Addendum_1_26036.pdf
PDF 276 KB Posted
- Solicitation number
- RFP 171 260000001750 3
- Issued by
- Huron County, Michigan
About this file
This is an Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division, in conjunction with the Department of Natural Resources (DNR), Parks & Recreation Division, for the Port Austin & East Tawas Harbors of Refuge Fuel System Upgrades project (File Number 751/26036.BDW). The RFP requests a Phase 100 and Phase 200 study and program analysis of the existing fuel storage and delivery systems at each harbor location, including recommendations for interim and final improvements, volumetric storage analysis, and evaluation of current and future usage for storage capacities. The proposal due date is April 30, 2026, at 2:00 p.m. local time, with five hard copies plus three electronic copies required via SIGMA VSS. A pre-proposal meeting was held on April 20, 2026, online, with the last day for submitting questions established as Thursday, April 23, 2026. The project completion timeline includes a draft report in September 2026 and a final report in October 2026. This is a not-to-exceed, billable rate contract with no specific award date identified in the addendum.
The contract contains no established budget, and proposers are explicitly not expected to provide a budget analysis as part of their response. Volumetric usage data will be provided in subsequent addenda (Addendum 2), though a note clarifies that Port Austin Harbor's 2025 delivery figures may not reflect true demand trends due to historically slow fill rates prior to that season. The study itself will serve as the source for future budget recommendations. The addendum includes the pre-proposal meeting attendance record and agenda, documenting participation from both government agencies (DTMB, DNR) and private firms including consulting engineers and service providers (Hubbell, Roth & Clark; Edgewater Resources; Weston Solutions, Inc.; C2AE; and others).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| RFP_26036.pdf | ||
| Photos_ETawas_26036.pdf | ||
| Photo_PtAustin_26036.pdf | ||
| Addendum_2_FY2025 Port Austin Bulk Fuel Deliveries.xlsx | XLSX spreadsheet | |
| Addendum_2_26036.pdf | ||
| Project Statement_26036-1.pdf | ||
| Plans_1994_PtAustin_26036.pdf | ||
| Plans_1996_ETawas_26036.pdf | ||
| Plans_2016_ETawas_26036.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 6/16)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL ADDENDUM NO. 1
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
4/20/2026
PROJECT NAME
Port Austin & East Tawas Harbors of Refuge - Fuel System Upgrades
FILE NUMBER
751/26036.BDW
PROJECT DIRECTOR
Bruce Watkins, P.E.
PROPOSAL DUE DATE:
4/30/2026
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
ITEM 1 - Proposal Due Date = April 30, 2026 [UNCHANGED]
ITEM 2 – PreProposal Sign-in Sheeti – Attached.
ITEM 3 – PreProposal Agenda/Notes – Attached
ITEM 4 – Questions/Answers Q1: RFP requests a budget analysis?. Answer: There is no budget provided and a budget analysis will not be expected as part of the proposal.
Q2: Will usage quantities be provided in electronic format and can it be provided prior to proposal?.: Answer: We will attempt to provide usage for each facility {if provided, it will be in later addenda. NOTE: Port Austin Harbor was provided new delivery for use in the 2025 season and higher usage should not be inferred to be a true trend, but a reflection that boaters likely filled tanks, rather than just secure enough fuel to get them to a nearby harbor for topping off. This due to the fact that fill rates were excessively slow prior to 2025.
APPROVED BY:
DATE: 4/20/2026
http://www.michigan.gov/SIGMAVSS
D M
B -4
(R
/1
0)
PR
E
-P R
O
PO
SA
L
M E
E T
IN
G
A T
T E
N D
A N
C E
R E
C O
R
EP
A
R
TM
EN
T
O F
TE
C
H N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
Fa ci lit ie s A dm in is tra tio n
PR
O
JE
C
T D
ES
CR
IP
TI
O N
/L O
C A
TI
O
N
Pt . A us tin
E
. T aw as H ar bo rs
Fu el
S ys te m
U pg ra de s D
A
TE
pr il
, 2
IN
D
EX
N
U M
B
ER
FI
LE
N U
M
1/
6.
B
W
C
N
TR
A
CT
N
U M
Y
TI
E
1:
P
EE
TI
N G
P
LA
C E
O nl in e
X
A tt en di ng
PA
E _1
O F
_2
PL
A
SE
P
R
IN
T Y
O U
R N
A
M
Y O
U R
E
PR
E
SE
T
L
E
PH
O N
E N
U M
B
A
IL
A
D D
R
SS
ru ce
W at ki ns
TM
B
- S ta te o f M ic hi ga n
7-
2-
(M w at ki ns b1 m ic hi ga n.
go v Sc ot t C oo k
D N
R -P
9-
9-co ok s1 0@ m ic hi ga n.
go v Jo rd an
B ye lic h
R -P by el ic hj m ic hi ga n.
go v
Jo sh
P el lo w
R -P
3-pe llo w j@ m ic hi ga n.
