This document provides details for a federal contract solicitation to upgrade the chiller plant at the John L. McClellan VA Medical Center in Little Rock, Arkansas. The solicitation seeks general construction, fire protection, structural, architectural, mechanical and electrical work to selectively remove existing construction and implement other specified items. Offerors must be registered in VETBIZ under NAICS code 236220 with a size standard of $36.5 million to be eligible for award. The acquisition is set aside as 100% for Service Disabled Veteran Owned Small Businesses. The dollar magnitude is estimated between $1,000,000 to $2,500,000. Interested vendors must register at the contract opportunities website and acknowledge any amendments posted there by the anticipated issue date of March 18, 2021. The point of contact for inquiries is Bradley Martin of the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER: 598-19-101
PROJECT SUMMARY
THE PROJECT INVOLVES THE REPLACEMENT OF CHILLER EQUIPMENT AT JOHN
L. MCCLELLAN MEMORIAL VETERANS HOSPITAL, LITTLE ROCK, AR.
PROJECT DESCRIPTION
THE PROJECT SCOPE INCLUDES REPLACEMENT OF ONE CHILLER; CONDENSOR
AND CHILLED WATER PUMPS; CONDENSOR AND CHILLED WATER PIPING; AN
OPENING IN AN EXTERIOR WALL OF THE MECHANICAL ROOM WILL BE CREATED
TO ACCOMMODATE NEW PIPEWORK ROUTING.
CONSTRUCTION TYPE: TYPE I-A (NON-COMBUSTIBLE MATERIALS)
OCCUPANCY TYPE: I-2 - INSTITUTIONAL, HOSPITAL
BUILDING SUMMARY
PRIMARY OCCUPANCY: HEALTHCARE
CLASSIFICATION: HEALTHCARE
FUNCTION: AMBULATORY HEALTHCARE
MAIN USE: HEALTHCARE
SECONDARY USE: N/A
GROSS AREA OF WORK: 7,070 SQFT (ENERGY PLANT & SWITCHGEAR ROOM)
PROJECT INFORMATION
N
N
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
NOT TO SCALE
CAMPUS MAP
NOT TO SCALE
VICINITY MAP
Revisions:
/3
0/
0:
:3
AM
C
:\U se rs \jc or de ll\ R ev it
Lo ca l\5
-1 9-
1_
JL
M
_C hi lle r_
U pg ra de
_A rc h_ ja co b.
co rd el l.r vt
COVER SHEET CONSTRUCTION
DOCUMENTS
UPGRADE CHILLER PLANT @ JLM -
PROJECT 1
2020.12.30 SMc TSS
GI001
JDA PROJECT #: 2018.001
UPGRADE CHILLER PLANT
@ JLM - PROJECT 1
PROJECT No: 598-19-101
JOHN L. McCLELLAN MEMORIAL VETERANS HOSPITAL
4300 WEST 7TH STREET
LITTLE ROCK, AR 72205
CONSTRUCTION DOCUMENTS
JLM
598-19-101
VAMC LITTLE ROCK
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
FIRE PERTECTION
FP&C CONSULTANTS KC, LLC
1330 Burlington Street, Ste. 200 North Kansas City, MO 64116
MAINTENANCE OF EMERGENCY EXITS AND COMMUNICATION DURING
CONSTRUCTION:
CONTRACTORS AND STAFF SHALL COMPLY WITH NFPA 241 “STANDARD FOR
SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS”
2019 EDITION. CONTRACTORS SHALL COORDINATE PROPOSED CONSTRUCTION
ACTIVITIES REGULARLY AND IN ADVANCE OF ANY CHANGES THAT MAY IMPACT
OCCUPANT EGRESS, TRAVEL PATHS, EMERGENCY ACCESS, OR OTHER DAILY
BUSINESS OPERATIONS. PROPOSED ACTIVITIES SHALL BE COMMUNICATED TO
STAFF AT LEAST ONE WEEK IN ADVANCE. STAFF SHALL COMMUNICATE WITH ALL
DEPARTEMENTS OF THE PROPOSED ACTIVITIES. EMERGENCY ACTION PLANS
SHALL BE EVALUATED AND ADAPTED AS NECESSARY TO ACCOUNT FOR CLOSED
EXIT PATHS, DETOURS FOR IMPACTED AREAS, AND RELOCATION OF OCCUPANTS
AROUND AFFECTED AREAS. TEMPORARY DIRECTIONAL SIGNS SHALL BE
UTALIZED TO CLEARLY COMMUNICATE CHANGES IN DETOURS, IMPACTED EXITS,
AND IMPACATED TRAVEL PATHS. IMPAIRMENTS TO FIRE PROTECTION SYSTEMS
SHALL BE REVIEWED AND DOCUMENTED IN ACCORDANCE WITH NFPA 25
(SUPPRESSION SYSTEMS) AND NFPA 72 (FIRE ALARM SYSTEMS). EVACUATION
AND RELOCATION PLANS SHALL BE REVIEWED AND MODIFIED AS APPROPRIATE IN
ACCORDANCE WITH NFPA 101, 19.7.1. PROCEDURES IN CASE OF FIRE SHALL BE
REVIEWED AND MODIFIED AS APPROPRIATE IN ACCORDANCE WITH NFPA 101,
19.7.2. HOSPITAL STAFF SHALL BE UPDATED ON CONSTRUCTION PROGRESS AND
SHALL ADAPT THEIR RESPONSE APPROPRIATELY IN ACCORDANCE WITH NFPA
101, 19.7.2.3. CONTRACTOR SHALL ENSURE ACTIVITIES THAT WILL IMPACT FIRE
DEPARTMENT ACCESSS TO THE BUILDING, OR RESPONSE TO AN EMERGENCY
ARE COMMUNICATED WITH THE FIRE DEPARTMENT PRIOR TO STARTING SUCH
ACTIVITIES.
