Cath Lab - APPENDIX A PHILIPS_IFC_5-20-2025.pdf
PDF 3 MB Posted
- Attached to
- Y1DA--Project 688-CSI-013 Cardiac Cath Lab Replacement Room 4A124 at the Washington DC VAMC.
- Solicitation number
- 36C24525R0080
About this file
This document is a comprehensive site preparation support document for a Philips Azurion 7 C20 Cardiac Catheterization Lab installation at the Washington DC Veterans Affairs Medical Center. The document details technical specifications, equipment layout, electrical requirements, network configurations, and installation prerequisites for a complete medical imaging system replacement in Room 4A124.
The file outlines specific requirements for the medical center's renovation, including interior modifications to approximately 2,200 square feet on the 4th floor of Building 1. The project involves selective demolition, architectural and systems upgrades, and installation of a new Philips medical imaging system with complex electrical, network, and structural specifications. The total construction period is specified as 240 calendar days from the Notice to Proceed, with detailed requirements for safety protocols, infection control, security badging, utility management, and comprehensive submittal and documentation processes. Key system components include the Azurion 7 C20 imaging system, supporting equipment like UPS systems, network connections, and various technical cabinets and infrastructure elements.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Table of ContentsRevision History Note for Architects and/or Contractors: If revisions are listed, these drawings must be thoroughly reviewed so that all changes can be incorporated into your project
Rev. Date Revision Descriptions By
- 10/12/2023 Created a Preliminary drawing per Order #: 6600654618.010000 & 6600654618.020000. AH
A 12/14/2023 Updated background per document SD-3. Showing two views of the system both horizontal and vertical. AH
B 2/2/2024 Added Skytron booms per document #: 24-016 Washington DC VA Preliminary. AH
C 2/12/2024 Updated Skytron booms per document #: 24-016 Washington DC VA Skytron Layouts. Updated equipment per upcoming CO. AH
D 3/6/2024 Shifted table isocenter 1'-0" plan (E) and 1'-0" plan (S) per PM request. DB
E 3/20/2024 Created Final Site Preparation Support Document with Order #: 6600654618.010000, 6600654618.020000. DB
Transport Details ------------------------------------ AD1 Equipment Details -------------------------- AD2 - AD7
Site Layout ---------------------------------------------- A1 Equipment Legend ------------------------------------ AL General Notes ----------------------------------------- AN
Section A - Equipment Plan
Check List -------------------------------------------- CHK Remote Service Network ----------------------- N1-N2
Electrical Details ---------------------------- ED1 - ED5 Raceway & Conduit Information ------------- E2 - E4 Electrical Layout ---------------------------------------- E1 Electrical Legend ----------------------------- EL1 - EL2 Electrical Notes ---------------------------------------- EN
Section E - Electrical Plan
Support Details ------------------------------ SD1 - SD4 Support Layout - Ceiling ----------------------- S2 - S3 Support Layout - Floor & Wall ---------------------- S1 Support Legend ---------------------------------------- SL Support Notes ------------------------------------------ SN
Section S - Support Plan
Final Site Preparation Support Document The equipment components shown in this drawing package are based on the current proposed purchase and are subject to change if modifications are made to the configuration.
www.healthcare.philips.com
*Photo shown is not site specific.
Equipment Layout -------------------------------------A2 Elevation View ----------------------------------------- A3
AN
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Minimum Site Preparation Requirements
A smooth efficient installation is vital to Philips and their customers. Understanding what the minimum site preparation requirements are will help achieve this goal. The following list clearly defines the requirements which must be fulfilled by the customer before the delivery and installation of equipment can begin.
1. Walls to be painted or covered, baseboards installed, floors to be tiled and/or covered, ceiling shall have grid tiles and luminaires installed and operational.
2. Doors and windows, especially radiation protection barriers, installed and finished with locksets operational.
3. All electrical convenience outlets, raceways, wireways, auxiliary fittings, knockouts, cable connectors, terminal and power distribution blocks, cable openings, chase nipples, junction boxes and pull boxes installed and operational.
4. A private supply mains branch circuit with overcurrent protective circuit breaker and manual operable circuit disconnect means shall be present and operational. Definition of "Private supply" means an end-leave of the hospital distribution system after the last overcurrent protective disconnect means from which all equipment included in the Azurion ground domain is powered.
Note that only equipment included in the Azurion certification and equipment with which the Azurion has a compatibility statement are allowed to be inside the Azurion ground domain. All other electrical equipment is not allowed to have a functional connection to the Azurion system and shall have no direct galvanic connection to prevent ground loops. 3rd party equipment that does not have a function connection with the Azurion system, but that is intended to be used inside the same patient area as the Azurion System shall be grounded to the PCB inside the ERB with a ground bonding of <= 200 mOhm for plugable equipment.
5. Philips does not allow 3rd party equipment inside our cabinets.
6. 120V convenience outlets operational.
