PAST PERFORMANCE SURVEY SPS.pdf

PDF 145 KB Posted

Attached to
Y1DA--598-21-2-8786-0005 CHILLER PLANT UPGRADE PROJECT 598-19-101
Solicitation number
36C25621R0076
Issued by

About this file

This document contains a past performance survey for a contractor competing for a Department of Veterans Affairs contract to upgrade a chiller plant. The survey requests feedback on the contractor's performance on prior projects in various areas such as commitment of resources, responsiveness, management, safety compliance, and overall quality of service. It also asks whether any cure notices, labor investigations, safety investigations, or security investigations occurred on the prior projects. The federal contract opportunity involves upgrading the chiller plant at the John L. McClellan VA Medical Center in Little Rock, Arkansas, with a dollar value between $1 million and $2.5 million. The work includes general construction, fire protection, structural, architectural, mechanical and electrical upgrades. The solicitation number is 36C25621R0076 and is 100% set aside for Service Disabled Veteran Owned Small Businesses. Interested vendors must register at the contract opportunities website and acknowledge any amendments issued there by the anticipated solicitation date of March 18, 2021. The contracting officer is Brad Martin.

View the file

Other files

File Type Posted
36C25621R0076 0007.docx DOCX document
236400 Packaged Water Chillers.doc DOC document
36C25621R0076 0006.docx DOCX document
Updated RFI questions.docx DOCX document
36C25621R0076 0005.docx DOCX document
REV RFI questions_JDa Response_2021.06.24 (002).docx DOCX document
36C25621R0076 0004.docx DOCX document
RFI questions_JDa Response_2021.06.24 (002).docx DOCX document
36C25621R0076 0003.docx DOCX document
261316 - Medium-Voltage Fusible Interrupter Switches.pdf PDF
262416 - Panelboards.pdf PDF
Site Visit Sign In_Chiller Upgrade.pdf PDF
260519 - Low-Voltage Electrical Power Conductors and Cables.pdf PDF
265100 - Interior Lighting.pdf PDF
262921 - Enclosed Switches and Circuit Breakers.pdf PDF
260573 - Overcurrent Protective Device Coordination Study.pdf PDF
260800.pdf PDF
264313 - Surge Protective Devices.pdf PDF
260533 - Raceway and Boxes for Electrical Systems.pdf PDF
260526 - Grounding and Bonding for Electrical Systems.pdf PDF
262726 - Wiring Devices.pdf PDF
262419 - Motor Control Centers.pdf PDF
261313 - Metal Clad breakers 02.pdf PDF
261116 - Secondary Unit Substation.pdf PDF
262200 Low-Voltage Transformers.pdf PDF
260513 - Medium-Voltage Cables.pdf PDF
262413 - Distribution Switchboards.pdf PDF
36C25621R0076 0002.docx DOCX document
260533 - Raceway and Boxes for Electrical Systems 02.pdf PDF
260511 - Requirements for Electrical Installation.pdf PDF
261313 - Metal Clad breakers.pdf PDF
Division Cost Page (002).docx DOCX document
36C25621R0076 0001.docx DOCX document
36C25621R0076_2.docx DOCX document
598-19-101 CD Submission Specifications.pdf PDF
WAGE DETERMINATION_.docx DOCX document
598-19-101 CD Submission Drawings.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25621R0076

PAST PERFORMANCE SURVEY

Upgrade Chiller Plant Project

To: ____________________ (Point of Contact)** ____________________ (Company)** ____________________ (Phone) ____________________ (Fax) ____________________ (E-Mail)** _____________________ (Name of Company requesting survey)**

The company from which you received this survey is competing for award of a contract with the Department of Veterans Affairs, Little Rock, AR. As part of the process for screening potential Offerors, this company is soliciting your input and assessment of its past performance for one or more projects they performed for your firm. Please respond to each of the questions below and forward the completed survey directly to the CAVHS Contract Specialist.

To consider your responses, the Contract Officer must receive your responses, either by fax or e-mail.

If you have any questions or comments, feel free to contact me. Thank you in advance for your assistance.

Brad Martin Contracting Officer Email: Bradley.Martin@va.gov

Please identify the project(s) that this company has performed for your organization, description, city, state, and award amount and final dollar value at completion of contract:

mailto:Bradley.Martin@va.gov

Respond to the question using the following scale: O- Outstanding, A- Acceptable, S- Satisfactory, M- Marginal, U-Unacceptable.

1. Did the contractor commit adequate resources in timely fashion to the contract to meet the requirements and to successfully solve problems? O A S M U

2. To what extent did the contractor respond positively and promptly to technical direction, contract change orders, etc.?

O A S M U

3. How reliably did the contractor follow through on commitments?

O A S M U

4. To what extent did the contractor’s management system provide visibility into problems and risks?

O A S M U

5. How responsive do you think the contractor was to information requests, issues, or problems during the course of the contract? O A S M U

6. How effective has the contractor been in identifying requirements?

O A S M U

7. To what extent did the contractor have the ability to administer and manage the contract?

O A S M U

8. To what extent did the contractor issue professional correspondence?

O A S M U

9. How well did the contractor adhere to the Statement of Work? O A S M U

10. What was your level of satisfaction with the contractor’s management and support staff?

O A S M U

11. What was your level of satisfaction with the contractor’s Supervisor(s)?

O A S M U

12. To what extent did the contractor submit required reports and documentation in a timely manner? O A S M U

13. To what extent were the contractor’s reports and documentation accurate and complete?

O A S M U

14. To what extent was the contractor’s maintenance and problem tracking/reporting documentation timely, accurate and of appropriate content?

O A S M U

15. To what extent did the contractor comply with safety requirements?

O A S M U

16. What was your level of satisfaction with the contractor’s overall quality of service?

O A S M U

17. To what extent was the contractor effective in interfacing with the Government staff?

O A S M U

18. What was your level of overall customer satisfaction? O A S M U

19. To what extent were the contractor’s employees experienced and qualified?

O A S M U Respond: Yes or No.

20. Were there any cure notices issued? Yes: ____ No: ____

21. Was contractor pro-active? Yes: ____ No: ____

22. Did contractor suggest cost-saving changes? Yes: ____ No: ____

23. Would you recommend this contractor? Yes: ____ No: ____

For Federal contracts:

24. Were there any Labor Department Investigations? Yes: ____ No: ____

24a. If yes, please describe reason and final outcome.

25. Were there any safety investigations? Yes: ____ No: ____

25a. If yes, please describe reason and final outcome.

26. Were there any security investigations? Yes: ____ No: ____

26a. If yes, please describe reason and final outcome.

27. Was there a partial or complete termination for default or convenience?

Yes: ____ No: ____

27a. If yes, please describe reason and final outcome.

28. Are there any pending terminations? Yes: ____ No: ____

29. What is/was the duration of the contract? _____________________

30. Were there any performance issues regarding the contractor’s work? If yes, please describe

(use a separate sheet of paper if necessary).

Please provide other comments (Use a separate sheet of paper if necessary):

Signature: ____________________________

Date: ____________________________