These architectural drawings detail the gymnasium reroofing project for the Patterson Park Community Center located at 521 Dr. Martin Luther King, Jr. Blvd. in Murfreesboro, Tennessee. The project, prepared by Johnson + Bailey Architects P.C., involves a comprehensive roof replacement for the main gymnasium (11,526 sq. ft.) and auxiliary gymnasium (8,256 sq. ft.), with additional work on two stair areas totaling 318 sq. ft. The plans outline a detailed demolition and reconstruction process that includes removing the existing gravel surface built-up roofing, inspecting and potentially replacing gypsum board, and installing a new roofing system.
The proposed roofing system includes mechanically fastening a 1/2" cover board to the existing metal deck, installing 4 1/2" polyiso roof insulation, and applying a new adhered EPDM roof membrane. The project includes specific technical details for maintaining fire-rated assemblies, installing new metal coping and drip edges, addressing mechanical curbs and penetrations, and ensuring proper water drainage through tapered insulation and scuppers. The drawings provide extensive technical specifications for demolition, new work, and detailed interface points, indicating a comprehensive approach to replacing the community center's gymnasium roofing while maintaining structural integrity and performance standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID_FORM-_ITB-14-2026_-_Patterson_Park_Gym_Reroof.pdf | ||
| Patterson_Park_Gym_Reroof_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Johnson + Bailey Architects P.C.
34 35 36
Index of Drawings
P a t t e r s o n
P a r k
C o m m u n it y
C e n t
G y m s
R r o o f in g
J
B
P o j e c t
N o
Murfreesboro Tennessee
Murfreesboro, TN 37130 521 Dr. Martin Luther King, Jr. Blvd.
Patterson Plark Community Center
PROJECT ADDRESS:
Gymnasium Reroofing Community Center Patterson Park
A1.1
FIRE RATED ASSEMBLIES
NOTES:
REVISIONS DATE
PERMISSION OF THE ARCHITECT
IN ANY WAY WITHOUT THE WRITTEN
REPRODUCED, PUBLISHED, OR USED
THIS DRAWING SHALL NOT BE
PROJECT NO.
DATE
DRAWN BY
CHECKED BY
B.D.S.
Center Community
Park Patterson
Murfreesboro, Tn
K.S.P.
10/08/25
Reroofing Gymnasium
R.D.
R.D. R.D.
R.D.R.D.
R.D.
R.D.R.D.R.D.
R.D.
R.D.
G A S
L
IN
E
L
IN
E
C O
N D E N S A T E
G A S
L
IN
E
L
IN
E
C O
N D E N S A T E
R.D.
A1.1 N O
RT
HPLAN
08'
SCALE 1/16" = 1'-0"
32'16'16'
MASTER ROOF PLAN
NOTES:
REVISIONS DATE
PERMISSION OF THE ARCHITECT
IN ANY WAY WITHOUT THE WRITTEN
REPRODUCED, PUBLISHED, OR USED
THIS DRAWING SHALL NOT BE
PROJECT NO.
DATE
DRAWN BY
CHECKED BY
B.D.S.
Center Community
Park Patterson
Murfreesboro, Tn
K.S.P.
10/08/25
Reroofing Gymnasium
AREA OF WORK
AREA OF WORK
101'-2"
42'-0" 7'-4"
7'-4" 23'-0"
19'-10"
19'-10"
73'-10"
R D
R D
R D
GAS LINE
LINE
CONDENSATE
GAS LINE
LINE
CONDENSATE
R D
A2.1
NORTH
P
LA
N
04'
SCALE 1/8" = 1'-0"
16'8'8'
DEMOLITION ROOF PLAN
NOTES:
REVISIONS DATE
PERMISSION OF THE ARCHITECT
IN ANY WAY WITHOUT THE WRITTEN
REPRODUCED, PUBLISHED, OR USED
THIS DRAWING SHALL NOT BE
PROJECT NO.
DATE
DRAWN BY
CHECKED BY
B.D.S.
Center Community
Park Patterson
Murfreesboro, Tn
K.S.P.
10/08/25
Reroofing Gymnasium
SLOPE 1/4":1'-0"SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
S L O P E
S L O P E
S L O P E
S L
O P
E
MECH.