7. All support structure correctly installed. All channels, pipes, beams and/or other supporting devices should be level, parallel, and free of lateral or longitudinal movements.
8. All contractor supplied cables pulled and terminated.
9. A dust-free environment in and around the procedure room.
10. All HVAC (heating, ventilating and air conditioning) installed and operational as per specifications.
11. Architectural features such as computer floor, wood floor, casework, bulkheads, installed and finished. When technical cabinets are installed in a closet with doors, it is suggested that the customer install a temperature alarm in the event of an air conditional failure.
12. All plumbing installed and finished.
13. Philips does not install or connect developing tanks, automatic processors or associated equipment, built in illuminators, cassette pass boxes, loading benches and cabinets, lead protective screens, panels or lead glass window and frame. This is to be done by the customer/contractor.
14. Clear door openings for moving equipment into the building must be 42" (1067mm) W x 82" (2083mm) H min. 48" (1219mm) W x 82" (2083mm) H rec., Or larger contingent on an 8'-0" (2438mm) corridor width.
15. Countertop is 30" (765mm) for seated height and 36" (915mm) for standing height.
Note Once Philips has moved equipment into the suite and started the installation, the contractor shall schedule his work around the Philips installation team on site. It is suggested that a telephone be provided in the room to receive telephone calls. This would alleviate facility staff from answering calls for Philips personnel.
Remote Service Diagnostics Medical imaging equipment to be installed by Philips Medical is equipped with a service diagnostic feature which allows for remote and on site service diagnostics. To establish this feature, a RJ45 type ethernet 10/100/1000 Mbit network connector must be installed as shown on plan. Access to customer's network via their remote access server is needed for Remote Service Network (RSN) connectivity. All cost with this feature are the responsibility of the customer.
(22.0)
Remote Control of Room Lighting
The control of customer lighting must incorporate an electrical isolation system such as demonstrated on Sheet ED3. Lighting scheme is the responsibility of the customer.
(12.0)
General Conditions
1. Planning, Design, and Implementation Process The multidisciplinary project team should be assembled as early as possible in the design process. The multidisciplinary team should include administrators, clinicians, infection preventionists, architects and other design professionals, facility managers, safety officers, security managers, users of equipment, and support staff relevant to the areas affected by the project as well as those with knowledge of the organization's functional goal for the project. Inclusion of patient advocates/consumers, A/E consultants, and construction specialists should be considered. FGI 2018 APPENDIX A1.2-1.2
2. Responsibility The customer shall be solely responsible, at their expense for preparation of site. Philips required specifications and any required MEP, construction and structural alterations shall be incorporated into customer's design and construction documents. Compliance with all safety, electrical, and building design codes relevant to the build out of the clinical area for Philips equipment and its installation is the customer's responsibility. Sufficiency of such plans and specifications, specifically including, but not limited to the accuracy of the dimensions described therein, shall be the sole responsibility of the customer. The customer shall advise Philips of conditions at or near the site, which could adversely affect the function of the equipment and/or carrying out of the delivery and installation work. This shall ensure that such conditions are corrected and that the site is fully prepared and available to Philips before the installation work is due to begin.
3. Permits Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and shall bear any expense in obtaining same or in complying with any related rules, regulations, ordinances and statutes.
4. Radiation Protection The customer or their contractor, at their own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection and testing.
5. Asbestos and Other Toxic Substances Philips assumes that there is no hazardous material contained in project site. The customer is responsible for the removal of any materials, including but not limited to asbestos, deemed hazardous by local authorities, the EPA, OSHA, or any other authority having jurisdiction over the work. If such materials are discovered at any time that the work is proceeding, the work will immediately cease, the owner will be notified, and the work will again proceed after the owner has removed all of the hazardous material from the job site.
6. Labor In the event local labor conditions make it impossible or undesirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate engineering supervision for proper completion of the installation.
7. Schedule The customer or general contractor shall provide Philips with a project/construction schedule with milestones to assist in the coordination of delivery of Philips supplied products and primary equipment.
8. Extended Installation or Turnkey Work by Philips Any room preparation requirements for Philips equipment indicated on these drawings is the responsibility of the customer. If an extended installation or turnkey contract exists between Philips and the customer for room preparation, then additional work required for the equipment will not be represented on these drawings. Some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract work scope and these drawings, the turnkey contract work scope shall govern.
9. Infection Control and Interim Life Safety Measure Compliance with all Infection Control and Interim Life Safety Measures shall be the sole responsibility of the customer. The customer shall provide all means and methods necessary for compliance with Infection Control (IC) and Interim Life Safety Measures (ILSM) in connection with the construction and installation/operation of the products shown herein and shall bear any expenses related to same.
(21.0)
HVAC Requirement for General Equipment Locations
*Average heat emission during clinical use Data applicable for basic system:
Large monitor + 4 x small monitor in Monitor Ceiling Suspension 1 workstation + 2 x small monitor in Control Room
Add 1705 BTU/hr for additional large monitor Add 273 BTU/hr for additional small monitor Add 1024 BTU/hr for additional workstation See AL sheet for additional heat load in case of UPS
Equipment's designed airflow is from front/side to back. Please design the air handling in the rack cabinet equipment area accordingly.
