These architectural drawings detail a chiller replacement project for the U.S. Department of Veterans Affairs located in Pittsburgh, Pennsylvania. The project involves comprehensive demolition and renovation of an existing multi-level facility, focusing on replacing the chiller plant and modifying structural and architectural elements across the first, second, and roof levels. The drawings include detailed demolition plans, floor plans, exterior elevations, building sections, and technical details for wall and roof penetrations, with specific emphasis on preserving existing masonry walls and exterior face brick while implementing new mechanical equipment, roofing systems, and structural modifications.

The architectural plans by LaBella Associates show meticulous planning for equipment placement, including new mechanical equipment pads, electrical upgrades, and roof penetrations. Key elements include removing existing mechanical equipment, modifying roof structures, installing new chiller equipment, and carefully integrating new construction with the existing building fabric. The project appears to be a comprehensive upgrade of the facility's mechanical systems, with careful consideration given to structural integrity, thermal performance, and maintaining the existing architectural character of the building.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM STAFF0507

CONSTRUCTION BID

DOCUMENTS

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JD, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM WM

2 1 /4"

3'

- 7

1/ 2"

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM WM

File details come from the government source that posted it. Updated .