This document is a Project Financial Overview for the Pinellas County Capital Improvement Program, specifically for the Stormwater Starkey Facility M10 Modification project (Project Number 003900A). The project aims to provide additional stormwater treatment by modifying the existing M10 Starkey stormwater management facility located near Starkey Road and 126th Ave N in Largo, Florida. The project is in the design phase, with a planned start date of June 15, 2018, and an expected completion date of October 1, 2025. The project is classified under the American Rescue Plan Act (ARPA) Expenditure Category for Water, Sewer, and Broadband Infrastructure, focusing on surface water management and flood control.

The total project budget is $5,774,000, with funding sources including $4,555,000 from ARPA, $324,000 from a local grant, and $895,000 from the Penny for Pinellas program. The budget is allocated across fiscal years 2024 and 2025, with most of the construction costs scheduled for FY25. However, the current project estimate exceeds the amended budget, and additional ARPA funding is being requested to cover the construction estimate increase. The project involves modifying a weir within the Starkey M10 Mitigation facility and constructing two upstream stormwater ponds to improve water quality treatment and maintain the existing flooding level of service in the Starkey Watershed.

View the file

Other files

File Type Posted
ARPA_Stormwater_Starkey_Facility_M10_Modification_(PID_003900A)_(Rebid).pdf PDF
Appendix_6-Geosyntec_Soil_Characterization_Testing_Results_Summary-3-24-2020.pdf PDF
Appendix_6-Geosyntec_Supplemental_Soil_Sampling_Results_Summary-3-18-2024.pdf PDF
FINAL_PLANS_2024-02.pdf PDF
Final_Plan_Sheet_32_REVISED_.pdf PDF
Pricing_Proposal-24-0692(reference_only).pdf PDF
Supplemental_Specifications.pdf PDF
Appendix_1_-_Permits.pdf PDF
Appendix_6-Tierra_Geotechnical_Engineering_Services_Report-4-7-2022.pdf PDF
Appendix_4_-_Special_Notices.pdf PDF
Appendix_6-Geosyntec_Geotechnical_Evaluation-4-17-2020.pdf PDF
SBE_Compliance_Form.pdf PDF
Sample_Agreement-24-0692.pdf PDF
Appendix_6-Intertek_PSI_Geotechnical_Engineering_Services_Report-3-29-2019.pdf PDF
Performance_and_Payment_Bonds.pdf PDF
QUALIFICATION_SUBMITTAL_FORM.pdf PDF
Affdavit_of_Release_and_Guarantee24-0692.pdf PDF
Project_Location_Map_(For_Legistar_Only).pdf PDF
Sample_Application_for_Payment.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Sample_Change_Order.pdf PDF
Airport_Security_Program.pdf PDF
County_LD_Schedule_(for_purchasing_only).xlsx XLSX spreadsheet
E-Verify_Affidavit.pdf PDF
EOR_SBE_Letter_(for_Purchasing_only).pdf PDF
Engineer_Estimate-Final-20240410.xls XLS spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amended Planned Planned Multi-Year CIP Plan FY24 FY25 FY26 Total Acquisitions -$ -$ -$ -$ Professional Services/Design 39,000$ 27,000$ -$ 66,000$ Construction 5,060,000$ 648,000$ -$ 5,708,000$ Testing -$ -$ -$ -$ Other -$ -$ -$ -$ CIP Plan Totals 5,099,000$ 675,000$ -$ 5,774,000$ Budget Adjustment +/- -$ -$ -$ -$ Adjusted Total 5,099,000$ 675,000$ -$ 5,774,000$

Project Resources

ARPA 4,555,000$ -$ -$ 4,555,000$

Local grant -$ 324,000$ -$ 324,000$ Penny 544,000$ 351,000$ -$ 895,000$ Total Project Resources 5,099,000$ 675,000$ -$ 5,774,000$ Budget Adjustment +/- -$ -$ -$ -$ Adjusted Total Project Resources 5,099,000$ 675,000$ -$ 5,774,000$

(1)

Estimate Proposed Proposed Multi-Year CIP Plan FY24 FY25 FY26 Total Acquisitions -$ -$ -$ -$ Professional Services/Design 76,000$ 19,000$ 19,000$ 114,000$ Construction 648,000$ 7,171,000$ -$ 7,819,000$ Testing -$ -$ -$ -$ Other -$ -$ -$ -$ CIP Plan Totals 724,000$ 7,190,000$ 19,000$ 7,933,000$ Budget Adjustment +/- -$ -$ -$ -$ Adjusted Total 724,000$ 7,190,000$ 19,000$ 7,933,000$

Project Resources

ARPA -$ 4,555,000$ -$ 4,555,000$

Local grant 324,000$ -$ -$ 324,000$ Penny 400,000$ 2,635,000$ 19,000$ 3,054,000$ Total Project Resources 724,000$ 7,190,000$ 19,000$ 7,933,000$ Budget Adjustment +/- -$ -$ -$ -$ Adjusted Total Project Resources 724,000$ 7,190,000$ 19,000$ 7,933,000$