Heating, ventilation, and air conditioning requirements must maintain temperature at 59°F (15°C) to 86°F (30°C) as well as a non-condensing relative humidity at 20-80% with 10% maximum variation. These temperature and humidity levels must be maintained in all (3) rooms (equipment, examination and control rooms).
(23.0)
Operation
Temperature 59°F (15°C) to 86°F (30°C)
Temperature gradient Max. 1°F / Minute (0.5°C / Minute)
Humidity (non-condensing) Humidity shall be stable within 10% 20% to 80%
Exam Room *6479 BTU/hr
Equipment Room *8184 BTU/hr
Control Room *1705 BTU/hr
Electrical Requirements Mains 40E Cabinet
Maximum Rated Power: 100kW
Supply Configuration: 3 phase, equally sized insulated power conductors and an insulated equipment grounding conductor. Insulated grounding conductor shall have the same or larger size than line conductors. Line wires shall be no smaller than 6 AWG, 90°C or higher temperature rating. The conductor size is dependant on the upstream circuit breaker rating:
Minimum 4 AWG for 80A circuit breaker rating.
Nominal Line Voltage: 480 VAC, 60 Hz
Branch Power Requirement: 100 kVA (System only; verify UPS power requirements)
Circuit Breaker: 3 phase, Type D 80A with long-time delay
(20.1)
AL
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
A SP Clea Stand 2557 - AD2
A MSA Angio Diagnost 7 w/ Cradle, Pivot and Tilt 999 - AD2
A ME Certeray iX Generator Cabinet 320 - AD3
A MA Mains 40E Cabinet 826 - AD3
A DB Documentation Box - Mounted on Wheels (Final location to be coordinated with customer and/or local Philips Service)
176 - AD4
A ATY Exam Room Auxiliary Box 7 - AD4
A MB Image 40E Cabinet 441 - AD3
A CY Control Room Connection Box 115 - AD6
Furnished by Philips and installed by Third PartyH
Weight (lbs)
Heat Load (BTU/hr)
Detail SheetEquipment Designation
Description
Equipment Legend
Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor
G
D C B
Furnished and installed by PhilipsA
F E
Furnished by Philips and installed by Third PartyH
Weight (lbs)
Heat Load (BTU/hr)
Detail SheetEquipment Designation
Description
Equipment Legend
Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor
G
D C B
Furnished and installed by PhilipsA
F E
Items not on Philips Quote/Order
A FW Firewall 4 - AD5
A VB8 Video Connection Box 2.2 - AD4
A VB10 Video Connection Box 2.2 - AD4
A MR Peripheral 40E Cabinet with CRC + Extension 386 - AD3
A IH Interventional Hardware (Integrated with FlexSpot - Not shown)
73 - -
D BC Schneider Galaxy VS Battery Cabinet 2220 - AD4
D UPS Schneider Galaxy VS - 80 kVA UPS 551 7000 AD4
D RAP Remote Alarm Panel (for Schneider Galaxy VS
UPS)
25 - AD4
A IC Injector Room Console 11 - AD5
A RIC Injector Remote Panel 7 - AD5
A INJ Medrad Universal T-Rail Bracket for Injector Head (Not shown on plan)
A INT IntraSight- Workstation (Integrated with FlexSpot) 83 - AD7
A SYNC SyncVision (Integrated with FlexSpot) 71 - AD7
B A Skytron Boom: Utility / Dual Display - - -
B B Skytron Boom: Light w/Camera / X-Ray - - -
B C Skytron Boom: Philips Display - - -
B D Skytron Boom: Equipment - - -
B E Skytron Boom: Philips Display / X-Ray / Light - - -
A TV 58" LCD Monitor Suspension (To be mounted on third party boom C)
159 - -
A TV2 58" LCD Monitor Suspension (To be mounted on third party boom E)
159 - -
G EPIQ Ultrasound System EPIQ CVxi 365 - AD7
A SCWS AVIDIS Smart Cable Wall Socket 2.2 - -
A SCW AVIDIS Smart Cable Workstation 2.2 - -
A EN EchoNavigator (Integrated with FlexSpot) 44 - AD7
A VB1 Video Connection Box 2.2 - AD4
A VB7 Video Connection Box 2.2 - AD4
AD
Ta bl e Fl oo r P la te
Clea / Table
'-6
14'-0"
1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'
.5 m
1m 1.
5m 2m
2.
5m
3m 3.
