PIE_PAVE_STRAWBERRY_LOT_DRAWINGS_10-17-23.pdf
PDF 32 MB Posted
- Attached to
- Pave Strawberry Parking Lot (PID 004570A)
- Solicitation number
- 24-0116-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
The document is a comprehensive set of engineering and construction drawings for the Pave Strawberry Parking Lot project at St. Pete-Clearwater International Airport (PIE) in Clearwater, Florida. The project involves reconstructing and expanding the existing temporary Strawberry Parking Lot into a permanent facility, with an additive alternate for an adjacent overflow parking lot. The base bid includes reconstructing approximately 26,500 square yards of existing asphalt millings, installing new 2-inch FDOT Superpave asphalt pavement, expanding the stormwater pond, and constructing various site improvements. The project scope encompasses multiple elements including new light poles, fencing, bus shelters, entrance/exit plaza, electrical and communications infrastructure, security equipment, and parking lot equipment.
The project is funded through a 50/50 split between the airport's Capital Improvement Program (CIP) budget and an FDOT grant, with a total project area of approximately 595,747 square feet. The parking lot will increase from 770 to 1,080 total parking spaces, including 24 handicap spaces. The construction is planned in three phases, with an estimated total construction time of 180 calendar days, including a 60-day mobilization phase, a 100-day Strawberry Lot construction phase, and an optional 60-day Future Employee Lot phase. The project includes specialized equipment such as a pre-engineered ticketing plaza canopy, toll booth, shuttle bus shelters, security cameras, emergency call boxes, and complex electrical and communications infrastructure to integrate with existing airport systems.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X:
\4
\2
0.
\T
EC
H \C
AD
\D
R
AW
IN
G
S\
SH
EE
TS
\G -0
C
O
VE
R S
H
EE
T.
D
W G
/1
6/
:5 5:
P
M
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead and Hunt, Inc.
© Copyright 2022 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
2203 North Lois Avenue, Suite 225
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
VICINITY MAP
LOCATION MAP
PINELLAS COUNTY
PROJECT
LOCATION
PROJECT
LOCATION 1
ST. PETE-CLEARWATER INTERNATIONAL AIRPORT
PAVE STRAWBERRY LOT
15295 FAIRCHILD DRIVE
CLEARWATER, FL 33762
4625000-221000.01
OCTOBER 27, 2023
BID DOCUMENTS
PROJECT
LOCATION 2
LEGAL DESCRIPTION
AIRPORT SUB (UNRECORDED) (ST. PETE-CLWTR AIRPORT) UPLAND & SUBMLANDS IN SEC'S 21, 22, 27, 28, 33, 34, &35/29/16 & IN SEC'S 2, 3 & 4/30/16 LESS LEASED PARCELS & LESS U.S.C.G.
PARCELS & LESS LANDING OF CLEARWATER CONDO & LESS RD'S & LESS THOSE PARTS DESC
IN O.R. 19436/1883 & O.R. 19436/1889
SECTION 33, TOWNSHIP 29 SOUTH, RANGE 16 EAST
COVER SHEET
G-001
RAD
ACC
DES
OCTOBER 27, 2023
4625000-221000.01
BID DOCUMENTS
ST
. P
ET
E
C
LE
AR
W
AT
ER
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (P
IE
PA
VE
S
TR
AW
BE
R R
Y
LO
T
FA
IR
C H
IL
D
D R
IV
E
C
LE
AR
W
AT
ER
, F L
PARCEL ID 342916001100000000
PERMIT NO'S
STP-23-00002 STRAWBERRY LOT
STP-23-00034 FUTURE EMPLOYEE LOT
PROJECT 1 LOCATION - PAVE STRAWBERRY LOT: 15295 FAIRCHILD DRIVE CLEARWATER, FL 33762 PROJECT 2 LOCATION - PAVE FUTURE EMPLOYEE LOT: 14199 46TH STREET N CLEARWATER, FL 33762
\2
0.
\T
EC
H \C
AD
\D
R
AW
IN
G
S\
SH
EE
TS
\G -0
S
H
EE
T
IN
D
EX
S
U M
M
AR
Y O
F Q
U
AN
TI
TI
ES
.D
W G
/1
6/
:5 5:
P
M
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead and Hunt, Inc.
© Copyright 2022 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
2203 North Lois Avenue, Suite 225
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
SHEET INDEX &
SUMMARY OF
QUANTITIES
G-002
RAD
ACC
DES
OCTOBER 27, 2023
4625000-221000.01
BID DOCUMENTS
ST
. P
ET
E
C
LE
AR
W
AT
ER
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (P
IE
PA
VE
S
TR
AW
BE
R R
Y
LO
T
FA
IR
C H
IL
D
D R
IV
E
C
LE
AR
W
AT
ER
, F L
SUMMARY OF QUANTITIES
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY
BASE BID- PAVE STRAWBERRY LOT
101-1 MOBILIZATION, CLEANUP, AND DEMOBILIZATION LS 1
101-2 SURVEY, STAKING, AND LAYOUT LS 1
101-3 MATERIALS AND LABORATORY TESTING LS 1
102-1 MAINTENANCE OF TRAFFIC LS 1
104-1 INSTALLATION AND REMOVAL OF SILT FENCE, TYPE B LF 2,500
104-2 FLOATING TURBIDITY BARRIER LF 450
104-3 INLET PROTECTION EA 7
110-1 CLEARING AND GRUBBING AC 7.6
327-1 ASPHALT MILLINGS REMOVAL SY 26,500
327-2 ASPHALT PAVEMENT DEMOLITION SY 570
110-1
MISCELLANEOUS DEMOLITION (CONCRETE, RIP-RAP, FENCE, DRAINAGE PIPE &
STRUCTURES) LS 1
110-2 REMOVE AND STOCKPILE EXISTING WHEEL STOP EA 777
120-1 UNCLASSIFIED EXCAVATION (PLACED ON SITE) CY 11,500
120-2 UNCLASSIFIED EXCAVATION (HAULED TO AIRPORT STOCKPILE AREA OR OFFSITE) CY 11,000
160-1 STABILIZED SUBBASE / SUBGRADE PREPARATION SY 45,600
285-1 OPTIONAL BASE GROUP 04 (6" LIMEROCK OR EQUIVALENT) SY 22,800
285-2 PLACE AND COMPACT AIRPORT PROVIDED LIMEROCK BASE COURSE SY 22,800
334-1 2" FDOT SUPERPAVE ASPHALT PAVEMENT TONS 5,100
334-2 BITUMINOUS PRIME COAT GAL 6,800
350-1 6" CONCRETE PAVEMENT (DRIVEWAYS, ISLANDS, PADS) SY 260
350-2 6" CONCRETE SIDEWALK PAVEMENT SY 50
425-1 14"X23" MITERED END SECTION EA 6
425-3 RAISE EXISTING DRAINAGE MANHOLE EA 1
425-4 COVERT EXISTING DRAINAGE INLET TO DRAINAGE MANHOLE EA 1
425-5 MODIFY EXISTING DRAINAGE CONTROL STRUCTURE EA 1
430-1 14"X23" ELLIPTICAL REINFORCED CONCRETE PIPE LF 232
524-1 CONCRETE RIP RAP SY 725
570-1 SODDING SY 15,000
700-1 STOP SIGN (SIGN TYPE A- R1-1) 30"X30" AND POST EA 2
700-2
ADA PARKING SIGN ASSEMBLY (SIGN TYPE C- FTP-21-06 & FTP-2206) AND POSTS (4
TOTAL PANELS PER SIGN LOCATION) EA 12
700-3 NO PARKING SIGNS (SIGN TYPE B & F) 12"X18" AND POST EA 17
700-4 DO NOT ENTER (SIGN TYPE D - R5-1) 30"X30" AND POST EA 3
700-5 NO RIGHT TURN (SIGN TYPE E- R3-1) 24"X24" AND POST EA 1
700-6 EXIT SIGNS ( SIGN TYPE G, H, & I- 18"X24") PANEL ONLY EA 27
700-7 SHUTTLE BUS ENTRANCE/EXIT ONLY (SIGN TYPE J1 & J2) PANEL ONLY EA 3
700-8 SHUTTLE PICK-UP (SIGN TYPES K & L - 2'X2') PANEL ONLY EA 13
700-9 SHUTTLE PICK UP AT SHELTERS ONLY (SIGN TYPE M- 48"X36") INCLUDING 2 POSTS EA 1
700-10
PARKING LOT ROW NUMBERING SIGNS (SIGN TYPE N - 24" DIAMETER) INCLUDING
POSTS (2 PANELS PER SIGN LOCATION) EA 37
700-11 SPECIAL DIRECTIONAL SIGN (SIGN TYPE O & P- 120"X96") INCLUDING 4 POSTS EA 2
700-12 DAILY RATE SIGN ASSEMBLY (SIGN TYPE Q- 72" X 66" TOTAL) INCLUDING 2 POSTS EA 1
710-1 PAVEMENT MARKINGS SF 25,000
704-1 TUBULAR TRAFFIC DELINEATOR EA 15
705-1 TRAFFIC BOLLARDS EA 32
107316-1
29' X 73' PRE-ENGINEERED TICKETING PLAZA CANOPY, COMPLETE AND IN-PLACE
INCLUDING LIGHTING, FOUNDATIONS, SIGNAGE, COMPLETION OF
STAMPED-PERMITTED DRAWINGS AND ALL ASSOCIATED WORK.
