Cath Lab - Plumbing_IFC_5-20-2025.pdf
PDF 5 MB Posted
- Attached to
- Y1DA--Project 688-CSI-013 Cardiac Cath Lab Replacement Room 4A124 at the Washington DC VAMC.
- Solicitation number
- 36C24525R0080
About this file
These are architectural and engineering plumbing design documents for a Cardiac Cath Lab Renovation project at the Washington DC Veterans Affairs Medical Center, located at 50 Irving Street NW. The documents, dated 05/20/2025, detail comprehensive plumbing system modifications for a 2,200 square foot renovation on the 4th floor of Building 1, specifically Room 4A124. The design includes detailed floor plans for demolition and new work, covering plumbing water systems, sanitary and vent systems, and medical gas systems, with accompanying riser diagrams, valve schedules, and technical notes.
The project is fully sprinklered and involves phased construction with three distinct work phases, focusing on selective demolition and comprehensive interior renovations of architectural, structural, mechanical, electrical, and plumbing systems. Key components include modifications to existing plumbing infrastructure, installation of new medical gas systems, and coordinated work to minimize patient impact. The project has a 240-calendar day performance period from Notice to Proceed, with specific requirements for daily reporting, safety precautions, and close coordination with VA facility management, including adherence to infection control and safety protocols.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P001
PLUMBING COVER SHEET
AM 37
95 WASHINGTON STREET, MORRISTOWN, NJ 07960
t. 973.539.5353
f. 973.539.0916
THE WOOLWORTH BUILDING
233 BROADWAY SUITE 2150, NEW YORK, NY 10279
t. 212.982.7900
f. 212.982.8111 www.nkarchitects.com
NK ARCHITECTS
STAMP
SIGNATURE:
Drawing Title
Approved: Project Director
Project Title
Issued Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS ARCHITECT/ENGINEER OF RECORD
NO. 1
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
FULLY SPRINKLERED
688-CSI-013
05/20/2025
NO: REVISION DESCRIPTION: DATE:
ART - ARCHITECTURE - ENGINEERING
2787 HILL ROAD
VIENNA, VA 22181
FRANK V. STURGEON, AIA
AMBRISH RASTOGI, PE
703.938.5226
FRANK@ADG10.COM
A DESIGN GROUP, LLC
35% SUBMISSION 01-30-2024
50 Irving St NW, Washington, DC 20422
4TH FLOOR CATH LAB
RENOVATION
AR
65% SUBMISSION 04-05-2024
95% SUBMISSION 05-31-20243
100% SUBMISSION 03-21-20254
ISSUED FOR CONSTRUCTION 05-20-20255
05/20/2025
1/4" = 1'-0"1
GENERAL NOTES - DEMOLITION WORK KEYED NOTES - DEMOLITION WORK
CLEAN UTILITY
4A120
CORRIDOR
4A117
HAC
4A126
BREAK RM
MISCELLANEOUS
4A129B
FOYER
4A129D
PULM
PHYSIOLOGY
LAB WAITING
4A129
STRESS LAB
4A128
CATH LAB
CONTROL
CORRIDOR
4A119A
CATH LAB
OPERATING