STRUCTURAL ENGINEER
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 2600
LITTLE ROCK, AR 72202
SHEET INDEX
NUMBER SHEET NAME
65% DESIGN
DEVELOPMENT
2020.12.04
95% CONSTRUCTION
DOCUMENTS
2020.12.18
CONSTRUCTION
DOCUMENTS
2020.12.30
GENERAL
GI001 COVER SHEET X X X
GI002 STANDARD ABBREVIATIONS X X X
GI003 DRAFTING SYMBOLS X X X
GI004 LIFE SAFETY PLAN - GROUND LEVEL X
GC101 ICRA PLANS X X X
STRUCTURAL
S001 GENERAL NOTES X X X
SD101 GROUND LEVEL DEMOLTION PLANS X X X
SB101 GROUND LEVEL PLANS X X X
SJ101 FOUNDATION SECTIONS X X X
ARCHITECTURAL
AD101 DEMOLITION PLAN - GROUND LEVEL X X X
AD111 DEMOLITION - REFLECTED CEILING PLAN - THIRD LEVEL X X
AE101 CONSTRUCTION PLAN - GROUND LEVEL X X X
AE304 WALL SECTIONS X X X
FIRE PROTECTION
FD101 CONSTRUCTION PLAN - GROUND LEVEL X X X
FX101 CONSTRUCTION PLAN - GROUND LEVEL X X X
PLUMBING
PD101 FLOOR PLAN - PLUMBING DEMOLITION X X X
PL100 PLUMBING GENERAL NOTES, LEGEND, AND SCHEDULES X X X
PL101 FLOOR PLAN - PLUMBING NEW X X X
PJ101 PLUMBING DETAILS X X X
MECHANICAL
MD101 FLOOR PLAN - HVAC DEMOLITION X X X
MH100 MECHANICAL GENERAL NOTES AND LEGEND X X X
MH101 FLOOR PLAN - HVAC PIPING NEW X X X
MI101 MECHANICAL PIPING DIAGRAM X X X
MI102 MECHANICAL PIPING DIAGRAM X X X
MI103 MECHANICAL PIPING DIAGRAM X X X
MI104 MECHANICAL PIPING DIAGRAM X X X
MI105 CONTROL DIAGRAMS X X X
MJ101 MECHANICAL DETAILS X X X
ELECTRICAL
ED101 FLOOR PLAN - ELECTRICAL DEMOLITION X X X
ED102 FLOOR PLAN - POWER DEMOLITION X X
ED103 FLOOR PLAN - ELECTRICAL DEMOLITION X
EJ101 ELECTRICAL ONE LINE DIAGRAM X X
EK101 ELECTRICAL SCHEDULES X X
EL101 FLOOR PLAN -LIGHTING NEW X
EP101 FLOOR PLAN - POWER NEW X X
EP102 FLOOR PLAN - ELECTRICAL POWER X X
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/2 /2
:2
:5
P M
C U s e rs
\a m o rr is \D o c u m e n ts
\5
-1
-1
J L M
C h ill e r_
U p g ra d e
A rc h a la n a
.m o rr is
.r v t
STANDARD ABBREVIATIONS CONSTRUCTION
DOCUMENTS
UPGRADE CHILLER PLANT @
JLM - PROJECT 1
VAMC LITTLE ROCK
2020.12.30 SMc TSS
598-19-101
GI002
JLM
JDA PROJECT #: 2018.001
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
STRUCTURAL ENGINEER
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 2600
LITTLE ROCK, AR 72202
FIRE PROTECTION
FP&C CONSULTANTS KC, LLC
1330 BURLINGTON STREET, STE. 200
NORTH KANSAS CITY, MO 64116
SJI STEEL JOIST SLIDING WINDOW
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SMS SHEET METAL SCREW
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL
UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE
SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION
CLASSIFICATION
STIF STIFFENER
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUB
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT
STL
STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SNTHETIC
SYS SYSTEM
T
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL,
TEMPERATURE CONTROL PANEL,
OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TLT TOILET
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ______
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TYP TYPICAL
U
U.N.O. UNLESS NOTED OTHERWISE
U.O.N. UNLESS OTHERWISE NOTED
V
VC VA FURNISHED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE OR
VITRIFIED CLAY TILE
VENT VENTILATION
VERT VERTICAL
VIF VERIFY IN FIELD
VV VA FURNISHED / VA INSTALLED
W
W/ WITH
WD WOOD
WP WALL PROTECTION
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R
R RADIUS OR RISER
RA RETURN AIR
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER
BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE, REINFORCED, OR
REINFORCING
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
S
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID
CORE
SCH SCHOOL
SCHED SCHEDULE, SCHEDULED
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE
DETECTOR, OR SOAP DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL
FLASH
SHEET METAL (FLASHING)
SHTHG SHEATHING
SIM SIMILAR
SJ SCORED JOINT
SJ SCORED JOINT
NS NARROW STILE
NUM NUMERAL
O
O OXYGEN
O/H OVER HEAD
O/O OUT TO OUT
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE
DIMENSION
OFD OVERFLOW DRAIN
OFF OFFICE
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSIE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE
RADIUS
ORD ORDNANCE OR OVERFLOW ROOF
DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
OUT OUTLET
OZ OUNCE
P
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR
PORTLAND CEMENT
PCA PORTLAND CEMENT
ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTYLINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE ORDER
OR PURCHASE ORDER POST
OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMAIC TUBE, OR
PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE OR QUART
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING
CONCRETE
LYR LAYER
M
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTAIN, MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM O MEDIUM
MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMBO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MIN MINIMUM MINUTE OR MINUTE
MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOICE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGAR
HM HOLLOW METAL OR
HECTOMETER
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HR HOUR
HRS HOURS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATION, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATED, INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
IWH INSTANANEOUS WATER HEATER
J
J-BOX JUNCTION BOX
JAN JANITOR
K
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LATENT
HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCEN FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF
CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF CURB
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR
FIREPROOF OR FLAT PANEL
DOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT,
OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
OR FIBERGLASS REINFORCED
PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUT
FWC FABRIC WALL COVERING
G
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON, GALLONS
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
GFRG GLASS-FIBER-REINFORCED