LS 1
107343-1
SHUTTLE BUS SHELTER INCLUDING CONCRETE PAD, STRUCTURE, MOUNTING,
COMPLETION OF STAMPED-PERMITTED DRAWINGS AND ALL ASSOCIATED WORK-
COMPLETE IN PLACE
EA 4
107343-2
PRE-ENGINEERED TOLL BOOTH INCLUDING RESTROOM, PLUMBING, ELECTRICAL,
MECHANICAL SYSTEMS, COMPLETION OF STAMPED-PERMITTED DRAWINGS , AND ALL
ASSOCIATED WORK
LS 1
260500-1
ELECTRICAL DISTRIBUTION SYSTEM INCLUDING SERVICE FROM EXISTING
TRANSFORMER TO METER, PANEL AND RACK, SERVICE TO NEW LIGHT POLES,
SERVICE TO NEW CAMERAS, EMERGENCY CALL BOXES, TOLL PLAZA, TOLL BOOTH,
AND BUS ENTRANCE/EXIT LANE EQUIPMENT INCLUDING ALL ASSOCIATED CABLE,
ELECTRICAL AND COMMUNICATION CONDUIT, AND CONNECTIONS
LS 1
265600-1
20' TALL ALUMINUM LIGHT POLE AND FIXTURE (1 OR 2 FIXTURES PER POLE)
INSTALLED ON NEW CONCRETE BASE INCLUDING ALL WIRING, CONNECTIONS, AND
ASSOCIATED WORK
EA 32
265600-2 NEW HANDHOLE FOR FUTURE LIGHT POLE EA 7
271000-1 12 COUNT BLUE ARMOURED OM3 MULTIMODE FIBER INSTALLED IN NEW OR EXISTING
DUCT/INTERDUCT LF 3,000
323119-1 NEW 5' HIGH ORNAMENTAL FENCE (FENCE TYPE 3) LF 1,015
323119-2 NEW 5' WIDE ORNAMENTAL MAN GATE EA 1
323119-3 NEW 16' MANUAL ORNAMENTAL CANTILEVER SLIDE GATE (1-16' LEAF) EA 1
329000-1 LANDSCAPING LS 1
331400-1 NEW 3/4" PVC WATERLINE INSTALLED IN TRENCH INCLUDING ALL FITTINGS, BENDS, AND ASSOCIATED WORK LF 1,200
331400-2 NEW 3/4" PVC WATERLINE INSTALLED VIA DIRECTIONAL BORING LF 75
331400-3 CONNECT NEW 3/4" WATERLINE TO EXISTING 8" WATERLINE INCLUDING ALL VALVES, BOXES, AND ASSOCIATED APPURTENANCES LS 1
333000-1 NEW 6" SANITARY SEWER GRAVITY LINE INCLUDING ALL CLEANOUTS, FITTINGS,
BENDS, VALVES, AND ASSOCIATED WORK. LF 80
333000-2 CONNECT NEW SANITARY SEWER LINE TO EXISTING MANHOLE INCLUDING NEW
INTERIOR DROP CONNECTION EA 1
333000-3 RAISE TOP OF EXISTING SANITARY SEWER AIR RELEASE VALVE MANHOLE EA 1
F-162-1 NEW 8' HIGH CHAIN LINK FENCE WITH 3 STRANDS OF BARBED WIRE (FENCE TYPE 1) LF 1,020
F-162-2 NEW BARRICADE FENCE INSTALLED ON ASPHALT (FENCE TYPE 2) LF 450
9990000-1
UNSPECIFIED WORK ITEM NO 1.
SECURITY EQUIPMENT, INSTALLATION AND INTEGRATION:
UNSPECIFIED WORK FOR THE PURCHASE, DELIVERY AND INSTALLATION OF TWO
NEW NETWORK SWITCHES; TWO NEW TRANSCEIVER MODULES; ALL PATCH CABLES;
REQUIRED SURGE PROTECTORS; REQUIRED ENCLOSURES; TWO MULTILENS
CAMERAS; FOUR H5SL CAMERAS; SIX CAMERA MOUNTS; REQUIRED CAMERA
COVERS; ADAPTERS AND ARMS; TWO CONTROLLERS; TWO PROXIMITY/KEYPAD CARD
READERS READERS; TWO PEDESTALS; TWO CARD READER HOUSINGS; ALL
REQUIRED FIBER AND ETHERNET CABLING; SIX CAMERA LICENSES; FOUR EMERGECY
CALL BOXES; ALL INSTALLATION; PROGRAMMING AND MISCELLANEOUS EQUIPMENT
AND MATERIALS. ALL SECURITY ITEMS ARE REQUIRED TO BE COMPATIBLE WITH THE
AIRPORTS SECURITY SYSTEM AND MUST BE INTEGRATED BY THE AIRPORTS
SECURITY VENDOR.
AL 1
9990000-2
UNSPECIFIED WORK ITEM NO 2.
JUPITER PARKING EQUIPMENT, INSTALLATION AND INTEGRATION:
UNSPECIFIED WORK FOR THE MAIN ENTRANCE/EXIT PLAZA AND SHUTTLE BUS
ENTRANCE/EXIT EQUIPMENT INCLUDING:
MAIN ENTRANCE, PURCHASE, DELIVERY, AND INSTALLATION OF TWO JUPITER EXIT
STATIONS AND ALL RELATED COMPONENTS; ONE MAGNETIC BARRIER GATE ARM;
TWO LED SIGNS AND POSTS; TWO IN-PAVEMENT DETECTOR LOOPS. MAIN EXIT,
PURCHASE, DELIVERY, AND INSTALLATION OF TWO JUPITER ENTRY STATIONS AND
ALL RELATED COMPONENTS; CASHIER STATION AND ALL RELATED COMPONENTS;
ONE MAGNETIC BARRIER GATE ARM; THREE RELAYS AND SOCKETS; ONE JBL
CONTROLLER; ONE WIRELESS BRIDGE; ONE 8 PORT SWITCH; TWO IN-PAVEMENT
DETECTOR LOOPS. SHUTTLE ENTRANCE, PURCHASE, DELIVERY, AND INSTALLATION
OF; ONE LANE CONTROLLER; ONE AVI READER, MOUNTING BRACKET AND
CONVERTER; ONE AVI MOUNTING POLE; ONE WIRELESS BRIDGE; ONE 8 PORT
SWITCH. SHUTTLE EXIT, PURCHASE, DELIVERY, AND INSTALLATION OF; ONE LANE
CONTROLLER; ONE AVI READER, MOUNTING BRACKET AND CONVERTER; ONE AVI
MOUNTING POLE; ONE MAGNETIC BARRIER GATE ARMONE WIRELESS BRIDGE; ONE 8
PORT SWITCH; TWO IN-PAVEMENT DETECTOR LOOPS. PURCHASE, DELIVERY AND
INSTALLATION OF ALL REQUIRED MISC. PARTS AND HARDWARE; ANNUAL LICENSING
AND ANNUAL FEES. ALL PARKING EQUIPMENT ITEMS ARE REQUIRED TO BE
COMPATIBLE WITH THE AIRPORTS EXISTING PARKING SYSTEM AND MUST BE
INTEGRATED BY THE AIRPORTS PARKING VENDOR.
AL 1
9990000-3
UNSPECIFIED WORK ITEM NO 3.
MAIN FIBER FEED CONNECTIONS & EQUIPMENT:
UNSPECIFIED WORK FOR INSTALLATION OF EQUIPMENT AND TERMINATIONS IN THE
ENTRY/EXIT ATTENDANT BOOTH AND TERMINAL BUILDING (MDF) INCLUDING THE
PURCHASE, DELIVERY, AND INSTALLATION OF ONE NEW COMMUNICATIONS
ENCLOSURE; REQUIRED CONVERTERS; ONE NEW TRIPPLITE; ONE NEW UPS AND
REQUIRED LIU'S; CONNECTORS, ETC.; INCLUDING FIBEROPTIC CONNECTIONS AND
ETHERNET CONVERSIONS REQUIRED IN THE TOLL BOOTH FOR BOTH THE PARKING
SYSTEM EQUIPMENT AND SECURITY EQUIPMENT AND FIBEROPTIC CONNECTIONS
AND ETHERNET CONVERSIONS AT THE HEAD END SYSTEM IN TERMINAL BUILDING
(MDF) FOR BOTH PARKING SYSTEM EQUIPMENT AND SECURITY EQUIPMENT
AL 1
9990000-4
UNSPECIFIED WORK ITEM NO 4.
UNSPECIFIED WORK FOR REIMBURSABLE COSTS ASSOCIATED WITH PINELLAS
COUNTY WATER AND CITY OF LARGO SEWER PERMITTING AND IMPACT FEES
AL 1
9990000-5
UNSPECIFIED WORK ITEM NO 5.
UNSPECIFIED WORK FOR REIMBURSABLE COSTS ASSOCIATED WITH DUKE ENERGY
PROVIDED WORK
AL 1
9990000-6
UNSPECIFIED WORK ITEM NO 6.
UNSPECIFIED WORK FOR UNFORESEEN CIRCUMSTANCES FOR THE STRAWBERRY
PARKING LOT
AL 1
9990000-8 UNSPECIFIED WORK ITEM NO 8.