5m
Recommended Minimum
2'-8"
19'-5"
1' -8
2'-4"
1' -3
5'-75 8"
2' -3
1'-111 2"
'-9
1 2"
1'-61 2"
3' -7
3 8"
2'-1"
'-5
1 8"
30'-5"
2' -6
1 4" 3' -1
17 8"
1'-61 2" 17'-113
4"
5' -1
0"
13'-11 8"
3' -0
3 8"
'-0
11 16
2'-95 8"
8' -6
1 16
7' -6
1 4"
5' -0
2'-3"
3'-03 8"
2'-13 4"
415 16
2' -1
3 4"
915 16
5'-11"
2' -2
1 2"
'-1
7 8"
9' -1
11 8"
A1 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Site Layout 3/16" = 1'-0"
Required Unistrut Height: 9' - 6 3 16", +3
8" / -0 (2900mm, +10mm / -0) Unistrut height measured from finished floor to bottom of Unistrut.
Walls
Soffit
Existing (to be removed)
Beams or other building construction elements
Legend
* Counters and cabinetry shown to be supplied and installed by contractor.
General Notes
* Field to verify all room dimensions.
* Refer to A.D.A. Guidelines for doors and clearances. Verify all other applicable code(s) with the architect of record.
Ta bl e Fl oo r P la te
Clea / Table
SP
MSA
'-6
14'-0"
1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'
.5 m
1m 1.
5m 2m
2.
5m
3m 3.
5m
ATY
IC
RICCYVB1 FWVB2
MR
ME
MA
MB
DB
VB3
VB4 VB5
Equipment closet doors to be hung from ceiling mounted track, no floor tracks allowed
UPS
BC
R
AP
SYNC
INT
SCW
EN
SP
EPIQ
SCWS
TV2
D
C
B
A
E
TV
VB6 VB7 VB8
VB9
VB10
'-1
7 8"
9' -1
11 8"
MSA
A2 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Equipment Layout 3/16" = 1'-0"
Required Unistrut Height: 9' - 6 3 16", +3
8" / -0 (2900mm, +10mm / -0) Unistrut height measured from finished floor to bottom of Unistrut.
Source Location Displayed
VB1 INT Control FlexVision
VB2 SYNC Control FlexVision
VB3 EN Control FlexVision
VB4 TBD TBD FlexVision
VB5 TBD TBD FlexVision
VB6 TBD TBD FlexVision
VB7 TBD TBD FlexVision
VB8 TBD TBD FlexVision
VB9 TBD Exam FlexVision
VB10 TBD Exam FlexVision General Notes
* Architect to coordinate with end users/technicians to determine final placement of control desk components prior to installation in order to avoid rework.
Architect to coordinate with Philips Project Manager to reflect final placement on Philips drawings.
* The customer shall advise Philips of existing and/or new conditions at or near the site, which could adversely affect the function of the equipment and/or carrying out of the delivery and installation work. Refer to sheet - AN line #2 of General Conditions for additional information.
Verify quantity and designation of Live/Reference slaving monitors with local Philips Service.
Planning Issues and Considerations
Conduit run(s) from SP to MA/ME/MR must be able to take the most direct route. (Maximum distance point to point = 37'/37'/39')
Patient loading may be difficult. Verify with customer requirement.
Recommend a more direct access between control room and exam room.
Verify with customer requirement.
Third Party Items - It is the customer's responsibility to interface and coordinate all non-Philips' item(s) / equipment to ensure full functionality and movement of all equipment.
Exact equipment configuration to be verified. The following is listed on the order but not shown as it is in the upcoming change order:
- 2.5m Mavig, Cable spooler, Rad shield and Lamp Y LED 1F
- Two (2) MCS, Flexvision XL HD, Additional Flexvision are listed on
Order, but shown are two (2) FlexVisions on 3rd Party Booms.
Exact equipment configuration to be verified. EPIQ is being shown for Site Planning considerations needed for Echo Navigator but the EPIQ Ultrasound Unit will need to be purchased at a future date. The following is not listed on the order but is shown as it is on the upcoming change order:
- (QTY 7) Video Wall Connection Boxes are listed on Order but (QTY 10) are shown
- Echonav Rel 4
View of patient may be limited. Verify with customer requirement.
Upper Floor and core drill is planned. Verify site conditions.
16"
[99mm]
9' -6
3 16
[2
0m m
Fi ni sh ed fl oo r t o bo tto m o f u pp er d ec k he ig ht
4'-9 1 16"
[1449mm] 1'-6 7
16" [468mm]
3'-1115 16"
[1217mm]
3'-11 1 16"
[1196mm] 3'-11 1
16" [1196mm]
4'-51 8"
[1349mm]
3' -2
7 8" [9 m m
3' -3
3 8" [1
0m m
Vertical Arm
No fly zone
Elevation check needed
No fly zone
Elevation check needed
Patient Right Patient Left
Hose Arm
Hose Outlet Note: Corrugated hose connects from hose outlet to hose arm.Finished Ceiling
Min. distance for boomsUse this area only when boom can fit between bottom of rails and of vertical arm.
x-ax is
C en te r l in e of Tr an sv er sa l m ov em en t
Min. distance for booms.