ROOM
4A124
LAB
4A129A
15A 14A 13A
N
Q
R
TYPICAL DEMOLITION NOTES
PARTIAL FLOOR PLAN-DEMOLITION WORK-PLUMBING
SCALE: NOT TO SCALE
SCHEMATIC-RISER DIAGRAM -
EXISTING PLUMBING VENT
MODIFICATION WORK (TYPICAL)
SCALE: NOT TO SCALE
SCHEMATIC-RISER DIAGRAM-
EXISTING PLUMBING CW
MODIFICATION WORK
(TYPICAL)
SCALE: NOT TO SCALE
SCHEMATIC-RISER DIAGRAM-
EXISTING PLUMBING HW
MODIFICATION WORK
(TYPICAL)
PD101
FLOOR PLAN - DEMOLITION WORK -
PLUMBING
AM 38
95 WASHINGTON STREET, MORRISTOWN, NJ 07960
t. 973.539.5353
f. 973.539.0916
THE WOOLWORTH BUILDING
233 BROADWAY SUITE 2150, NEW YORK, NY 10279
t. 212.982.7900
f. 212.982.8111 www.nkarchitects.com
NK ARCHITECTS
STAMP
SIGNATURE:
Drawing Title
Approved: Project Director
Project Title
Issued Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS ARCHITECT/ENGINEER OF RECORD
NO. 1
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
FULLY SPRINKLERED
688-CSI-013
05/20/2025
NO: REVISION DESCRIPTION: DATE:
ART - ARCHITECTURE - ENGINEERING
2787 HILL ROAD
VIENNA, VA 22181
FRANK V. STURGEON, AIA
AMBRISH RASTOGI, PE
703.938.5226
FRANK@ADG10.COM
A DESIGN GROUP, LLC
35% SUBMISSION 01-30-2024
50 Irving St NW, Washington, DC 20422
4TH FLOOR CATH LAB
RENOVATION
AR
NOT TO SCALE
KEY PLAN - 4TH FLOOR
NOT TO SCALE
KEY PLAN - UPPER ROOF
FEC
FEC
FE
C
FEC
65% SUBMISSION 04-05-2024
95% SUBMISSION 05-31-20243
100% SUBMISSION 03-21-20254
1/4" = 1'-0"1
GENERAL NOTES - DEMOLITION WORK KEYED NOTES - DEMOLITION WORK
CLEAN UTILITY
4A120
CORRIDOR
4A117
HAC
4A126
BREAK RM
MISCELLANEOUS
4A129B
FOYER
4A129D
PULM
PHYSIOLOGY
LAB WAITING
4A129
STRESS LAB
4A128
CATH LAB
CONTROL
CORRIDOR
4A119A
CATH LAB
OPERATING
ROOM
4A124
LAB
4A129A
15A 14A 13A
N
Q
R
TYPICAL DEMOLITION NOTES
PARTIAL FLOOR PLAN-DEMOLITION WORK-MEDICAL GAS
PD102
FLOOR PLAN - DEMOLITION WORK
- MEDICAL GAS
AM 39
95 WASHINGTON STREET, MORRISTOWN, NJ 07960
t. 973.539.5353
f. 973.539.0916
THE WOOLWORTH BUILDING
233 BROADWAY SUITE 2150, NEW YORK, NY 10279
t. 212.982.7900
f. 212.982.8111 www.nkarchitects.com
NK ARCHITECTS
STAMP
SIGNATURE:
Drawing Title
Approved: Project Director
Project Title
Issued Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS ARCHITECT/ENGINEER OF RECORD
NO. 1
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
FULLY SPRINKLERED
688-CSI-013
05/20/2025
NO: REVISION DESCRIPTION: DATE:
ART - ARCHITECTURE - ENGINEERING
2787 HILL ROAD
VIENNA, VA 22181
FRANK V. STURGEON, AIA
AMBRISH RASTOGI, PE
703.938.5226
FRANK@ADG10.COM
A DESIGN GROUP, LLC
35% SUBMISSION 01-30-2024
50 Irving St NW, Washington, DC 20422
4TH FLOOR CATH LAB
RENOVATION
AR
NOT TO SCALE
KEY PLAN - 4TH FLOOR
NOT TO SCALE
KEY PLAN - UPPER ROOF
FEC
FEC
FE
C
FEC
65% SUBMISSION 04-05-2024
95% SUBMISSION 05-31-20243
100% SUBMISSION 03-21-20254