LADDER
H A T C H
A3.1
A3.1
A3.2
A3.2
A3.2
A3.1
A3.2
A3.1
A3.1
A3.1
MECH.
SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
A3.13
A3.1
8,256 S.F.
AUXILIARY GYM
11,526 S.F.
MAIN GYM
159 S.F.
STAIR 2
159 S.F.
STAIR 1
A .2
FROM HIGH ROOF AREA.
SPLASHBLOCKS TO REMAIN
HEADS, DOWNSPOUTS AND
EXISTING CONDUCTOR
FROM HIGH ROOF AREA.
SPLASHBLOCKS TO REMAIN
HEADS, DOWNSPOUTS AND
EXISTING CONDUCTOR
A3.3
A3.3
A3.3
ROOF DEMOLITION LEGEND
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
OF EXISTING GYPSUM BOARD.
INSPECT AND REPLACE DAMAGED AREAS
AND FASTNERS TO BE REMOVED.
SYSTEM, INSULATION, FLASHING, CAP FLASHING
AREA OF EXISTING BUILT-UP ROOFING
101'-2"
42'-0" 7'-4"
7'-4" 23'-0"
19'-10"
19'-10"
73'-10"
R D
R D
R D
GAS LINE
LINE
CONDENSATE
GAS LINE
LINE
CONDENSATE
R D
A2.2
NORTH
P
LA
N
04'
SCALE 1/8" = 1'-0"
16'8'8'
NEW ROOF PLAN
NOTES:
REVISIONS DATE
PERMISSION OF THE ARCHITECT
IN ANY WAY WITHOUT THE WRITTEN
REPRODUCED, PUBLISHED, OR USED
THIS DRAWING SHALL NOT BE
PROJECT NO.
DATE
DRAWN BY
CHECKED BY
B.D.S.
Center Community
Park Patterson
Murfreesboro, Tn
K.S.P.
10/08/25
Reroofing Gymnasium
SLOPE 1/4":1'-0"SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
S L O P E
S L O P E
S L O P E
S L
O P
E
MECH.
LADDER
H A T C H
A3.1
A3.1
A3.2
A3.2
A3.2
A3.1
A3.2
A3.1
A3.1
A3.1
MECH.
SLOPE 1/4":1'-0"
SLOPE 1/4":1'-0"
A3.13
A3.1
8,256 S.F.
AUXILIARY GYM
11,526 S.F.
MAIN GYM
159 S.F.
STAIR 2
159 S.F.
STAIR 1
A .2
FROM HIGH ROOF AREA.
SPLASHBLOCKS TO REMAIN
HEADS, DOWNSPOUTS AND
EXISTING CONDUCTOR
FROM HIGH ROOF AREA.
SPLASHBLOCKS TO REMAIN
HEADS, DOWNSPOUTS AND
EXISTING CONDUCTOR
A3.3
A3.3
A3.3
CURB - SEE 2/A3.2
EXISTING MECHANICAL
PADS
NEW ROOF WALKWAY
PADS
NEW ROOF WALKWAY
CURB - SEE 2/A3.2
EXISTING MECHANICAL
SCUPPERS - TYP.
POSITIVE DRAINAGE TO
AS REQ'D. TO PROVIDE
INSTALL ROOF CRICKETS
SCUPPERS - TYP.
POSITIVE DRAINAGE TO
AS REQ'D. TO PROVIDE
INSTALL ROOF CRICKETS
- SEE DRAWING A0.1 (TYP)
CEILING ASSEMBLY, UL P710
TO MAINTAIN EXISTING ROOF
METAL DECK. NEW CONSTRUCTION
ROOF INSULATION TO EXISTING
COVERBOARD AND RIGID
MECHANICALLY ATTACH
4 1/2" RIGID ROOF INSULATION.
TO 1/2" COVERBOARD AND
NEW EPDM ROOF ADHERED
- SEE DRAWING A0.1 (TYP)
CEILING ASSEMBLY, UL P710
TO MAINTAIN EXISTING ROOF
METAL DECK. NEW CONSTRUCTION
ROOF INSULATION TO EXISTING
COVERBOARD AND RIGID
MECHANICALLY ATTACH
4 1/2" RIGID ROOF INSULATION.