Hose Arm travels along with vertical arm. Refer to sheet AD2 Top detail for further information.
A3 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Elevation View (Not Site Specific)
1/2" = 1'-0"
General Notes
* Finished ceiling height is not the same as unistrut height as illustrated on SD1 Philips Fixing Block for Philips Ceiling Rails (Clip Rails) detail.
AD1
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Detail - Clea Ceiling (C-ARM) Transport Details
Detail - Clea Ceiling (L-ARM) Transport Details
(12.0)
Transport Possibilities
Crate Pallet Kick Wheels Wide Kick Wheels Small Height 77.95" (1980mm) 76.22" (1936mm) 69.02" (1753mm) 77.76" (1975mm)
Weight 2050 lbs (930 kg) 1940 lbs (880 kg) 2061 lbs (935 kg) 1764 lbs (800 kg)
3'-7 5 16"
[1100mm]
8' -2
7 16
[2
0m m
3'-7 5 16"
[1100mm]
8' -0
5 16
[2
6m m
5'-415 16"
[1649mm]
7' -5
9 16
[2
4m m
3'-13 4"
[960mm]
7' -5
1 2"
[2
4m m
Transport Possibilities
Crate Pallet Klick Wheels Wide Klick Wheels Wide Elevator Klick Wheels Small Klick Wheels Small
Elevator Height 57.09" (1450mm) 54.80" (1392mm) 49.25" (1251mm) 79.53" (2020mm) 49.25" (1251mm) 79.53" (2020mm)
Weight 2094 lbs (950 kg) 1973 lbs (895 kg) 1896 lbs (860 kg) 1896 lbs (860 kg) 1896 lbs (860 kg) 1896 lbs (860 kg)
3'-3" [990mm]
9' -9
11 16
[2
0m m
2'-11 7 16"
[900mm]
9' -9
3 4"
[2
0m m
5'-13 4"
[1568mm]
9' -7
1 4"
[2
7m m
5'-13 4"
[1568mm]
7' -9
1 8"
[2
5m m
9' -6
7 8"
[2
8m m
2'-10 1 16"
[865mm]
2'-1013 16"
[884mm]
7' -9
1 8"
[2
5m m
AD2
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
1' -0
[3 m m
2' -7
3 16
[7 m m
3' -6
3 16
[1
2m m
M ax
Floor Plate ℄
Top
Side
2'-1 9 16"
[650mm]
12'-9 9 16"
[3900mm] Maximum Travel
3' -5
15 16
[1
5m m
5'-1011 16"
[1795mm]
11 7 16"
[290mm]
11 7 16"
[290mm]Front
Table Pivot is optional. This allows the table to rotate -90, +180 degrees about center of table base.
9' -6
3 16
+3 /8
-0
[2
0m m m m
-0
] 45 8"
[1 m m
Hose Arm
6'-1011 16"
[2100mm]
185° 120°
R eq ui re d U ni st ru t h ei gh t
6' -2
13 16
[1
0m m
3'-3" [990mm]
7'-73 4"
[2330mm]
1' -7
1 16
[4 m m
1' -7
1 16
[4 m m
5'-1011 16"
[1795mm]
Optional Table Pivot ℄ (-90, +180 degrees)
Indicates equipment movement
Hose Outlet
Hose Arm
*Parked position limited 300mm for shorter rooms
Hose Arm and Outlet on opposite side (Optional)
8'-61 8"
[2594mm]
1' -0
[3 m m
M in
3'-3" [990mm]
Minimum clearance required for installation of carriage into rails (either side)
2'-1 9 16"
[650mm]
1'-11 3 16"
[588mm]
4'-51 8"
[1350mm]
5 8"
[1 5m m
(23.0)
SP
Clea Stand
Weight Heat Dissipation
2557 lbs - BTU/hr
(23.0)
MSA
Angio Diagnost 7 Weight Heat Dissipation
999 lbs - BTU/hr
9' -5
9 16
[2
5m m
* 300mm rail end stop adjustment is possible at either end of rails, to accommodate room size, ceiling obstructions, or non-standard unistrut spacing.
End stop adjustment can have a workflow (clear parking space) or clinical (C-Arm table top coverage) impact.
Minimum clearance required for installation of carriage into rails (either side)
AD3
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Front
The CRC Cover must be attached to the back box.
Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")
CRC Cover CRC Extension
Top
6' -4
15 16
[1
5m m
Side
1'-81 2"
[520mm]
8"
[276mm]
6 5 16"
[160mm]
CRC Cover
1'-95 8"
[550mm]
(23.0)
MA
Mains 40E Cabinet
Weight Heat Dissipation
826 lbs - BTU/hr
Top
6' -4
15 16
[1
5m m
Side
1'-81 2"
[520mm]
8"
[175mm]
1'-95 8"
[550mm]
Front
The CRC Cover must be attached to the back box.
