This is a project plan document for the East Tawas Harbor Underground Fuel Storage Tanks Replacement and Dock Electrical Upgrade project (Project No. 27-8735), prepared by the Michigan Department of Natural Resources, Parks & Recreation Division. The project involves the replacement of underground fuel storage tanks and upgrading dock electrical infrastructure at the East Tawas Harbor facility located in East Tawas, Michigan. The plans indicate installation of new fuel tank locations with painted parking islands, sheet piling design for structural integrity and groundwater infiltration prevention, electrical conduit installation for dock power (480 volt), and tank monitoring systems. The project includes parking lot renovations and utility relocations. The document establishes limits of excavation, specifies contractor responsibilities for utility verification and protection, and requires coordination with telecommunications and utility providers. The sheet piling depth and design specifications are to be determined by the contractor based on structural requirements and groundwater management needs.

The project documentation indicates that the general contractor bears responsibility for field verification of all utilities, protection of existing infrastructure, and restoration of disturbed areas including lawns and landscaping. The contractor must consult with Ameritech Communications and other utility providers regarding existing lines and potential relocations. The plans note that groundwater extent was determined through a 1993 study, informing the design requirements for preventing seepage into excavation areas. The project encompasses both Phase I tank replacement work and Phase II dock electrical upgrades, with detailed specifications provided across multiple plan sheets numbered 1 through 6. All work must comply with the established limits of excavation and coordinate with existing community facilities including the toilet/shower building, community building, and filtration plant.

View the file

Other files

File Type Posted
Addendum_1_26036.pdf PDF
SAMPLE Billable Rate Contract (Rev 04-25).pdf PDF
RFP_26036.pdf PDF
Photos_ETawas_26036.pdf PDF
Photo_PtAustin_26036.pdf PDF
Addendum_2_FY2025 Port Austin Bulk Fuel Deliveries.xlsx XLSX spreadsheet
Addendum_2_26036.pdf PDF
Project Statement_26036-1.pdf PDF
Plans_1994_PtAustin_26036.pdf PDF
Plans_2016_ETawas_26036.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EAST TAWAS HARBOR

UNDERGROUND FUEL STORAGE

TANKS REPLACEMENT AND

DOCK ELECTRICAL UPGRADE

PROJECT NO. 27-8735

PROJECT

LOCATION

W I L B E R

R

D IRPOR

EMLO

CH

EAST

TAWAS

TAWAS

CITY

TAWAS

HARBOR

BAY

SOLITUDETAWAS

ACH RD.

DE

TR

OI

T

MAC

KIN

AC

R R

PROJECT

LOCATION TAWAS

PUINT

STATESTATE LAKE

PARK

HURON

800-482-7171

O

DEPARTMENT OF NATURAL RESO RCES

PLOT NAME TAWAS-CS PLOT DATE 918/96

ST REPLAC

PARKS & RECREATION DIVISI PROJECT NO. 27-8735 INDEX 54380 95259 240057/00

HARBOR

PHASE

NO.

SHEET INDEX

TITLE

ICOVER SHEET

PIER PLAN & SECTION

5 TANK SECTIONS

PHASE II6

PARKS RECREATION DIVISION

PLANNING SERVICES BRANCH

i9-12-9

MCES CHE

FOR APPROVNS SUPERVSOR DATE

FoRPROL: ie20/4

ENGINEERING SECTION

FOR APPROVAL:

COVER SHEET

SHEET T

LAN No. WB5C-2

HEET OF

FILTRATION

PLANT

[stra

Approximate exter rough a

1993 stu

N E W M A N

S T R E E T

Condhuit to Electric g repl

E M

C US-23

[See Proposed Layout]

СOMMUNITY BUILDING

Un

DE

RD

RU

ne

EL

EC

TR

IC

al co nd ui t

(2 u n g n a e

Co nD ui ts

(non itor ins

NOTES:

All utilitles verifled by by the contractor. All existing utllitles shall b properly protected by the contractortor. Any disturbed utilitles eplaced I

2. If necessary, repair

Con lawns, etc., to a

4.

sheet pllin revent seeра Imiting clay layer re va

5'-0"

48'-0" mits of

Excavation of tank

20'-0" 10'-0"

43-0"

-58

38-0

PL

+Fuel tank lodlocation and Canew painted parking islands

Se6 Sheet 5 for tank

Sheet piling design by contractor.

Depth of piling, as required for structural integrity and to minimize groundwater Infiltration (See

Note 4). Sheet piling shown on y, areal as required for

TYP

24-0"

Painted

38-0"

3-0" TYP.

