This is a technical plans and specifications document prepared by the Michigan Department of Natural Resources, Parks & Recreation Division, Marine Engineering Section for fuel system improvements at Port Austin Harbor in Port Austin Township, Huron County. The project involves the design and installation of a comprehensive fuel distribution system with secondary containment features for both gasoline and diesel fuel delivery at the harbor facility located in Section 30, T19N, R13E. The system includes primary and secondary fuel piping, sump boxes, direction change boxes, and support infrastructure along a pier structure extending approximately 3+87 to 4+87 stations, with specifications for materials, installation methods, and component details clearly delineated across four sheets of technical drawings and specifications.

The project specifications require hot-dip galvanized steel components meeting ASTM A123 and A153 standards, with primary fuel pipes capable of withstanding 250 psi pressure in accordance with ASTM D-380 testing protocols and secondary piping composed of 3-inch threaded carbon steel pipe. All sump and direction boxes must include lockable doors and be fabricated with concrete reinforcement using 6x6 wire mesh. Support structures are required at H-piles and midway between piles, with clean-outs spaced at 50-foot intervals. The document, prepared by the Marine Engineering Section for approval on 4/8/34 with drawing number 27-8719 32-H-01, establishes the technical requirements for contractor fabrication and installation of secondary containment piping and structural components necessary for safe fuel handling operations at the harbor facility.

View the file

Other files

File Type Posted
Addendum_1_26036.pdf PDF
SAMPLE Billable Rate Contract (Rev 04-25).pdf PDF
RFP_26036.pdf PDF
Photos_ETawas_26036.pdf PDF
Photo_PtAustin_26036.pdf PDF
Addendum_2_FY2025 Port Austin Bulk Fuel Deliveries.xlsx XLSX spreadsheet
Addendum_2_26036.pdf PDF
Project Statement_26036-1.pdf PDF
Plans_1996_ETawas_26036.pdf PDF
Plans_2016_ETawas_26036.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MICHIGAN

DEPARTMENT OF NATURAL RESOURCES

PARKS & RECREATION DIVISION

PORT AUSTIN HARBOR

PORT AUSTIN TOWNSHIP, HURON COUNTY

FUUEL SYSTEM IMPROVEMENTS

PROROJECT SITE

PORT AUSTIN HARBOR

T 19 N, R 13 E, SECTION 30

POR

SEBEWAING

CASEVILLE

PORT AUSTIN

HARBOR BEACH

АCCOUNT NUMBER:

117-75-2799-324

MARINE ENGINEERING SECTION

MMENDED

FOR APRCOUAL: A4/8/34

7 SECTION CHEP / ga

PLANNING & DESIGN BRANCH

OF NATURAL

MARNE ENGINEERING SECTION

APPROVED:

DATE

27-8719

32-H-01 SHEET 1 OF

D2 &€ D3

HINGE SPACED EVENLY

AS REQUIRED

2 FORCE MA

1-BEAM W

1.5 T

LL SECONDARY IPING

(TYPICAL ALL BOXES)

TYP.

FIONG/B0QUID TIGHT BULKH

NOTE "A":

ALL SUMP/DIRECTION BOXES FABRICATED FROM

T BOXES TO BE

LOCKABLE DOOR.DOR CONTRACTOR TO SUSUPPLY

ALL SECONDARY CONTAINMENT PIPING

SUMP AND DIRECTION BOXES EXCEPON ALL

WHERE NOTED OTHERWISE

PRTMARY FUEL LINESEEXIBLE PIPE.

SECONDARY THREADED 3 DIA. CARBON STEEL

BOX/SECONDARY PIPE INTERFAD FITTING/BOOT

STEEL SUMP/DIRECTION BOX DETAIL

STA. 0+00 TO 3+87 (PIER JOINT)

BOXES

CONCRETE

H

ELEV. 580.57

ON SUMP BOXES

S1.

GENERAL NOTE:

OUT OF WATERo

FORCE MAIN NOTES:

LOCATED AS SHOWN ON SHEET 2

2. SUPPORTS TO BE PROVIDED AS FOLLOWS

AT H-PILES AND MIDWAY BETWEEN PILES

B. AT ELEVATION CHANGES

AT ELEVATION 580.49 (1955 IGLD).

4. MENCING WORIK CLEAN

ELECTRICAL NO

FLANGE CUT AT SOME PILE LOCATI

CONDUIT AND ELECTRICAL BOXES TO ВE

n-BOLT ANCHOR-

SECURE BOX TO PILE W/ANGLES

NECESSARY FOR NEW

MIN WIOTH OF PILE WEB

SEE NOTE "B

71955 IGLD)

CUT EXIST. AN

AS NECESSARY TO

DIRECTION CHANGE BOX

STA. 0+00 TO 3+87 (PIER JOINT)

SCALE: 1

SUMP BOX

STA. 0+00 TO 3+87 (PIER JOINT)

SCALE: 1" = 1'-0

RJO SCS HRB DCT 10-92 DRAWN 93 NO.

