The document is a comprehensive bid specification for the Patterson Park Community Center Gymnasium Reroofing project issued by the City of Murfreesboro, Tennessee. The project involves the removal of existing roofing and installation of a new EPDM roofing system for the Adult and Youth Gymnasium roofs. Sealed bids will be accepted until November 18, 2025, at 2:00 pm CST, with a pre-bid conference scheduled for November 4, 2025, at 10:00 am at Patterson Park. The scope of work includes demolition of existing roofing, inspection and potential replacement of gypsum board, installation of new rigid insulation and cover board, and installation of new prefinished metal flashing, coping, scuppers, collectors, and downspouts.
The project will be awarded to a licensed Tennessee General Contractor, with a bid security requirement of 5% of the bid amount. A performance bond and labor and material payment bond for 100% of the contract sum will be required. The contract includes a quantity allowance of 20,400 square feet for potential gypsum board replacement. Contractors must submit electronic bids through the OpenGov procurement portal, and the project is expected to be completed within 45 calendar days from the date of commencement. The City of Murfreesboro will provide a 20-year total system warranty covering membrane, flashings, adhesives, and other roofing components, with wind speed coverage up to 72 miles per hour.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID_FORM-_ITB-14-2026_-_Patterson_Park_Gym_Reroof.pdf | ||
| Patterson_Park_Gym_Reroof_Drawings_10-08-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Patterson Park
Community Center
Gymnasium Reroofing
City of Murfreesboro
October 8, 2025
JOHNSON + BAILEY ARCHITECTS P.C.
100 EAST VINE STREET, SUITE 700
MURFREESBORO, TENNESSEE
TELEPHONE: (615) 890-4560
FAX: (615) 890-4564
J+B NO. 2513
10/08/25
SECTION 00 01 10 TABLE OF CONTENTS
DIVISION PAGES
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION
00 01 10 - TABLE OF CONTENTS 1
00 01 15 - DRAWING INDEX 1
00 11 13 - ADVERTISEMENT FOR BIDS 1
00 21 13 - INSTRUCTIONS TO BIDDERS 8
00 41 13 - BID FORM 6
00 52 13 - CITY STANDARD FORM OF AGREEMENT BETWEEN OWNER
AND CONTRACTOR WITH EXHIBIT A 14
00 72 13 - GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION WITH
ADDENDUM A & ADDENDUM B 56
DIVISION 01 - GENERAL REQUIREMENTS
SECTION
01 11 00 - SUMMARY OF WORK 1
01 21 29 - QUANTITY ALLOWANCES 1
01 21 43 - TIME ALLOWANCES 2
01 22 00 - UNIT PRICES 1
01 25 13 - SUBSTITUTIONS AND PRODUCT OPTIONS 3
01 29 00 - APPLICATIONS FOR PAYMENT 2
01 33 23 - SCHEDULES, REPORTS AND SUBMITTALS 2
01 41 00 - REGULATORY REQUIREMENTS 1
01 50 00 - TEMPORARY FACILITIES 1
01 70 00 - CONTRACT CLOSEOUT 2
01 78 00 - CLOSEOUT SUBMITTALS 2
DIVISION 02 - EXISTING CONDITIONS
SECTION
02 41 19 - SELECTIVE DEMOLITION 2
DIVISION 07 - THERMAL & MOISTURE PROTECTION
SECTION
07 53 23 - EPDM ROOFING SYSTEM 11
07 71 23 - SCUPPER, COLLECTORS AND DOWNSPOUTS 3
- END OF TABLE OF CONTENTS -
October 8, 2025 © 2025 JOHNSON + BAILEY ARCHITECTS P.C. 2513 00 01 10 - 1
SECTION 00 01 15 DRAWING INDEX
COVER SHEET WITH DRAWING INDEX
A0.1 FIRE RATED ASSEMBLIES
A1.1 MASTER ROOF PLAN
A2.1 DEMOLITION ROOF PLAN
A2.2 NEW ROOF PLAN
A3.1 ROOF DETAILS
A3.2 ROOF DETAILS
A3.3 ROOF DETAILS
- END OF SECTION -
October 8, 2025 © 2025 JOHNSON + BAILEY ARCHITECTS P.C. 2513 00 01 15 - 1
October 8, 2025 8 2025 JOHNSON + BAILEY ARCHITECTS P.C. 2513 00 11 13 - 1
SECTION 00 11 13 ADVERTISEMENT FOR BIDS
Patterson Park Adult and Youth Gymnasium Reroofing Project
J+B No. 2513
The City of Murfreesboro is accepting bids for the Patterson Park Gymnasium Reroofing project until 2:00 p.m. local time on November 18, 2025, at which time the Bids will be opened publicly and read aloud via Zoom.
