These architectural drawings detail a chiller replacement project for the U.S. Department of Veterans Affairs located in Pittsburgh, Pennsylvania. The project involves comprehensive demolition and renovation of an existing multi-level facility, focusing on replacing the chiller plant and modifying structural and architectural elements across the first, second, and roof levels. The drawings include detailed demolition plans, floor plans, exterior elevations, building sections, and technical details for wall and roof penetrations, with specific emphasis on preserving existing masonry walls and exterior face brick while implementing new mechanical equipment, roofing systems, and structural modifications.
The architectural plans by LaBella Associates show meticulous planning for equipment placement, including new mechanical equipment pads, electrical upgrades, and roof penetrations. Key elements include removing existing mechanical equipment, modifying roof structures, installing new chiller equipment, and carefully integrating new construction with the existing building fabric. The project appears to be a comprehensive upgrade of the facility's mechanical systems, with careful consideration given to structural integrity, thermal performance, and maintaining the existing architectural character of the building.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM STAFF0507
CONSTRUCTION BID
DOCUMENTS
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JD, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JH, WM
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM WM
2 1 /4"
3'
- 7
1/ 2"
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM JH, WM
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM WM
File details come from the government source that posted it. Updated .