UNSPECIFIED WORK FOR TEMPORARY PARKING LOT LIGHTING AL 1
ADDITIVE ALTERNATE 1- PAVE FUTURE EMPLOYEE LOT
101-1 MOBILIZATION, CLEANUP, AND DEMOBILIZATION LS 1
101-2 SURVEY, STAKING, AND LAYOUT LS 1
101-3 MATERIALS AND LABORATORY TESTING LS 1
102-1 MAINTENANCE OF TRAFFIC LS 1
104-1 INSTALLATION AND REMOVAL OF SILT FENCE, TYPE B LF 2,250
110-1 MISCELLANEOUS DEMOLITION (BUS SHELTER, STRUCTURES) LS 1
110-2 REMOVE AND STOCKPILE EXISTING WHEEL STOP EA 460
120-2 UNCLASSIFIED EXCAVATION CY 750
283-1 IN-PLACE RECYCLING OF EXISTING ASPHALT MILLINGS AND SUBGRADE- INCLUDES
REWORKING OF MATERIAL AND GRADE ADJUSTMENTS SY 15,500
327-1 ASPHALT MILLINGS REMOVAL SY 2,250
334-1 2" FDOT SUPERPAVE ASPHALT PAVEMENT TONS 1,750
334-2 BITUMINOUS PRIME COAT GAL 2,500
425-6 MODIFY EXISTING DRAINAGE CONTROL STRUCTURE EA 1
570-2 SODDING SY 6,000
700-1
ADA PARKING SIGN ASSEMBLY (FTP-21-06 & FTP-2206) AND POSTS (2 TOTAL PANELS
PER SIGN LOCATION) EA 9
710-1 PAVEMENT MARKINGS SF 8,000
705-1 TRAFFIC BOLLARDS EA 4
107343-1
SHUTTLE BUS SHELTER INCLUDING CONCRETE PAD, STRUCTURE, MOUNTING,
COMPLETION OF STAMPED-PERMITTED DRAWINGS AND ALL ASSOCIATED WORK-
COMPLETE IN PLACE
EA 1
329000-1 LANDSCAPING LS 1
F-162-3 REMOVE AND REPLACE EXISTING FENCE USING EXISTING FABRIC LF 250
9990000-7
UNSPECIFIED WORK ITEM NO. 7
UNSPECIFIED WORK FOR UNFORESEEN CIRCUMSTANCES FOR THE OVERFLOW
PARKING LOT
AL 1
SHEET LIST
SHEET # SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX & SUMMARY OF QUANTITIES
G-003 LEGEND & ABBREVIATIONS
G-021 PROJECT LAYOUT PLAN
G-071 GENERAL NOTES - SHEET 1
G-072 GENERAL NOTES - SHEET 2
G-081 CONSTRUCTION OPERATIONS & SAFETY PHASING PLAN
G-082 FAIRCHILD DRIVE MAINTENANCE OF TRAFFIC PLAN
G-083 FUTURE EMPLOYEE LOT MAINTENANCE OF TRAFFIC PLAN
CIVIL SHEETS: STRAWBERRY LOT
C-101 EXISTING CONDITIONS
C-102 SOIL BORING LOGS
C-111 EROSION CONTROL PLAN
C-121 DEMOLITION PLAN
C-131 SITE PLAN
C-132 ENLARGED VIEW ENTRY-EXIT PLAZA
C-133 SHUTTLE BUS ENTRANCE ENLARGED VIEW
C-134 SHUTTLE BUS EXIT ENLARGED VIEW
C-135 TYPICAL SECTIONS - SHEET 1
C-136 TYPICAL SECTIONS - SHEET 2
C-141 GRADING & DRAINAGE PLAN
C-151 SWALE PLAN AND PROFILE - SHEET 1
C-152 SWALE PLAN AND PROFILE - SHEET 2
C-153 SWALE PLAN AND PROFILE - SHEET 3
C-154 SWALE PLAN AND PROFILE - SHEET 4
C-161 MARKING PLAN
C-162 SIGNAGE PLAN
C-171 SITE UTILITY PLAN
C-172 SITE UTILITY PLAN - COMMUNICATIONS HOMERUN
C-180 MASTER CROSS SECTION PLAN
C-181 CROSS SECTIONS - SHEET 1
C-182 CROSS SECTIONS - SHEET 2
C-183 CROSS SECTIONS - SHEET 3
C-184 CROSS SECTIONS - SHEET 4
C-185 CROSS SECTIONS - SHEET 5
C-186 CROSS SECTIONS - SHEET 6
LS-101 LANDSCAPING PLAN
CIVIL SHEETS: FUTURE EMPLOYEE LOT
C-201 EXISTING CONDITIONS
C-202 SOIL BORING LOGS
C-211 EROSION CONTROL PLAN
C-221 DEMOLITION PLAN
C-231 SITE PLAN
C-235 TYPICAL SECTIONS & PROFILES - SHEET 1
C-236 TYPICAL SECTIONS & PROFILES - SHEET 2
C-241 GRADING & DRAINAGE PLAN
C-261 SIGNAGE & MARKING PLAN
LS-201 LANDSCAPING PLAN
CIVIL SHEETS: DETAILS
EP-101 ENTRY - EXIT PLAZA CANOPY DETAILS
EP-102 ENTRY - EXIT PLAZA ATTENDANT BOOTH DETAILS - SHEET 1
EP-103 ENTRY - EXIT PLAZA ATTENDANT BOOTH DETAILS - SHEET 2
EP-104 ENTRY - EXIT PLAZA ATTENDANT BOOTH DETAILS - SHEET 3
BS-101 BUS SHELTER DETAIL - SHEET 1
BS-102 BUS SHELTER DETAIL - SHEET 2
C-301 EROSION CONTROL DETAILS & NOTES
C-311 SITE DETAILS
C-321 FENCING DETAILS - SHEET 1
C-322 FENCING DETAILS - SHEET 2
C-331 DRAINAGE DETAILS - SHEET 1
C-332 DRAINAGE DETAILS - SHEET 2
C-341 MARKING DETAILS
C-351 SIGNAGE DETAILS - SHEET 1
C-352 SIGNAGE DETAILS - SHEET 2
C-361 SITE UTILITY DETAILS
ELECTRICAL
E-001 ELECTRICAL NOTES, SYMBOLS, & ABBREVIATIONS
E-011 ELECTRICAL DEMOLITION PLAN
E-111 ELECTRICAL SITE PLAN
E-401 ELECTRICAL SITE ENLARGED PLAN
E-601 SCHEDULES AND ONE-LINE
NOTE: SEE SHEET G-072 FOR ADDITIONAL PAY ITEM NOTES.
\2
0.
\T
EC
H \C
AD
\D
R
AW
IN
G
S\
SH
EE
TS
\G -0
L
EG
EN
D .D
W G
/1
6/
:5 6:
P
M
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead and Hunt, Inc.
© Copyright 2022 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
2203 North Lois Avenue, Suite 225
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
LEGEND:
ANTENNA
BENCHMARK
BOLLARD
CONTROL POINT
CHISELED X
CLEANOUT, SANITARY OR STORM
DOWNSPOUT
ELECTRICAL METER
ELECTRICAL / COMMUNICATIONS PEDESTAL
ELECTRICAL TRANSFORMER BOX
ELECTRICAL SERVICE PANEL
ELECTRICAL HANDHOLE/PULLBOX
FIRE HYDRANT
FLAGPOLE
GAS METER
GAS VALVE
GATE
GUY WIRE
HANDHOLE, GENERIC
INLET, CURB
INLET, ROUND
INLET, SQUARE
IRON PIN
LIGHT POLE (SINGLE)
LIGHT POLE (DOUBLE)
MAILBOX
MANHOLE, ELECTRIC
MANHOLE, FIBER OPTIC
MANHOLE, SANITARY SEWER
MANHOLE, STORM SEWER
MANHOLE, TELECOMMUNICATIONS
MANHOLE, VALVE
MARKER, CABLE
MARKER, DUCT
PK or MAG NAIL
POWER POLE
POWER POLE, DOUBLE
POWER POLE WITH LIGHT
PVC PIPE
REBAR
SANITARY VALVE
SATELLITE DISH
SEPTIC TANK VENT
SIGN (SINGLE POST)
SIGN (DOUBLE POST)
SOIL BORING
SHRUB
STORM FLARED END SECTION
STUMP
CRAPE MYRTLE (LAGERSTROEMIA INDICA)
CABBAGE PALM (SABAL PALMETTO)
CTV PEDESTAL BOX
WATER CURB STOP
WATER VALVE
WATER SHUT OFF
WATER METER
WATER SURFACE
WELL
GAS
ELECTRIC, OVERHEAD
ELECTRIC, UNDERGROUND
EXISTING CONTOUR LINES
FENCE
FIBER OPTIC CABLE
HANDRAIL
PROPERTY LINE
SANITARY SEWER
STONE RETAINING WALL
STORM SEWER / CULVERT
SWALE
TELEPHONE
TV CABLE
WATER
WETLAND BOUNDARY
VEGETATION
RIPRAP
STANDING WATER
WETLAND
EXISTING CONCRETE
PROPOSED ASPHALT PAVEMENT
B
DS
ESP
HH
CB
CB
MBX
E
FO
S
ST
T
MHV
C
D
PVC
STV
CTV
W V
OSW
WM
WELL
G
OHE
E xxx.x xxx.x x o
SS
SD
T
TV
W
ABBREVIATIONS:
A ABANDON
AB AGGREGATE BASE
A/C AIRCRAFT
ABAND ABANDON
AC ASPHALT CONCRETE
ALCMS AIRFIELD LIGHTING CONTROL AND MONITORING SYSTEM
ALT ALTERNATE
AMSL ABOVE MEAN SEA LEVEL
AOA AIRCRAFT OPERATIONS AREA
APCH APPROACH
APPROX APPROXIMATE
ASB AGGREGATE SUB-BASE
AR ACCESS ROAD
ARFF AIRCRAFT RESCUE AND FIRE FIGHTING
ATCT AIR TRAFFIC CONTROL TOWER
AWG AMERICAN WIRE GAUGE
BC BEGINNING OF CURVE
BIT BITUMINOUS
BLDG BUILDING
BM BENCHMARK
BOT BOTTOM
BVC BEGINNING OF VERTICAL CURVE
CA TEAM CONSTRUCTION ADMINISTRATION TEAM
C-C CENTER TO CENTER
CB CATCH BASIN
CIPCP CAST IN-PLACE CONCRETE PIPE
CJ CONSTRUCTION JOINT
CFS CUBIC FEET PER SECOND
CL CENTERLINE
CLF CHAINLINK FENCE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CONC CONCRETE
CE CONCRETE ENCASED
CONT CONTINUOUS
CP CONTROL POINT
CTB CEMENT TREATED BASE
CKT CIRCUIT
CSPP CONSTRUCTION SAFETY PHASING PLAN
DB DIRECT BURIAL
DEG DEGREE
DI DROP INLET
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DP DEPTH
(E) EXISTING
E ELECTRICAL LINE
EC END OF CURVE
EG EXISTING GRADE
ELEV ELEVATION
EOP EDGE OF PAVEMENT
EQ EQUAL
EVC END OF VERTICAL CURVE
ETR EXISTING TO REMAIN
FAA FEDERAL AVIATION ADMINISTRATION
FBO FIXED BASE OPERATOR
FES FLARED END SECTION
FF FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOW LINE
FOD FOREIGN OBJECT DEBRIS
FPS FEET PER SECOND
FT FEET
G GAS LINE
GAL GALLON
GALV GALVANIZED
GA MUTCD GEORGIA MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES
GB GRADE BREAK
GND GROUND
GPM GALLONS PER MINUTE
GPSP GENERAL PERRY SMITH PARKWAY
GS GLIDE SLOPE