A Zoom link will be provided to all proposers on file. Only electronic bids will be accepted. Bid documents are to be obtained online after registering with OpenGov at:
https://procurement.opengov.com/portal/murfreesborotn.com Bids received after the above time and date will be rejected.
The project consists of removal of existing roofing and installation of new EPDM roofing on the Adult and Youth Gymnasium roofs. Included in the work is demolition of existing roofing and new construction of EPDM roofing. Refer to Specification Section 01 11 00 - SUMMARY OF WORK, for a more complete description of the work.
The issuing office is the City of Murfreesboro located at 111 West Vine Street, Murfreesboro, Tennessee 37130. Prospective Bidders shall be registered with the City of Murfreesboro through the Purchasing Department’s procurement portal, OpenGov. Bidding Documents shall be obtained from the City of Murfreesboro Purchasing Department on OpenGov’s website.
All Bidders must be registered with the City of Murfreesboro through the Purchasing Department’s procurement portal, OpenGov.
A Pre-Bid Conference will be conducted at Patterson Park, 521 Dr. Martin Luther King Jr. Blvd, Murfreesboro, TN 37130, on November 4, 2025, at 10:00 a.m., local time. Attendance at the Pre-Bid Conference is highly recommended but is not a requirement for bid submittal.
Bidders shall be licensed General Contractors by the State of Tennessee.
Each Proposal shall be accompanied by a bid security in the amount of 5% of the bid. The security is required as a guarantee that, if the bid is accepted, a bidder will enter into a contract. A copy of Bid Security must be uploaded with Bid via the OpenGov Bid Post. Physical copy of Bid Security must be in hand to the City of Murfreesboro’s Purchasing Department prior to an award being made. Bid Security should be delivered to 111 West Vine Street, Murfreesboro, TN 37130, Attn: Purchasing Dept.
A performance bond and a labor and material payment bond in the amount of 100% of contract sum, issued by a bonding company licensed in the State of Tennessee and acceptable to Owner, will be required of successful bidder to guarantee faithful performance of work under the contract (see Supplement to General Conditions of the Contract). In the event the Bidder to whom the contract is awarded fails to execute a satisfactory contract and bond, they shall be eliminated and shall forfeit their bid bond and shall be liable for any loss occasioned to the Owner because of such failure.
BY: JOHNSON + BAILEY ARCHITECTS, P.C.
FOR: CITY OF MURFREESBORO
111 WEST VINE STREET
MURFREESBORO, TN. 37130
CATHY SMITH, PURCHASING DIRECTOR
https://procurement.opengov.com/portal/murfreesborotn
00 41 13 - 1
SECTION 00 41 13 BID FORM
Patterson Park Community Center
Gymnasium Reroofing
Murfreesboro Tennessee
J+B No. 2513
DATE SUBMITTED: CONTRACTOR:
TO: City of Murfreesboro
111 West Vine Street Murfreesboro, Tennessee 37130
The undersigned, as Bidder, hereby declares that the only person, or persons interested in this Proposal as principal, or principals, is or are named herein and that this Proposal is in all respects fair and in good faith without collusion or fraud.
The Bidder further declares that they have examined the site of the Work and are informed fully in regard to all conditions thereon and has examined the Drawings, Specifications, and Contractual Documents for the Work and is satisfied relative to the Work to be performed.
Time being of the essence, the Bidder proposes and agrees to commence work with an adequate force and equipment, as will be specified in a written Order of the Architect, and to complete all work by the date set forth in Section 01 32 13 - Scheduling of Work.
It is understood that the Notice to Proceed with construction will not be issued until the following documents have been delivered to the Owner through the Architect for review and execution:
- Contractor executed Standard Form of Agreement Between Owner and Contractor, AIA Document, A101, 2017 Edition.
- Performance Bond, Material and Labor Payment Bond.
- Insurance Certificate
- List of Subcontractors
- Schedule of Values
- Builders Risk Insurance (purchased for Owner by Contractor)
Whereas the Owner will suffer loss of use if the project is not complete on or before the dates stated in Section 01 32 13 - Scheduling of Work, the Contractor and their Surety shall be liable for and shall pay to the Owner the sum of Two Hundred Dollars ($200.00) as fixed and agreed liquidated damages for each calendar day of delay (in excess of the Contract Completion Date established herein) until the work is substantially complete as defined in AIA Document A201, Subparagraph 9.8.1. Architect shall issue a Certificate of Substantial Completion (AIA Document G704) to verify date work is substantially complete.
