Past Performance Questionnaire.pdf
PDF 237 KB Posted
- Attached to
- Y1DA--Project 688-CSI-013 Cardiac Cath Lab Replacement Room 4A124 at the Washington DC VAMC.
- Solicitation number
- 36C24525R0080
About this file
This document is a Past Performance Questionnaire for the Department of Veterans Affairs' Cardiac Cath Lab Replacement Room 4A124 project at the Washington DC VAMC. The questionnaire is designed to collect detailed performance feedback from previous contract references, evaluating the contractor's performance across multiple dimensions including quality management, workmanship, business practices, customer relationships, compliance, safety, and overall customer satisfaction.
The evaluation form allows reference contacts to rate the contractor on a scale of 0 (Neutral) to 5 (Exceptional) across 20 specific performance criteria. These criteria cover areas such as management capabilities, personnel quality, adherence to schedules, problem-solving skills, regulatory compliance, infection control processes, and willingness to be awarded future contracts. The document is part of solicitation 688-CSI-013 for a construction project involving interior renovations of approximately 2,200 square feet within the Washington DC Veterans Affairs Medical Center, with a planned construction period of 240 calendar days from the Notice to Proceed.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs Network Contracting Office 5
Washington DC VAMC 50 Irving Street, N.W., Washington DC 20422
Past Performance Questionnaire for: 688-CSI-013 Cardiac Cath Lab Replacement Room 4A124 at the Washington DC VAMC (Construction)
Instruction to Interested Party:
Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes).
Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and return to you in a timely manner.
Company Name Street Address
Point of Contact (POC) City
POC Phone Number State
Reference Project Title Zip Code
Contract Period of Performance
Contract Number Contract Dollar Value
Description of Work
Role of Contractor on referenced contract (check box)
Prime Contractor Sub-Contractor Key Personnel
Washington DC VAMC
Instructions to Reference Contract:
The contractor named above is an interested party for a United States Department of Veterans Affairs solicitation, and has sent this form to you as a past performance reference contact. Please complete the following pages in full (all areas shaded in light yellow, below). Once completed, please return this form to
[insert name / email address] ______________________________ by no later than [insert date and time]
RESPONDENT INFORMATION [completed by Reference Contact]
Company Name Street Address
Point of Contact (POC) City
POC Phone Number State
POC Email Zip Code
Washington DC VAMC
Performance Information:
Choose the number on the scale of 0 (Neutral) to 5 (Exceptional) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE AN EXPLANATION FOR THE OVERALL RATING in the Remarks section, below.
0 1 2 3 4 5 Neutral Unacceptable Marginal Acceptable Very Good Outstanding
No record of past performance, or not applicable or the record is inconclusive.
Performance did not meet most contractual requirements.
There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements.
There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met most contractual requirements.
There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.
Performance exceeded all contract requirements. There were no problems.
Quality – Management and Workmanship The Contractor… 0 1 2 3 4 5 1 Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
2 Demonstrated ability to hire, maintain, and replace, if necessary, qualified construction personnel during the contract period.
3 Provided and followed approved quality control plan and/or inspection procedures to meet contract requirements.
4 Corrected deficiencies in timely manner and pursuant to their quality control procedures.
5 Submittals clearly identified the proposed item IAW the specifications and drawings.
6 Suggested alternative approaches to problems.
7 Contractor provided timely notices of possible delays / schedule revisions.
REMARKS:
Washington DC VAMC
8 Timeliness in submitting submittals and reports and responding to agency inquiries, RFP's, etc.
9 Developed realistic and met approved progress schedules.
Business Practices / Customer Relationship and Ability to Perform
The Contractor… 0 1 2 3 4 5 10 Displayed initiative to solve problems.
11 How well did the contractor work independent of Government guidance, oversight, and assistance?
12 Subcontractors / tradesmen were adequately managed and coordinated. Explain any subcontracting issues (positive or negative) that impacted the performance of your contract(s).
Washington DC VAMC
13 For contract changes, contractor provided timely and realistic change order proposals.
Compliance and Safety The Contractor… 0 1 2 3 4 5 14 Reports (i.e., daily, test, logs) / records were submitted completely and accurately satisfy the requirement.
15 Applicable to Federal Contracts –Contractor complied with applicable Federal Laws and Regulations such as Construction Wage Rate Requirements – timely payrolls and compliance;
Drug-Free Workplace; Environmental Regulations and Use of Recovered Materials; Executive Order 13101 Greening the Government.
16 Contractor’s safety program was in compliance with federal regulations. Contractor implemented and followed their safety plan and ran a “safe jobsite”.
Infection Control
17 Contractor had an Infection Control Process in place and complied with agency Infection Control Requirements.
Overall Customer Satisfaction
18 Demonstrated reasonableness in modifications cost proposal.
19 Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
Yes No
20 Would you award another contract to this contractor? If not, please explain in “remarks.”
Yes No
Washington DC VAMC
OVERALL PERFORMANCE RATING
Remarks:
I hereby certify that the information that I have reported above is accurate to the best of my knowledge.
Printed Name Signature Date
Business Title / Company Name E-mail address
File details come from the government source that posted it. Updated .