HH HANDHOLE
H HEIGHT
HDPE HIGH DENSITY POLYETHYLENE
HIRL HIGH INTENSITY RUNWAY LIGHT
HIR;THL HIGH INTENSITY THRESHOLD LIGHT
HORIZ HORIZONTAL
HMA HOT MIX ASPHALT
HP HIGH POINT
HW HEADWALL
HWL HIGH WATER LEVEL
HWY HIGHWAY
IE INVERT ELEVATION
IFR INSTRUMENT FLIGHT RULES
ILS INSTRUMENT LANDING SYSTEM
IN INCHES
IP IN-PAVEMENT
L LENGTH
LBS POUNDS
LF LINEAL FEET
LOC LOCALIZER
LWL LOW WATER LEVEL
MH MANHOLE
MALS MEDIUM INTENSITY APPROACH LIGHTING SYSTEM
MALSF MALS W/ SEQUENCED FLASHERS
MALSR MALS W/ RUNWAY ALIGNMENT INDICATOR LIGHTS
MAX MAXIMUM
ME MATCH EXISTING
MID MID POINT
MIN MINIMUM
MIRL MEDIUM INTENSITY RUNWAY LIGHT
MITL MEDIUM INTENSITY TAXIWAY LIGHT
MPH MILES PER HOUR
N NO
(N) NEW
NIC NOT IN CONTRACT
NO. OR # NUMBER
NOTAM NOTICE TO AIRMAN
NTS NOT TO SCALE
OFF OFFSET
OFZ OBJECT FREE ZONE
O/S OFFSET
OC ON CENTER
OH OVERHEAD
OWS OIL WATER SEPARATOR
PAPI PRECISION APPROACH PATH INDICATOR
PR PAIR
PB PULL BOX
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PCSO PINELLAS COUNTY SHERIFF'S OFFICE
PERF PERFORATED
PI POINT OF INTERSECTION
POB POINT OF BEGINNING
POC POINT OF CURVE
POE POINT OF ENDING
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVE
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
Q RATE OF FLOW
QTY QUANTITY
R RADIUS
(R) REMOVE
R&R REMOVE AND REPLACE
RC RELATIVE COMPACTION
REL RELOCATE EXISTING
RCP REINFORCED CONCRETE PIPE
REQ REQUIRED
ROFA RUNWAY OBJECT FREE AREA
ROW RIGHT OF WAY
RGL RUNWAY GUARD LIGHT
RSA RUNWAY SAFETY AREA
RWA RUNWAY WORK RESTRICTED AREA
RWAPP RUNWAY APPROACH LIGHT
RWY OR RW RUNWAY
S SANITARY LINE
SF SQUARE FOOT
SG STRAIGHT GRADE
SH SHOULDER
SIDA SECURITY IDENTIFICATION DISPLAY AREA
SMGS SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM
SPCD SAFETY PLAN COMPLIANCE DOCUMENT
SS STAINLESS STEEL
ST STORM LINE
STA STATION
STD STANDARD
STL STEEL
T TELEPHONE LINE
TC TOP OF CURB
TG TOP OF GRATE
T/L TAXILINE
TOE TOE OF BANK
TOP TOP OF BANK
TDZ TOUCHDOWN ZONE
TWY TAXIWAY
TOFA TAXIWAY OBJECT FREE AREA
TSA TAXIWAY SAFETY AREA
TYP TYPICAL
UD UNDERDRAIN
OFA OBJECT FREE AREA
UFN UNTIL FURTHER NOTICE
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
V VELOCITY
VC VERTICAL CURVE
VERT VERTICAL
VFR VISUAL FLIGHT RULES
VG VALLEY GUTTER
VIF VERIFY IN FIELD
VASI VISUAL APPROACH SLOPE INDICATOR
W WATER LINE
WA WORK AREA
W/ WITH
W/O WITHOUT
WSE WATER SURFACE ELEVATION
WSP WELDED STEEL PIPE
WV WATER VALVE
WWM WELDED WIRE MESH
LEGEND AND ABBREVIATIONS
132.75 131.53
PROPOSED ELEVATION
EXISTING ELEVATION
DIRECT-BURIED CABLE TO BE ABANDONED
IN-PLACE
E NEW ELECTRICAL PULLBOX
EXISTING WIRE AND CONDUIT
TO REMAINE
EXISTING DUCT BANK
EXISTING JUNCTION CAN
NEW DIRECTIONAL BORED DUCT
REMOVE
| | | | | | | | | REMOVE
PROPOSED CONCRETE PAVEMENT
LEGEND &
ABBREVIATIONS
G-003
RAD
ACC
DES
OCTOBER 27, 2023
4625000-221000.01
BID DOCUMENTS
ST
. P
ET
E
C
LE
AR
W
AT
ER
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (P
IE
PA
VE
S
TR
AW
BE
R R
Y
LO
T
FA
IR
C H
IL
D
D R
IV
E
C
LE
AR
W
AT
ER
, F L
AutoCAD SHX Text
CO
AutoCAD SHX Text M
AutoCAD SHX Text
TRANS
AutoCAD SHX Text E
AutoCAD SHX Text
GM
AutoCAD SHX Text
GV
SV
PA
NEL
TB
SE
C
CA
BI
NE
T
M.H
TR
x x x x x x x x xx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xx x x x x x x x x x x x x x
ARFF
PCSO AVIATION SERVICE RD
FAIRCHILD DR
SPADCO DR
RUNWAY 18/36
R U
N W
AY
/2
ADDITIVE ALTERNATIVE 1-
PAVE FUTURE EMPLOYEE LOT
TW T
T E R M
I N A L
R A M
P
TERMINAL
TW
B
TW
C
ROOSEVELT AVE
144TH AVE N
46TH ST N
ENTERPRISE
READY
CENTER24' MIN. AISLE
ENTERPRISE
READY
CENTER24' MIN. AISLE
ENTERPRISE
READY
CENTER
24' MIN. AISLE
ENTERPRISE
READY
CENTER
24' MIN. AISLE
ENTERPRISE
READY
CENTER24' MIN. AISLE
ENTERPRISE
READY
CENTER24' MIN. AISLE
ENTERPRISE
READY
STOP
STOP
STOP STOP STOP
STOP
STOP
STOP
STO
P
STOP
ROOSEVELT AVE
APPROXIMATE STOCKPILE LOCATION AND
ACCESS ROUTE FOR SUITABLE EXCESS MATERIAL-
SEE SHEET C-135 FOR ADDITIONAL INFORMATION
ROOSEVELT BLVD
BASE BID-
PAVE STRAWBERRY LOT
EVERGREEN AVE
X:
\4
\2
0.
\T
EC
H \C
AD
\D
R
AW
IN
G
S\
SH
EE
TS
\G -0
P
R O
JE
C
T
LA
YO
U
T
PL
AN
.D
W G
/1
6/
:5 6:
P
M
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead and Hunt, Inc.
© Copyright 2022 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
2203 North Lois Avenue, Suite 225
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
00 200 400
PROJECT LAYOUT
PLAN
G-021
RAD
ACC
DES
OCTOBER 27, 2023
4625000-221000.01
BID DOCUMENTS
ST
. P
ET
E
C
LE
AR
W
AT
ER
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (P
IE
PA
VE
S
TR
AW
BE
R R
Y
LO
T
FA
IR
C H
IL
D
D R
IV
E
C
LE
AR
W
AT
ER
, F L
DELIVERIES
AutoCAD SHX Text
DELIVERIES
AutoCAD SHX Text
SHORT TERM
AutoCAD SHX Text
LONG TERM
AutoCAD SHX Text
DROP-OFF LANE
DROP-OFF LANE
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead and Hunt, Inc.
© Copyright 2022 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
2203 North Lois Avenue, Suite 225
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
GENERAL
1. THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT PLANS AND
SPECIFICATIONS AND ANY RULES, REGULATIONS, STANDARDS OR SPECIFICATIONS
REFERENCED THEREIN. THE PROJECT IS SUBJECT TO INSPECTION BY REPRESENTATIVES OF
THE CITY OR COUNTY, THE FEDERAL AVIATION ADMINISTRATION (FAA) AND OTHER GOVERNING
AGENCIES.
2. LIQUIDATED DAMAGES, AS STATED IN THE SPECIFICATIONS AND IN THE CONTRACT
AGREEMENT, SHALL APPLY TO THIS PROJECT.
3. A PORTION OF CONSTRUCTION WILL OCCUR WITHIN THE AIR OPERATIONS AREA (AOA). THIS IS
A CLOSELY MAINTAINED SECURITY AREA WITH RESTRICTED ACCESS. THE CONTRACTOR SHALL
MEET ALL REQUIREMENTS FOR ENTERING AND OPERATING IN THIS AREA AT ALL TIMES. IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH ALL REQUIREMENTS FOR
ENTERING AND OPERATING IN THE AOA. FURTHER, IT WILL REMAIN THE CONTRACTOR'S
RESPONSIBILITY TO KEEP ADVISED OF ANY CHANGES IN THESE REQUIREMENTS AND TO
ADHERE TO CURRENT REGULATIONS.
4. BECAUSE A PORTION OF THE CONSTRUCTION IS NEAR ACTIVE TAXIWAYS AND APRONS, ALL
CONSTRUCTION ACTIVITIES SHALL BE CONDUCTED IN A MANNER ACCEPTABLE TO THE OWNER
AND THE FEDERAL AVIATION ADMINISTRATION (FAA) TO PROVIDE ACCEPTABLE LEVELS OF
SAFETY FOR ALL AIRPORT OPERATIONS.
5. EACH CONTRACTOR INVOLVED SHALL ASSUME ALL LIABILITY, FINANCIAL OR OTHERWISE, IN
CONNECTION WITH THEIR CONTRACT AND SHALL PROTECT AND SAVE HARMLESS THE OWNER
FROM ANY AND ALL DAMAGES OR CLAIMS THAT MAY ARISE BECAUSE OF INCONVENIENCES,
DELAYS, OR LOSS EXPERIENCED BY THEM BECAUSE OF THE PRESENCE AND OPERATIONS OF
HIS SUBCONTRACTORS WORKING WITHIN THE LIMITS OF THE SAME PROJECT.
CONTRACTOR REQUIREMENTS
1. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS REQUIRED FOR THE
PERFORMANCE OF THIS CONTRACT, EXCEPT WHERE OTHERWISE STATED. AN UNSPECIFIED
WORK ITEMS FOR REIMBURSABLE COSTS HAS BEEN ESTABLISHED TO ACCOUNT FOR COSTS
RELATED TO WATER AND SEWER IMPACT AND CONNECTION FEES (PAY ITEM 9990000-4). AN
ADDITIONAL UNSPECIFIED WORK ITEM FOR REIMBURSABLE COSTS HAS BEEN ESTABLISHED TO
ACCOUNT FOR COSTS RELATED TO DUKE ENERGY PROVIDED WORK (PAY ITEM 9990000-5).
