This is a project plan document for the East Tawas Harbor Underground Fuel Storage Tanks Replacement and Dock Electrical Upgrade project (Project No. 27-8735), prepared by the Michigan Department of Natural Resources, Parks & Recreation Division. The project involves the replacement of underground fuel storage tanks and upgrading dock electrical infrastructure at the East Tawas Harbor facility located in East Tawas, Michigan. The plans indicate installation of new fuel tank locations with painted parking islands, sheet piling design for structural integrity and groundwater infiltration prevention, electrical conduit installation for dock power (480 volt), and tank monitoring systems. The project includes parking lot renovations and utility relocations. The document establishes limits of excavation, specifies contractor responsibilities for utility verification and protection, and requires coordination with telecommunications and utility providers. The sheet piling depth and design specifications are to be determined by the contractor based on structural requirements and groundwater management needs.
The project documentation indicates that the general contractor bears responsibility for field verification of all utilities, protection of existing infrastructure, and restoration of disturbed areas including lawns and landscaping. The contractor must consult with Ameritech Communications and other utility providers regarding existing lines and potential relocations. The plans note that groundwater extent was determined through a 1993 study, informing the design requirements for preventing seepage into excavation areas. The project encompasses both Phase I tank replacement work and Phase II dock electrical upgrades, with detailed specifications provided across multiple plan sheets numbered 1 through 6. All work must comply with the established limits of excavation and coordinate with existing community facilities including the toilet/shower building, community building, and filtration plant.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum_1_26036.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| RFP_26036.pdf | ||
| Photos_ETawas_26036.pdf | ||
| Photo_PtAustin_26036.pdf | ||
| Addendum_2_FY2025 Port Austin Bulk Fuel Deliveries.xlsx | XLSX spreadsheet | |
| Addendum_2_26036.pdf | ||
| Project Statement_26036-1.pdf | ||
| Plans_1994_PtAustin_26036.pdf | ||
| Plans_2016_ETawas_26036.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EAST TAWAS HARBOR
UNDERGROUND FUEL STORAGE
TANKS REPLACEMENT AND
DOCK ELECTRICAL UPGRADE
PROJECT NO. 27-8735
PROJECT
LOCATION
W I L B E R
R
D IRPOR
EMLO
CH
EAST
TAWAS
TAWAS
CITY
TAWAS
HARBOR
BAY
SOLITUDETAWAS
ACH RD.
DE
TR
OI
T
MAC
KIN
AC
R R
PROJECT
LOCATION TAWAS
PUINT
STATESTATE LAKE
PARK
HURON
800-482-7171
O
DEPARTMENT OF NATURAL RESO RCES
PLOT NAME TAWAS-CS PLOT DATE 918/96
ST REPLAC
PARKS & RECREATION DIVISI PROJECT NO. 27-8735 INDEX 54380 95259 240057/00
HARBOR
PHASE
NO.
SHEET INDEX
TITLE
ICOVER SHEET
PIER PLAN & SECTION
5 TANK SECTIONS
PHASE II6
PARKS RECREATION DIVISION
PLANNING SERVICES BRANCH
i9-12-9
MCES CHE
FOR APPROVNS SUPERVSOR DATE
FoRPROL: ie20/4
ENGINEERING SECTION
FOR APPROVAL:
COVER SHEET
SHEET T
LAN No. WB5C-2
HEET OF
FILTRATION
PLANT
[stra
Approximate exter rough a
1993 stu
N E W M A N
S T R E E T
Condhuit to Electric g repl
E M
C US-23
[See Proposed Layout]
СOMMUNITY BUILDING
Un
DE
RD
RU
ne
EL
EC
TR
IC
al co nd ui t
(2 u n g n a e
Co nD ui ts
(non itor ins
NOTES:
All utilitles verifled by by the contractor. All existing utllitles shall b properly protected by the contractortor. Any disturbed utilitles eplaced I
2. If necessary, repair
Con lawns, etc., to a
4.
sheet pllin revent seeра Imiting clay layer re va
5'-0"
48'-0" mits of
Excavation of tank
20'-0" 10'-0"
43-0"
-58
38-0
PL
+Fuel tank lodlocation and Canew painted parking islands
Se6 Sheet 5 for tank
Sheet piling design by contractor.
Depth of piling, as required for structural integrity and to minimize groundwater Infiltration (See
Note 4). Sheet piling shown on y, areal as required for
TYP
24-0"
Painted
38-0"
3-0" TYP.
