Attachment_7_-_Go-Live_Checklist.pdf
PDF 94 KB Posted
- Attached to
- Benefit Administration Support Services
- Solicitation number
- PBGC01-RP-14-0015
- Issued by
-
Pension Benefit Guaranty Corporation
About this file
Attachment 7 - Go-Live Checklist
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7: Go-Live Checklist
Before transitioning work to the BASS Contractor, PBGC will perform the following verifications to ensure the readiness of the Contractor:
Verify that facility requirements for build-out have been met (Section C.7.8 – C.7.8.8)
Verify Occupancy Permit has been obtained and that space meets local code for exiting and fire life safety (Section C.7.8 – C.7.8.9)
Verify that Security Control Plans have been met (see Security Control Template) (Section
C.7.9.2, Attachment 6: Security Controls Template)
File details come from the government source that posted it. Updated .