TO 1/2" COVERBOARD AND
NEW EPDM ROOF ADHERED
- SEE DRAWING A0.1 (TYP)
CEILING ASSEMBLY, UL P710
TO MAINTAIN EXISTING ROOF
METAL DECK. NEW CONSTRUCTION
ROOF INSULATION TO EXISTING
COVERBOARD AND RIGID
MECHANICALLY ATTACH
4 1/2" RIGID ROOF INSULATION.
TO 1/2" COVERBOARD AND
NEW EPDM ROOF ADHERED
- SEE DRAWING A0.1 (TYP)
CEILING ASSEMBLY, UL P710
TO MAINTAIN EXISTING ROOF
METAL DECK. NEW CONSTRUCTION
ROOF INSULATION TO EXISTING
COVERBOARD AND RIGID
MECHANICALLY ATTACH
4 1/2" RIGID ROOF INSULATION.
TO 1/2" COVERBOARD AND
NEW EPDM ROOF ADHERED
SPLASHBLOCKS (TYP)
DOWNSPOUTS AND
CONDUCTOR HEADS,
NEW WALL SCUPPERS,
SPLASHBLOCKS (TYP)
DOWNSPOUTS AND
CONDUCTOR HEADS,
NEW WALL SCUPPERS,
SPLASHBLOCKS (TYP)
DOWNSPOUTS AND
CONDUCTOR HEADS,
NEW WALL SCUPPERS,
SPLASHBLOCKS (TYP)
DOWNSPOUTS AND
CONDUCTOR HEADS,
NEW WALL SCUPPERS,
-SEE 1/A3.3
LINE PENETRATION
AT EXISTING GAS
NEW PITCH POCKET
-SEE 1/A3.3
LINE PENETRATION
AT EXISTING GAS
NEW PITCH POCKET
CURB (TYP.)
CRICKET AT MECH.
A3.1
1DETAIL
A3.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW WORK
2DETAIL
A3.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW WORK
3DETAIL
A3.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW WORK
4DETAIL
A3.1 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW WORK
NOTES:
REVISIONS DATE
PERMISSION OF THE ARCHITECT
IN ANY WAY WITHOUT THE WRITTEN
REPRODUCED, PUBLISHED, OR USED
THIS DRAWING SHALL NOT BE
PROJECT NO.
DATE
DRAWN BY
CHECKED BY
B.D.S.
Center Community
Park Patterson
Murfreesboro, Tn
K.S.P.
10/08/25
Reroofing Gymnasium
TO REMAIN
EXISTING WOOD BLOCKING
ACCESSORIES
INSULATION & ATTACHMENT
REMOVE EXISTING ROOF
ON EXISTING PARAPET
CANT & ROOFING MATERIAL
REMOVE EXISTING ROOF
ACCESSORIES
COPING & ATTACHEMENT
REMOVE EXISTING METAL
METAL COPING
PARAPET & UNDER NEW
MATERIAL UP EXISTING
RUN NEW EPDM ROOF
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
EXISTING METAL DECK
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
NEW ADHERED EPDM ROOF MEMBRANE
SECUREMENT STRIP
REINFORCED
PER ROOF MANUF. REQUIREMENTS
FASTENER & SEAM PLATE
SIZE - FIELD VERIFY
COPING. MATCH EXISTING
INSTALL NEW METAL
GYP. BOARD
EXISTING/ REPLACED
ACCESSORIES
INSULATION & ATTACHMENT
REMOVE EXISTING ROOF
ON EXISTING PARAPET
CANT & ROOFING MATERIAL
REMOVE EXISTING ROOF
TO REMAIN
EXISTING WOOD BLOCKING
ACCESSORIES
COPING & ATTACHEMENT
REMOVE EXISTING METAL
METAL COPING
PARAPET & UNDER NEW
MATERIAL UP EXISTING
RUN NEW EPDM ROOF
FIELD VERIFY
COPING. MATCH EXISTING SIZE -
INSTALL NEW PREFIN. METAL
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
NEW ADHERED EPDM ROOF MEMBRANE
SECUREMENT STRIP
REINFORCED
PER ROOF MANUF. REQUIREMENTS
FASTENER & SEAM PLATE
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
EXISTING METAL DECK
BY TAPERED ROOF INSULATION
CRICKET FORMED
EXISTING/ REPLACED GYP. BOARD
