Pitt Chiller Plant - Drawings - Part VI Electrical.pdf

PDF 28 MB Posted

Attached to
646-20-109 UD Chiller Capacity and Controls Upgrade
Solicitation number
36C24426R0007
Issued by

About this file

These are electrical engineering drawings for the University Drive (UD) Chiller Capacity Upgrade project located in Pittsburgh, Pennsylvania, with project number 646-20-109. The comprehensive set of drawings, dated May 11, 2022, includes multiple electrical plans for the first level, second level, and roof, covering detailed electrical systems such as demolition plans, lighting plans, power plans, conduit plans, and overall electrical systems layouts. The drawings are prepared for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4, and the solicitation is specifically targeted at contractors holding Multiple Award Task Order Contracts (MATOC) for the Pittsburgh-Butler-Erie VA Medical Centers. The project involves electrical infrastructure modifications and upgrades for a chiller plant facility, with precise technical specifications and scaled architectural drawings showing electrical system configurations across different building levels.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Projo ect Number

Building Number

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

PLAN

NORTH

ACTUAL

NORTH

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

DEMOLITION PLAN - FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

DEMOLITION PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

DEMOLITION PLAN - ROOF

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

LIGHTING PLAN - FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

LIGHTING PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

POWER PLAN - FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

POWER PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

CONDUIT PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

PLAN - ROOF

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

SYSTEMS PLAN - FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

SYSTEMS PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAVV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAVV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

File details come from the government source that posted it. Updated .