Island dimensions typical for both
TOILET
SHIWE
BUILDIN
-Reptoce in Kin Kind] 1-3/4 Baluanized Gnduit
3/2 GalvanızeP
To Dock (A80 volt)
For Poweg 人
-To each! taNk monitoring To each tank
LEGEND
of proposeddetalls
SPECIAL NOTE
AND HOLE
This drawing Indicates the majority of known orlatnal documents. However, It willl be the responsibity of the general contractor to autlons when excavatin
TOILET
SHOWER
BUILDING
Expansion
FOUNTAI
ELECTRIO
TELEPHO
SEWER
DIESEL FUEL LUNE
1 DIA. PVC CONG
FUEL LINES
PARKING LOT UTILITY RERENOVATIONS
SCALE I" = 30'-0"
76/6 existing
PROPOSED LAYOUT
SCALE I" = 20'-0"
DEPARTMENT OF NATURAL RESDURCES
PARKS & RECREATION DIVISION
PARKING LOT RENOVATIONS
ET TITLE
EAST S HARBOR ROJECT ND 27-8735
NT DOCK
SHEET 2 PLAN ND. W35C-2
TAVAS-PL - PLOT 1-37 -09/17/96
N E W M A N
S T R E E T
Eros required at two catch basin ations Istraw bale or equal] Typl
FILTRATION
PLANT
TOILET
Approximate extent of groundnater mined ы993 study.
ECKED BY D.M.
HOWER
BUTL DING
BUILDING
US-23
Liits of Excavation (See
A
COMMUNITY BUILDING
Fuel tank location and new painted parking islands and r n Kina] s ofLimits
Excavatvation
Installat
Sheet pliing design by contrad structural Integrtstructural intearit
Note 4) Sheet plan for referer eal extents
LEGEND SPECIAL NOTE
Tnis arawing inaica orlainal documents. will be the uof the general contractor to excavHOLE
OUNTAI
LECTRIC
PHONE
EL FUEL LINE
ELECTRIC, 3/4
PARKING LOT UTILITY RENOOVATIONS
SCALE I" = 30'-0"
DATE
76/6 propose
Expansion
NOTES:
2.
3.
All utiiitles shall be fleld verlfled by the contractor. All existing utilitles ected by the contractor. Any disturbed replac kind at contractors expense.
If necesscessary, repair or relocation of electrie
Consur Ameriteritech Co. at (800)660 for pay phone (800
ConContractor d in
Sheet piling required to prevent seepage of groundwater Into excavation, Iimiting ffect alor nearby locations grade
20'-0" 10-0"
10'-0" of tank
YP.
TOILET
SHOWER
BUILDING
43-0"
PL
38-0"
JOR
24-0"
38-0"
TYP.
Painted
Island dimensions typical for both
45.0
<isting
PROPOSED LAYOUT
SCALE I" = 20'-0"
DEPARTMENT OF NATURAL RESDURCES
PARKS & RECREATION DIVISION
PARKING LOT RENOVATIONS
PROJE
27-8735
OF 6 LAN NO
LS
N
-E
FILTRATION PLANT
LEGEND
EXISTING
BAIT
F O R
C
ON
TI
NU
JA
TI
ON
N E W M A N S T R E E T
TANKS
SEE PARKING LOT RENOVATIONS
PLAN ON SHEET NO. 2, FOR LOCATION
ECT.
LET/
SHOWER BUILDING
DEISEA
IN 3/4 UNDERGRUND
SINGLE WALL GAG 20 ABOVE GR
ON SHEET NOS FUEL LINES, SEE
UNDERG
OF UNDERGROUND UTILITIES.
6000 GALLON GAS UNDERGROUND
CONCRETE PADS
AND PIPING. EXISTING SUBMERSIBLE PUMPS MOTORS
TURNED OVER TO THE OWNE
UNDERGROUND ELECTRICAL LINES AND
ARE TO BE REVSED WITH NEW UST TANK
VERIFY EXISTING CIRCUIT BREAKERS AND
EUSED TO ENSURE
THEIR COMPATIBILITY AND CODE COMPLIANG
UNDERGROUND FUEL STORAGE TANK PLAN
ELECTR
BLDG. MECH.
SINGLE
20A-2
CONTROL
DEPARTMENT OF NATURAL RESDURCES
ON DIVISID
FUEL SYSTEM PLAN
SHEET TITLE
O LEAD FUEL
FILL PIPE
MANHOLE COVER
DIESE RUELFILL PIPE
WER
15,000 GAL UNDERGROUND
20 SCHEDULE 40 GALY.
ABOVE FINISHED SLAB WIT
2" ALUMIN
27-0° LONe
UNDERGROUND
STOR
VENT LINE
MANHOLE COVER
MANHOLE COVER
8 DEEP
DEPTH.
MANHOLE COVER
CONDUIT UNDERGRUND
1-3/4"0 UNDERGROUND
FUEL LINES
MONITORING CABLES
IN 3/4" UNDERGRUND
CONDUIT
PARTIAL PLANUST
SCALE 1/8 = 1'-0
SQUARE D
TANK MONITORING CABLES
CONDUT BLE WERGROUND
FUEL
THIS SHEET FOR CONTINJATION
3/48 INDERGROU
CONDUIT.
