The document is a bid tabulation spreadsheet for the St. Pete-Clearwater International Airport's Strawberry Parking Lot project, issued by Pinellas County with project number STP-23-00002. The project involves reconstructing and expanding the Strawberry Parking Lot from a temporary to a permanent facility, including comprehensive infrastructure improvements such as asphalt pavement, drainage modifications, electrical systems, fencing, signage, bus shelters, and security equipment installations. The bid includes a base bid for the main parking lot and an alternate bid for a future employee/overflow parking lot, with work encompassing excavation, paving, electrical distribution, landscaping, utility connections, and specialized equipment integrations.
The total base bid is $353,000, with significant allocations for specialized components like security equipment ($100,000), parking system equipment ($105,000), and fiber/network connections ($15,000). The project is funded through a 50/50 split between the Airport's Capital Improvement Program (CIP) budget and an FDOT Grant. Unspecified work items include provisions for permitting fees, utility work, unforeseen circumstances, and temporary lighting. The bid tabulation details 69 line items for the base bid and 21 line items for the alternate bid, covering comprehensive site development and infrastructure enhancement for the airport's parking facilities.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE BID
| St. Pete Clearwater International Airport |
| Pave Strawberry Lot |
| Pinellas County Project No. STP-23-00002 |
| MH #: 4625000-221000.01 |
| Item No. | Spec. | Description | Unit of Issue | Quantity | Unit Price | Extended Price |
| BASE BID-PAVE STRAWBERRY LOT | ||||||
| 1 | 101-1 | Mobilization, Cleanup, and Demobilization | LS | 1 | $ - 0 | |
| 2 | 101-2 | Survey, Staking, and Layout | LS | 1 | $ - 0 | |
| 3 | 101-3 | Materials and Laboratory Testing | LS | 1 | $ - 0 | |
| 4 | 102-1 | Maintenance of Traffic | LS | 1 | $ - 0 | |
| 5 | 104-1 | Installation and Removal of Silt Fence, Type B | LF | 2,500 | $ - 0 | |
| 6 | 104-2 | Floating Turbidity Barrier | LF | 450 | $ - 0 | |
| 7 | 104-3 | Inlet Protection | EA | 7 | $ - 0 | |
| 8 | 110-1 | Clearing and Grubbing | AC | 7.6 | $ - 0 | |
| 9 | 327-1 | Asphalt Millings Removal | SY | 26,500 | $ - 0 | |
| 10 | 327-2 | Asphalt Pavement Demolition | SY | 570 | $ - 0 | |
| 11 | 110-1 | Miscellaneous Demolition (Concrete, Rip-Rap, Fence, Drainage Pipe & Structures) | LS | 1 | $ - 0 | |
| 12 | 110-2 | Remove and Stockpile Existing Wheel Stop | EA | 777 | $ - 0 | |
| 13 | 120-1 | Unclassified Excavation (Placed on Site) | CY | 11,500 | $ - 0 | |
| 14 | 120-2 | Unclassified Excavation (Hauled to Airport Stockpile Area or offsite) | CY | 11,000 | $ - 0 | |
| 15 | 160-1 | Stabilized Subbase / Subgrade Preparation | SY | 45,600 | $ - 0 | |
| 16 | 285-1 | Optional Base Group 04 (6" Limerock or Equivalent) | SY | 22,800 | $ - 0 | |
| 17 | 285-2 | Place and compact airport provided limerock base course | SY | 22,800 | $ - 0 | |
| 18 | 334-1 | 2" FDOT Superpave Asphalt Pavement | Tons | 5,100 | $ - 0 | |
| 19 | 334-2 | Bituminous Prime Coat | Gal | 6,800 | $ - 0 | |
| 20 | 350-1 | 6" Concrete Pavement (Driveways, Islands, Pads) | SY | 260 | $ - 0 | |
| 21 | 350-2 | 6" Concrete Sidewalk Pavement | SY | 50 | $ - 0 | |
| 22 | 425-1 | 14"x23" Mitered End Section | EA | 6 | $ - 0 | |
| 23 | 425-3 | Raise Existing Drainage Manhole | EA | 1 | $ - 0 | |