ON EXISTING WALL
CANT & ROOFING MATERIAL
REMOVE EXISTING ROOF
FLASHING
MATERIAL AND EXISTING
REMOVE EXISTING ROOFING
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
SECUREMENT STRIP
REINFORCED
PER ROOF MANUF. REQUIREMENTS
FASTENER & SEAM PLATE
UP WALL AND UNDER WINDOW FLASHING
NEW ADHERED EPDM ROOF MEMBRANE - TURN
EXISTING METAL DECK
ACCESSORIES
INSULATION & ATTACHMENT
REMOVE EXISTING ROOF
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
GYP. BOARD
EXISTING/ REPLACED
ACCESSORIES
INSULATION & ATTACHMENT
REMOVE EXISTING ROOF
ON EXISTING WALL
CANT & ROOFING MATERIAL
REMOVE EXISTING ROOF
FLASHING
MATERIAL AND EXISTING
REMOVE EXISTING ROOFING
EXISTING METAL DECK
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
SECUREMENT STRIP
REINFORCED
PER ROOF MANUF. REQUIREMENTS
FASTENER & SEAM PLATE
UP WALL AND UNDER WINDOW FLASHING
NEW ADHERED EPDM ROOF MEMBRANE - TURN
GYP. BOARD
EXISTING/ REPLACED
PER ROOF MANUF. REQUIREMENTS
TERMINATION BAR INSTALLED
FASTENERS @ 12" O.C. ENCAPSULATED IN SEALANT.
KYNAR 500 FINISHED METAL COUNTER-FLASHING.
AT COMPLETION OF ROOFING INSTALLATION
FLASHING. RETURN TO ORIGINAL POSITION
AS REQUIRED TO INSTALL NEW COUNTER
EXISTING WINDOW FLASHING - FOLD UP
PER ROOF MANUF. REQUIREMENTS
TERMINATION BAR INSTALLED
SEALANT
PANEL FLASHING
BEHIND EXISTING METAL
EXTEND EPDM MEMBRANE UP
A3.2
1DETAIL
A3.2 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW WORK
DEMOLITION NEW WORK
3DETAIL
A3.2 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW WORK
DEMOLITION
NEW WORK
2DETAIL
A3.2 03" 3" 6"1.5"
SCALE 3" = 1'-0"
4DETAIL
A3.2 03" 3" 6"1.5"
SCALE 3" = 1'-0"
NOTES:
REVISIONS DATE
PERMISSION OF THE ARCHITECT
IN ANY WAY WITHOUT THE WRITTEN
REPRODUCED, PUBLISHED, OR USED
THIS DRAWING SHALL NOT BE
PROJECT NO.
DATE
DRAWN BY
CHECKED BY
B.D.S.
Center Community
Park Patterson
Murfreesboro, Tn
K.S.P.
10/08/25
Reroofing Gymnasium
TO REMAIN
EXISTING WOOD BLOCKING
SCUPPER & DOWNSPOUT
CONDUCTOR HEAD,
REMOVE EXISTING
ACCESSORIES
COPING & ATTACHEMENT
REMOVE EXISTING METAL
TAPER INSULATION TO SCUPPER.
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
ADHERED EPDM ROOF MEMBRANE
WRAP UP AND OVER PARAPET
ADHERED EPDM ROOF MEMBRANE - VERIFY
MATCH EXISTING SIZE - FIELD
HEAD, SCUPPER & DOWNSPOUT.
INSTALL NEW CONDUCTOR
EXISTING METAL DECK
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
& ATTACHMENT ACCESSORIES
REMOVE EXISTING ROOF INSULATION
MATERIAL & COVERBOARD
SURFACE BUILT-UP ROOFING
REMOVE EXISTING GRAVEL
MATERIAL FROM PARAPET WALL
REMOVE EXISTING ROOFING
SIZE - FIELD VERIFY
COPING. TO MATCH EXISTING
INSTALL NEW PREFIN. METAL
EXISTING/ REPLACED GYP. BOARD
PER ROOF MANUF. REQUIREMENTS
TERMINATION BAR INSTALLED
ADAPTER CURB
WRAP UP CURB AND UNDER HVAC UNIT
NEW ADHERED EPDM ROOF MEMBRANE -
FASTENERS @ 12" O.C. ENCAPSULATED IN SEALANT.