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CTLINDER LOCK
D
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR
DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM,
OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC, ELECTRICAL
ELEC DR
OP
ELECTRIC DOOR OPENER
ELEV ELEVATOR
ELEVS ELEVATIONS
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C
C CELSIUS CHANNEL OR CHANNEL
CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
C/C CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
C/VA CONTRACTOR FURNISHED/
GOVERNMENT INSTALLED
CAB CABINET
CAC CEILING ATENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT, CEMENTITIOUS
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR
CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULATING, CIRCULAR
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LIINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CM CONSTRUCTION MANAGEMENT
cm2 SQUARE CENTIMETER cm3 CUBIC CENTIMETER
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE,
CERTIFICATE OF OCCUPANCY,
CLEAN OUT, OR COMPANY
co2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINAION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS, CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR COORDINATION OFFICER
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
A
A LABEL CLASS A DOOR
A/C AIR CONDITIONING
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR
ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ACT
ADB AUTOMATIC DOOR BOTTOM
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION,
ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE, ALTERNATIVE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLAYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE, APPROXIMATELY
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT, ARCHITECTURAL
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO-VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL
WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'S
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
A
1F157B
D2 / AE512
AE501
AE201
AE201
AE211
20' - 6"
FIRST FLOOR
P-01
SCOPE INDICATORS
DRAWING TITLE
DETAIL CALLOUT
DETAIL INDICATOR FOR SMALL CONDITIONS
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR,
INTERIOR, MULTIPLE
VIEW
BUILDING SECTION INDICATOR
SPACE IDENTIFICATION
OPENING INDICATOR
WINDOW INDICATOR
EQUIPMENT INDICATOR
SHEET NOTES
PARTITION TYPE INDICATOR
NORTH ARROW
INDICATES PROJECT NORTH
INDICATES TRUE NORTH
EXISTING
INDICATES
COLUMN LINE
DESIGNATION
COLUMN LINE INDICATORS
DRAWING REVISION INDICATOR
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO BE
REMOVED
NEW CONSTRUCTION
VV ITEM - GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
VC ITEM - GOVERNMENT
FURNISHED / CONTRACTOR
INSTALLED
ELEVATION INDICATOR
WALL FINISH INDICATOR
CC ITEM - CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
N
1 1/8" = 1'-0"
View Name
A_4A
BA3034
CASEWORK TAG
LETTER PAIR INDICATES CASEWORK FAMILY:
RE: AE511-514 FOR DETAILS
FIRST PAIR OF NUMBERS INDICATES UNIT
WIDTH (I.E. 30")
SECOND PAIR INDICATES COUNTERTOP
HEIGHT (I.E. 34")
TOILET ACCESSORY TAG
XXXX
JSN
A
NEW
INDICATES
COLUMN LINE
DESIGNATION
CEILING HEIGHT INDICATOR
Room name 1A105
9' - 0"
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/2 /2
:2
:0
P M
C U s e rs
\a m o rr is \D o c u m e n ts
\5
-1
-1
J L M
C h ill e r_
U p g ra d e
A rc h a la n a
.m o rr is
.r v t
DRAFTING SYMBOLS CONSTRUCTION
DOCUMENTS
UPGRADE CHILLER PLANT @
JLM - PROJECT 1
VAMC LITTLE ROCK
2020.12.30 SMc TSS
598-19-101
GI003
JLM
JDA PROJECT #: 2018.001
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
STRUCTURAL ENGINEER
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 2600
LITTLE ROCK, AR 72202
FIRE PROTECTION
FP&C CONSULTANTS KC, LLC
1330 BURLINGTON STREET, STE. 200
NORTH KANSAS CITY, MO 64116
DRAFTING SYMBOLS
23 24 25
K
L
N
R
F
IR
E
E X
IT
E X
IT
PRIMARY
SWITCHGEAR
GE116-JLM
STAIR 8
SG8-JLM
CORRIDOR
CG39-JLM
PRIMARY
TRANSFORMER
GE117-JLM
CONCRETE CURB
19' - 1" 19' - 1"
78'-0" PROVIDED
250'-0" MAX ALLOWABLE
51'-0" PROVIDED
250'-0" MAX ALLOWABLE
EXTERIOR
EXIT
2-HR RATED
EXIT
ENCLOSURE
EGRESS WIDTH
84" PROVIDED
32" REQUIRED
EGRESS WIDTH
46" PROVIDED
32" REQUIRED
3 OCC LOAD
FROM SWCHGR
3 OCC LOAD
FROM SWCHGR
E
23 24 252119 20
D
C
A
B
B.4
BOILER ROOM
GD129-JLM
CHILLER ROOM
GD133-JLM
EMERGENCY
GENERATORS
GD134-JLM
BOILER PLANT
OFFICE
GD130-JLM
HALL
GD130A
MEN'S RR
GD132-JLM
MEN'S LOCKER
GD131-JLM
CO
FD
FD
19' - 1" 19' - 1" 27' - 0" 27' - 0" 19' - 1" 19' - 1"
/2
GD133
C
DUCT
120'-0" PROVIDED
250'-0" MAX ALLOWABLE
131'-0" PROVIDED
250'-0" MAX ALLOWABLE
161'-0" PROVIDED
250'-0" MAX ALLOWABLE
/2
EXTERIOR
EXIT
EGRESS WIDTH
46" PROVIDED
32" REQUIRED
EXTERIOR
EXIT
EGRESS WIDTH
46" PROVIDED
32" REQUIRED
18 OCC LOAD
16 OCC LOAD
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/3 /2
:4
:4
A M
C U s e rs
\s m c g u ir e
\D o c u m e n ts \5
-1
-1
J L
M
C h ill e r_
U p g ra d e
A rc h s m c g u ir e
.r v t
LIFE SAFETY PLAN - GROUND
LEVEL
CONSTRUCTION
DOCUMENTS
UPGRADE CHILLER PLANT @
JLM - PROJECT 1
VAMC LITTLE ROCK
2020.12.30 SM SM
598-19-101
GI004
JLM
JDA PROJECT #: 2018.001
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
STRUCTURAL ENGINEER
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 2600
LITTLE ROCK, AR 72202
FIRE PROTECTION
FP&C CONSULTANTS KC, LLC
1330 BURLINGTON STREET, STE. 200
NORTH KANSAS CITY, MO 64116
1/8" = 1'-0"F3
LIFE SAFETY - SWITCHGEAR ROOM
1/8" = 1'-0"F5
LIFE SAFETY PLAN - GROUND LEVEL - CHILLER PLANT
NN
LIFE SAFETY LEGEND / NOTES
EXISTING STRUCTURE - NO CHANGE IN USE OR FUNCTION OF SPACE
OCCUPANCY TYPE: HOSPITAL I-2 (INDUSTRIAL-2)
CONSTRUCTION TYPE: TYPE 1A (ASSUMED)
SPRINKLER COVERAGE: YES
FIRE ALARM SYSTEM: YES, VOICE
TRAVEL DISTANCE ALLOWED [FOR I-2 MECHANICAL SPACE]:
MAXIMUM TRAVEL DISTANCE: 250-FEET
COMMON PATH OF TRAVEL: 100-FEET
MAXIMUM DEAD END PATH: 50-FEET
LIFE SAFETY LEGEND
100'-0" PROVIDED
250'-0" MAX ALLOWABLE
MAXIMUM TRAVEL PATH PROVIDED
(TO PROTECTED ENCLOSURE
OR ETERIOR AREA)
MOST
REMOTE
POINT
OCCUPANT LOADS
CHILLER ROOM
EMERGENCY GENERATORS
HALL
MEN'S RESTROOM
MEN'S LOCKER RM
BOILER PLANT OFFICE
GD133-JLM
GD134-JLM
GD130A
GD132-JLM
GD131-JLM
GD130-JLM
ROOM NAME ROOM NO