Acoustic noise level: <= 48 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")
CRC Cover
CRC Cover
(23.0)
MB
Image 40E Cabinet Weight Heat Dissipation
441 lbs - BTU/hr
Top
6' -4
15 16
[1
5m m
Side
1'-81 2"
[520mm]
8"
[175mm]
1'-95 8"
[550mm]
The CRC Cover must be attached to the back box.
Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")
Front
CRC Cover
CRC Cover
(23.0)
ME
Certeray iX Generator 40E Cabinet Weight Heat Dissipation
320 lbs - BTU/hr
Front
The CRC Cover must be attached to the back box.
Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and 1 meter high (1 meter = 39.37")
CRC Cover CRC Extension
Top
6' -4
15 16
[1
5m m
Side
1'-81 2"
[520mm]
8"
[276mm]
6 5 16"
[160mm]
CRC Cover
1'-95 8"
[550mm]
(23.1)
MR
Peripheral 40E Cabinet Weight Heat Dissipation
386 lbs - BTU/hr
AD4
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Front
Top
Side
9 16
[6 5m m
16"
[195mm]
1 4"
[2 m m
(23.0)
ATY
Auxiliary Box Weight Heat Dissipation
7 lbs - BTU/hr
Front
Top
Side
1'-95 8"
[550mm]
4' -0
[1
0m m
3' -8
1 16
[1
0m m
1'-1 3 16"
[335mm]
(23.0)
DB
Documentation Box
Weight Heat Dissipation
176 lbs - BTU/hr
1' -1
3 16
[3 m m
Front
Top
Side
2"
[242mm]
9 7 16"
[240mm]
3 16
[5 5m m
(23.0)
VB1
VB10
Video Connection Box Weight Heat Dissipation
2.2 lbs - BTU/hr
(23.0) Schneider - Galaxy VS 80 kVA UPS
Weight Heat Dissipation
UPS 551 lbs 7000 BTU/hr
BC 2220 lbs
RAP 25 lbs -
4' -1
01 2"
[1
6m m
FRONT SIDE
TOP
2'-91
8"
[841mm]
FRONT
FRONT SIDE
2'-9 1 16"
[840mm]
4' -1
011 16
[1
0m m
Battery Cabinet
1'-10" required for ventilation
1'-81 2"
[521mm]
1' -1
0" [5 m m
4' -1
01 2"
[1
6m m
Front
Remote Alarm Panel
Top
10" [254mm]
[2 m m
65 8"
[1 m m
FRONT
1' -1
0" [5 m m
1' -1
0" [5 m m
UPS Cabinet
1'-10" required for ventilation
TOP TOP
2'-3 9 16"
[700mm]
2' -9
13 16
[8 m m
8" required for ventilation
8" required for ventilation
57 8"
[1 m m
2' -9
3 16
[8 m m
57 8"
[1 m m
57 8"
[1 m m
8" required for ventilation
AD5
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Weight shown is for all components.
Firewall must be installed maximum of 6'-6 34" from the CY.
Front Side
Top
Mounted on the Wall
Front Side
Mounted below the Control Room Desk
(23.0)
FW
Firewall
Weight Heat Dissipation
4 lbs - BTU/hr
Top
16"
[46mm]
8"
[200mm]
3 16
[2 m m
16"
[46mm]Counter
8"
[200mm]
FW
3 16
[2 m m
Front
Top
Side
(23.0)
IC
Injector Room Console Weight Heat Dissipation
11 lbs - BTU/hr
4"
[248mm]
45 8"
[1 m m
1'-3 3 16"
[386mm]
Front
Top
Side
(23.0)
RIC
Injector Remote Panel Weight Heat Dissipation
7 lbs - BTU/hr
1'-4 9 16"
[420mm]
53 8"
[1 m m
2"
[190mm]
AD6
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Review Module
Front Side
Top
Front Side
Top
Touch Screen Module (Optional)
DVD Writer (Optional)
1'-0" [304mm]
9 16
[1 m m
6 5 16"
[160mm]
13 16
[2 0m m
Front Side
Top
LCD Monitor
8" [2 m m
2'-11 2"
[648mm]
1' -5
3 8"
[4 m m
Front Side
Top
Keyboard / Mouse
83 8"
[2 m m
315 16
[1 m m
1'-7 5 16"
[490mm]
8"
[60mm] 13 8"
[3 5m m
Front Side
Top
Connection Box (See SD3 for mounting options)
55 8"
[1 m m
2'-71 2"
[800mm] 1' -9
9 16
[5 m m
5 16
[1 m m
81 2"
[2 m m
(23.0)
CY
Control Room Connection Box (All Components)
Weight Heat Dissipation
115 lbs - BTU/hr
Front Side
Top
Multiswitch (Optional)
1'-5 1 16"
[434mm]
2" [5
1m m
7 16
[1 m m
Front Side
Top
Control Module
1'-5 7 16"
[442mm]
1'-5 7 16"
[442mm]
4" [1 m m
Front Side
Top
61 4"
[1 m m
9" [228mm]
11 2"
[3 8m m
Detail - Typical Control Room Layout with FlexSpot (Not to scale - Not site specific)
AD7
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
8"
[212mm]
37 8"
[9 9m m
Weight shown is for all components.