| 24 | 425-4 | Covert Existing Drainage Inlet to Drainage Manhole | EA | 1 | $ - 0 | |
| 25 | 425-5 | Modify Existing Drainage Control Structure | EA | 1 | $ - 0 | |
| 26 | 430-1 | 14"x23" Elliptical Reinforced Concrete Pipe | LF | 232 | $ - 0 | |
| 27 | 524-1 | Concrete Rip Rap | SY | 725 | $ - 0 | |
| 28 | 570-1 | Sodding | SY | 15,000 | $ - 0 | |
| 29 | 700-1 | Stop Sign (Sign Type A- R1-1) 30"X30" and Post | EA | 2 | $ - 0 | |
| 30 | 700-2 | ADA Parking Sign Assembly (Sign Type C- FTP-21-06 & FTP-2206) and Posts (4 total panels per sign location) | EA | 12 | $ - 0 | |
| 31 | 700-3 | No Parking Signs (Sign Type B & F) 12"x18" and Post | EA | 17 | $ - 0 | |
| 32 | 700-4 | Do Not Enter (Sign Type D - R5-1) 30"x30" and Post | EA | 3 | $ - 0 | |
| 33 | 700-5 | No Right Turn (Sign Type E- R3-1) 24"x24" and Post | EA | 1 | $ - 0 | |
| 34 | 700-6 | Exit Signs ( Sign Type G, H, & I- 18"x24") Panel Only | EA | 27 | $ - 0 | |
| 35 | 700-7 | Shuttle Bus Entrance/Exit Only (Sign Type J1 & J2) Panel Only | EA | 3 | $ - 0 | |
| 36 | 700-8 | Shuttle Pick-Up (Sign Types K & L - 2'x2') Panel Only | EA | 13 | $ - 0 | |
| 37 | 700-9 | Shuttle Pick Up at Shelters Only (Sign Type M- 48"x36") including 2 posts | EA | 1 | $ - 0 | |
| 38 | 700-10 | Parking Lot Row Numbering Signs (Sign Type N - 24" diameter) including posts (2 panels per sign location) | EA | 37 | $ - 0 | |
| 39 | 700-11 | Special Directional Sign (Sign Type O & P- 120"x96") including 4 posts | EA | 2 | $ - 0 | |
| 40 | 700-12 | Daily Rate Sign Assembly (Sign Type Q- 72" x 66" total) including 2 posts | EA | 1 | $ - 0 | |
| 41 | 710-1 | Pavement Markings | SF | 25,000 | $ - 0 | |
| 42 | 704-1 | Tubular traffic delineator | EA | 15 | $ - 0 | |
| 43 | 705-1 | Traffic Bollards | EA | 32 | $ - 0 | |
| 44 | 107316-1 | 29' x 73' pre-engineered ticketing plaza canopy, complete and in-place including lighting, foundations, signage, completion of stamped-permitted drawings and all associated work. | LS | 1 | $ - 0 | |
| 45 | 107343-1 | Shuttle bus shelter including concrete pad, structure, mounting, completion of stamped-permitted drawings and all associated work- complete in place | EA | 4 | $ - 0 | |
| 46 | 107343-2 | Pre-engineered Toll Booth including restroom, plumbing, electrical, mechanical systems, completion of stamped-permitted drawings , and all associated work | LS | 1 | $ - 0 | |
| 47 | 260500-1 | Electrical distribution system including service from existing transformer to meter, panel and rack, service to new light poles, service to new cameras, emergency call boxes, toll plaza, toll booth, and bus entrance/exit lane equipment including all associated cable, electrical and communication conduit, and connections | LS | 1 | $ - 0 | |
| 48 | 265600-1 | 20' tall aluminum light pole and fixture (1 or 2 fixtures per pole) installed on new concrete base including all wiring, connections, and associated work | EA | 32 | $ - 0 | |
| 49 | 265600-2 | New handhole for future light pole | EA | 7 | $ - 0 | |
| 50 | 271000-1 | 12 Count Blue Armoured OM3 Multimode Fiber installed in new or existing duct/interduct | LF | 3,000 | $ - 0 | |
| 51 | 323119-1 | New 5' High Ornamental Fence (Fence Type 3) | LF | 1,015 | $ - 0 | |
| 52 | 323119-2 | New 5' Wide Ornamental Man Gate | EA | 1 | $ - 0 | |
| 53 | 323119-3 | New 16' Manual Ornamental Cantilever Slide Gate (1-16' Leaf) | EA | 1 | $ - 0 | |
| 54 | 329000-1 | Landscaping | LS | 1 | $ - 0 | |