ELECTRICAL NOTES
CLACOFIED HAZARIRED. PLACE CONDUIT FILL AND SEALS
SHALL THE CURRENT MICHIGAN ELE
ELECTRIC
SHALL BE AS DESIGNED A
TURER OR MANUF. CERTIFIED R
SHALL BE INTRINSICALLY SAF
BREAKERS AND PUMP CONTROLS TO BE REVSED TO ENSURE
EXPLOSION PROOF SUBMERSIBLE PUMPS.
RN PROOF
ELECTRICAL RISER DIAGRAM
O SCALE
AREA D
LECTRICAL UPGRADE
CT NO. 27-8735
SHEET 3 PLAN NI. W35C-2
ESISTANT, IV RATED, TRIPLE WALL DIES
ECTRICAL PANEL
B
CABLES IN RISID METAL
20A-P
DISPENSERWITH NEM 1-2/40 A
REISTANT, IV RATTD, TRIPLE WALL
ELECTRICAL NOTES
AND DEVICES REGURED, PLACE CONDUT PILL AND SEALS
CODE CHAPTER S MICHIGAN ELECTRIC
2. RECONNECT EXISTING DISFENSER ELECTRICAL AFTER NEW
VERIEY INSTALLATION TO ENGURE COMPLIANCE WITH CURRENT
MICHIGAN ELECTRICAL CODE COMPLIANCE.
PAPCUT
AND DIESEL FIEL
PIRES IN COREUT CIRCUT
PUEL LINE
SANITARY
ELECTRICAL RISER DIAGRAMDI
WATER LINE
PIER PLAN
SCALE I" = 50-0"
DEPARTMENT OF NATURAL RESDI
PARKS & RECREATION DIVISION
PIER PLAN & SECTIONS
SHEET TITLE
BENNETT 601 BENNETT #6012 aX DECK BOARDS
PER VAVE FOR EXISTING BENMETT
RVAVE PO EXIBTINS BENETT
REL DISFENERS AS REGURED. PROVIDE
NEM COND
DISPENSER SUMP DETAIL
SECTION C-C
V2
TRIM MEMBERS
DECK BOARDS
STRINOERS
SINGLE WALL, DIESEL AND GAS FUEL LINES
AND GAS FUEL LINES UTILIZE EXOS
HANGNG BRACKETS
BRACKET SUPPORT.
SECTION B-B
SGALE 1/2° = 1
SECTION A-A
ALE 1/2" =I
SUPPORT MEMBER
DESEL AND GAS FUEL LINES
VTILIZE EOSTNG
27-8735
ELECTRICAL W35C-2
ОТE SLOPE
S LATER
REBAR CDNE EA SIDE
10-1/2
5,000 GAL
FUEL STORAGE TANK
FIN. ELEV. = 584.4'
EXIPLOSIDN PROLLEAK DETECTOR FOR
99-99 MELDED WIRE FABRIC AT
BRASS BALL VALVE
NOTE NET EXTRA DPENINGS PR JUNCTIDN BOX
LEAK SENSURS
NOTE FINISH GRADE
TOP EDGE
OF CONCRETE SLAB.
BAE VALL BIESE FL LDE SE
10,000 GAL
FUEL STORA
OR EXPANSICN JOINT AS
PER TANK MANUEAS
NNER CATION
FUEL TANK END ELEVATION
SCALE 1/
FUEL SYSTEM NOTES
HALE E PROVIDER BY A CERTIFIED FIELD REPRESENTATIVE OF
FLEL SYSTEN INSTALLATLEN VNETHER INDICATED IN THE BEDDING
AALL NAVE SECINDARY CONTAINMENT AE S SN
MIN 12 SAND FILL
BRASS BALL VALVE
T GALV. NC.
GALY HOK BOLT
ELECTRICAL CABLES IN UNDERGROUND
CONDUIT SE FUEL SYSTEN PLAN ON
OF JUNCTION BOX 10g TT H
INTERSTTIBE
-66-66 WEL DEDDED VIRE FARIC AT
NOTE RESEAXTRA OPENINGS
SUNP LEAK SENSORS
ELECTRICAL CARLES IN UNDERGROUND
SRDUIT SEE F
OOF JUNCTION BUX
INTERSTITIAL HINITOR TUBE
PIPE SUPPLY
PUMP MOTOR
SUPPLY
RSHOTOR
SVING JINT
SIDE ELEVATION
AND CUVER
PRODE RISER
10,000 GALLLLON DIESEL FUEL37 TANK
SCALE 1/2
COVER W/18 SKIRT
PROOF JUNCTION Bх
PROBE RISER
SVING JINT
SIDE ELEVATION
15,000 GALLON GAS FUEL TANK
SCALE 1/2" 1-0*
DRAWN BY
CHECKED BY D.M. 6/67 DEPARTMENT OF NATURAL RESDURCES
TANK SECTIONS
PREVENTION
TUBE
PE VENTION
TUBE
S HARBOR
PROJECT NO. 27-8735
GRADE SHEET 5 OF 6 PLAN Na. W35C-2