The Bidder further agrees that they will not withdraw this Proposal within a period of forty-five (45) consecutive calendar days from and including the date of this Proposal and that, if this Proposal is accepted, they will execute a Contract within said forty-five (45) day period and within five (5) consecutive calendar days after date of written notice of such acceptance. In case of failure on the Bidder's part to perform as agreed above, the monies payable on the Bid Bond accompanying this Proposal shall be paid into the funds of the Owner as liquidated damages for such failure; otherwise, the Bid Bond shall be returned to the Bidder.
The Bidder further proposes and agrees to contract with the Owner on the AIA Standard Form of Agreement between Owner and Contractor for a Lump Sum to furnish for the following sum all necessary materials, equipment, tools, apparatus, means of transportation and labor necessary to complete the construction of the Project in complete accordance with the shown, noted, described, and reasonable intended requirements of Drawings, Specifications, and Contract Documents with the definite understanding that no money will be allowed for extra work except as set forth in the Contractual Documents.
00 41 13 - 2
The Bidder further agrees that they and each subcontractor employing no less than five (5) employees will execute and submit to the Owner the attached DRUG FREE WORKPLACE AFFIDAVIT. No Contractor or Subcontractor may perform work on this project unless this form is fully executed and submitted prior to the start of the project. The General Contractor shall submit a fully executed, notarized copy of this form with this bid.
By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each bidder is not on the list created pursuant to T.C.A. '12-12-106 (The Iran Divestment Act - 2016).
By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each supplier is not boycotting Israel pursuant to T.C.A.
§ 12-4-119, and will not boycott Israel during the term of contract.
BID DOLLARS
UNIT PRICE PROPOSALS
The following unit price Proposals shall be utilized to compute additional compensation due the Contractor for additional work. Refer to Section 01 22 00 - UNIT PRICES, for definitions. Refer to Section 01 21 29, QUANTITY ALLOWANCES, for quantities to be included in base bid.
1. DOLLARS PER SQUARE FOOT ($ ).
For removal of damaged existing 5/8” gypsum board and replacement with new 5/8” Type ‘X’ gypsum board.
The undersigned states that he has received and taken into consideration.
Addenda No. Dated
EXECUTION OF AGREEMENT:
The undersigned agrees that if written notice of acceptance of this proposal is mailed, telegraphed, or delivered to them within forty-five (45) days after opening of proposals, they will promptly execute an
Agreement with the Owner in accordance with the Bid Documents.
COMPANY: DATE:
BY: TITLE:
00 41 13 - 3
FORM FOR CERTIFICATE OF COMPLIANCE
WITH
TENNESSEE LICENSING LAW
This is to certify that the undersigned has fully complied with all requirements of Chapter 135, Public Acts of 1945, and Chapter 164, Public Acts of 1947, of the General Assembly of the State of Tennessee, known as the General Contractors Licensing Law. Certificate No.
was issued to the undersigned on , 20 , by the State Board of
Licensing General Contractors.
My license limit is and my bid does not exceed this. My license classification and limit are as follows:
____________________________________________Classification
Limit
BIDDER
BY
TITLE
00 41 13 - 4
DRUG-FREE WORKPLACE PROGRAM CERTIFICATION
STATE OF
COUNTY OF
CONTRACTOR’S AFFIDAVIT ON COMPLIANCE
WITH DRUG-FREE WORKPLACE ACT AND CERTIFICATE
Bidder, after being first duly sworn, affirms that it has a Drug-Free Workplace Program that complies with
Tennessee Code Annotated, Title 50, Chapter 9, in effect at the time of submission of its bid, at least to the extent required of governmental entities. Bidder affirms that:
1. it has received a Certificate of Compliance with the applicable proportions of the Drug-Free Workplace
Act from the Department of Labor and Workforce Development and has attached a copy of such certificate to this Affidavit; or,
2. it operates a drug and alcohol testing program at least as stringent as the City of Murfreesboro’s drug and alcohol testing program as contained in Sections 3005 and 3006 of the City of Murfreesboro
Employee Handbook and shall, upon request, provide documentation of such program to the City.
Name of Bidder
Printed Name and Title of Principal Officer
Signature by Principal Officer
Sworn to and subscribed before me a Notary Public for the above state and county, on this ________ day of _____________________, 20___.
Notary Public
My Commission Expires ____________________
00 41 13 - 5
Pursuant to T.C.A. § 50-9-113, a Bidder must have a Drug-Free Workplace Program that complies with
Tennessee Code Annotated, Title 50, Chapter 9 in effect at the time of submission of its bid, at least to the extent required of governmental entities.