KYNAR 500 FINISHED METAL COUNTER-FLASHING.
REINFORCED SECUREMENT STRIP
REQUIREMENTS
FASTENER & SEAM PLATE PER ROOF MANUF.
EXISTING HVAC UNIT ADAPTER CURB
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
EXISTING METAL DECK
MATERIAL ON EXISTING MECHANICAL CURB
REMOVE EXISTING ROOF CANT & ROOFING
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
EXISTING MECHANICAL CURB TO REMAIN
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
ATTACHMENT ACCESSORIES
REMOVE EXISTING FLASHING &
EXISTING HVAC UNIT ADAPTER CURB
& ATTACHMENT ACCESSORIES
REMOVE EXISTING ROOF INSULATION
GYP. BOARD
EXISTING/ REPLACED
TO REMAIN
EXISTING WOOD BLOCKING
ON EXISTING PARAPET
CANT & ROOFING MATERIAL
REMOVE EXISTING ROOF
TO REMAIN
EXISTING ROOFING MATERIAL
ACCESSORIES
COPING & ATTACHEMENT
REMOVE EXISTING METAL
EXISTING METAL DECK
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
WRAP UP AND OVER PARAPET
NEW ADHERED EPDM ROOF MEMBRANE -
REINFORCED SECUREMENT STRIP
MANUF. REQUIREMENTS
FASTENER & SEAM PLATE PER ROOF
EXISTING SIZE - FIELD VERIFY
INSTALL NEW PREFIN. METAL COPING. MATCH
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
& ATTACHMENT ACCESSORIES
REMOVE EXISTING ROOF INSULATION
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
EXISTING/ REPLACED GYP. BOARD
POURABLE SEALER
TWO COMPONENT
REMOVE & REPLACE GRAVEL UNCURED EPDM FLASHING
MEMBRANE
NEW ADHERED EPDM ROOFROOF TO REMAIN
EXISTING BUILT UP
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
INSTRUCITONS.
BUILT UP ROOF PER ROOF MANUF. WRITTEN
INSTALL COLD TIE-IN WITH EXISTING**
TYPE "X" GYPSUM BOARD
EXISTING/ REPLACED 5/8"
EXISTING METAL DECK
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
& ATTACHMENT ACCESSORIES
REMOVE EXISTING ROOF INSULATION
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
EXISTING METAL DECK
ROOFING TO REMAIN
EXISTING BUILT UP
WATER CUT-OFF MASTIC
SENSITIVE EPDM FLASHING
MIN. 6" WIDE PRESSURE
EPDM PRIMER
LAP SEALANT
SCUPPER BOX FLANGE
SENSITIVE EPDM FLASHING
MIN. 6" WIDE PRESSURE
LAP SEALANTFLANGE
SCUPPER BOX
LAP SEALANT
MANUF. REQUIREMENTS
SECURED TO DECK PER
PT WOOD NAILER
EPDM PRIMER
LAP SEALANT
MIN.
2"
6" MIN.6" MIN.6" MIN.
M I
N
2" MIN.
A3.3
DEMOLITION
NEW WORK
3DETAIL
A3.3 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW WORK
2DETAIL
A3.3 06" 6" 1'3"
SCALE 1 1/2" = 1'-0"
DEMOLITION NEW WORK
1DETAIL
A3.3 03" 3" 6"1.5"
SCALE 3" = 1'-0"
NOTES:
REVISIONS DATE
PERMISSION OF THE ARCHITECT
IN ANY WAY WITHOUT THE WRITTEN
REPRODUCED, PUBLISHED, OR USED
THIS DRAWING SHALL NOT BE
PROJECT NO.
DATE
DRAWN BY
CHECKED BY
B.D.S.
Center Community
Park Patterson
Murfreesboro, Tn
K.S.P.
