Performance Work Statement Dock Levelers.pdf

PDF 126 KB Posted

Attached to
Dock Levelers
Solicitation number
FA448426Q0027
Issued by

About this file

This is a Performance Work Statement (PWS) for the purchase and installation of cargo terminal dock levelers and equipment at Joint Base McGuire-Dix-Lakehurst in New Jersey.

The contractor must procure, deliver, and install eight (8) dock leveler systems with a minimum load capacity of 45,000 lbs and dimensions of 7 feet wide by 10 feet long. Each system requires integrated truck restraints, eight (8) 3-phase 460V terminal panels for power, and eight (8) seals and shelters with 16 bumpers total. Delivery is FOB Destination to 1757 Vandenberg Avenue, Joint Base McGuire-Dix-Lakehurst, NJ 08041, where the contractor must install all equipment upon arrival, verify functionality through load testing, and provide on-site operator training for up to four personnel. Training must cover safety procedures, operation, routine maintenance, and troubleshooting, with training materials provided in multiple formats including manuals, quick reference guides, and digital media. All work including training must be completed within 45 calendar days from contract award. Performance standards require on-time and undamaged equipment delivery verified by inspection upon receipt, fully functional dock levelers and control panels confirmed through government witness and test logs, and completed operator training documented with attendance sheets and feedback. The contract will support the 305th Aerial Port Squadron and must comply with Air Force Instruction DAFI 24-602V2, OSHA 29 CFR 1910, ANSI MH30.1-2022, UFC 4-440-01, and DAFI 91-203. Contractor personnel must comply with base security access procedures, submit personnel lists 10 business days in advance for background checks, and adhere to safeguarding protocols for military information with no unauthorized photography permitted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

JOINT BASE MCGUIRE-DIX-LAKEHURST

Purchase And Installation of Cargo Terminal Dock Levelers and Equipment

1.0 SCOPE

This Performance Work Statement (PWS) defines the requirements for the removal or current equipment, procurement, delivery, installation, and operator training for eight (8) new Dock Leveler systems and all associated auxiliary equipment. These systems will directly support the 305th Aerial Port Squadron (305 APS) at Joint Base McGuire-Dix-Lakehurst (JB MDL), New Jersey. All delivered equipment, installation procedures, and operational capabilities shall strictly comply with all applicable Department of War (DoW), Air Force, and Occupational Safety and Health Administration (OSHA) regulations.

2.0 APPLICABLE DOCUMENTS

Air Force Instruction DAFI24-602V2 (Cargo Movement) OSHA 29 CFR 1910 (General Industry) ANSI MH30.1-2022 (Dock Leveling Devices) UFC 4-440-01 (Warehouse and storage facilities) DAFI 91-203 (Air Force Consolidated Occ Safety Inst)

3.0 REQUIREMENTS

3.1 Equipment Specifications

The contractor shall provide:

Eight (8) Dock Levelers Load capacity: 45,000 lbs. minimum Dimensions: W 7 ft x L 10 ft Integrated Truck Restraints Power source: Eight (8) 3 Phase 460V Terminal Panels Eight (8) Seals and Shelters/ (16) bumpers

3.2 Delivery and Setup

Delivery shall be FOB Destination to 1757 Vandenberg Ave Joint Base McGuire-Dix- Lakehurst, NJ 08041

Contractor shall Install all necessary equipment upon arrival Contractor shall verify functionality and conduct a load test

3.3 Training

Provide on-site operator training for up to 4 personnel Training shall include safety procedures, operation, routine maintenance, and troubleshooting Provide training materials (manuals, quick reference guides, digital media)

4.0 PERFORMANCE REQUIREMENTS

Task Standard Method of Surveillance

Equipment delivery On-time, undamaged Inspection upon receipt

Install

Fully Functional, Dock Levelers, Restraints and Control Panels

Government witness/test logs

Operator training Completed, with materials provided

Attendance sheets & feedback

5.0 PERIOD OF PERFORMANCE

All work, including training, shall be completed within 45 calendar days from date of contract award.

6.0 GOVERNMENT FURNISHED PROPERTY / SERVICES

The Government will provide access to the setup area, electricity, and support personnel for coordination. No other government furnished property or services are provided.

7.0 SECURITY

Contractor personnel must comply with base access procedures and may be subject to background checks. A list of personnel requiring access and proper identification must be submitted at least 10 business days in advance.