The City of Murfreesboro has a Drug-Free Workplace Program certified by the Tennessee Department of
Labor and Workforce Development pursuant to Title 50, Chapter 9. The City of Murfreesboro Drug-Free
Workplace Program is set forth in City of Murfreesboro Employee Handbook Sections 3005 and 3006 (copies available without charge upon request). City of Murfreesboro Employee Handbook Sections 3005 and
3006 provide for the random testing, reasonable suspicion testing, pre-employment testing, promotion or transfer testing, post-accidental testing, return-to-duty testing, and follow-up testing of all employees classified as safety sensitive or as CDL employees for alcohol and/or drugs. Additionally, Murfreesboro
Employee Handbook Section 3005 provides for reasonable suspicion testing, return-to-duty testing, and follow-up testing for non-safety sensitive employees for drugs and alcohol. Such testing is conducted using the same standards as in the United State Department of Transportation Regulations established for the drug and alcohol testing of CDL operators.
A bidder for construction services is required to submit an Affidavit, as part of its bid, that attests that such bidder operates a Drug-Free Workplace Program or other drug or alcohol testing program with requirements at least as stringent as that of the program operated by the City of Murfreesboro.
Bidder may satisfy this requirement by attaching a copy of a Certificate of Compliance with the applicable provisions of the Drug-Free Workplace Act from the Department of Labor and Workforce Development to the City to the required Affidavit.
Pursuant to T.C.A. § 50-9-114(d), unless suit is filed in Chancery Court, bidders shall have seven (7) calendar days to contest a contract entered into by contractors subject to the provisions of this section.
Bidders who do not contest such contracts within seven (7) days by filing suit in Chancery Court waive any right to challenge such contract for violating the provisions of T.C.A. § 50-9-113 and T.C.A.. § 50-9-114.
Such suits shall be brought in the Chancery Court in Rutherford County.
00 41 13 - 6
Iran Divestment Act
By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each bidder is not a person included within the list created pursuant to T.C.A. § 12-12-106.
Signature Date
Title
Non-Boycott of Israel
By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each supplier is not boycotting Israel pursuant T.C.A. § 12-4-119, and will not boycott Israel during the term of contract. This applies to contracts of $250,000 or more and to contractors with ten (10) or more employees.
Signature Date
Title
AIA
Document A101TM – 2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 12:50:48 ET on 12/31/2019 under Order No.0773232877 which expires on 01/24/2020, and is not for resale.
User Notes: (913913456)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion.
The author may also have revised the text of the original AIA standard form.
An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.
This document has important legal consequences.
Consultation with an attorney is encouraged with respect to its completion or modification.
The parties should complete A101™–2017, Exhibit A, Insurance and Bonds, contemporaneously with this Agreement. AIA Document A201™–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
AGREEMENT made as of the « » day of « » in the year 2024 (In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
« City of Murfreesboro, Tennessee, »«a municipality organized under the laws of the State of Tennessee » «111 West Vine Street » «Murfreesboro, Tennessee 37130» and the Contractor:
(Name, legal status, address and other information) for the following Project:
(Name, location and detailed description)
Patterson Park Adult and Youth Gymnasium Reroofing Project 521 Dr. Martin Luther King Jr. Blvd, Murfreesboro, TN 37130 J+B No. 2513
The Architect:
(Name, legal status, address and other information)
Johnson + Bailey Architects, P.C.
100 East Vine Street City Center, Suite 700 Murfreesboro, TN 37130
The Owner and Contractor agree as follows.
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 12:50:48 ET on 12/31/2019 under Order No.0773232877 which expires on 01/24/2020, and is not for resale.
TABLE OF ARTICLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACT SUM
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
8 MISCELLANEOUS PROVISIONS
9 ENUMERATION OF CONTRACT DOCUMENTS
EXHIBIT A INSURANCE AND BONDS
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ 3.1 The date of commencement of the Work shall be the date specified in the Notice to Proceed issued by the Owner. Contractor is not authorized to undertake any Work until the date set forth in the Notice to Proceed.
§ 3.2 The Contract Time shall be measured from the date of commencement of the Work.
§ 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work:
(Check one of the following boxes and complete the necessary information.)
[ X ] Not later than forty-five (45) calendar days from the date of commencement of the Work.
[ ] By the following date: « »
§ 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates:
Portion of Work Substantial Completion Date
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 12:50:48 ET on 12/31/2019 under Order No.0773232877 which expires on 01/24/2020, and is not for resale.