10/08/25
Reroofing Gymnasium
EXISTING METAL DECK
POURABLE SEALER
SHEET METAL DAM
SENSITIVE FLASHING
EPDM PRESSURE
EPDM PRIMER
OTHER MATERIAL
OF POURABLE SEALER AND ANY
EPDM PRIMER AT INTERFACE
EXISTING GAS PIPING
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
ROOF MEMBRANE
ADHERED EPDM
LAP SEALANT
FILLER
CONSTRUCTION
POCKET AS REQ'D. FOR
REMOVE EXISTING PITCH
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
& ATTACHMENT ACCESSORIES
REMOVE EXISTING ROOF INSULATION
PIPING TO REMAIN
EXISTING GAS
GYP. BOARD
EXISTING/ REPLACED
TO REMAIN
EXISTING WOOD BLOCKING
ACCESSORIES
INSULATION & ATTACHMENT
REMOVE EXISTING ROOF
TO REMAIN
EXISTING ROOFING MATERIAL
ACCESSORIES
DRIP EDGE & ATTACHEMENT
REMOVE EXISTING METAL
EXISTING METAL DECK
ROOFING MATERIAL & COVERBOARD
REMOVE EXISTING GRAVEL SURFACE BUILT-UP
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
TO METAL DECK PER ROOF MANUF. REQUIREMENTS.
1/2" COVER BOARD - MECHANICALLY FASTENED
4 1/2" POLYISO ROOF INSULATION WITH
EXTEND UNDER DRIP EDGE
NEW ADHERED EPDM ROOF MEMBRANE -
EXISTING SIZE - FIELD VERIFY
NEW METAL DRIP EDGE. MATCH
CURED COVER STRIP
6" WIDE PRESSURE SENSITIVE
EPDM PRIMER
EXISTING METAL DECK
GYP. BOARD
EXISTING/ REPLACED
TO REMAIN
EXISTING WOOD BLOCKING
ACCESSORIES
INSULATION & ATTACHMENT
REMOVE EXISTING ROOF
ON EXISTING PARAPETS
CANT & ROOFING MATERIAL
REMOVE EXISTING ROOF
ACCESSORIES
COPING & ATTACHEMENT
REMOVE EXISTING METAL
METAL COPING
PARAPET & UNDER NEW
MEMBRANE UP EXISTING
RUN NEW EPDM ROOF
(BEYOND)
TERMINATION BAR
WRAP UP WALL
ROOF MEMBRANE -
NEW ADHERED EPDM
EXISTING THRU-WALL FALSHING
COUNTER-FLASHING. INSTALL UNDER
NEW KYNAR 500 FINISHED METAL
PER ROOF MANUF. REQUIREMENTS
TERMINATION BAR INSTALLED
SECUREMENT STRIP
REINFORCED
REQUIREMENTS
PER ROOF MANUF.
FASTENER & SEAM PLATE
SIZE - FIELD VERIFY
COPING. MATCH EXISTING
INSTALL NEW METAL
REQUIREMENTS
PER ROOF MANUF.
FASTENER & SEAM PLATE
SECUREMENT STRIP
REINFORCED
ROOF MANUF. REQUIREMENTS.
FASTENED TO METAL DECK PER
COVER BOARD - MECHANICALLY
INSULATION WITH 1/2"
4 1/2" POLYISO ROOF
ON EXISTING PARAPET
TERMINATION BAR
REMOVE EXISTING
FLASHING
REMOVE EXISTING COUNTER
MAINTAIN UL ASSEMBLY DESIGN NO. P710
WITH NEW 5/8" TYPE "X" GYPSUM BOARD TO
MOISTURE DAMAGE. REPLACE DAMAGED BOARD
EXISTING 5/8" GYPSUM BOARD - INSPECT FOR
EXISTING METAL DECK
MATERIAL & COVERBOARD
SURFACE BUILT-UP ROOFING
REMOVE EXISTING GRAVEL
GYP. BOARD
EXISTING/ REPLACED
| 2513_zCover |
| 2513_zA01 |
| 2513_zA11 |
| 2513_zA21 |
| 2513_zA22 |
| 2513_zA31 |
| 2513_zA32 |
| 2513_zA33 |