Front Side
Top
Front Side
Control Console- Keyboard / Mouse
CPU (46.6 lbs)
Front Side
Front Side
Sony Medical Grade Printer (12.2 lbs)
19" (480mm) LCD Monitor (13.2 lbs)
(20.0)
INT
IntraSight - Workstation Weight Heat Dissipation
83 lbs - BTU/hr
Top Top
Isolation Transformer (~10 lbs)
Front Side
Top 16"
[223mm]
7 16
[1 m m
1'-0 1 16"
[306mm]
1'-43 4"
[425mm]
1' -6
7 8"
[4 m m
7 7 16"
[189mm]
10" [255mm]
1'-4 7 16"
[418mm]
1' -5
5 16
[4 m m
11" [280mm]
8"
[60mm] 13 8"
[3 5m m
5" [1 m m
Top
1'-3 9 16"
[396mm]
Front Side
Top
Front Side
Control Console- Keyboard / Mouse
CPU (46.6 lbs)
Front Side
19" (480mm) LCD Monitor (13.2 lbs)
Top Top
Isolation Transformer (~10 lbs)
Front Side
Top 16"
[223mm]
7 16
[1 m m
1'-0 1 16"
[306mm]
1'-43 4"
[425mm]
1' -6
7 8"
[4 m m
7 7 16"
[189mm]
10" [255mm]
1'-4 7 16"
[418mm]
1' -5
5 16
[4 m m
11" [280mm]
8"
[60mm] 13 8"
[3 5m m
5" [1 m m
Weight shown is for all components.
(20.0)
SYNC
SyncVision Weight Heat Dissipation
71 lbs - BTU/hr
Weight shown is for CPU
Front Side
Top
Front Side
Top
CPU (44.1 lbs) Keyboard / Mouse 1'
-8 1 2"
[5 m m
8"
[194mm]
1' -4
15 16
[4 m m
611 16
[1 m m
1'-6" [457mm]
8"
[66mm]
41 2"
[1 m m
115 16
[5 0m m
(23.0)
EN
EchoNavigator Weight Heat Dissipation
44 lbs - BTU/hr
Front
Top
Side
(23.0)
EPIQ
EPIQ Ultrasound Unit Weight Heat Dissipation
365 lbs - BTU/hr
3' -8
1 4"
[1
4m m
1'-85 8"
[523mm]
1'-103 4"
[578mm]
2'-1 3 16"
[639mm]
97 8"
[2 m m
SN
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Equipment Support Information
1. General The customer shall be solely responsible, at its expense, for preparation of the site, including any required structural alterations. The site preparation shall be in accordance with this plan and specifications, the architectural/construction drawings and in compliance with all safety and building codes. The customer shall be solely responsible for obtaining all construction permits from jurisdictional authority.
2. Equipment Anchorage Philips provides, with this plan and specifications, information relative to equipment size, weight, shape, anchoring hole locations and forces which may be exerted on anchoring fasteners. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of equipment anchoring to floors, wall and/or ceiling of the building. Any anchorage test required by local authority shall be the customer's responsibility. Stud type anchor bolts should not be specified as they hinder equipment removal for service. Consult with Philips service prior to specifying anchor methods. Philips equipment must be electrically isolated from anchorage.
3. Floor Loading and Surface Philips provides, with this plan and specifications, information relative to size, weight and shape of floor mounted equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings confirmation of the structural adequacy of the floor upon which the equipment will be placed. Any load test required by local authority, shall be the customer's responsibility.
The floor surface upon which Philips equipment is to be placed/anchored shall be flat and level to within 1
16" (2mm) over a length of 39" (1m).
4. Ceiling Support Apparatus
a. Philips provides, with this plan and specifications, information relative to size, weight and shape of ceiling supported equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of structural support apparatus, fasteners and anchorage to which Philips will attach equipment.
Any anchorage and/or load test required by local authority shall be the customer's responsibility. Philips equipment must be electrically isolated from anchorage.
b. Contractor to clearly mark Philips equipment longitudinal centerline on bottom of each structural support.
c. The structural support apparatus surface to which Philips equipment is to be attached, shall have horizontal equipment attachment surfaces parallel, square and level to within .236" (6mm) per entire span.
d. Any drilling and/or tapping of holes required to attach Philips equipment to the structural support apparatus shall be the responsibility of the customer.
e. Fasteners/anchors (i.e., bolts, spring nuts, lock and flat washers) and strip closures shall be provided by the customer.
5. Lighting Luminaires shall be placed in such a position that they are not obscured by equipment or its movement, nor shall they interfere with Philips ceiling rails and equipment movement or otherwise adversely affect the equipment. Such luminaire locations shall be the sole responsibility of the customer.