§ 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5.
ARTICLE 4 CONTRACT SUM
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. The Contract Sum shall be « » ($ « » ), subject to additions and deductions as provided in the Contract Documents.
§ 4.2 Alternates § 4.2.1 Alternates, if any, included in the Contract Sum:
Item Price
§ 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement.
(Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.)
Item Price Conditions for Acceptance
§ 4.3 Allowances, if any, included in the Contract Sum:
(Identify each allowance.)
Item Quantity Allowance for actual quantity of materials required for removal of damaged existing gypsum board and replacement with new 5/8”
20,400 Square Feet
§ 4.4 Unit prices, if any:
(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.)
Item Units Price per Unit ($0.00)
§ 4.5 Liquidated Damages § 4.5.1 Because failure to complete the Project within the time fixed in Section 3.3 will result in substantial injury to the Owner, and as damages arising from such failure cannot be calculated with any degree of certainty, should the Contractor fails to achieve Substantial Completion of the Work within the time so fixed, or within such further time, if any, as shall be allowed for time extensions in accordance with the provisions of the Contract Documents, the Contractor or its Surety shall pay to the Owner as liquidated damages for such delay, and not as a penalty, $200.00 for each and every calendar day elapsing between the date fixed for Substantial Completion in Section 3.3 and the date such Substantial Completion shall have been fully accomplished.
§ 4.5.2 Any liquidated damages assessed pursuant to Section 4.2.1. shall be payable in addition to any excess expenses or costs payable by the Contractor to the Owner under the provisions of Article 14 of the General Conditions, and shall not preclude the recovery of damages by the Owner under other provisions of the Contract Documents, except for Contractor's delays. This provision for liquidated damages for delay shall in no manner affect the Owner's right to terminate the Contract as provided in Article 14 of the General Conditions ("Termination or Suspension of the Contract") or elsewhere in the Contract Documents. The Owner may deduct from the balance of retainage the liquidated damages stipulated herein or in the next paragraph hereof, as the case may be, or such portion thereof as the retained balance will cover.
§ 4.6 Other:
(Insert provisions for bonus or other incentives, if any, that might result in a change to the Contract Sum.)
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 12:50:48 ET on 12/31/2019 under Order No.0773232877 which expires on 01/24/2020, and is not for resale.
« § 4.6.1 The Owner shall not be liable for the Contractor or any Subcontractor for claims or damages of any nature caused by or arising out of any delays. The sole remedy of Contractor or any Subcontractor for delays of any cause shall be the allowance of addition time for completion of Work, provided such additional time is reflected in a written, signed Change Order. »
ARTICLE 5 PAYMENTS
§ 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.
§ 5.1.2 At least every 30 calendar days after the Contractor’s commencement of the Work, but not more frequently than once per calendar month, the Contractor shall submit an Application for Payment to the Architect requesting payment for labor, services, and materials rendered or delivered during the preceding 30 calendar days. Each Application for Payment request shall contain such detail and be supported by sufficient information for the Owner and Architect to fully assess the request. The Architect will review the Contractor’s Application for Payment and the accompanying data, information, and schedules (which are submitted in accordance with the Contract Document or at the Architect’s request) to determine the amount the Contractor is due and, based on such review, together with its inspections of the Work, shall authorize in writing the requested payment to the Contractor.
§ 5.1.3 Provided the Application for Payment and all required supporting documentation is received by the Architect not later than the fifth day of the month, within 30 calendar days following Architect’s authorization of payment, the Owner shall pay the sum authorized to the Contractor. No payment nor any use or occupancy of the Project, whether in total or partially, by the Owner constitutes an acceptance of any Work not in accordance with the Contract Documents.
(Federal, state or local laws may require payment within a certain period of time.)
§ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect may require. This schedule of values shall be used as a basis for reviewing the Contractor’s Applications for Payment.
§ 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment.
§ 5.1.6 In accordance with AIA Document A201™–2017, General Conditions of the Contract for Construction, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
§ 5.1.6.1 The amount of each progress payment shall first include:
.1 That portion of the Contract Sum properly allocable to completed Work;
.2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and
.3 That portion of Construction Change Directives that the Architect determines, in the Architect’s professional judgment, to be reasonably justified.
§ 5.1.6.2 The amount of each progress payment shall then be reduced by:
.1 The aggregate of any amounts previously paid by the Owner;
.2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201–2017;
.3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay;
.4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201–2017; and
.5 Retainage withheld pursuant to Section 5.1.7.
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 12:50:48 ET on 12/31/2019 under Order No.0773232877 which expires on 01/24/2020, and is not for resale.