Island dimensions typical for both

TOILET

SHIWE

BUILDIN

-Reptoce in Kin Kind] 1-3/4 Baluanized Gnduit

3/2 GalvanızeP

To Dock (A80 volt)

For Poweg 人

-To each! taNk monitoring To each tank

LEGEND

of proposeddetalls

SPECIAL NOTE

AND HOLE

This drawing Indicates the majority of known orlatnal documents. However, It willl be the responsibity of the general contractor to autlons when excavatin

TOILET

SHOWER

BUILDING

Expansion

FOUNTAI

ELECTRIO

TELEPHO

SEWER

DIESEL FUEL LUNE

1 DIA. PVC CONG

FUEL LINES

PARKING LOT UTILITY RERENOVATIONS

SCALE I" = 30'-0"

76/6 existing

PROPOSED LAYOUT

SCALE I" = 20'-0"

DEPARTMENT OF NATURAL RESDURCES

PARKS & RECREATION DIVISION

PARKING LOT RENOVATIONS

ET TITLE

EAST S HARBOR ROJECT ND 27-8735

NT DOCK

SHEET 2 PLAN ND. W35C-2

TAVAS-PL - PLOT 1-37 -09/17/96

N E W M A N

S T R E E T

Eros required at two catch basin ations Istraw bale or equal] Typl

FILTRATION

PLANT

TOILET

Approximate extent of groundnater mined ы993 study.

ECKED BY D.M.

HOWER

BUTL DING

BUILDING

US-23

Liits of Excavation (See

A

COMMUNITY BUILDING

Fuel tank location and new painted parking islands and r n Kina] s ofLimits

Excavatvation

Installat

Sheet pliing design by contrad structural Integrtstructural intearit

Note 4) Sheet plan for referer eal extents

LEGEND SPECIAL NOTE

Tnis arawing inaica orlainal documents. will be the uof the general contractor to excavHOLE

OUNTAI

LECTRIC

PHONE

EL FUEL LINE

ELECTRIC, 3/4

PARKING LOT UTILITY RENOOVATIONS

SCALE I" = 30'-0"

DATE

76/6 propose

Expansion

NOTES:

2.

3.

All utiiitles shall be fleld verlfled by the contractor. All existing utilitles ected by the contractor. Any disturbed replac kind at contractors expense.

If necesscessary, repair or relocation of electrie

Consur Ameriteritech Co. at (800)660 for pay phone (800

ConContractor d in

Sheet piling required to prevent seepage of groundwater Into excavation, Iimiting ffect alor nearby locations grade

20'-0" 10-0"

10'-0" of tank

YP.

TOILET

SHOWER

BUILDING

43-0"

PL

38-0"

JOR

24-0"

38-0"

TYP.

Painted

Island dimensions typical for both

45.0

<isting

PROPOSED LAYOUT

SCALE I" = 20'-0"

DEPARTMENT OF NATURAL RESDURCES

PARKS & RECREATION DIVISION

PARKING LOT RENOVATIONS

PROJE

27-8735

OF 6 LAN NO

LS

N

-E

FILTRATION PLANT

LEGEND

EXISTING

BAIT

F O R

C

ON

TI

NU

JA

TI

ON

N E W M A N S T R E E T

TANKS

SEE PARKING LOT RENOVATIONS

PLAN ON SHEET NO. 2, FOR LOCATION

ECT.

LET/

SHOWER BUILDING

DEISEA

IN 3/4 UNDERGRUND

SINGLE WALL GAG 20 ABOVE GR

ON SHEET NOS FUEL LINES, SEE

UNDERG

OF UNDERGROUND UTILITIES.

6000 GALLON GAS UNDERGROUND

CONCRETE PADS

AND PIPING. EXISTING SUBMERSIBLE PUMPS MOTORS

TURNED OVER TO THE OWNE

UNDERGROUND ELECTRICAL LINES AND

ARE TO BE REVSED WITH NEW UST TANK

VERIFY EXISTING CIRCUIT BREAKERS AND

EUSED TO ENSURE

THEIR COMPATIBILITY AND CODE COMPLIANG

UNDERGROUND FUEL STORAGE TANK PLAN

ELECTR

BLDG. MECH.

SINGLE

20A-2

CONTROL

DEPARTMENT OF NATURAL RESDURCES

ON DIVISID

FUEL SYSTEM PLAN

SHEET TITLE

O LEAD FUEL

FILL PIPE

MANHOLE COVER

DIESE RUELFILL PIPE

WER

15,000 GAL UNDERGROUND

20 SCHEDULE 40 GALY.

ABOVE FINISHED SLAB WIT

2" ALUMIN

27-0° LONe

UNDERGROUND

STOR

VENT LINE

MANHOLE COVER

MANHOLE COVER

8 DEEP

DEPTH.

MANHOLE COVER

CONDUIT UNDERGRUND

1-3/4"0 UNDERGROUND

FUEL LINES

MONITORING CABLES

IN 3/4" UNDERGRUND

CONDUIT

PARTIAL PLANUST

SCALE 1/8 = 1'-0

SQUARE D

TANK MONITORING CABLES

CONDUT BLE WERGROUND

FUEL

THIS SHEET FOR CONTINJATION

3/48 INDERGROU

CONDUIT.

