Attachment 7: Go-Live Checklist

Before transitioning work to the BASS Contractor, PBGC will perform the following verifications to ensure the readiness of the Contractor:

Verify that facility requirements for build-out have been met (Section C.7.8 – C.7.8.8)

Verify Occupancy Permit has been obtained and that space meets local code for exiting and fire life safety (Section C.7.8 – C.7.8.9)

Verify that Security Control Plans have been met (see Security Control Template) (Section

C.7.9.2, Attachment 6: Security Controls Template)