R
EA
TI
O
N ed ge w at er re so ur ce s.
co m
O
VE
R
AL
L
EX
IS
TI
N G
C O
N D
IT
IO
N S 2
P:\2020\20-040 PADR\CAD\PERMITTING\PADR PERMIT BASE.DWG
EXISTING STEEL CELL BREAKWATER - TO REMAIN
EXISTING RUBBLEMOUND BREAKWATER - TO REMAIN
NOTES:
1. BATHYMETRIC SURVEY PERFORMED ON 10/13/2020
2. VERTICAL DATUM IS IGLD85
3. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANES, SOUTH
ZONE, INTERNATIONAL FOOT
4. AVERAGE WATER LEVEL ON DAY OF SURVEY = 581.51' (IGLD85)
5. USACE OHWM = 581.5' (IGLD85), EGLE OHWM = 580.5' (IGLD85)
6. LWD = 577.5'
SCALE: 1" = 300'
150' 300'0
NORTH
USACE FEDERAL NAVIGATION CHANNEL (TYP.)
MARINA EXISTING CONDITIONS
- SEE PAGE 3
WATER'S EDGE ON DAY OF SURVEY
ELEV. = 581.51' (TYP.)
LAKE HURON
EGLE
WRP034736 v1.1
Approved
AP
PL
IC
AN
T:
W
AT
ER
W
AY
C
IT
Y:
C O
U N
TY
D
AT
E:
D
AT
U
M
BR
O
AD
S
TR
EE
T, S
U
IT
E
ST
. J O
SE
PH
, M I 4
P:
.9
.4
SH
EE
T:
O
F
/0
1/
(R
EV
. 2 /1
4/
IG
LD
H U
R O
N
PO
R T
AU
ST
IN
, M
I
LA
KE
H
U R
O N
M D
N R
P
AR
KS
A
N D
R
EC
R
EA
TI
O
N ed ge w at er re so ur ce s.
co m
M
AR
IN
A
EX
IS
TI
N
G C
O N
D
IT
IO
N
S 3
P:\2020\20-040 PADR\CAD\PERMITTING\PADR PERMIT BASE.DWG
EXISTING FIXED PIER - TO REMAIN
(15,693 SF)EXISTING FLOATING WEST DOCK
AS PERMITTED - TO BE REPLACED
(10,600 SF)
EXISTING BOAT LAUNCH RAMP
- TO REMAIN
NOTES:
1. BATHYMETRIC SURVEY PERFORMED ON 10/13/2020
2. VERTICAL DATUM IS IGLD85
3. HORIZONTAL DATUM IS NAD83, MICHIGAN STATE PLANES, SOUTH
ZONE, INTERNATIONAL FOOT
4. AVERAGE WATER LEVEL ON DAY OF SURVEY = 581.51' (IGLD85)
5. USACE OHWM = 581.5' (IGLD85), EGLE OHWM = 580.5' (IGLD85)
6. LWD = 577.5'
SCALE: 1" = 100'
50' 100'0
NORTH
EXISTING FLOATING EAST DOCK
- TO REMAIN (4,807 SF)
WATER'S EDGE ON DAY OF SURVEY
ELEV. = 581.51' (TYP.)
BIRD CREEK
ADJACENT PARCEL OWNER
- TOWN OF PORT AUSTIN
ADJACENT PARCEL OWNER
- HURON COUNTY
EGLE
WRP034736 v1.1
Approved
File details come from the government source that posted it. Updated .