COSTS RELATED TO OBTAINING BUILDING PERMITS FOR THOSE ITEMS SPECIFIED IN THE
PROJECT SPECIFICATIONS AND DRAWING NOTES (BUS SHELTER, CANOPY, TOLL PLAZ
ATTENDANT BOOTH SHALL BE PAID FOR BY THE CONTRACTOR. NO SEPARATE PAYMENT SHALL
BE MADE FOR THESE PERMITS.
2. THE CONTRACTOR MUST OBTAIN PROPER PERMITS FOR DELIVERY OF MATERIALS AND
EQUIPMENT TO THE SITE. ANY DAMAGE TO OFF-SITE ROADS SHALL BE THE COMPLETE
RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED AT THE CONTRACTOR'S SOLE
EXPENSE.
3. ALL CONTRACTOR'S VEHICLES AND TRAFFIC (UNLESS OTHERWISE AUTHORIZED) SHALL REMAIN
WITHIN THE DESIGNATED CONSTRUCTION LIMITS OR HAUL ROUTES.
4. THE CONTRACTOR SHALL CONTROL DUST FROM OPERATIONS TO A LEVEL ACCEPTABLE TO THE
AIRPORT AND ENGINEER AT ALL TIMES. THE CONTRACTOR SHALL HAVE AVAILABLE VACUUM
BROOMS, WATERING TRUCKS AND OTHER EQUIPMENT NECESSARY TO CONTROL DUST AND
DEBRIS AT ALL TIMES. ALL METHODS FOR CONTROLLING DUST AND DEBRIS SHALL BE SUBJECT
TO THE AIRPORTS APPROVAL. DUST AND DEBRIS CONTROL SHALL BE STRICTLY MONITORED
DUE TO ITS IMPACT ON AIRCRAFT SAFETY. FAILURE TO PROPERLY CONTROL DUST AND DEBRIS
OR TO RESPOND TO ANY REQUESTS TO DO SO WILL RESULT IN CONSTRUCTION ACTIVITIES
BEING STOPPED.
5. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL LAWS THAT ARE
PERTINENT TO THIS WORK.
6. BEFORE RECEIVING A NOTICE TO PROCEED, THE CONTRACTOR SHALL FURNISH THE ENGINEER
WITH A DETAILED CRITICAL PATH METHOD SCHEDULE OF WORK FOR EACH PHASE OF
CONSTRUCTION INCLUDING THE VARIOUS ROADWAY CLOSURES REQUIRED.
7. ALL ELEMENTS OF THE CONSTRUCTION SHALL BE DONE IN SUCH A MANNER THAT, AT THE END
OF THE CLOSURE PERIOD, THE AREA WILL BE IN CONDITION SUITABLE FOR AIRPORT
OPERATIONS AND SUBJECT TO AIRPORT AND ENGINEER APPROVAL.
COORDINATION AND OPERATIONS
1. THE CONTRACTOR SHALL ACQUAINT HIS SUPERVISORS AND EMPLOYEES TO THE AIRPORT
ACTIVITY AND OPERATIONS THAT ARE INHERENT TO THIS AIRPORT. HE SHALL CONDUCT HIS
CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE AND EMERGENCY AIR TRAFFIC
REQUIREMENTS AND GUIDELINES AS NOTED AND/OR SHOWN ON THE PLANS AND THE SAFETY
AND SECURITY REQUIREMENTS DETAILED IN THE SPECIFICATIONS.
2. THE CONTRACTOR SHALL CONDUCT WEEKLY COORDINATION MEETINGS TO DISCUSS WORK
AREAS, SCHEDULING, SAFETY, ETC. WITH THE ENGINEER, THE AIRPORT, FAA, AND OTHER
APPROPRIATE OFFICIALS. MINUTES FROM THE WEEKLY MEETINGS SHALL BE PREPARED BY THE
CONTRACTOR AND COPIES DISTRIBUTED TO ALL APPROPRIATE INDIVIDUALS.
3. CONSTRUCTION AND MAINTENANCE OPERATIONS BY OTHERS MAY OCCUR CONCURRENTLY
AND AT TIMES IN THE VICINITY OF CONSTRUCTION ASSOCIATED WITH THIS PROJECT. THE
CONTRACTOR SHALL COORDINATE HIS OPERATIONS AND COOPERATE WITH MAINTENANCE
CREWS AND OTHER CONTRACTORS WORKING ON THE AIRPORT. COORDINATION WITH
APPROPRIATE GOVERNMENT AND UTILITY AGENCIES IS ALSO REQUIRED.
MATERIALS AND EQUIPMENT
1. ALL MATERIALS AND EQUIPMENT, WHEN NOT IN USE, SHALL BE PLACED IN APPROVED AREAS
WHERE THEY WILL NOT CONSTITUTE A HAZARD TO AIRPORT OPERATIONS. ALL EQUIPMENT
SHALL BE STORED IN A LOWERED CONFIGURATION WHEN NOT IN USE. THE APPROVED
STORAGE AREA FOR EQUIPMENT AND MATERIALS IS THE CONTRACTOR'S STAGING AREA. ANY
OTHER AREAS TO BE USED FOR STORAGE MUST BE APPROVED BY THE AIRPORTS PROJECT
MANAGER. EQUIPMENT AND STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO
PREVENT MOVEMENT RESULTING FROM AIRCRAFT JET BLAST OR WIND CONDITIONS.
2. ALL EXCESS EXCAVATED MATERIAL, UNSUITABLE MATERIAL AND CONSTRUCTION DEBRIS SHALL
BE PROMPTLY DISPOSED OF OFF AIRPORT PROPERTY UNLESS STATED OTHERWISE IN THE
CONSTRUCTION PLANS OR BY THE AIRPORT.
3. ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE WORK SITE WILL USE A
DELIVERY ADDRESS. THE DELIVERY ADDRESS SHALL BE ESTABLISHED AT THE
PRECONSTRUCTION CONFERENCE.
HAUL ROUTES
1. LOCATION OF HAUL ROUTES AND STAGING AREAS ON THE AIRPORT SITE SHALL BE AS SHOWN
ON THE CONTRACT LAYOUT PLAN. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE OFF-SITE HAUL ROUTES (STATE HIGHWAYS, COUNTY ROADS OR CITY STREETS)
WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ON-SITE
HAUL ROUTES AND STAGING AREAS SHALL BE MAINTAINED BY THE CONTRACTOR AND SHALL
BE RESTORED TO THEIR ORIGINAL CONDITION UPON COMPLETION OF BEING USED AS A HAUL
ROUTE AT THE CONTRACTOR'S EXPENSE. THE BEFORE AND AFTER CONDITION OF ON-SITE
HAUL ROUTES AND STAGING AREAS SHALL BE JOINTLY INSPECTED AND DOCUMENTED BY THE
CONTRACTOR, AIRPORT, AND/OR ENGINEER. THE CONTRACTOR SHALL PROVIDE A VIDEO TAPE
OR DIGITAL PICTURES OF ALL ON-SITE HAUL ROUTES AND STAGING AREAS BEFORE START OF
WORK AND UPON COMPLETION. FENCING, DRAINAGE, SEDIMENT CONTROL, GRADING AND
OTHER MISCELLANEOUS CONSTRUCTION REQUIRED TO CONSTRUCT TEMPORARY HAUL
ROUTES OR ACCESS POINTS ON THE AIRPORT WILL BE THE CONTRACTOR'S TOTAL
RESPONSIBILITY AND SHALL BE APPROVED BY THE AIRPORT PRIOR TO THE WORK. ALL ON-SITE ACCESS ROADS TO AIRPORT FACILITIES SHALL REMAIN OPEN AND MAINTAINED AT ALL TIMES.
2. USE OF UNAUTHORIZED HAUL ROUTES WILL NOT BE ACCEPTABLE. THE CONTRACTOR SHALL
ONLY USE THE HAUL ROUTES APPROVED BY THE AIRPORT PROJECT MANAGER. THE HAUL
TRUCKS MUST BE COVERED AT ALL TIMES. THE CONTRACTOR SHALL CONTINUOUSLY CLEAN
THE HAUL ROUTE WITH A POWER VACUUM DURING ALL PERIODS WHEN HAULING. FAILURE TO
MAINTAIN THE HAUL ROUTE IN AN ACCEPTABLE MANNER WILL RESULT IN SUSPENSION OF
WORK. IN THE EVENT THAT ANY FOREIGN OBJECT, SPILLAGE, DEBRIS OR DUST BUILDS UP AS A
RESULT OF HAULING, THE CONTRACTOR SHALL BE REQUIRED TO IMMEDIATELY CLEAN AND
REMOVE THE MATERIAL
SUPERVISION
1. THE PRIME CONTRACTOR SHALL HAVE AT ALL TIMES ON SITE, WHILE WORK IS IN PROGRESS, A
JOB SUPERINTENDENT/FOREMAN. THIS PERSON SHALL BE FAMILIAR WITH ALL TYPES OF
CONSTRUCTION BEING PERFORMED AND SHALL BE THE SAME PERSON EACH DAY
THROUGHOUT THE PROJECT. THE SUPERINTENDENT/FOREMAN SHALL HAVE THE
RESPONSIBILITY OF COORDINATING EACH DAYS WORK WITH THE AIRPORT OR AUTHORIZED
REPRESENTATIVE AND SHALL HAVE AUTHORITY TO SCHEDULE AND ADJUST ALL WORKERS,
PRIME AND SUBCONTRACTORS, TO ACCOMMODATE AIRPORT OPERATION AS DIRECTED BY THE
AIRPORT PERSONNEL OR AUTHORIZED REPRESENTATIVE.
2. ALL PERSONNEL SHALL CLEAR THE CONSTRUCTION AREA ONCE WORK HAS STOPPED FOR THE
DAY OR EVENING. ALL MECHANICS NEEDING ACCESS TO THE AOA DURING DAYS, EVENINGS
AND WEEKENDS TO WORK ON CONSTRUCTION EQUIPMENT SHALL BE ESCORTED AND HAVE
THEIR VEHICLES IDENTIFIED WITH THE CONTRACTOR'S NAME AND APPROPRIATE LIGHTING.