EXIST. SSP WALL

SUPPORT

U-BOLT ANCHOR

ASOLINE

PILE DETAIL

STA. 0+00 TO 3+87 (PIER JOINT)

SCALE: 1

UTNECIGANNGLE

SECTION 5A

OUT EXIST STEEL COVER

PLATE & ANGLE TO ALLOW

5A

5B

UNDER FUEL LINES

PI

LE

トーチール SECONDARY PIPING

CONC. DECKING

SECTION 5B

MAGMUM OSTANCE TO ALLOW

SUMP BOX D4

トーチャー

ВOX D5 DETAIL

STA. 3+87

SCALE: 1" = 1-0

TO REMAINER PLATE

SEE NOTE "

1.5

ЕХPANSION JOINT

5B

PLAN

INSTALL

45 WYE

/PLUG

EXISTING JOINT OPENING

BOX D4 DETAIL

STA. 3+87

SCALE: 1" = 1-0

DEPARTMENT OF NATURAL RESOURCES

RECREATION D

MARINE ENGINEERING SECTIONDNR

PORT AUSTIN FUEL SYSTEM

DETAILS

NSTALINEAR

OF PIER DECKING

NOTES:

BOXES D4 AND SECURED

TO SURROUNDING STER STRUCTURE

AS NECESSARY TO FOSGN MEMBERS

ALL DEBRIS IS TO BE KEPT OUT

PORT AUSTIN HARBOR

T19 N, R 13 E SECTION 30

32-H-01

DIESEL

EXIST.

TEEL SUMP/DIRECTION

BOX D6

B

1.5

DIRECTION BOX, D6. FASTEN TO

AND 1/A325 ANCHOR BOLTS, LOCK SECONDARY CONTAINMENT PI

1/2x2x 1/2 ANGLES

WITH 1/2 A325 ANCHOR

BOLTS, LOCK NUTS & WASHERS

BOX D7

BOTH SIDES NNECTION

BOTH SIDES ECTION

BOX D6 DETAIL

SCALE: 1° = 1'

-2 SUPPORTS-

EVENLY SPACED

INSTALL SUMP

CONCRETE ISLAND

SECTION B-B

SND CENTERED OVERFABRIC REINFORCEMEN

ECTION

DISPENSERS. (DISPENSERS BY OTHERS)

SECTION A-A

NO SCALE

SURVEY HRB DCT 10-92 DRAWN BY DCT 93

CONC.

MP

BOX D

1.

LIQUID

HOT- OP HINGED & LOCKABLE

(SEE BOX DETAIL, SHEET 3)

FORCE MAIN:

STEEL:

SCHEDULE 6 DS E ST E SUFPOTER, AT ALL

CLEAN OUTS TO BE SPACED AT 50 FOOT INTERVALS.

PROVED

BY THE STATE DEPARTMANT OF PUBLIC HEALTH.

SIEL FOR SUADDRETONOK FABRICATION SSHALISHA

BOXES SHALL BE HOT-DIP GALVANIZED MEETING ASTM TM AA 123.

PIPING SUPPORT

ALL COMPONENTS OF SUPPORTS BOTH ABOVE AND ANG BELOW

WITH ASTM A 123 OR ASTM A 153 WHERE APPLICPPLICABLE.

PRIMARY FUEL PIPE:

MINIMUM BEND RADIUSRADIUS OF 18 WITH NOKKINKING SHALL

250 psi WHEN WHEN TESTED TESTE IN ACCORDANCE WITH ASTM D-380.

GREATER THAN THAT OF THE PUMPS NORMAL OPERATING PRESSURE

WHEN TESTED IN ACCORDANCE WITH ASTM D-638 TEST METHOD.

TES PIOR O SUBJET0 el AIR PRESSURE HOLD

ONLY WITHIN A SUMP OR DIRECTION BOX

ALLE COMPONENTS BEUSED WITHIN EM SHALL DE COMPATIBLE WITH

SECONDARY FUEL PIPE:

3 THREADED PIPE AND ALL COUPLINGS SHALLBXIRA STRENGTH PIPE WALL THICKNESS OF 33ODIAMETER

CONCRETE:

WRE NESH REINFORCEMENT SHALL BE USED. 66-66

ON PLANS AND MIDWAY BETWEEN PILES. ABOVE DECK PIPE TO BE

MATERIAL SHALL BE HOT-DIP GALVANIZED MEETING ASTM A 153

PIPE SHALL EXTEND 1 INTO ON BOXES.

FINAL ACCEPTANAL

PORT

BOOT/BULKHEAD FITTING

WITH ALL PRODUCTS

FASTEN THE SEDOALLOW FOR PIPE

TO THE WALL OF THE SUMP/DIRECTIO(TYPICAL) INSPECTION HOLE-

AT DIESEL LOCATION

T

LOCK NUT AND WASHERS 1/4 STEEL

SUPPORT PIPE

REQUIREDS SET DEPTH

9-6

OF PIER

PIPE SUPPORT

STA. 3+87* T0 4+87

fCARBON STEEL SECONDARY PIPE

OSITION PARALLEL TO FUEL

OF DISNOSPENGER SUS INSIDE

SUPPORT

ENTIRE CIRCUMFERENCE

NSTALL

SUMP AT GASOLINE

LOCATION

ноВ Z DA. A325 ANCHOR

WEDLOCK NUTS & WASHER

RTMENT OF NATURAL RESOURO

MARINE ENGINEERING SECTION DNR SHEET

3/8

FUEL LINE

PORT AUSTIN FUEL SYSTEM

DETAILS

PORT AUSTIN HARBOR

TR 13 SECTION

LOCATION

SHEET 4 OF 4 -H-01