§ 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due:
(Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be limited by governing law.)
«Five percent (5%) »
§ 5.1.7.1.1 The following items are not subject to retainage:
(Insert any items not subject to the withholding of retainage, such as general conditions, insurance, etc.)
§ 5.1.7.2 Reduction or limitation of retainage, if any, shall be as follows:
(If the retainage established in Section 5.1.7.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion of portions of the Work as provided in Section 3.3.2, insert provisions for such modifications.)
§ 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows:
(Insert any other conditions for release of retainage upon Substantial Completion.)
§ 5.1.8 [Intentionally omitted.]
§ 5.1.9 Except with the Owner’s prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site.
§ 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment;
.2 a final Certificate for Payment has been issued by the Architect;
.3 the Contractor has submitted its final waiver of lien and final waivers of lien from all of its Subcontractors and suppliers in a form acceptable to the Owner; and
.4 the Contractor has submitted to the Owner all close-out documents, including without limitation, all as-build plans, warranties, manuals, and other materials set forth in the Contract Documents.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
§ 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the daily interest rate factor (365 days) of the prime interest rate reported by JP Morgan as of the payment due date.
ARTICLE 6 DISPUTE RESOLUTION
§ 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201–2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision Maker.
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 12:50:48 ET on 12/31/2019 under Order No.0773232877 which expires on 01/24/2020, and is not for resale.
(If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.)
§ 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of AIA Document A201–2017, the method of binding dispute resolution shall be as follows:
(Check the appropriate box.)
[ « » ] Arbitration pursuant to Section 15.4 of AIA Document A201–2017
[ « » ] Litigation in a court of competent jurisdiction
[ « X » ] Other (Specify)
« AIA Document A201™–2017, General Conditions of the Contract for Construction Addendum B, Dispute Resolution Procedures»
If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.
ARTICLE 7 TERMINATION OR SUSPENSION
§ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201–2017. In addition, the Owner may terminate this Contract in the event of the unavailability of appropriated funds or a determination by Owner of the absence of continued need for the Project.
§ 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201–2017.
ARTICLE 8 MISCELLANEOUS PROVISIONS
§ 8.1 Where reference is made in this Agreement to a provision of AIA Document A201–2017 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents.
§ 8.2 The Owner’s representative:
(Name, address, email address, and other information)
«Brad Hennessee, Facilities Manager» « 111 West Vine Street » « Murfreesboro, TN 37130 » « Tel: (629) 543-4581 » « Email: bhennessee@murfreesborotn.gov »
« or his designee as indicated in writing from time to time.»
§ 8.3 The Contractor’s representative:
(Name, address, email address, and other information)
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 12:50:48 ET on 12/31/2019 under Order No.0773232877 which expires on 01/24/2020, and is not for resale.
§ 8.4 Neither the Owner’s nor the Contractor’s representative shall be changed without ten days’ prior notice to the other party.
§ 8.5 Insurance and Bonds § 8.5.1 The Contractor shall purchase and maintain insurance as set forth in Exhibit A, and elsewhere in the Contract Documents.
§ 8.5.2 The Contractor shall provide bonds as set forth in Exhibit A, and elsewhere in the Contract Documents.
§ 8.6 Notice in electronic format, pursuant to Article 1 of AIA Document A201–2017, may be given in accordance with AIA Document E203™–2013, Building Information Modeling and Digital Data Exhibit, if completed, or as otherwise set forth below:
(If other than in accordance with AIA Document E203–2013, insert requirements for delivering notice in electronic format such as name, title, and email address of the recipient and whether and how the system will be required to generate a read receipt for the transmission.)
§ 8.7 Other provisions:
ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS
§ 9.1 This Agreement is comprised of the following documents:
.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor
.2 Exhibit A, Contractor’s Insurance and Bonds Requirements
.3 AIA Document A201™–2017, General Conditions of the Contract for Construction, including Addendum A, Contractor’s Standard Form Subcontract, and Addendum B, Dispute Resolution Procedures
.4 [Intentionally Omitted]
.5 Drawings
.6 Specifications
Section Title Date Pages 00 01 10 Table of Contents October 7, 2025 1
.7 Addenda, if any:
Number Date Pages
Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9.
.8 Other Exhibits:
(Check all boxes that apply and include appropriate information identifying the exhibit where required.)
Number Title Date Pages 00 01 15 Drawing Index October 8, 2025 8
October 8, 2025
AIA Document A101™ – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 12:50:48 ET on 12/31/2019 under Order No.0773232877 which expires on 01/24/2020, and is not for resale.
[ « » ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:
(Insert the date of the E204-2017 incorporated into this Agreement.)
[ « » ] The Sustainability Plan:
Title Date Pages
[ X ] Supplementary and other Conditions of the Contract:
Document Title Date Pages Attachment A 1
.9 Other documents, if any, listed below:
(List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201™–2017 provides that the advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor’s bid or proposal, portions of Addenda relating to bidding or proposal requirements, and other information furnished by the Owner in anticipation of receiving bids or proposals, are not part of the Contract Documents unless enumerated in this Agreement. Any such documents should be listed here only if intended to be part of the Contract Documents.)
Section 00 11 13, Advertisement for Bids, October 10, 2025 (2 pages) Section 00 21 13, Instructions to Bidders, October 10, 2025 (8 pages) Section 00 31 13, Bid Form, October 10, 2025 (6 pages)
This Agreement entered into as of the day and year first written above.
OWNER (Signature) CONTRACTOR (Signature)
«Shane McFarland»«Mayor» « »« » (Printed name and title) (Printed name and title)
APPROVED AS TO FORM:
Adam F. Tucker, City Attorney
Rev. 101316
EXHIBIT A
CONTRACTOR'S INSURANCE AND BOND REQUIREMENTS
Contractor must, as a material obligation to the Owner and a condition precedent to any payment otherwise due to Contractor, furnish and maintain, and cause its Subcontractors to furnish and maintain, the insurance and bonds required by this Exhibit.
Contractor must secure and maintain such insurance coverage and bonds, without interruption, from the date of commencement of the Work until the later of the date of Final Completion, the date of final payment, or the date until which this Agreement requires any coverage to be maintained after final payment, in accordance with the requirements set forth below.
1. Commercial General Liability Insurance.
1.1 The CGL policy must be written on an occurrence basis, on ISO form CG 001 or its equivalent, providing coverage for bodily injury, broad form property damage, personal injury (including coverage for contractual and employee acts), contractual liability, incidental professional liability, the hazards commonly referred to as XCU (explosion, collapse, and underground), and products and completed operations, with a combined single limit of liability of not less than $2,000,000 for each occurrence applicable to the Work, and an annual aggregate limit of liability of not less than $2,000,000 applicable solely to the Work, and meeting all other requirements of this Exhibit.
1.2 The general liability insurance may be accomplished with a combination of a general liability and an excess/umbrella liability policy.
1.3 Each general liability policy must be endorsed or written to:
a. Include the per project aggregate endorsement;
b. Name as additional insureds the following: the City of Murfreesboro and its elected officials, officers, employees, representatives and agents (collectively, the “Additional Insureds”);
c. Stipulate that the insurance afforded by the policies furnished by Contractor will be primary insurance and that any insurance, self-insured retention, deductibles, or risk retention programs maintained or participated in by the Additional Insureds, or their agents, officials or employees will be excess and not contributory to the liability insurance furnished by Contractor and by its Subcontractors;
d. Includes a severability of interest clause; and
e. Waive all rights of recovery against the Additional Insureds.
2. Workers' Compensation Insurance. Workers’ Compensation policy must meet all Tennessee statutory requirements, including Employers' Liability Insurance with limits of at least $ 1,000,000 per accident or disease per employee, both policies endorsed to waive subrogation against the Additional Insureds.
3. Auto Liability Insurance
3.1 Commercial auto liability must be carried with minimum combined single limit of $1,000,000 per occurrence.
3.2 This policy must include a duty to defend and cover all owned, non-owned, leased, hired, assigned or borrowed vehicles.
3.3 This policy must be endorsed, by specific or blanket endorsement, to name the Additional Insureds as such, stipulate that any insurance carried by the Additional Insureds must be excess and not contributory, and to waive subrogation against the Additional Insureds.
4. Environmental Liability. Contractor must secure, pay for, and maintain Contractor’s Pollution Liability (CPL) coverage, including mold coverage, in an amount not less than $1,000,000 and endorsing the Owner as an Additional Insured. Contractor must also provide to the Owner proof of Contractor’s Pollution Legal Liability (PLL) for sites owned or operated by Contractors and by any Subcontractors handling hazardous or potentially hazardous materials. Environmental liability coverage may be part of a package policy.
5. Professional Liability. Contractor must secure, pay for, and maintain professional liability coverage in the amount of not less than $1,000,000 on a form acceptable to the Owner and with tail coverage of not less than two years.
6. Umbrella Coverage. Contractor must secure, pay for, and maintain professional liability coverage in the amount of not less than $5,000,000 on a form acceptable to the Owner. Umbrella coverage must not be limited to excess coverage that merely follows form of underlying coverages.