CONTRACTOR'S VEHICLES
1. ALL CONTRACTORS VEHICLES SHALL BE IN GOOD WORKING ORDER. ALL CONTRACTOR VEHICLES
SHALL BE ESCORTED WHILE INSIDE THE A.O.A THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING ESCORTS WITH THE AIRPORTS PROJECT MANAGER.
2. ALL CONTRACTOR VEHICLES/EQUIPMENT THAT ARE AUTHORIZED TO OPERATE ON THE AIRPORTS A.O.A. SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE/EQUIPMENT A 3'x3' (MIN.) ORANGE AND
WHITE CHECKER BOARD FLAG (DAY OPERATIONS). EACH CHECKER BOARD COLOR BEING ONE
SQUARE FOOT. ANY VEHICLE OPERATING ON THE A.O.A. SHALL ALSO BE EQUIPPED WITH A
FLASHING AMBER (YELLOW) DOME TYPE LIGHT, MOUNTED ON TOP OF THE VEHICLE AND OF SUCH
INTENSITY TO CONFORM TO LOCAL AND FEDERAL CODES FOR MAINTENANCE AND EMERGENCY
VEHICLES (DAY OR NIGHT OPERATIONS).
SAFETY
1. THE CONTRACTOR SHALL ACQUAINT HIS SUPERVISORS, EMPLOYEES AND SUBCONTRACTORS OF THE AIRPORT ACTIVITY AND OPERATIONS THAT ARE INHERENT OF THIS BUSY AND ACTIVE AIR CARRIER AIRPORT, AND SHALL CONDUCT HIS CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON SAFETY SPECIFIED IN SPECIAL PROVISION SECTION 1 AND 2 OF THE CONTRACT
DOCUMENTS.
2. NO RUNWAY, TAXIWAY, APRON OR AIRPORT ROADWAY SHALL BE CLOSED WITHOUT WRITTEN APPROVAL OF ST.
PETERSBURG - CLEARWATER INTERNATIONAL AIRPORT TRANSMITTED BY THE ENGINEER, TO ENABLE NECESSARY "NOTICES TO AIRMEN" (NOTAM) OR ADVISORIES TO AIRPORT SERVICE OR TENANTS. A MINIMUM OF 48 HOURS NOTICE OF REQUESTED CLOSING SHALL BE DIRECTED TO THE ENGINEER, WHO WILL COORDINATE THE REQUEST WITH PIE
OPERATIONS.
3. ANY CONSTRUCTION ACTIVITY WITHIN 250' OF AN ACTIVE RUNWAY CENTERLINE OR 129.5' FROM AN ACTIVE TAXIWAY CENTERLINE OR OPEN EXCAVATIONS IN EXCESS OF 3" INCHES DEEP WITHIN THE ABOVE AREAS, WILL REQUIRE CLOSURE OF THE AFFECTED RUNWAY OR TAXIWAY, UNLESS OTHERWISE APPROVED BY PIE OPERATIONS. CLOSURE
REQUIRES THE SAME PROVISIONS AS SAFETY NOTE 2 ABOVE.
4. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE FIRE AND SAFETY
PRECAUTIONS HAVE BEEN TAKEN AND THE PROCEDURE APPROVED.
5. STOCKPILED MATERIALS AND EQUIPMENT STORAGE IS NOT PERMITTED WITHIN THE RSA, OFA, OR OFZ OF AN OPERATIONAL RUNWAY. THE AIRPORT OPERATOR MUST ENSURE THAT STOCKPILED MATERIALS AND EQUIPMENT ADJACENT TO THESE AREAS ARE PROMINENTLY MARKED WITH RED FLAGS AND LIGHTED DURING HOURS OF RESTRICTED VISIBILITY OR DARKNESS. THIS INCLUDES DETERMINING AND VERIFYING THAT MATERIALS ARE STORED AT AN APPROVED LOCATION TO PREVENT FOREIGN OBJECT DAMAGE AND ATTRACTION BY WILDLIFE.
6. ALL DEBRIS DEPOSITED ON THE PAVEMENT DUE TO CONSTRUCTION ACTIVITIES SHALL BE REMOVED IMMEDIATELY.
METHODS OF IMMEDIATE REMOVAL OF LARGE DEBRIS SUCH AS GRAVEL, DIRT CLODS, CONCRETE CHUNKS, MATERIAL CANISTERS, FORM WORK, ETC., SHALL BE AT THE CONTRACTOR'S DISCRETION, SUBJECT TO APPROVAL OF
THE ENGINEER. THE OPERATIONAL PAVEMENT MUST BE FOREIGN OBJECT-FREE AT ALL TIMES.
7. ALL TRUCKS HAULING DEBRIS FROM THE AIRPORT OR MATERIAL TO THE PROJECT SHALL BE EQUIPPED WITH TAILGATES WHICH SHUT TIGHTLY AND DO NOT PERMIT DEBRIS TO SPILL FROM THE TAILGATE AREA. TRUCK BEDS SHALL BE SWEPT CLEAN BEFORE ENTERING THE AOA OR LEAVING THE WORK AREA. SIDEBOARDS SHALL BE KEPT IN GOOD REPAIR. UNDER NO CIRCUMSTANCES WILL TRUCKS BE PERMITTED TO BE LOADED GREATER THAN LEGAL LIMIT OR HIGHER THAN THE SIDEBOARDS. TRUCKS NOT MEETING THESE REQUIREMENTS OR THAT ALLOW MATERIAL TO BE WIND BLOWN OR TO ESCAPE THEIR CONTAINMENT BEDS ONTO THE ROADWAYS OR TAXIWAYS WILL BE REMOVED
FROM THE PROJECT IMMEDIATELY AT THE ENGINEER'S DIRECTION.
8. THE CONTRACTOR'S SECURITY OFFICER (C.S.O.) WILL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS. PRIOR TO THE COMMENCEMENT OF THE WORK THE C.S.O. SHALL PROVIDE THE ENGINEER AN OUTLINE OF A PROPOSED ACCIDENT AND FIRE PROTECTION PLAN FOR ALL WORK CONTEMPLATED UNDER THE CONTRACT AND CONDUCT AT LEAST ONE SAFETY MEETING EACH MONTH FOR EACH SHIFT AND REQUIRE THE ATTENDANCE OF ALL SUPERVISORS AT SUCH MEETINGS. COPIES OF THE MINUTES OF SAFETY MEETINGS SHALL BE KEPT ON FILE IN THE CONTRACTOR'S
FIELD OFFICE AND AVAILABLE UPON REQUEST BY THE ENGINEER.
9. MAXIMUM CONSTRUCTION TRAFFIC SPEED ON ALL AIRPORT PROPERTY SHALL BE 15 MPH.
10. THE CONTRACTOR SHALL ACQUAINT HIMSELF WITH FAA ADVISORY CIRCULAR AC-150/5370-2G "OPERATIONAL SAFETY
ON AIRPORTS DURING CONSTRUCTION".
11. THE CONTRACTOR SHALL HAVE (ON-SITE) SUFFICIENT RADIO EQUIPMENT TO MONITOR THE AIRPORT UNICOM FREQUENCY OF 123.0. CONTRACTOR PERSONNEL AND VEHICLES SHALL GIVE WAY TO AIRCRAFT OPERATING ON THE
AIRFIELD.
SECURITY
1. GENERAL INTENT: IT IS INTENDED THAT THE CONTRACTOR SHALL
COMPLY WITH ALL REQUIREMENTS OF THE AIRPORT SECURITY
PLAN AND WITH THE SECURITY REQUIREMENTS SPECIFIED HEREIN.
THE CONTRACTOR SHALL DESIGNATE TO THE ENGINEER IN
WRITING, THE NAME OF HIS "CONTRACTOR SECURITY OFFICER"
(C.S.O.). THE C.S.O. SHALL REPRESENT THE CONTRACTOR ON THE
SECURITY REQUIREMENTS FOR THE CONTRACT
2. .THE AOA MUST REMAIN SECURE AT ALL TIMES THROUGH THE USE
OF SECURED FENCING OR A CONTRACTOR PROVIDED GUARD.
GUARDING IS AT THE COST OF THE CONTRACTOR. SEE
SPECIFICATION 001143 AIRPORT PROJECT WORK PROCEDURES
FOR ADDITIONAL INFORMATION.
3. CONTRACTOR PERSONNEL SECURITY ORIENTATION: THE
CONTRACTOR SECURITY OFFICER SHALL BE RESPONSIBLE FOR
BRIEFING ALL CONTRACTOR PERSONNEL ON THESE
REQUIREMENTS AND OTHER SECURITY PROVISIONS. ALL NEW
CONTRACTOR EMPLOYEES SHALL BE BRIEFED ON THESE
REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.
4. ACCESS TO THE SITE: THE CONTRACTOR'S ACCESS TO THE SITE
SHALL BE AS SHOWN ON THE PLANS. NO OTHER ACCESS POINTS
SHALL BE ALLOWED UNLESS APPROVED BY THE ENGINEER. ALL
CONTRACTOR TRAFFIC AUTHORIZED TO ENTER THE SITE SHALL BE
EXPERIENCED IN THE ROUTE OR GUIDED BY CONTRACTOR
PERSONNEL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
TRAFFIC CONTROL TO AND FROM THE CONSTRUCTION AREA ON
THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR IMMEDIATE
CLEAN UP OF ANY DEBRIS DEPOSITED ALONG THE ACCESS ROUTE
AS A RESULT OF HIS CONSTRUCTION TRAFFIC. DIRECTIONAL
SIGNING AT THE ACCESS GATE AND ALONG THE DELIVERY ROUTE
TO THE STORAGE AREA, PLANT SITE OR WORK SITE SHALL BE AS
DIRECTED BY THE ENGINEER.
5. MATERIALS DELIVERY TO THE SITE: ALL CONTRACTOR'S MATERIAL
ORDERS FOR DELIVERY TO THE WORK SITE WILL USE AS A
DELIVERY ADDRESS, THE STREET NAME ASSIGNED TO THE
ACCESS POINT AT THE CONTRACTOR'S STORAGE SITE AT THE
AIRPORT. THIS WILL PRECLUDE DELIVERY TRUCKS FROM
ENTERING INTO THE TERMINAL COMPLEX OR TAKING SHORT CUTS
THROUGH THE PERIMETER GATES AND ENTERING INTO AIRCRAFT
OPERATIONS AREAS INADVERTENTLY.