7,044 SF
2,047 SF
75 SF
64 SF
45 SF
276 SF
AREA FACTOR
300 GROSS
FOR MECH
SPACES
OCC LOAD
359,551 SFTOTAL AT MECH AREA SCOPE OF WORK
PRIMARY SWITCHGEAR GE116-JLM 1,670 SF 300 GROSS 6
OCCUPANTS
61,670 SFTOTAL AT SWITCHGEAR SCOPE OF WORK OCCUPANTS
EGRESS COMPONENTS OTHER THAN STAIRWAYS (DOORS) SHALL BE SIZED TO
ACCOMMODATE 0.2 INCHES PER OCCUPANT, OR AT LEAST 32-INCHES MINIMUM
E
23 24 252119 20
D
C
A
B
G
F
B.4
ELECTRICAL
POWER ROOM
GD123-JLM
BOILER ROOM
GD129-JLM
CHILLER ROOM
GD133-JLM
EMERGENCY
GENERATORS
GD134-JLM
MEDICAL WASTE
ROOM
GD135-JLM
BOILER PLANT
OFFICE
GD130-JLM
HALL
GD130A
MEN'S RR
GD132-JLM
MEN'S LOCKER
GD131-JLM
STAIR 4
SG4-JLM
VESTIBULE
GD123A-JLM
CLEAN STORAGE
GD102-JLM
CORRIDOR
CG37-JLM
ROOM
GD130F
SIGNAL
GD126-JLM
CHIEF SPD
OFFICE
GD120-JLM
SPD OFFICE
ADMINISTRATION
GD121-JLM
ACETIC ACID
ROOM
GD124-JLM
WAREHOUSE
GD103-JLM
SPD EQUIPMENT
STORAGE ISSUE
GD122-JLM
23 24 25
K
L
N
R
PRIMARY
SWITCHGEAR
GE116-JLM
STAIR 8
SG8-JLMCORRIDOR
CG39-JLM
PRIMARY
TRANSFORMER
GE117-JLM
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE
AREA CLASS DESIGNATION
TYPE OF CONTRUCTION/PROJECT ACTIVITY TABLE
GROUP 1-LOW RISK
● OFFICE AREAS (NON-
CLINICAL)
PATIENT RISK GROUP TABLE
GROUP 2-MEDIUM RISK
GROUP 3-HIGH RISK GROUP 4-HIGHEST RISK
INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP TYPE A
I I I
III
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION
ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES
ARE NECESSARY.LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AN EXIT OF WORK AREA.
REPLACE USED MATS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR
FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT
BEFORE CONSTRUCTION BEGINS.
3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR
IMPLEMENT CONTROL CUBE METHOD.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
7. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERS.
8. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING
WORK AREAS.
9. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
1. WIPE SURFACES TO REMOVE DUST.
1. WIPE WORK SURFACES WITH
DISINFECTANT.
2. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WORK
AREA WITH HEPA FILTERED VACUUM
BEFORE LEAVING WORK AREAS.
4. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE WORK
WAS BEING PERFORMED.
1. REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE
COVERING.
4. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE
WORK WAS BEING PERFORMED.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III.
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER
OR FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING
DEPARTMENT BEFORE CONSTRUCTION BEGINS.
3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE
METHOD BEFORE CONSTRUCTION BEGINS.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS.
6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS-
THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER
EXITS THE WORK AREA.
8. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA WITH
ANTEROOM. REPLACE PER MANUFACTURER'S RECOMMENDATIONS.
9. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED
PROJECT IS INSPECTED EACH BY THE HOSPITAL SAFETY OFFICER,
FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT
AND THOROUGHLY CLEANED BY THE HOSPITAL ENVIRONMENTAL
SERVICES DEPARTMENT OR THEIR CONTRACTED ENVIRONMENTAL
SERVICES COMPANY.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
11. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERING.
12. VACUUM WITH HEPA FILTERED VACUUM. WET MOP WITH DISINFECTANT
AFTER BARRIERS ARE REMOVED.
13. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
1. REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE
COVERING.
4. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT
AFTER BARRIERS ARE
REMOVED.
6. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE
WORK WAS BEING PERFORMED.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
CLASS I
CLASS II
CLASS III
CLASS IV
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES BUT IS NOT LIMITED TO:
● REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TILE IN 50 SQUARE FEET
● PAINTING (BUT NOT SANDING), WALL COVERING
● ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT
DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR
ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST
INCLUDES BUT IS NOT LIMITED TO:
● INSTALLATION OF TELEPHONE AND COMPUTER CABLING
● ACCESS TO CHASE SPACES
● CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED
TYPE B
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
INCLUDES BUT IS NOT LIMITED TO:
● SANDING OF WALLS FOR PAINTING OR WALL COVERING
● REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
● NEW WALL CONSTRUCTION
● MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
● MAJOR CABLING ACTIVITIES
● ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE
WORK SHIFT
TYPE C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT IS NOT LIMITED TO:
● ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS
● REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM
● NEW CONSTRUCTION
TYPE D
ICRA GENERAL NOTES
● CARDIOLOGY
● ECHOCARDIOLOGY
● ENDOSCOPY-GI
● PHYSICAL THERAPY
● RADIOLOGY/MRI
● NUCLEAR MEDICINE
● RESPIRATORY CARE (EXCEPT
BRONCHOSCOPY AREA)
● CAFETERIA
● OUTPATIENT AREAS-CLINICS AND OFFICES
(EXCEPTION: TRANSPLANT AND ONCOLOGY)
● EMERGENCY ROOM
● POST ANESTHESIA
● CARE UNITS
● LABOR AND DELIVERY
● PEDIATRICS
● ADMISSION /
DISCHARGE AREA
● LABORATORIES
● PHARMACY
● INPATIENT UNITS (NOT
OTHERWISE
SPECIFIED)
● ALL OPERATING ROOMS INCLUDING LABOR
AND DELIVERY
● ANESTHESIA AND PUMP AREAS
● CENTRAL EQUIPMENT/STERILE SUPPLY
● CARDIAC CATHETERIZATION AND
ANGIOGRAPHY AREAS
● INTERVENTIONAL RADIOLOGY
● RADIATION ONCOLOGY
● ALL INTENSIVE CARE UNITS
● NEWBORN NURSERIES, INCLUDING NICU
● DIALYSIS UNIT
● ONCOLOGY-INPATIENT AND OUTPATIENT
● TRANSPLANT-INPATIENT AND OUTPATIENT
● PHARMACY ADMIXTURE
● NEGATIVE PRESSURE ISOLATION
ROOMS/AREAS (INCLUDING BRONCHOSCOPY
AREA)
TYPE B
II
II
III
III / IV
TYPE C
II
III
III / IV
III / IV
TYPE D
III / IV
IV
IV
IV
A. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL) INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA.
B. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY WORK IN THE CEILING PLENUM.
C. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST.
D. PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE; HOWEVER, ALL GENERAL CONSTRUCTION TRAFFIC SHOULD BE THROUGH VESTIBULE.
E. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT NOT LIMITED TO) FLOORING, CEILING, WALL SURFACES, DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF MATERIALS TO/FROM LIMIT OF WORK. COORDINATE WITH COR AND SPECIFICATIONS FOR PROCEDURES/REQUIREMENTS.
NEW UNRATED PARTITION
NEW / EXISTING 1 HOUR BARRIER
EXISTING PARTITION TO BE REMOVED
EXISTING PARTITION
NEW / EXISTING 2 HOUR BARRIER
INDICATES PROJECT
BOUNDRY
ICRA CLASS LEGEND
CLASS 4
ICRA CLASS LEGEND
CLASS 2
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/3
0/
:5 0:
A
M Z:
\J D a D es ig n\
_A ct iv e\
D -1
8-
_5
-1 9-
1_
JL
M
C hi lle r P la nt
\0 2_
C or re sp on de nc e\
Fi le
S ha rin g\
Ar ch
\D an
Bu sh
\P ro je ct
F ile s\
IC
R
A Pl an \9 re vi se d pl an \jd m
.0
C hi lle r P la nt
P ro je ct
IC
R
A Pl an r2
0.
rv t
ICRA PLANS CONSTRUCTION
DOCUMENTS
UPGRADE CHILLER PLANT @
JLM - PROJECT 1
VAMC LITTLE ROCK
2020.12.30 JDM DB
598-19-101
GC101
JLM
JDA PROJECT #: 2018.001
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
ICRA - GENERAL NOTES
1. ICRA WORK LIMITS ARE TO ENCOMPASS ALL AREAS WITH
REQUIRED WORK ACROSS ALL DISCIPLINES WHICH
REQUIRES CONTRACTOR TO FULLY FAMILIARIZE
THEMSELVES WITH THE COMPLETE SET OF CONSTRUCTION
DOCUMENTS AND THE INTENDED WORK.
2. ICRA CLASS(ES) SHOWN ARE CONCEPTUAL AND MAY BE
USED AS A STARTING POINT FOR THE CONTRACTOR'S
REQUIRED WORK UNDER SPECIFICATION SECTION 01 35 26
"SAFETY REQUIREMENTS".
3. CONTRACTORS ARE ENCOURAGED TO ATTEND ANY AND
ALL SITE VISITS PROVIDED BY THE VA DURING BIDDING TO
FAMILIARIZE THEMSELVES WITH THE AREAS OF WORK.
4. CONTRACTOR SHALL EXAMINE THE FULL SET OF PLANS
AND DETERMINE IF THERE ARE ADDITIONAL AREAS OF
WORK ( AND THEIR ASSOCIATED ICRA CLASS(ES) ) DURING
BIDDING.
5. CONTRACTOR IS TO CONSIDER AND INCLUDE MONIES FOR
REQUIRED WORK IN ALL PROJECT AREAS AS PART OF
THEIR BASE BID.
6. IF CONTRACTOR IDENTIFIES POTENTIAL CONFLICTS OR
LIMITATIONS IN THEIR ABILITY TO FULLY COMPLY WITH
ICRA SAFETY REQUIREMENTS CONTAINED IN THE BIDDING
DOCUMENTS, THEY SHALL SEEK RESOLUTION IN WRITING
AS INDICATED IN BIDDING INSTRUCTIONS.
7. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL)
INFECTION CONTROL REPRESENTATIVE FOR WORK
OUTSIDE MAJOR AREA.
8. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY
WORK IN THE CEILING PLENUM.
9. PROVIDE TEMPORARY DOOR WITH GASKETING TO
PREVENT THE MOVEMENT OF DUST.
10. PROVIDE TEMPORARY EMERGENCY EXIT FROM
CONSTRUCTION ZONE; HOWEVER, ALL GENERAL
CONSTRUCTION TRAFFIC SHOULD BE THROUGH
VESTIBULE.
11. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT
NOT LIMITED TO) FLOORING, CEILING, WALL SURFACES,
DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF
MATERIALS TO/FROM LIMIT OF WORK. COORDINATE WITH
COR AND SPECIFICATIONS FOR PROCEDURES /
REQUIREMENTS.
GRAPHIC LEGEND
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
KEY PLAN
F
B A
D
C
E
PROJECT
AREA
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
STRUCTURAL ENGINEER
BERNHARD TME
BUILDING 2, 1 ALLIED DRIVE
SUITE 2600
LITTLE ROCK, AR 72202
FIRE PROTECTION
FP&C CONSULTANTS KC, LLC
1330 BURLINGTON STREET, STE. 200
NORTH KANSAS CITY, MO 64116
1/16" = 1'-0"F1 GROUND LEVEL ICRA PLAN - CHILLER PLANT
1/16" = 1'-0"F6 GROUND LEVEL ICRA PLAN - SWITCHGEAR ROOM
LEGEND
F.V. INDICATES FIELD VERIFY
GENERAL INFORMATION
SUBMITTAL PROCEDURES
ADHESIVE SET ANCHORS, REINFORCING
BARS, & DOWEL NOTES
A. CONCRETE ANCHORS
I. MECHANICAL ANCHORS SHALL HAVE BEEN TESTED AND QUALIFIED
FOR USE IN ACCORDANCE WITH ACI 355.2 AND ICC-ES AC193 FOR
CRACKED AND UNCRACKED CONCRETE RECOGNITION.
II. ADHESIVE ANCHORS SHALL HAVE BEEN TESTED AND QUALIFIED FOR
USE IN ACCORDANCE WITH ACI 355.4 AND ICC-ES AC308 FOR
CRACKED AND UNCRACKED CONCRETE RECOGNITION.
B. MASONRY ANCHORS
I. ANCHORAGE TO SOLID-GROUTED CONCRETE MASONRY
- MECHANICAL ANCHORS SHALL HAVE BEEN TESTED AND QUALIFIED
FOR USE IN ACCORDANCE WITH ICC-ES AC01 OR AC106.