| 55 | 331400-1 | New 3/4" PVC Waterline installed in trench including all fittings, bends, and associated work | LF | 1,200 | $ - 0 | |
| 56 | 331400-2 | New 3/4" PVC Waterline installed via directional boring | LF | 75 | $ - 0 | |
| 57 | 331400-3 | Connect new 3/4" waterline to existing 8" waterline including all valves, boxes, and associated appurtenances | LS | 1 | $ - 0 | |
| 58 | 333000-1 | New 6" Sanitary Sewer Gravity Line including all cleanouts, fittings, bends, valves, and associated work. | LF | 80 | $ - 0 | |
| 59 | 333000-2 | Connect new sanitary sewer Line to existing manhole including new interior drop connection | EA | 1 | $ - 0 | |
| 60 | 333000-3 | Raise top of existing sanitary sewer air release valve manhole | EA | 1 | $ - 0 | |
| 61 | F-162-1 | New 8' High Chain Link Fence with 3 strands of barbed wire (Fence Type 1) | LF | 1,020 | $ - 0 | |
| 62 | F-162-2 | New Barricade Fence Installed on Asphalt (Fence Type 2) | LF | 450 | $ - 0 | |
| 63 | 9990000-1 | Unspecified work item No 1. |
Security Equipment, Installation and Integration:
| Unspecified work for the purchase, delivery and installation of two new network switches; two new transceiver modules; all patch cables; required surge protectors; required enclosures; two multilens cameras; four H5SL cameras; six camera mounts; required camera covers; adapters and arms; two controllers; two proximity/keypad card readers readers; two pedestals; two card reader housings; all required fiber and ethernet cabling; six camera licenses; four emergecy call boxes; all installation; programming and miscellaneous equipment and materials. All security items are required to be compatible with the Airports Security System and must be integrated by the Airports Security Vendor. | AL | 1 | $ 100,000.00 | $ 100,000.00 |
| 64 | 9990000-2 | Unspecified work item No 2. |
Jupiter Parking Equipment, Installation and Integration:
Unspecified work for the main entrance/exit plaza and shuttle bus entrance/exit equipment including:
| Main Entrance, purchase, delivery, and installation of two Jupiter exit stations and all related components; one magnetic barrier gate arm; two LED signs and posts; two in-pavement detector loops. Main Exit, purchase, delivery, and installation of two Jupiter entry stations and all related components; cashier station and all related components; one magnetic barrier gate arm; three relays and sockets; one JBL controller; one wireless bridge; one 8 port switch; two in-pavement detector loops. Shuttle Entrance, purchase, delivery, and installation of; one lane controller; one AVI reader, mounting bracket and converter; one AVI mounting pole; one wireless bridge; one 8 port switch. Shuttle Exit, purchase, delivery, and installation of; one lane controller; one AVI reader, mounting bracket and converter; one AVI mounting pole; one magnetic barrier gate armone wireless bridge; one 8 port switch; two in-pavement detector loops. Purchase, delivery and installation of all required misc. parts and hardware; annual licensing and annual fees. All parking equipment items are required to be compatible with the Airports existing parking system and must be integrated by the Airports Parking Vendor. | AL | 1 | $ 105,000.00 | $ 105,000.00 |
| 65 | 9990000-3 | Unspecified work item No 3. |
Main Fiber Feed Connections & Equipment:
| Unspecified work for installation of equipment and terminations in the entry/exit attendant booth and Terminal Building (MDF) including the purchase, delivery, and installation of one new communications enclosure; required converters; one new tripplite; one new UPS and required LIU's; connectors, etc.; Including fiberoptic connections and ethernet conversions required in the toll booth for both the parking system equipment and security equipment and fiberoptic connections and ethernet conversions at the head end system in Terminal Building (MDF) for both parking system equipment and security equipment | AL | 1 | $ 15,000.00 | $ 15,000.00 | |
| 66 | 9990000-4 | Unspecified work item No 4. | |||
| Unspecified work for reimbursable costs associated with Pinellas County Water and City of Largo Sewer permitting and impact fees | AL | 1 | $ 8,000.00 | $ 8,000.00 | |
| 67 | 9990000-5 | Unspecified work item No 5. | |||
| Unspecified work for reimbursable costs associated with Duke Energy provided work | AL | 1 | $ 5,000.00 | $ 5,000.00 | |
| 68 | 9990000-6 | Unspecified work item No 6. | |||
| Unspecified work for unforeseen circumstances for the Strawberry Parking Lot | AL | 1 | $ 100,000.00 | $ 100,000.00 | |
| 69 | 9990000-8 | Unspecified work item No 8. | |||
| Unspecified work for temporary parking lot lighting | AL | 1 | $ 20,000.00 | $ 20,000.00 | |
| BASE BID TOTAL | $ 353,000.00 |
ALT 1
| St. Pete Clearwater International Airport |
| Pave Strawberry Lot |
| Pinellas County Project No. STP-23-00002 |
| MH #: 4625000-221000.01 |
| Item No. | Spec. | Description | Unit of Issue | Quantity | Unit Price | Extended Price | |
| BID ALTERNATE 1- PAVE FUTURE EMPLOYEE LOT | |||||||
| 1 | 101-1 | Mobilization, Cleanup, and Demobilization | LS | 1 | $ - 0 | ||
| 2 | 101-2 | Survey, Staking, and Layout | LS | 1 | $ - 0 | ||
| 3 | 101-3 | Materials and Laboratory Testing | LS | 1 | $ - 0 | ||
| 4 | 102-1 | Maintenance of Traffic | LS | 1 | $ - 0 | ||
| 5 | 104-1 | Installation and Removal of Silt Fence, Type B | LF | 2,250 | $ - 0 | ||
| 6 | 110-1 | Miscellaneous Demolition (Bus Shelter, Structures) | LS | 1 | $ - 0 | ||
| 7 | 110-2 | Remove and Stockpile Existing Wheel Stop | EA | 460 | $ - 0 | ||
| 8 | 120-2 | Unclassified Excavation | CY | 750 | $ - 0 | ||
| 9 | 283-1 | In-place recycling of existing asphalt millings and subgrade- includes reworking of material and grade adjustments | SY | 15,500 | $ - 0 | ||
| 10 | 327-1 | Asphalt Millings Removal | SY | 2,250 | $ - 0 | ||
| 11 | 334-1 | 2" FDOT Superpave Asphalt Pavement | Tons | 1,750 | $ - 0 | ||
| 12 | 334-2 | Bituminous Prime Coat | Gal | 2,500 | $ - 0 | ||
| 13 | 425-6 | Modify Existing Drainage Control Structure | EA | 1 | $ - 0 | ||
| 14 | 570-2 | Sodding | SY | 6,000 | $ - 0 | ||
| 15 | 700-1 | ADA Parking Sign Assembly (FTP-21-06 & FTP-2206) and Posts (2 total panels per sign location) | EA | 9 | $ - 0 | ||
| 16 | 710-1 | Pavement Markings | SF | 8,000 | $ - 0 | ||
| 17 | 705-1 | Traffic Bollards | EA | 4 | $ - 0 | ||
| 18 | 107343-1 | Shuttle bus shelter including concrete pad, structure, mounting, completion of stamped-permitted drawings and all associated work- complete in place | EA | 1 | $ - 0 | ||
| 19 | 329000-1 | Landscaping | LS | 1 | $ - 0 | ||
| 20 | F-162-3 | Remove and replace existing fence using existing fabric | LF | 250 | $ - 0 | ||
| 21 | 9990000-7 | Unspecified work item No. 7 | |||||
| Unspecified work for unforeseen circumstances for the Overflow Parking Lot | AL | 1 | $ 25,000.00 | $ 25,000.00 | |||
| BID ALTERNATE 1 TOTAL | $ 25,000.00 |
File details come from the government source that posted it. Updated .