go v B ria n
D un n
R
-P
8-du nn b1 m ic hi ga n.
go v
M ic ah Jo rd an
R -P
2-
-2
-4
3M jo rd an m 2@ m ic hi ga n.
go v Li ns da y A ve rs a
R
-P av er sa l@ m ic hi ga n.
go v
Le e
M ar tin
R
-P
2-
-3
-0
9M m ar tin l1
3@ m ic hi ga n.
go v
Ja so n Po ag
TM
B -D
(5
) 2
-2 po ag j@ m ic hi ga n.
go v
R an dy S pi lle r X
L Se rv ic es
0-
7-ra nd y.
sp ill er ow ls er vi ce s.c om ol an d lix
H ub be ll, R ot h
C la rk
8-
6-ra lix hr ce ng r.c
Pa tri ck
H ai re
H ub be ll, R ot h
C rk
8-
3-ph ai re hr ce ng r.c ol in H as se ng
Ed ge w at er R es ou rc es
5-ch as se ng er ed ge w at er re so ur ce
Ju st in N ew el l X ju st in m af fe tt-lo fti
B -4
(R
/1
0)
PR
-P R
O
PO
SA
L
M E
E T
IN
G
A T
T E
N D
A N
C E
R E
C O
EP
A
R
TM
EN
T
O F
TE
C
H N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
ET
Fa ci lit ie s A dm in is tra tio n
PR
O
JE
C
T D
ES
CR
IP
TI
O N
/L O
C A
TI
Pt . A us tin
E
. T aw as H ar bo rs
Fu el
S ys te m
U pg ra de s D
TE
pr il
, 2
IN
D
EX
N
U M
N U
M
1/
6.
B
N
TR
A
CT
N
U M
Y
TI
E
1:
P
EE
TI
N G
P
LA
C E
O nl in e
PA
G
E _2
O F
_2
PL
A
SE
P
R
IN
T Y
O U
R N
A
M
Y O
U R
E
PR
E
SE
L
E
PH
O N
E N
U M
B
A
IL
A
D D
R
SS
Er ik C ro nk
2A E
6-
4-ik .c ro nk c2 ae .c
Jo hn
B ow an
2A E
6-
8-jo hn .b ow m an c2 ae
Jo e R ui z to n
So lu tio ns
, I nc
3-
5-j.r ui z@ w es to ns ol ut io ns
Ti ot hy
W al ls to n So lu tio ns , I nc
7-
9-tim ot hy
.w al ls w es to ns ol ut io ns
Li nn ae
D aw so n
R -P
Ji nn e Eg le st on
R
-P
1-
3-eg le st on j@ m ic hi ga n.
go v El iz ab et h
W eg en
R -P
3-w eg en er e@ m ic hi ga n.
go v
Rev 4/10
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration, Design & Construction Division
3111 W. St. Joseph Street Lansing, Michigan 48917
Or P.O. Box 30026, Lansing, MI 48909
Pre-Proposal Meeting Agenda
Date: April 20, 2026
Progress Mtg. No.: Preproposal Meeting
Location: ONLINE
Project: Department: Natural Resources Agency: Parks & Recreation Division Project Name: Port Austin & East Tawas Harbors of Refuge - Fuel System Upgrades File No.: 751/26036.BDW Index No.:
Contract No.: N/A Project Completion Date: Draft Report September 2026 - Final Report October 2026 Attendance: Attached
1. Introductions
2. General Project Description
A. Phase 100 and Phase 200 Study and Program Analysis of the existing fuel storage and delivery systems at each Harbor. Recommendations for improvements (interim & final), volumetric storage. Current and future usage for storage capacities.
3. Proposal Information:
A. Date Due April 30, 2026, 2:00pm local time B. Proposal will be not to exceed, Billable Rate Contract C. Number of copies of proposals required: 5 (plus 3 electronic) Submitted via
SIGMA
D. Addenda
i. The last day for questions for the project is Thursday, April 23, 2026.
Answers to questions will be placed in Addendum format and posted to SIGMA.
ii. With the exception of questions asked at the pre-proposal meeting, all questions shall be via email with the File Number and Project Name as the Subject line.
4. Additional Project Statement Information A. See advertised Project Statement and known site plans for information.
5. Project Budget
A. N/A – there is not budget provided. Study will be the source of budget recommendations.
Rev 4/10
6. Project Schedule
A. Draft Report September 2026 - Final Report October 2026.
7. Questions A. Question: RFP requests a budget analysis. Answer: There is no budget provided and a budget analysis will not be expected as part of the proposal.
B. Question: Will volumetric usage be provided before proposal submission?
Answer: We will provide limited information with respect to usage at each facility. Noted in the meeting, that for Pt. Austin Harbor, low flow delivery may have artificially decreased delivered volumes, until the 2025 Season.
[note, volumetric data will be included in Addendum 2 as it will take some time to gather].
| 2026-04-20T16:32:42-0400 | |
| Bruce Watkins, P.E. |
File details come from the government source that posted it. Updated .