- ADHESIVE ANCHORS SHALL HAVE BEEN TESTED AND QUALIFIED
FOR USE IN ACCORDANCE WITH ICC-ES AC58.
II. ANCHORAGE TO HOLLOW CONCRETE MASONRY/UNREINFORCED
CLAY BRICK MASONRY
- MECHANICAL ANCHORS SHALL HAVE BEEN TESTED AND
QUALIFIED IN ACCORDANCE WITH ICC-ES AC106
- ADHESIVE ANCHORS WITH SCREEN TUBES SHALL BE TESTED
AND QUALIFIED IN ACCORDANCE WITH ICC-ES AC58 OR AC60, AS
APPROPRIATE.
STRUCTURAL DESIGN CRITERIA
PER INTERNATIONAL BUILDING CODE (IBC 2012)
1. SEISMIC DESIGN:
RISK CATEGORY: IV
IMPORTANCE FACTOR: 1.5
MAPPED SPECTRAL RESPONSE ACCELERATIONS: SS = 0.4 S1 = 0.162
SITE CLASS: C (ASSUMED)
SPECTRAL RESPONSE COEFFICIENTS: SDS = 0.319, SD1 = 0.177
SEISMIC DESIGN CATEGORY: D
SEISMIC BASE SHEAR: V = CS x UNIT WEIGHT
SEISMIC RESPONSE COEFFICIENTS: CS = 0.16
2. WIND LOAD
DESIGN ULTIMATE WIND SPEED: 120 MPH
RISK CATEGORY: IV
EXPOSURE CATEGORY: B
INTERNAL PRESSURE COEFFICIENTS: GCpi = ±0.18 VELOCITY PRESSURE: qh = 23 PSF
3. DESIGN SOIL CRITERIA AS FOLLOWS:
THE FOUNDATION DESIGN/VERIFICATION FOR THIS STRUCTURE HAS BEEN
BASED UPON THE RECOMMENDATIONS OF THE SOIL AND FOUNDATION
INVESTIGATIONS FOR THIS SITE BY McCLELLAND CONSULTING ENGINEERS, INC (MCE) OF FAYETTEVILLE, AR (479-443-2377) DATED JUNE 6, 1979 AND APRIL
12, 2019 (PROJECT #: 19-5724)
USE HILTI'S HY270 SYSTEM OR APPROVED EQUAL FOR ATTACHMENT TO
HOLLOW AND GROUT-FILLED MASONRY UNITS.
USE HILTI'S HY200 SYSTEM OR APPROVED EQUAL FOR ATTACHMENT INTO
SOLID SURFACES ONLY. (E.G., SOLID CONCRETE )
FOR REBAR AND DOWEL EMBEDMENT, USE HY200 ADHESIVE, OR
APPROVED EQUAL AS NOTED ABOVE.
USE HILTI'S THREADED RODS OR APPROVED EQUAL UNLESS SPECIFICALLY
NOTED OTHERWISE. SUBSTITUTION OF A-36 ALL-THREAD ROD WILL NOT BE
ALLOWED. RODS ANCHORING INTO UNREINFORCED MASONRY SHALL BE
BENT AT 22 1/2° ANGLE UNO.
WHERE BASE MATERIAL IS HOLLOW BLOCK, BRICK OR OTHER MATERIAL
CONTAINING POCKETS OR VOIDS, A SCREEN TUBE, PER MANUFACTURERS
RECOMMENDATIONS, SHALL BE EMPLOYED IN THE SYSTEM.
1.
2.
3.
4.
5.
FOLLOW MANUFACTURERS REQUIREMENTS FOR MINIMUM DEPTH OF BASE
MATERIAL, MINIMUM EDGE DISTANCES, AND MINIMUM BOLT/BAR SPACING.
6.
UNLESS SPECIFIED OTHERWISE, ANCHORS SHALL BE EMBEDDED IN THE
APPROPRIATE SUBSTRATE WITH A MINIMUM EMBEDMENT OF 8 TIMES THE
NOMINAL ANCHOR DIAMETER OR THE EMBEDMENT DEPTH REQUIRED TO
SUPPORT THE INTENDED LOAD.
7.
POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE SPECIFIED ON THE
CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM
THE ENGINEER-OF-RECORD PRIOR TO INSTALLING POST-INSTALLED ANCHORS IN
PLACE OF MISSING OR MISPLACED CAST-IN-PLACE ANCHORS. CARE SHALL BE
TAKEN IN PLACING POST-INSTALLED ANCHORS TO AVOID CONFLICTS WITH
EXISTING REINFORCING. HOLES SHALL BE DRILLED AND CLEANED IN
ACCORDANCE WITH THE MANUFACTURER’S WRITTEN INSTRUCTIONS.
SUBSTITUTION REQUESTS FOR PRODUCTS OTHER THAN THOSE SPECIFIED BELOW
SHALL BE SUBMITTED BY THE CONTRACTOR TO THE ENGINEER-OF-RECORD
ALONG WITH CALCULATIONS THAT ARE PREPARED & SEALED BY A REGISTERED
PROFESSIONAL ENGINEER. THE CALCULATIONS SHALL DEMONSTRATE THAT THE
SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING THE PERTINENT EQUIVALENT
PERFORMANCE VALUES (MINIMUM) OF THE SPECIFIED PRODUCT USING THE
APPROPRIATE DESIGN PROCEDURE AND/OR STANDARD(S) AS REQUIRED BY THE
BUILDING CODE. PROVIDE CONTINUOUS SPECIAL INSPECTION FOR ALL ADHESIVES
AND MECHANICAL ANCHORS PER THE PRODUCT’S APPLICABLE ICC-ES OR IAPMO-
ES EVALUATION REPORT (ICC-ES ESR). CONTACT MANUFACTURER’S
REPRESENTATIVE FOR THE INITIAL TRAINING AND INSTALLATION OF ANCHORS AND
FOR PRODUCT RELATED QUESTIONS AND AVAILABILITY.
8.
1. UNLESS OTHERWISE NOTED OR DETAILED, CONCRETE PADS FOR
MECHANICAL EQUIPMENT SHALL BE 4" THICK (MINIMUM) AND REINFORCED
WITH #3 @ 12" OC EACH WAY CENTERED.
SUBSTITUTION OF EXPANSION OR ADHESIVE ANCHORS FOR EMBEDDED
ANCHORS SHALL NOT BE PERMITTED UNLESS SPECIFICALLY APPROVED IN
WRITING BY THE STRUCTURAL ENGINEER OF RECORD PRIOR TO PLACING OF
CONCRETE CONTAINING THE ANCHORS.