6. CONSTRUCTION AREA LIMITS: THE LIMITS, MATERIAL STORAGE
AREAS, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER
AREAS DEFINED FOR THE CONTRACTORS EXCLUSIVE USE DURING
CONSTRUCTION SHALL BE MARKED BY THE CONTRACTOR. THE
CONTRACTOR SHALL ERECT AND MAINTAIN AROUND THE
PERIMETER OF THESE AREAS SUITABLE FENCING, MARKING AND
OR WARNING DEVICES VISIBLE FOR DAY AND NIGHT USE.
TEMPORARY BARRICADES, FLAGGING AND FLASHING WARNING
LIGHTS WILL BE REQUIRED AT CRITICAL ACCESS POINTS. TYPE OF
MARKING AND WARNING DEVICES SHALL BE APPROVED BY
AIRPORT OPERATIONS, THROUGH THE ENGINEER.
7. THE CONTRACTOR'S ACCESS TO THE PROJECT SHALL BE VIA THE
GATES SHOWN IN THE PLANS.
8. ALL EQUIPMENT, MATERIAL DELIVERIES AND PERSONNEL
ENTERING/LEAVING THIS PROJECT SITE SHALL BE ESCORTED.
CONSTRUCTION LAYOUT
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT. EXISTING CONDITIONS
ARE SHOWN ON THE DRAWINGS. EXISTING CONDITIONS SHOWN ARE BELIEVED TO BE
ACCURATE, BUT THE AIRPORT OWNER NOR THE ENGINEER ASSUMES ANY RESPONSIBILITY FOR
THE ACCURACY OF THESE CONDITIONS. THE RE CONTRACTOR SHALL NOTIFY THE ENGINEER IN
WRITING PRIOR TO CONSTRUCTION OF ANY DISCREPANCIES ON THE DRAWINGS. FAILURE TO
NOTIFY THE ENGINEER SHALL RESULT IN A WAIVER OF THE CONTRACTOR'S RIGHT FOR A
CHANGE ORDER. THE HORIZONTAL POSITIONS FOR ALL FEATURES SHOWN ARE RELATIVE TO
FLORIDA STATE PLANE COORDINATE SYSTEM (NAD83/99). VERTICAL INFORMATION IS BASED
UPON NGVD 29. A TOPOGRAPHIC FIELD SURVEY WAS COMPLETED BY ECHEZABAL AND
ASSOCIATES ON DECEMBER 1, 2016 AND USED AS THE BASIS FOR DESIGN ON THIS PROJECT.
2. THE VERTICAL CONTROL ON THIS PROJECT IS TIED TO BENCH MARKS LOCATED ON THE
AIRPORT. ALL EXISTING SURVEY MONUMENTS SHALL BE PROTECTED BY THE CONTRACTOR
DURING CONSTRUCTION. ALL MONUMENTS DISTURBED BY THE CONTRACTORS OPERATIONS
SHALL BE RESET BY A REGISTERED SURVEYOR AT THE CONTRACTOR'S EXPENSE.
EXISTING UTILITY & NAVIGATIONAL FACILITIES
1. BEFORE ANY WORK IS STARTED ON ANY PHASE OF THIS PROJECT AND AGAIN BEFORE FINAL
ACCEPTANCE BY THE ST. PETERSBURG - CLEARWATER INTERNATIONAL AIRPORT,
REPRESENTATIVES OF THE CONTRACTOR AND THE AIRPORT SHALL MAKE AN INSPECTION OF
THE EXISTING STORM SEWERS, CATCH BASINS, MANHOLES, ELECTRICAL MANHOLES,
HANDHOLES, DUCT BANKS, WHICH ARE TO REMAIN IN SERVICE OR WHICH MAY BE AFFECTED BY
THE WORK. THE CONDITION SHALL BE DETERMINED FROM FIELD OBSERVATIONS. RECORDS OF
THE INSPECTION WILL BE KEPT BY THE AIRPORT. THE CONTRACTOR SHALL PROVIDE TO THE
AIRPORT A VIDEO TAPE OR DIGITAL PICTURES OF SURFACE AND SEWER CONDITIONS IN THE
PROJECT AREA BEFORE START OF WORK AND UPON COMPLETION OF THE PROJECT.
2. ALL EXISTING FACILITIES, INSPECTED INITIALLY BY THE ABOVE MENTIONED PARTIES, SHALL BE
PROTECTED, MAINTAINED, AND LEFT IN A CONDITION COMPARABLE TO THAT DETERMINED BY
THE ORIGINAL INSPECTION. ANY CHANGES IN THE CONDITION RESULTING FROM THE
CONTRACTOR'S OPERATIONS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS SOLE
EXPENSE TO THE SATISFACTION OF THE ENGINEER.
CONTRACTOR ACCESS & STORAGE AREAS
1. THE CONTRACTOR'S ACCESS POINTS TO THE SITE SHALL BE AS SHOWN ON THE CONTRACT
LAYOUT PLAN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL VEHICLES AND PERSONNEL
WHO ENTER THROUGH THESE GATES. GATES SHALL BE LOCKED WHEN NOT IN USE.
2. AREAS WILL BE MADE AVAILABLE FOR THE CONTRACTOR'S MOBILIZATION AND STAGING AS
SHOWN ON THE CONTRACT LAYOUT PLAN. THESE AREAS SHALL BE RESTORED TO THEIR
ORIGINAL CONDITION UPON COMPLETION OF THE PROJECT AT THE CONTRACTOR'S EXPENSE.
ON SITE EMPLOYEE PARKING SHALL BE ADDRESSED AT THE PRE-CONSTRUCTION
CONFERENCE.
3. THERE ARE NO PROPOSED STOCKPILE LOCATIONS IDENTIFIED ON THE PLANS. IF THE
CONTRACTOR DOES CHOOSE TO STOCKPILE MATERIAL DURING DEMOLITION OR
CONSTRUCTION, A SEPARATE PERMIT WILL BE REQUIRED AND THE CONTRACTOR MUST
FOLLOW ALL APPLICABLE EROSION AND SEDIMENT CONTROL GUIDELINES.
WETLAND NOTES
1. THE CONTRACTOR SHALL NOT ENTER UPON OR IN ANY WAY ALTER THE EXISTING WETLAND
AREAS THAT ARE ON SITE EXCEPT AS DIRECTED BY THESE PLANS OR THE ENGINEER. ALL
WORK IN THE VICINITY OF OPEN WATER AND/OR WETLANDS IS TO BE PERFORMED IN
COMPLIANCE WITH THE ENVIRONMENTAL PERMITS FOR THE SITE. THE CONTRACTOR WILL BE
RESPONSIBLE AND SHALL PAY, AT NO COST TO ST. PETERSBURG CLEARWATER INTERNATIONAL
AIRPORT, ANY FINE RESULTING FROM THE CONTRACTORS VIOLATION OF PERMIT CONDITIONS
OR LOCAL, STATE, OR FEDERAL RULE, STATUE, OR LAW.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN COPIES OF ALL APPLICABLE PERMITS
ISSUED BY ENVIRONMENTAL PERMITTING AND REGULATORY AGENCIES TO THIS SITE. THIS
INCLUDES, BUT MAY NOT BE LIMITED TO SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT
AND U.S. ARMY CORPS OF ENGINEERS (ACOE). ALL WORK SHALL BE IN ACCORDANCE WITH
APPLICABLE SECTIONS OF PERMITS AND/OR APPROVALS, COPIES OF PERMITS WILL BE
AVAILABLE FROM ST. PETERSBURG - CLEARWATER INTERNATIONAL AIRPORT, AND SHALL BE
POSTED OR MAINTAINED ON-SITE AS REQUIRED BY PERMIT CONDITIONS.
3. THE CONTRACTOR SHALL ESTABLISH HIS INTERNAL HAUL ROUTES IN A MANNER THAT SHALL
NOT DISTURB ANY EXISTING WETLAND AREAS OR UPLAND TREES.
UNDERGROUND UTILITIES
1. THE LOCATION OF THE UNDERGROUND UTILITIES AND FAA CABLES SHOWN ON THE PLANS
HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND FIELD CHECKS AND ARE BELIEVED TO
BE CORRECT. NO GUARANTEE IS MADE AS TO THEIR ACCURACY OR COMPLETENESS. THE
CONTRACTOR SHALL LOCATE AND IDENTIFY ALL UNDERGROUND UTILITIES IN THE WORK AREA
PRIOR TO CONSTRUCTION. ANY UNDERGROUND UTILITIES LOCATED WHICH DO NOT APPEAR ON
THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. ANY DAMAGE TO
UTILITIES, CAUSED BY THE CONTRACTOR, SHALL BE REPAIRED AT THE CONTRACTOR'S SOLE
EXPENSE.
CONTRACTOR'S SAFETY AND SECURITY REQUIREMENTS
NPDES NOTIFICATION
1. ATTENTION: THE EROSION/SEDIMENTATION LOCATIONS AND DETAILS SET FORTH IN THIS
SITE PLAN HAVE BEEN DEVISED BY THE PROJECT ENGINEER TO MEET THE REQUIREMENTS
OF THE FEDERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
PROGRAM. FAILURE TO MAINTAIN THESE CONTROLS, OR AN ILLICIT DISCHARGE RESULTING
FROM THEIR FAILURE WILL LIKELY RESULT IN FINE CITATIONS. SEC. 58-239 OF PINELLAS
COUNTY CODE AUTHORIZES PENALTIES OF UP TO $10,000.00 FOR EACH OFFENSE.
PINELLAS COUNTY DRS NOTES
1. ALL DESIGNS AND CONSTRUCTION MUST CONFORM TO THE MINIMUM STANDARDS SET DOWN
IN PINELLAS COUNTY LAND DEVELOPMENT, ZONING AND/OR RELATED ORDINANCES AND
MINIMUM TESTING FREQUENCY REQUIREMENTS.