Year to Date Activity FY24 FY25 FY26 Multi-Year

Total YTD Expenditures 58,408.56 - - 58,408.56 Encumbrances 56,677.38 - - 56,677.38 Total 115,085.94 - - 115,085.94

Budget Less YTD Activity $4,983,914.06 $675,000.00 $0.00 $5,658,914.06

Estimated Activity FY24 FY25 FY26 Multi-Year

Total (2)

Design 76,000.00 19,000.00 19,000.00 114,000.00 Construction 648,000.00 7,171,000.00 - 7,819,000.00 Total 724,000.00 7,190,000.00 19,000.00 7,933,000.00

Estimated Remaining Appropriation $4,375,000.00 ($6,515,000.00) ($19,000.00) ($2,159,000.00) (3)

Result Sufficient Funds Insufficient Funds Insufficient Funds Insufficient Funds (4)

Notes:

Prepared By the Office of Management & Budget, April 23rd, 2024.

Approved

Proposed

(1) Proposed Budget updated to include 4/10/24 Engineer's Estimate attached to "ARPA Stormwater Starkey Facility M10 Modification (PID 003900A) (Rebid)" in OpenGov. And includes staff time, construction engineering inspection, and material testing.

(2) Estimated Activity includes YTD expenditures.

(3) Estimated Remaining Appropriation at the end of each fiscal year will vary based on actual expenditures.

(4) The current project estimate for Stormwater Starkey Facility M10 Modification exceeds the amended budget. Project may go out to bid but sufficient funding must be in place before a bid can be awarded. Public Works has requested additional ARPA funding to fund the construction estimate increase. Available ARPA funding has not been identified at this time. The additional funding requested is reflected as Penny in the Proposed or Planning budget.

Funding Source: budgeted in the Capital Improvement Program Title of Funding Source: Local Infrastructure Sales Surtax (Penny for Pinellas), Local Grant, ARPA

Are funds currently available? Yes If grant funding, select type: Southwest Florida Water Management District Grant, American Rescue Plan Act Date funds available: 10/1/23 (included in current budget). Additional funding needed beyond the Approved FY24-FY29 CIP plan must be requested during FY25 Budget Development.

Multi-Year Capital Improvement Program

PROJECT FINANCIAL OVERVIEW

Project Number: 003900A Stormwater Starkey Facility M10 Modification Description: provide additional stormwater treatment by modifying the existing M10 Starkey stormwater management facility (SMF) near Starkey Road and 126th Ave N.

Requested for: OpenGov Procurement Requested By : OpenGov Procurement Purchasing Financial Information:

2024 2025 2026 2027 2028 Total Fund: 1045

020.4 0 0 0 0 0 0

030.3 4,555,000 0 0 0 0 4,555,000

4,555,000 0 0 0 0 4,555,000 Fund: 3001

020.1 39,000 27,000 0 0 0 66,000

020.2 0 0 0 0 0 0

030.1 505,000 324,000 0 0 0 829,000

030.2 0 324,000 0 0 0 324,000

544,000 675,000 0 0 0 1,219,000

5,099,000 675,000 0 0 0 5,774,000

4,555,000 0 0 0 0 4,555,000 0 324,000 0 0 0 324,000

544,000 351,000 0 0 0 895,000

5,099,000 675,000 0 0 0 5,774,000

Report Total: 5,099,000 675,000 0 0 0 5,774,0000

Funding Total: 0

Grant - Local 0 Penny for Pinellas 0

Funding Source ARPA-Federal Grant 0

Total for Project: 003900A 0

030.1-Construction-Penny 0 030.2-Constr-LG-SWFWMD 0

Project Total for : Fund: 3001 Capital Projects Center: 413100 CIP-Physical Environment Program: 3014 Surface Water Quality Projects

CIP Projects Center: 413100 Physical Environment Program: 3014 Surface Water Quality Projects 020.1-Design-Penny 0 020.2-Prelim Design 0

030.3-Construction-ARPA 0 Project Total for : Fund: 1045 American Rescue Plan Act Center: 413100 CIP-Physical Environment Program: 3014 Surface Water Quality Projects

Budget 2029 CIP Projects Center: 413100 Physical Environment Program: 3014 Surface Water Quality Projects 020.4-Design-ARPA 0

Drainage Basin 25 Starkey Road Location Largo Penny Program Water Quality, Flood & Sewer Spill Prevention

CIE Elements Surface Water Management (Flood Control) CIP Phase Design

Start: 15-JUN-18 Finish: 01-OCT-25

Project Classifications:

American Rescue Plan Act Expenditure Category 5. Water, Sewer, Broadband Infrastructure

Function: Physical Environment Activity: Flood Control

Project: 003900A Stormwater Starkey Facility M10 Modification Description: provide additional stormwater treatment by modifying the existing M10 Starkey stormwater management facility (SMF) near Starkey Road and 126th Ave N.

Pinellas County Capital Improvement Program April 23, 2024