2. PERMANENT STABILITY OF THE BUILDING AND COMPONENTS IS NOT
PROVIDED UNTIL THE ERECTION IS COMPLETED AS SHOWN ON THE
CONTRACT DRAWINGS. PER SECT 7.10.3 OF AISC CODE OF STANDARD
PRACTICE FOR BUILDINGS AND BRIDGES MARCH 18, 2005. "TEMPORARY
SUPPORTS, SUCH AS TEMPORARY GUYS, BRACES, FALSEWORK, CRIBBING OR
OTHER ELEMENTS REQUIRED FOR THE ERECTION OPERATION WILL BE
DETERMINED, FURNISHED AND INSTALLED BY THE ERECTOR."
3. WEIGHTS OF MECHANICAL EQUIPMENT SHOWN ON THE STRUCTURAL PLANS
ARE FOR UNITS SPECIFIED BY THE MECHANICAL ENGINEER. CONTRACTOR
SHALL VERIFY WEIGHTS AND ANY SUBSTITUTIONS THAT RESULT IN INCREASED
WEIGHT SHALL BE APPROVED BY THE STRUCTURAL ENGINEER OF RECORD.
4. THE CONTRACTOR SHALL INSURE THAT NO CONSTRUCTION LOAD EXCEEDS
THE DESIGN LIVE LOADS INDICATED ON THE STRUCTURAL DRAWINGS AND THAT
THESE LOADS ARE NOT PLACED ON THE STRUCTURAL MEMBERS PRIOR TO THE
TIME THAT ALL FRAMING MEMBERS AND THEIR CONNECTIONS ARE IN PLACE.
5. THE SIZE AND LOCATION OF EQUIPMENT PADS AND PENETRATIONS THROUGH
THE STRUCTURE FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK
SHALL BE VERIFIED BY THE CONTRACTOR. OPENINGS AND PENETRATIONS
NOT SPECIFICALLY SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE
SUBJECT TO APPROVAL BY THE STRUCTURAL ENGINEER OF RECORD.
6. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION TO BE
COORDINATED WITH THE STRUCTURAL DRAWINGS.
7.
8.
PRIOR TO FABRICATION AND/OR ERECTION OF ANY MATERIALS, THE
CONTRACTOR SHALL FIELD VERIFY ALL PERTINENT EXISTING DIMENSIONS,
ELEVATIONS, AND CONDITIONS AND SHALL REPORT ANY DISCREPANCIES TO
THE STRUCTURAL ENGINEER OF RECORD OR THE ARCHITECT IMMEDIATELY
UPON DISCOVERY.
9.
10.
11.
THE GENERAL CONTRACTOR SHALL VERIFY THE SITE CONDITIONS INCLUDING
UNDERGROUND UTILITIES BEFORE STARTING WORK AND SHALL NOTIFY THE
STRUCTURAL ENGINEER OF RECORD OF ANY CONDITIONS ENCOUNTERED
CONTRADICTORY TO THOSE SHOWN ON THE STRUCTURAL CONTRACT
DOCUMENTS.
THE GENERAL CONTRACTOR SHALL COORDINATE THE ARCHITECTURAL,
MECHANICAL, ELECTRICAL, PLUMBING AND CIVIL WORK WITH THE
STRUCTURAL CONTRACT DOCUMENTS AND SHALL REPORT ANY SUSPECTED
DISCREPANCIES OR OMISSIONS TO THE ARCHITECT IMMEDIATELY.THE
STRUCTURAL CONTRACT DOCUMENTS DO NOT INCLUDE SHOP DRAWINGS,
VENDOR DRAWINGS NOR ANY MATERIAL PREPARED AND SUBMITTED BY THE
CONTRACTOR OR SUBCONTRACTORS.
12.
REFERENCE TO STANDARD SPECIFICATIONS OF ANY TECHNICAL SOCIETY,
ORGANIZATION OR ASSOCIATION OR TO CODES OF LOCAL OR STATE
AUTHORITIES SHALL MEAN THE LATEST STANDARD, CODE,SPECIFICATION OR
TENTATIVE SPECIFICATION ADOPTED AND PUBLISHED AT THE DATE OF
TAKING BIDS UNLESS SPECIFICALLY STATED OTHERWISE.
SEE ARCHITECTURAL DRAWINGS FOR EXACT THICKNESS AND NUMBER OF
LAYERS OF INTERIOR AND EXTERIOR SHEATHING, INSULATION, FLASHING,
EXTERIOR FINISHES, WINDOW WALL SYSTEMS, ROOFING, EXPANSION JOINT
COVERS, ETC. STRUCTURAL DRAWINGS DO NOT NECESSARILY DEPICT
EXACT CONDITIONS OF NON-STRUCTURAL ELEMENTS.
FOR DIMENSIONS NOT SHOWN ON THE STRUCTURAL CONTRACT
DOCUMENTS, SEE THE ARCHITECTURAL DRAWINGS.THE CONTRACTOR SHALL
REVIEW THE STRUCTURAL DRAWINGS FOR SECTIONS AND DETAILS THAT ARE
LABELED AS "TYPICAL" AND ARE NOT NECESSARILY REFERENCED ON THE
STRUCTURAL PLANS WHERE THEY APPLY.
1. TRANSMIT SUBMITTALS SUFFICIENTLY IN ADVANCE OF RELATED
CONSTRUCTION ACTIVITIES TO AVOID UNNECESSARY DELAY. THE
STRUCTURAL ENGINEER OF RECORD MAY WITHHOLD ACTION ON A
SUBMITTAL REQUIRING COORDINATION WITH OTHER SUBMITTALS UNTIL ALL
RELATED SUBMITTALS ARE RECEIVED.
2. SUBMIT DIGITAL COPIES FOR THE SUBMITTAL PROCESS.
3. CONTRACTOR SHALL COMPLY WITH DIVISION ONE SECTION - "SUBMITTALS"
4. NO REPRODUCTIONS OF THE CONSTRUCTION DOCUMENTS ARE
ACCEPTABLE FOR USE AS SHOP DRAWINGS.
5. ACTION STAMP: THE STRUCTURAL ENGINEER OF RECORD WILL STAMP EACH
SUBMITTAL WITH A UNIFORM ACTION STAMP TO INDICATE THE ACTION TAKEN
IN ONE OF FOUR OPTIONS LISTED BELOW:
APPROVED . . . . . . . . . . . . . . . . . . . . . . . . . WORK COVERED BY THE
SUBMITTAL COMPLIES WITH
THE REQUIREMENTS OF THE
CONTRACT DOCUMENTS.