15A 14A 13A
N
Q
R
4A122
EQUIPMENT
4A116
1/4" = 1'-0"1
GENERAL NOTES - NEW WORK KEYED NOTES - NEW WORK
PARTIAL FLOOR PLAN-NEW WORK-PLUMBING-WATER
SCALE: NOT TO SCALE
SCHEMATIC-RISER DIAGRAM-
EXISTING PLUMBING CW
MODIFICATION WORK (TYPICAL)
SCALE: NOT TO SCALE
SCHEMATIC-RISER DIAGRAM-
EXISTING PLUMBING HW
MODIFICATION WORK (TYPICAL)
PATIENT BAY
4A119A
HOUSE
KEEPING
CLOSET
4A125
CONTROL
4A128
PATIENT BAY
4A119B
CORRIDOR
4A119
HYBRID CATH
LAB
PROCEDURE
ROOM
EP LAB
CONTROL
4A120A
CLEAN
SUPPLY
4A129
CIRCULATION
SPACE
4A120
NURSE
STATION /
TEAMWORK
4A120B
EQUIPMENT
4A128A
4A124
NOTES FOR HUMIDIFIER
95 WASHINGTON STREET, MORRISTOWN, NJ 07960
t. 973.539.5353
f. 973.539.0916
THE WOOLWORTH BUILDING
233 BROADWAY SUITE 2150, NEW YORK, NY 10279
t. 212.982.7900
f. 212.982.8111 www.nkarchitects.com
NK ARCHITECTS
STAMP
SIGNATURE:
Drawing Title
Approved: Project Director
Project Title
Issued Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS ARCHITECT/ENGINEER OF RECORD
NO. 1
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
FULLY SPRINKLERED
688-CSI-013
05/20/2025
NO: REVISION DESCRIPTION: DATE:
ART - ARCHITECTURE - ENGINEERING
2787 HILL ROAD
VIENNA, VA 22181
FRANK V. STURGEON, AIA
AMBRISH RASTOGI, PE
703.938.5226
FRANK@ADG10.COM
A DESIGN GROUP, LLC
35% SUBMISSION 01-30-2024
50 Irving St NW, Washington, DC 20422
4TH FLOOR CATH LAB
RENOVATION
AR
NOT TO SCALE
KEY PLAN - 4TH FLOOR
NOT TO SCALE
KEY PLAN - UPPER ROOF
FEC
FEC
FE
C
FEC
65% SUBMISSION 04-05-2024
95% SUBMISSION 05-31-20243
100% SUBMISSION 03-21-20254
ISSUED FOR CONSTRUCTION 05-20-20255
05/20/2025
PL101
AM 40
FLOOR PLAN - NEW WORK -
PLUMBING - WATER
Q
R
4A122
EQUIPMENT
4A116
1/4" = 1'-0"1
GENERAL NOTES - NEW WORK PLAN KEYED NOTES - NEW WORK PLAN
PARTIAL FLOOR PLAN-NEW WORK-PLUMBING-SANITARY & VENT
PATIENT BAY
4A119A
HOUSE
KEEPING
CLOSET
4A125
CONTROL
4A128
PATIENT BAY
4A119B
CORRIDOR
4A119
HYBRID CATH
LAB
PROCEDURE
ROOM
EP LAB
CONTROL
4A120A
CLEAN
SUPPLY
4A129
CIRCULATION
SPACE
4A120
NURSE
STATION /
TEAMWORK
4A120B
EQUIPMENT
4A128A
4A124
SCALE: NOT TO SCALE
SCHEMATIC-RISER DIAGRAM -
EXISTING PLUMBING VENT
MODIFICATION WORK (TYPICAL)
95 WASHINGTON STREET, MORRISTOWN, NJ 07960
t. 973.539.5353
f. 973.539.0916
THE WOOLWORTH BUILDING
233 BROADWAY SUITE 2150, NEW YORK, NY 10279
t. 212.982.7900
f. 212.982.8111 www.nkarchitects.com
NK ARCHITECTS
STAMP
SIGNATURE:
Drawing Title
Approved: Project Director
Project Title
Issued Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS ARCHITECT/ENGINEER OF RECORD
NO. 1
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
FULLY SPRINKLERED
688-CSI-013
05/20/2025
NO: REVISION DESCRIPTION: DATE:
ART - ARCHITECTURE - ENGINEERING
2787 HILL ROAD
VIENNA, VA 22181
FRANK V. STURGEON, AIA
