PAST PERFORMANCE SPECIFIC RELEVANT CONTRACTS SHEET.pdf
PDF 155 KB Posted
- Solicitation number
- W50S7022R5001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bidders Questions (answered).docx | DOCX document | |
| Fire Detection and Suppression Inventory.doc | DOC document | |
| SITE SURVEY SIGN IN SHEET.pdf | ||
| W50S70-22-R-5001 Amendment 01.pdf | ||
| Fire Suppression PWS.pdf | ||
| Fire Alarm PWS.pdf | ||
| PAST PERFORMANCE QUESTIONNAIRE.pdf | ||
| UFC 3 601 02 Fire Protection Systems Inspection Testing and Maintenance.pdf | ||
| WD 15-4491.txt | TXT text file | |
| W50S70-22-R-5001 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE SPECIFIC RELEVANT CONTRACTS SHEET
Solicitation W50S70-22-R-5001
Fire Suppression, Fire Alarm, Fire Sprinkler System Inspection, Testing, Maintenance, and Repair
The offeror shall provide documentation outlining the offeror’s past performance with contracts, as a prime or major subcontractor, that is the same or similar in nature of work, size, qualifications, experience, and complexity to the services being procured under this Solicitation. The submittal shall include the rationale supporting your assertion of relevance and how it was determined, that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this Solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate
Contract Information
Contract Number Award Date Contract Type
Name of Contract Holder: Prime or Subcontractor?
Price/Cost
Original: Final (or projected final, if contract is current)
Delivery Schedule
Original: Final (or projected final, if contract is current)
Point of Contact Information
Procuring Contracting Officer (PCO)
Administrative Contracting Officer (ACO)
Government or Commercial Technical Representative or
COR
Name:
Office:
Address:
Phone:
Email:
Narrative Explanation Identify in specific detail for each contract listed, why or how you consider that effort relevant or similar to the effort required by this Solicitation.
In determining relevancy, consideration must be given but not limited to such things as product/service similarity of requirements, product/service, size and complexity, contract type, contract environment, qualifications, certifications, licenses, division of company proposing, and subcontractor interaction. Some Examples of relevant performance and experience are working with various makes and models of fire suppression systems, fire alarm, and fire sprinkler systems, and the process of recruiting and maintaining qualified personnel associated with these types of requirements.
On each contract listed describing the objectives achieved and the following data: any cost growth or schedule delays encountered. For any Government contracts which did not/do not meet original requirements with regard to cost, schedule, or technical performance, a brief explanation of the reason(s) for such shortcomings and any demonstrated corrective actions taken to avoid recurrence. Offerors may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a limited or a no confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a Satisfactory Confidence candidate.
Narrative Explanation A copy of any cure notices, show cause letters, or contract discrepancy reports received on each contract listed and a description of any corrective action by the offeror or proposed subcontractor
Completion Date/Delivery Schedule The contractor shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary.
Please complete this survey and return directly to contract specialist, Brittany Hopkins via email to brittany.hopkins.5@us.af.mil by 3:30 PM EST, 22 June 2022. Thank you!
File details come from the government source that posted it. Updated .