Attachment 4: List of Government Furnished Equipment

This is a sample listing of IT-related equipment expected to be deployed by the Government at the Contractor facility. This list is not intended as an exhaustive inventory. It is provided to indicate the approximate size and scope of space requirements.

LAN Room

Uninterruptible Power Supply (UPS) with batteries that can weigh up to 6,000 lbs

(Government-provided)

Minimum of 5 racks but with sufficient space for 8 or more racks, 19” as depicted in the sample diagram (Government-provided)

Patch panels for both data and voice with structured cabling (Government-provided)

Ceiling mounted HVACs (Contractor-provided)

Servers and communication equipment (Government-provided)

Ceiling mounted, thermal activated exhaust fan (Contractor-provided)

Termination point for data/voice connections back to PBGC

Structured cabling with 12” ladder racks (Government-provided)

Normal and specialized power (Contractor-provided)

LAN Closet

Uninterruptible Power Supply (UPS) (Government-provided)

HVAC (Contractor-Provided)

Switch/switches (Government-provided)

Patch panel (data), and an Intermediate Distribution Frame (IDF voice) (Government-provided)

Individual Workspace

Computer with keyboard and mouse (Government-provided)

Two computer screens (Government-provided)

One desk phone; two for those receiving forwarded calls from call center (Government-provided)

Common Area Workspace

Faxes, video conferencing equipment (VTC), multi-function devices (MFD), printers, scanners, etc. (Government-provided) o Mounting of VTC equipment will be performed by contractor, utilizing

Government-provided hardware

UPS

Rectifier

Inverter

Sample LAN Room

MDF Voice Cable 110 blocks

19" Rack

NEC SV8300

19" Rack

Patch Panels

19" Rack

Cisco

Server

Cabinet

Exagrid

Vertical Wire

Manager

Vertical Wire

Manager

Vertical Wire

Manager

Vertical Wire

Manager

Table

Batteries

AC Input

Breaker Panel 200A

Inverter Output

Breaker Panel 100A

Dedicated

20A 120V

Quad UPS

Inverter

Quad

Building

Power

Quad

Building

Power

Quad

Building

Power

Quad

Building

Power

Quad

Building

Power

Quad

Building

Power

Quad

Building

Power

12" Ladder

Rack

12" Ladder

Rack

Voice/Data

Voice/Data

Voice/Data

Voice/Data

Electrical requirements to be performed by electrical contractor

1: 6 20A 208VAC single phase inputs connected to rectifier from Circuit breaker panel A

2: 1 100A 120VAC UPS/Inverter output connected to UPS/Inverter circuit breaker Panel B.

3: Thermal activated exhaust fan wired to Panel B (exhaust ducted outside

LAN room).

4: 2 120VAC ceiling lights connected to panel B and wall switch by door.

Dedicated

20A 120V

Quad UPS

Inverter

Dedicated

20A 120V

Quad UPS

Inverter

Dedicated

20A 120V

Quad UPS

Inverter

Dedicated

20A 120V

Quad UPS

Inverter

Dedicated

20A 120V

Quad UPS

Inverter

Panel APanel B

Ceiling Light from Panel B Ceiling Light from Panel B

Ceiling Mounted HVAC

Ceiling Mounted HVAC

Front

Rear

Front

Rear

Front

Rear

Ceiling

Mounted

Exhaust

Fan