2. AS-BUILT SURVEY AND/OR RECORD DRAWINGS MUST BE SUBMITTED TO THE COUNTY FIVE (5)
BUSINESS DAYS PRIOR TO THE SITE INSPECTION FOR CERTIFICATION OF OCCUPANCY. NO CO
WILL BE ISSUED WITHOUT REVIEW AND ACCEPTANCE OF RECORD DRAWINGS.
3. ALL ELEVATIONS MUST BE PER NAVD88
4. ALL DISTURBED AREAS WITHIN THE RIGHT-OF-WAY WILL BE COMPACTED TO 100%OF MAXIMUM
DENSITY AND SODDED.
5. ALL PUBLIC SIDEWALK THAT IS DAMAGED OR DOES NOT MEET ADA CRITERIA SHALL BE
REPLACED.
6. DETENTION AREAS SHALL BE ROUGHED OUT PRIOR TO OTHER SITE GRADING AS A MEANS OF
EROSION CONTROL.
7. SILT FENCE SHALL BE INSTALLED AT ALL INFLOW POINTS TO STORMWATER MANAGEMENT
SYSTEMS AND SHALL BE MAINTAINED FOR THE DURATION OF THE CONSTRUCTION PROJECT.
RETAINED SEDIMENT SHALL BE REMOVED AT REGULAR INTERVALS OR AS DIRECTED BY THE
COUNTY.
GENERAL NOTES -
SHEET 1
G-071
RAD
ACC
DES
OCTOBER 27, 2023
4625000-221000.01
BID DOCUMENTS
ST
. P
ET
E
C
LE
AR
W
AT
ER
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (P
IE
PA
VE
S
TR
AW
BE
R R
Y
LO
T
FA
IR
C H
IL
D
D R
IV
E
C
LE
AR
W
AT
ER
, F L
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
Mead and Hunt, Inc.
© Copyright 2022 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
2203 North Lois Avenue, Suite 225
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
RETENTION BASIN CONSTRUCTION
RETENTION BASIN CONSTRUCTION PROCEDURES AND THE OVERALL SEQUENCE OF SITE
CONSTRUCTION ARE TWO KEY FACTORS THAT CAN CONTROL THE EFFECTIVENESS OF RETENTION
BASINS. THE APPLICANT MUST DEMONSTRATE THAT THE DESIGN INFILTRATION RATE WILL BE MET AFTER CONSTRUCTION BY MINIMIZING SOIL COMPACTION DURING CONSTRUCTION AND MINIMIZING
THE AMOUNT OF SEDIMENT DEPOSITED INTO THE RETENTION BASIN.
BECAUSE STORMWATER MANAGEMENT SYSTEMS ARE REQUIRED TO BE CONSTRUCTED DURING THE
INITIAL PHASES OF SITE DEVELOPMENT, RETENTION BASINS ARE OFTEN EXPOSED TO POOR QUALITY
SURFACE RUNOFF. STORMWATER RUNOFF DURING CONSTRUCTION CONTAINS CONSIDERABLE
AMOUNTS OF SUSPENDED SOLIDS, ORGANICS, CLAYS, SILTS, TRASH AND OTHER
UNDESIRABLE MATERIALS. FOR EXAMPLE, THE SUBGRADE STABILIZATION MATERIAL USED DURING THE CONSTRUCTION OF ROADWAYS AND PAVEMENT AREAS TYPICALLY CONSISTS OF CLAYEY SAND
OR SOIL CEMENT. IF A STORM OCCURS WHEN THESE MATERIALS ARE EXPOSED (PRIOR TO
PLACEMENT OF THE ROADWAY WEARING SURFACE), CONSIDERABLE AMOUNTS OF
THESE MATERIALS END UP IN THE STORMWATER CONVEYANCE SYSTEM AND THE RETENTION BASIN, HINDERING INFILTRATION THROUGH THE SYSTEM. ANOTHER SOURCE OF FINE MATERIAL GENERATED
DURING CONSTRUCTION IS DISTURBED SURFACE SOIL
THAT CAN RELEASE LARGE QUANTITIES OF ORGANICS AND OTHER FINE PARTICLES. FINE PARTICLES OF CLAY, SILT, AND ORGANICS AT THE BOTTOM OF A RETENTION BASIN ALSO CREATE A POOR
INFILTRATING SURFACE.
THE FOLLOWING CONSTRUCTION PROCEDURES ARE REQUIRED TO AVOID DEGRADATION OF
RETENTION BASIN INFILTRATION CAPACITY DUE TO CONSTRUCTION PRACTICES:
1. THE LOCATION AND DIMENSIONS OF THE RETENTION BASIN WILL BE VERIFIED ONSITE PRIOR TO ITS
CONSTRUCTION. ALL DESIGN REQUIREMENTS INCLUDING RETENTION BASIN DIMENSIONS AND
DISTANCES TO FOUNDATIONS, SEPTIC SYSTEMS, WELLS, ETC., NEED TO BE VERIFIED.
2. THE LOCATION OF RETENTION BASINS WILL BE CLEARLY MARKED AT THE SITE TO PREVENT
UNNECESSARY VEHICULAR TRAFFIC ACROSS THE AREA CAUSING SOIL COMPACTION.
3. INITIALLY CONSTRUCT THE RETENTION BASIN BY EXCAVATING THE BASIN BOTTOM AND SIDES TO
APPROXIMATELY 12 INCHES ABOVE FINAL DESIGN GRADES.
4. EXCAVATION WILL BE DONE BY LIGHTWEIGHT EQUIPMENT TO MINIMIZE SOIL COMPACTION.
TRACKED, CLEATED EQUIPMENT DOES LESS SOIL COMPACTION THAN EQUIPMENT WITH TIRES.
5. AFTER THE WATERSHED AREA CONTRIBUTING TO THE BASIN HAS BEEN FULLY STABILIZED, THE
INTERIOR SIDE SLOPES AND BASIN BOTTOM WILL BE EXCAVATED TO FINAL DESIGN
SPECIFICATIONS. THE EXCESS SOIL AND UNDESIRABLE MATERIALMUST BE CAREFULLY EXCAVATED AND REMOVED FROM THE BASIN SO THAT ALL ACCUMULATED SILTS, CLAYS, ORGANICS,AND OTHER FINE SEDIMENT MATERIAL HAS BEEN REMOVED FROM THE POND AREA. THE EXCAVATED MATERIAL WILL BE DISPOSED OF IN A MANNER THAT ASSURES IT WILL NOT RE-ENTER THE RETENTION BASIN.
6. ONCE THE BASIN HAS BEEN EXCAVATED TO FINAL GRADE, THE ENTIRE BASIN BOTTOM MUST BE DEEP RAKED AND LOOSENED FOR OPTIMAL INFILTRATION. THE DEPTH TO BE RAKED IS DEPENDENT
ON THE TYPE, WEIGHT AND CONTACT PRESSURE OF THE CONSTRUCTION EQUIPMENT USED
DURING THE BULK EXCAVATION OF THE BASIN.
AN APPLICANT MAY PROPOSE ALTERNATIVE CONSTRUCTION PROCEDURES TO ASSURE THAT THE
DESIGN INFILTRATION RATE OF THE CONSTRUCTED AND STABILIZED RETENTION BASIN IS MET.
GENERAL NOTES -
SHEET 2
G-072
RAD
ACC
DES
OCTOBER 27, 2023
4625000-221000.01
BID DOCUMENTS
ST
. P
ET
E
C
LE
AR
W
AT
ER
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (P
IE
PA
VE
S
TR
AW
BE
R R
Y
LO
T
FA
IR
C H
IL
D
D R
IV
E
C
LE
AR
W
AT
ER
, F L
INSPECTIONS, OPERATION AND MAINTENANCE
MAINTENANCE ISSUES ASSOCIATED WITH RETENTION BASINS ARE RELATED TO CLOGGING OF THE POROUS SOILS, WHICH REDUCES OR PREVENTS INFILTRATION THEREBY SLOWING RECOVERY OF THE STORMWATER TREATMENT VOLUME AND OFTEN RESULTING IN STANDING WATER. SEDIMENTATION CAN CAUSE CLOGGING AND RESULTING SEALING OF THE BOTTOM OR SIDE SLOPE SOILS. IT CAN ALSO
OCCUR FROM EXCESSIVE LOADING OF OILS AND GREASES OR FROM EXCESSIVE ALGAL OR
MICROORGANISM GROWTH. STANDING WATER WITHIN A RETENTION BASIN CAN ALSO RESULT FROM AN ELEVATED HIGH WATER TABLE OR FROM GROUND WATER MOUNDING, BOTH OF WHICH CAN PRESENT
LONG-TERM OPERATIONAL ISSUES THAT MAY REQUIRE REDESIGN OF THE SYSTEM.
TO DETERMINE IF AN INFILTRATION SYSTEM IS PROPERLY FUNCTIONING OR WHETHER IT NEEDS MAINTENANCE REQUIRES THAT AN INSPECTION BE DONE WITHIN 72 HOURS AFTER A STORM. THE INSPECTION SHOULD DETERMINE IF THE RETENTION BASIN IS RECOVERING ITS STORAGE VOLUME WITHIN ITS PERMITTED TIME FRAMES, GENERALLY 24 TO 72 HOURS AFTER A STORM. IF THIS IS NOT OCCURRING AND THERE IS STANDING WATER, THEN THE CAUSE MUST BE DETERMINED, AND ACTIONS UNDERTAKEN BEGINNING WITH THOSE SPECIFIED IN THE SYSTEM'S OPERATION AND MAINTENANCE
PLAN.
1. INSPECTION ITEMS:
1.1. INSPECT BASIN FOR STORAGE VOLUME RECOVERY WITHIN THE PERMITTED TIME, GENERALLY
LESS THAN 72 HOURS. FAILURE TO PERCOLATE THE REQUIRED TREATMENT VOLUMES
INDICATES REDUCTION OF THE INFILTRATION RATE AND A NEED TO RESTORE SYSTEM
PERMEABILITY.
1.2. INSPECT AND MONITOR SEDIMENT ACCUMULATION ON THE BASIN BOTTOM OR INFLOW TO
PREVENT CLOGGING OF THE RETENTION BASIN OR THE INFLOW PIPES.
1.3. INSPECT VEGETATION OF BOTTOM AND SIDE SLOPES TO ASSURE IT IS HEALTHY, MAINTAINING
COVERAGE, AND THAT NO…
This is the start of the file's text. The full file is on GovTribe.