AMBRISH RASTOGI, PE
703.938.5226
FRANK@ADG10.COM
A DESIGN GROUP, LLC
35% SUBMISSION 01-30-2024
50 Irving St NW, Washington, DC 20422
4TH FLOOR CATH LAB
RENOVATION
AR
NOT TO SCALE
KEY PLAN - 4TH FLOOR
NOT TO SCALE
KEY PLAN - UPPER ROOF
FEC
FEC
FE
C
FEC
65% SUBMISSION 04-05-2024
95% SUBMISSION 05-31-20243
100% SUBMISSION 03-21-20254
ISSUED FOR CONSTRUCTION 05-20-20255
05/20/2025
PL102
FLOOR PLAN - NEW WORK -
PLUMBING - SANITARY & VENT
AM 41
1/4" = 1'-0"
PARTIAL FLOOR PHASING PLAN-DEMOLITION WORK1
CLEAN UTILITY
4A120
CORRIDOR
4A117
HAC
4A126
BREAK RM
MISCELLANEOUS
4A129B
FOYER
4A129D
PULM
PHYSIOLOGY
LAB WAITING
4A129
STRESS LAB
4A128
CATH LAB
CONTROL
CORRIDOR
4A119A
CATH LAB
OPERATING
ROOM
4A124
LAB
4A129A
15A 14A 13A
N
Q
R
PHASE �1
15A 14A 13A
N
Q
R
1/4" = 1'-0"
PARTIAL FLOOR PHASING PLAN-NEW WORK2
PHASE �2
PHASE �3
PHASE �1
PHASE �2
PHASE �3
GENERAL NOTES-DEMOLITION/NEW WORK PHASING NOTES
95 WASHINGTON STREET, MORRISTOWN, NJ 07960
t. 973.539.5353
f. 973.539.0916
THE WOOLWORTH BUILDING
233 BROADWAY SUITE 2150, NEW YORK, NY 10279
t. 212.982.7900
f. 212.982.8111 www.nkarchitects.com
NK ARCHITECTS
STAMP
SIGNATURE:
Drawing Title
Approved: Project Director
Project Title
Issued Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS ARCHITECT/ENGINEER OF RECORD
NO. 1
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
FULLY SPRINKLERED
688-CSI-013
05/20/2025
NO: REVISION DESCRIPTION: DATE:
ART - ARCHITECTURE - ENGINEERING
2787 HILL ROAD
VIENNA, VA 22181
FRANK V. STURGEON, AIA
AMBRISH RASTOGI, PE
703.938.5226
FRANK@ADG10.COM
A DESIGN GROUP, LLC
35% SUBMISSION 01-30-2024
50 Irving St NW, Washington, DC 20422
4TH FLOOR CATH LAB
RENOVATION
AR
NOT TO SCALE
KEY PLAN - 4TH FLOOR
NOT TO SCALE
KEY PLAN - UPPER ROOF
FEC
FEC
FE
C
FEC
65% SUBMISSION 04-05-2024
95% SUBMISSION 05-31-20243
100% SUBMISSION 03-21-20254
ISSUED FOR CONSTRUCTION 05-20-20255
05/20/2025
PL103
PHASING FLOOR PLANS-
PLUMBING AND MEDICAL GAS
AM 42
Q
R
4A122
EQUIPMENT
4A116
EQUIPMENT
4A128A
1/4" = 1'-0"1
GENERAL NOTES - NEW WORK KEYED NOTES - NEW WORK
PARTIAL FLOOR PLAN-NEW WORK-MEDICAL GAS
MEDICAL GAS SYSTEM NOTES
PATIENT BAY
4A119A
HOUSE
KEEPING
CLOSET
4A125
CONTROL
4A128
PATIENT BAY
4A119B
CORRIDOR
4A119
HYBRID CATH
LAB
PROCEDURE
ROOM
EP LAB
CONTROL
4A120A
CLEAN
SUPPLY
4A129
CIRCULATION SPACE
4A120
NURSE
STATION /
TEAMWORK
4A120B
4A124
1/4" = 1'-0"2 PARTIAL FLOOR PLAN (PLAN-''A")-NEW WORK-MEDICAL GAS
95 WASHINGTON STREET, MORRISTOWN, NJ 07960
t. 973.539.5353
f. 973.539.0916
THE WOOLWORTH BUILDING
233 BROADWAY SUITE 2150, NEW YORK, NY 10279
t. 212.982.7900
f. 212.982.8111 www.nkarchitects.com
NK ARCHITECTS
STAMP
SIGNATURE:
Drawing Title
Approved: Project Director
Project Title
Issued Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS ARCHITECT/ENGINEER OF RECORD
