Pitt Chiller Plant - Drawings - Part IV Plumbing.pdf

PDF 1 MB Posted

Attached to
646-20-109 UD Chiller Capacity and Controls Upgrade
Solicitation number
36C24426R0007
Issued by

About this file

These are plumbing engineering design documents for a U.S. Department of Veterans Affairs (VA) facility, prepared by Miller Remick LLC, a professional engineering firm located in Cherry Hill, New Jersey. The comprehensive set of technical drawings includes plumbing plans for the first and second levels, along with detailed plumbing system diagrams. The documents cover extensive technical specifications including plumbing abbreviations, notes, symbols, valve configurations, and specific technical details such as trapeze pipe support, hub drain, floor drain, emergency shower, and sub-meter installation configurations. The project appears to be a construction bid document for a chiller capacity upgrade, with non-sprinkler plumbing systems as a key focus, and is marked as part of the VA's Office of Construction and Facilities Management project documentation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

PLAN

NORTH

ACTUAL

NORTH

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

PLAN

NORTH

ACTUAL

NORTH

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

File details come from the government source that posted it. Updated .