ELECTRICAL NOTES

CLACOFIED HAZARIRED. PLACE CONDUIT FILL AND SEALS

SHALL THE CURRENT MICHIGAN ELE

ELECTRIC

SHALL BE AS DESIGNED A

TURER OR MANUF. CERTIFIED R

SHALL BE INTRINSICALLY SAF

BREAKERS AND PUMP CONTROLS TO BE REVSED TO ENSURE

EXPLOSION PROOF SUBMERSIBLE PUMPS.

RN PROOF

ELECTRICAL RISER DIAGRAM

O SCALE

AREA D

LECTRICAL UPGRADE

CT NO. 27-8735

SHEET 3 PLAN NI. W35C-2

ESISTANT, IV RATED, TRIPLE WALL DIES

ECTRICAL PANEL

B

CABLES IN RISID METAL

20A-P

DISPENSERWITH NEM 1-2/40 A

REISTANT, IV RATTD, TRIPLE WALL

ELECTRICAL NOTES

AND DEVICES REGURED, PLACE CONDUT PILL AND SEALS

CODE CHAPTER S MICHIGAN ELECTRIC

2. RECONNECT EXISTING DISFENSER ELECTRICAL AFTER NEW

VERIEY INSTALLATION TO ENGURE COMPLIANCE WITH CURRENT

MICHIGAN ELECTRICAL CODE COMPLIANCE.

PAPCUT

AND DIESEL FIEL

PIRES IN COREUT CIRCUT

PUEL LINE

SANITARY

ELECTRICAL RISER DIAGRAMDI

WATER LINE

PIER PLAN

SCALE I" = 50-0"

DEPARTMENT OF NATURAL RESDI

PARKS & RECREATION DIVISION

PIER PLAN & SECTIONS

SHEET TITLE

BENNETT 601 BENNETT #6012 aX DECK BOARDS

PER VAVE FOR EXISTING BENMETT

RVAVE PO EXIBTINS BENETT

REL DISFENERS AS REGURED. PROVIDE

NEM COND

DISPENSER SUMP DETAIL

SECTION C-C

V2

TRIM MEMBERS

DECK BOARDS

STRINOERS

SINGLE WALL, DIESEL AND GAS FUEL LINES

AND GAS FUEL LINES UTILIZE EXOS

HANGNG BRACKETS

BRACKET SUPPORT.

SECTION B-B

SGALE 1/2° = 1

SECTION A-A

ALE 1/2" =I

SUPPORT MEMBER

DESEL AND GAS FUEL LINES

VTILIZE EOSTNG

27-8735

ELECTRICAL W35C-2

ОТE SLOPE

S LATER

REBAR CDNE EA SIDE

10-1/2

5,000 GAL

FUEL STORAGE TANK

FIN. ELEV. = 584.4'

EXIPLOSIDN PROLLEAK DETECTOR FOR

99-99 MELDED WIRE FABRIC AT

BRASS BALL VALVE

NOTE NET EXTRA DPENINGS PR JUNCTIDN BOX

LEAK SENSURS

NOTE FINISH GRADE

TOP EDGE

OF CONCRETE SLAB.

BAE VALL BIESE FL LDE SE

10,000 GAL

FUEL STORA

OR EXPANSICN JOINT AS

PER TANK MANUEAS

NNER CATION

FUEL TANK END ELEVATION

SCALE 1/

FUEL SYSTEM NOTES

HALE E PROVIDER BY A CERTIFIED FIELD REPRESENTATIVE OF

FLEL SYSTEN INSTALLATLEN VNETHER INDICATED IN THE BEDDING

AALL NAVE SECINDARY CONTAINMENT AE S SN

MIN 12 SAND FILL

BRASS BALL VALVE

T GALV. NC.

GALY HOK BOLT

ELECTRICAL CABLES IN UNDERGROUND

CONDUIT SE FUEL SYSTEN PLAN ON

OF JUNCTION BOX 10g TT H

INTERSTTIBE

-66-66 WEL DEDDED VIRE FARIC AT

NOTE RESEAXTRA OPENINGS

SUNP LEAK SENSORS

ELECTRICAL CARLES IN UNDERGROUND

SRDUIT SEE F

OOF JUNCTION BUX

INTERSTITIAL HINITOR TUBE

PIPE SUPPLY

PUMP MOTOR

SUPPLY

RSHOTOR

SVING JINT

SIDE ELEVATION

AND CUVER

PRODE RISER

10,000 GALLLLON DIESEL FUEL37 TANK

SCALE 1/2

COVER W/18 SKIRT

PROOF JUNCTION Bх

PROBE RISER

SVING JINT

SIDE ELEVATION

15,000 GALLON GAS FUEL TANK

SCALE 1/2" 1-0*

DRAWN BY

CHECKED BY D.M. 6/67 DEPARTMENT OF NATURAL RESDURCES

TANK SECTIONS

PREVENTION

TUBE

PE VENTION

TUBE

S HARBOR

PROJECT NO. 27-8735

GRADE SHEET 5 OF 6 PLAN Na. W35C-2