NO. 1
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
FULLY SPRINKLERED
688-CSI-013
05/20/2025
NO: REVISION DESCRIPTION: DATE:
ART - ARCHITECTURE - ENGINEERING
2787 HILL ROAD
VIENNA, VA 22181
FRANK V. STURGEON, AIA
AMBRISH RASTOGI, PE
703.938.5226
FRANK@ADG10.COM
A DESIGN GROUP, LLC
35% SUBMISSION 01-30-2024
50 Irving St NW, Washington, DC 20422
4TH FLOOR CATH LAB
RENOVATION
AR
NOT TO SCALE
KEY PLAN - 4TH FLOOR
NOT TO SCALE
KEY PLAN - UPPER ROOF
FEC
FEC
FE
C
FEC
65% SUBMISSION 04-05-2024
95% SUBMISSION 05-31-20243
100% SUBMISSION 03-21-20254
ISSUED FOR CONSTRUCTION 05-20-20255
05/20/2025
PM101
FLOOR PLAN - NEW WORK -
MEDICAL GAS
AM 43
NOT TO SCALE
RISER DIAGRAM-WATER1
NOT TO SCALE
RISER DIAGRAM-SANITARY & VENT2
NOT TO SCALE
RISER DIAGRAM-MEDICAL GAS3
PATIENT BAY
4A119A
HOUSE
KEEPING
CLOSET
4A125
CIRCULATION
SPACE
4A120
PATIENT BAY
4A119A
HOUSE
KEEPING
CLOSET
4A125
CIRCULATION
SPACE
4A120
CORRIDOR
4A119
CORRIDOR
4A119
HYBRID CATH
LAB
PROCEDURE
ROOM
4A124
HYBRID CATH
LAB
PROCEDURE
ROOM
4A124
EQUIPMENT
4A128A
PATIENT BAY
4A119A
PATIENT BAY
4A119B
95 WASHINGTON STREET, MORRISTOWN, NJ 07960
t. 973.539.5353
f. 973.539.0916
THE WOOLWORTH BUILDING
233 BROADWAY SUITE 2150, NEW YORK, NY 10279
t. 212.982.7900
f. 212.982.8111 www.nkarchitects.com
NK ARCHITECTS
STAMP
SIGNATURE:
Drawing Title
Approved: Project Director
Project Title
Issued Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS ARCHITECT/ENGINEER OF RECORD
NO. 1
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
FULLY SPRINKLERED
688-CSI-013
05/20/2025
NO: REVISION DESCRIPTION: DATE:
ART - ARCHITECTURE - ENGINEERING
2787 HILL ROAD
VIENNA, VA 22181
FRANK V. STURGEON, AIA
AMBRISH RASTOGI, PE
703.938.5226
FRANK@ADG10.COM
A DESIGN GROUP, LLC
35% SUBMISSION 01-30-2024
50 Irving St NW, Washington, DC 20422
4TH FLOOR CATH LAB
RENOVATION
AR
65% SUBMISSION 04-05-2024
95% SUBMISSION 05-31-20243
100% SUBMISSION 03-21-20254
ISSUED FOR CONSTRUCTION 05-20-20255
05/20/2025
PR101
AM 44
RISER DIAGRAMS-WATER,
SANITARY, VENT & MEDICAL GAS
| P001 PLUMBING COVER SHEET |
| Sheets and Views |
| P001 |
| PD101 PLUMBING DEMOLITION PLAN |
| Sheets and Views |
| PD101 |
| PD102 PLUMBING DEMOLITION PLAN-MEDICAL GAS |
| Sheets and Views |
| PD102 |
| PL101 PLUMBING NEW WORK PLAN-WATER |
| Sheets and Views |
| PL101 |
| PL102 PLUMBING NEW WORK PLAN-SANITARY & VENT |
| Sheets and Views |
| PL102 |
| PL103 PLUMBING AND MEDICAL GAS PHASING PLAN |
| Sheets and Views |
| PL103 |
| PM101 PLUMBING NEW WORK PLAN-MEDICAL GAS |
| Sheets and Views |
| PM101 |
| PR101 RISER DIAGRAMS-WATER, SANITARY, VENT & MEDICAL GAS |
| Sheets and Views |
| PR101 |
File details come from the government source that posted it. Updated .