7. Equipment Property Insurance. Contractor must secure, pay for, and maintain all-risk insurance as necessary and without exceptions in order to protect the Owner against loss of owned, non-owned, rented, or leased capital equipment and tools, equipment and scaffolding, staging, towers and forms owned or rented by Contractor, its Subcontractors, or Lower Tier Entities and any construction material in transit (unless shipped FOB destination Project Site or (Incoterm) DAP Project site) or materials stored in any location other than the Site.
8. Builder’s Risk. Unless otherwise instructed by the Owner, Contractor will secure a completed value, all-risk Builder’s Risk policy in manuscript form acceptable to Owner for the Project (not merely the Work), including appropriate, as determinate by the Owner, coverages, coverage amounts and limits, deductibles, and exclusions. The Owner must be a named insured and the policy may not terminate until Substantial Final Completion or a certificate of occupancy applicable to the entire property is issued, whichever is latest.
9. Waiver of Subrogation. Contractor hereby waives, and will require each of its Subcontractors and Lower Tier Entities to waive, all rights of subrogation under all polices against the Owner and other Additional Insureds for losses or damages covered by any policy of insurance. Contractor, Subcontractors, and Lower Tier Entities must provide notice of waiver to all insurance carriers.
10. Term of Coverage
10.1 The products and completed operations liability coverage required by this Agreement must extend for a period of not less than five years after the earlier of Final Payment for the Work, or the termination of the Agreement (the “Completed Operations Term”).
10.2 If at any time during the Completed Operations Term Contractor cannot obtain equivalent coverage by replacement or renewal, Contractor must acquire a tail policy prior to expiration of the existing policy that will extend coverage until the end of the Completed Operations Term.
10.3 Contractor will furnish certificates of insurance and other evidence that the Owner may reasonably require during the Completed Operations Term to establish compliance with the requirements of this paragraph.
10.4 All other policies of insurance must be maintained continuously in force from commencement of the Work until the date of Final Payment.
11. Subcontractor and Lower-Tier Entities Insurance Requirements
11.1 Contractor must require all of Contractor's Subcontractors and must require its Subcontractors to require their Lower Tier Entities, as a condition of working on the Project, and of receiving payment, to:
a. Purchase and maintain Commercial General Liability, Workers' Compensation and Employer's Liability, and Automotive insurance policies, with the same coverages, endorsements, terms of coverage and other provisions as are required of Contractor under by this Exhibit, EXCEPT THAT the combined coverage limits of the general liability insurance to be furnished by Lower Tier Entities must be $ 1,000,000 per occurrence, and $ 1,000,000 as the annual aggregate limit; and
b. Timely furnish to the Owner proper certificates, endorsements, copies of declarations pages, and other documents necessary to establish the Subcontractor's compliance with this Exhibit.
c. The Lower Tier Entities’ general liability policy must also be endorsed to provide the policy must be primary insurance, the general liability insurance furnished by Contractor must be the secondary and non-contributory, and any insurance carried by the Additional Insureds must be excess, tertiary and non-contributory to the insurance furnished by Contractor and Subcontractor.
d. The Owner has the right to inspect and copy all such certificates, endorsements, or other proof at any reasonable time.
12. Other Policy Provisions. Each policy to be furnished by Contractor and each Subcontractor must:
12.1 Be issued by an insurance carrier having a rating from A.M. Best Company of at least A- VII or better;
12.2 Provide that attorney’s fees are outside of the policy's limits and be unlimited;
12.3 Include the Project per aggregate endorsement;
12.4 Waive all rights of subrogation against the Owner;
12.5 Provide a Certificate that contains a provision that coverages afforded under the policies will not be canceled, allowed to expire, or reduced in amount until at least thirty (30) days' prior written Notice has been given to the Owner; and
12.6 Be otherwise satisfactory to the Owner. The Owner agrees to consider alternatives to the requirements imposed by this Exhibit but only to the extent that the Owner is satisfied the insurance is not commercially available to the insured. In such event, the Owner has the right to set conditions for such waiver, including, but not limited to, additional indemnities, and the request that the Owner be a loss-payee under the policy.
13. Certificates and Endorsements
13.1 Within 10 days after the execution of this Agreement, Contractor must provide the Owner with certificates and endorsements;
13.2 Upon the Owner request, Contractor must provide the Owner with certificates and endorsements from each of its Subcontractors, in all cases evidencing compliance by Contractor, each Subcontractor, and Lower Tier Entities with the requirements of this Exhibit together with letters from the…