REJECTED . . . . . . . . . . . . . . . . . . . . . . . . . . WORK COVERED BY THE
SUBMITTAL IS TOTALLY
UNACCEPTABLE AND MAY NOT
PROCEED.
APPROVED AS NOTED. . . . . . . . . . . . . . . . WORK COVERED BY THE
SUBMITTAL MAY PROCEED
PROVIDED IT COMPLIES WITH
NOTATIONS OR CORRECTIONS
ON THE SUBMITTAL AND
REQUIREMENTS OF THE
CONTRACT DOCUMENTS
REVISE AND RESUBMIT . . . . . . . . . . . . . . . WORK COVERED BY THE
SUBMITTAL DOES NOT COMPLY
WITH THE REQUIREMENTS OF
THE CONTRACT DOCUMENTS
AND MUST BE CHANGED TO
COMPLY AND RESUBMIT THE
ENTIRE SUBMITTAL.
EXISTING CONSTRUCTION
1. BEFORE FABRICATION AND ERECTION OF ANY MATERIALS, FIELD VERIFY
ALL EXISTING ELEVATIONS, DIMENSIONS, AND CONDITIONS AS SHOWN ON
THE DRAWINGS AND REPORT ANY DISCREPANICIES TO THE ARCHITECT &
ENGINEER OF RECORD AT ONCE.
STEEL FRAMING NOTES
ALL STEEL MEMBERS EXPOSED TO WEATHER SHALL BE HOT-DIPPED GALV.
(INCLUDING MASONRY SUPPORT LINTELS). GALVANIZED OR PAINTED WITH
TNEMEC EPOXY SYSTEM OR SIMILAR SYSTEM MEETING THE REQUIREMENTS FOR
PAINTING STRUCTURAL STEEL IN THE PROJECT SPECIFICATIONS. ALL OTHER
STEEL MEMBERS SHALL BE FURNISHED WITH A SHOP COAT OF TNEMEC RED OR
GRAY OXIDE PRIMER OR SIMILAR SYSTEM MEETING THE REQUIREMENTS FOR
PAINTING STRUCTURAL STEEL IN THE PROJECT SPECIFICATIONS. ALL PRIMERS
SHALL BE COMPATIBLE WITH TOP COATINGS SPECIFIED.
ALL STEEL MEMBERS THAT ARE TO RECEIVE SPRAY OR TROWEL APPLIED,
CEMENTITIOUS BASED, FIRE-RESISTING COATINGS SHALL BE FURNISHED
WITHOUT PRIME COATINGS UNO.
FIELD CUTTING, DRILLING, OR OTHER MODIFICATION OF STRUCTURAL STEEL
COMPONENTS IS NOT PERMITTED WITHOUT WRITTEN APPROVAL OF THE
STRUCTURAL ENGINEER OF RECORD. WHERE BEAM PENETRATIONS
CANNOT BE AVOIDED OR WHERE CUTTING IS REQUIRED, THE CONTRACTOR
SHALL SUBMIT, TO THE STRUCTURAL ENGINEER OF RECORD, ALL
PERTINENT INFORMATION INCLUDING PENETRATION SHAPE, SIZE,
LOCATION, AND METHOD OF CUTTING THE OPENINGS.
2. ALL STRUCTURAL STEEL HSS SQUARE/RECT SECTIONS SHALL BE ASTM A500,
GRADE B (Fy=46 ksi). ALL STRUCTURAL STEEL WIDE FLANGE SHALL BE ASTM
A992 GRADE 50. CHANNEL SHAPES AND ALL OTHER MISCELLANEOUS STEEL
SHALL BE ASTM A36 OR A572. ALL STRUCTURAL STEEL HSS ROUND SHALL BE
ASTM A500, GRADE B (Fy=42 ksi). ALL BASE PLATES SHALL BE ASTM A572-50.
3.
4.
WELD ELECTRODES SHALL BE E70XX.
5.
6.
1. UNLESS SPECIFICALLY NOTED OTHERWISE, FABRICATION AND ERECTION OF
STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH AISC SPECIFICATIONS,
LATEST EDITION.
7.
WHERE FIELD AND SHOP WELDS ARE INDICATED ON THE DRAWINGS,
THEY SHALL BE THE SIZE AND TYPE NOTED. ALL WELDING OF
STRUCTURAL STEEL SHALL BE DONE IN ACCORDANCE WITH THE LATEST
EDITION OF AWS D1.1 CORRESPONDING TO THE AISC SPECIFICATION
USED AND ALL WELDS INCLUDING FIELD WELDS SHALL BE MADE BY
CERTIFIED WELDERS USING E70XX ELECTRODES.
SPECIAL INSPECTION ITEMS
5. EARTHWORK (PER SECTION 1705.6).
6.
7.
8.
CONCRETE PLACEMENT (PER SECTION 1705.3)
MASONRY (PER SECTION 1705.4)
STRUCTURAL STEEL (PER SECTION 1705.2).
A.
B.
C. ALL STRUCTURAL FIELD WELDING PER AWS D1.1, EXCEPT AS FOLLOWS:
SHOP FABRICATION OF STEEL MEMBERS.
STEEL MATERIAL ID MARKINGS & CONFORMANCE TO ASTM STANDARDS.
I. THE SPECIAL INSPECTOR NEED NOT BE CONTINUOUSLY PRESENT
DURING WELDING OF THE FOLLOWING ITEMS, PROVIDED THE
MATERIALS, QUALIFICATIONS OF WELDING PROCEDURES AND
WELDERS ARE VERIFIED PRIOR TO THE START OF WORK; PERIODIC
INSPECTION ARE MADE OF THE WORK IN PROGRESS; AND A VISUAL
INSPECTION OF ALL WELDS IS MADE PRIOR TO COMPLETION OF
PRIOR TO SHIPMENT OF SHOP WELDING.
II. SINGLE PASS FILLET WELDS NOT EXCEEDING 5/16" SIZE.
9. ADDITIONALLY, COMPLIANCE IS REQUIRED WITH FIELD QUALITY CONTROL
PROVISIONS OF THE FOLLOWING SPECIFICATION SECTIONS:
A.
B.
C.
FOOTING BOTTOMS AND EARTHWORK: SECTION 31 2000.
CONCRETE: SECTION 03 3000.
MASONRY CONSTRUCTION: SECTION 04 2000.
1. SPECIAL INSPECTION SHALL BE PROVIDED BY THE OWNER ACCORDING TO
SECTION 1704 OF IBC 2012. THE APPROVED SPECIAL INSPECTOR SHALL
DEMONSTRATE COMPETENCE FOR INSPECTION OF…