6. Ceiling Obstructions There shall be no obstructions that project below the finished ceiling in the area covered by ceiling suspended equipment travel.
7. Seismic Anchorage (For Seismic Zones Only) All seismic anchorage hardware, including brackets, backing plates, bolts, etc., shall be supplied and installed by the customer/contractor unless otherwise specified within the support legend on this sheet. Installation of electronic cabinets to meet seismic anchorage requirements must be accomplished using flush mounted expansion type anchor/bolt systems to facilitate the removal of a cabinet for maintenance. Do not use threaded rod/adhesive anchor systems. Consult with Philips regarding any anchor system issues. Philips equipment must be electrically isolated from anchorage.
8. Floor Obstructions/ Floor Coverings There shall be no obstructions on the floor (sliding door tracks, etc.) within the serviceability area of the Philips technical cabinets. Floor must be clear to allow cabinets to be pulled away from the wall for service. Technical equipment room floor shall be commercial grade "VCT" Vinyl Composition Tile or a flooring material of equal hardness and compression resistance.
9. Safety Factors Ceiling loads as mentioned in the PRD are worst case loads and excluding safety factors. Proper safety factors need to be applied by Design Professional/Engineer of Record.
10. Stiffness Requirements of Ceiling Horizontal Stiffness: preferred 10,000,000 Newton/meter - 57.1 klb/in, minimal 6,000,000 Newton/meter - 34.2 klb/in Vertical Stiffness: preferred 10,000,000 Newton/meter - 57.1 klb/in, minimal 6,000,000 Newton/meter - 34.2 klb/in Rotation Stiffness: minimal 20,000,000 Newtonmeter/Rad - 177,014 (klb in)/Rad
(23.0)
Center frequency [Hz] 1 1.25 1.6 2 2.5 3.15 4 5 6.3 8
Terts band value [μm/s]
(RMS) 50.8 50.8 50.8 50.8 63.5 80.01 101.6 127 160 203.2
Center frequency [Hz] 10 12.5 16 20 25 31.5 40 50 63 80
Terts band value [μm/s]
(RMS) 254 317.5 406.4 406.4 406.4 406.4 406.4 406.4 406.4 406.4
Center frequency [Hz] 100 125 160 200
Terts band value [μm/s]
(RMS) 406.4 406.4 406.4 406.4
Equipment Support Information
11. Requirements for External Vibration The maximum allowed external vibration level of floors and ceilings, to which the equipment is mounted that will not adversely affect the image quality, is specified in terms of RMS velocity levels in 1/3-octave or terts bands, as follows:
Terts Band Specification for External Vibrations
A graphical representation of this specification is given below:
Terts Band Specification for External Vibrations
Terts band spectra shall be calculated on the basis of time traces with a duration of 10 minutes (600 seconds), taken at representative locations and during representative times during working days.
For Clea Stand (1160 kg or 11600 N): the maximum allowed deflection of the ceiling and/or floor construction is 1.93 mm.
SL
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Floor & Wall Support Legend
Item Number
Description
Detail Sheet
Optional Future Existing Furnished by Philips and installed/anchored by contractor Installed/anchored by customer/contractor Furnished and installed by customer/contractor and installed/anchored by customer/contractor
G
D C B
Furnished and installed/anchored by Philips (exceptions may exist, see Note 2)A
F E
See S1 for Floor & Wall Support Layout
Ceiling Support Legend
Item Number
Description
Detail Sheet
Optional Future Existing Furnished by Philips and installed by contractor Installed by customer/contractor Furnished by customer/contractor and installed by customer/contractor
G
D C B
Furnished and installed by PhilipsA
F E
See S2-S3 for Ceiling Support Layout
Notes:
1. Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor.
2. Anchors for items that are installed/anchored by Philips shall be provided by
Philips. If customer's engineering documents specify anchors other than those listed in this document, the anchors shall be provided by customer/contractor and installed by Philips.
3. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.
Furnished by Philips and installed by Third PartyH
D MSA AD7 Universal Floor Plate SD1
A SP 2 - Philips Clea Rails SD1
B CY Support in wall for Control Room Connection Box (CY) SD3
A CY Anchors in wall for Control Room Connection Box (CY) SD3
B FW Firewall AD5
SD2
B UNI Unistrut (P1000/P1001 in meeting Philips ceiling requirements, geometry of channel and geometry of fixing block) - Bottom of Unistrut 1/4" (6mm) to 1/2" (13mm) Below Finished Ceiling
SD1
Ta bl e Fl oo r P la te
Clea / Table
'-2
3 8"
3'-6"3'-6"
3' -6
Le ve l o f f lo or
1 16
2m m ) p er
9" (1 m ) w ith in th is a re a.
MSA
'-6
14'-0"
1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'
.5 m
1m 1.
5m 2m
2.
5m
3m 3.
5m
CYFW
2'-7"8'-9"
Level of floor ± 1 16" (2mm) per 39" (1m) within this area.
'-1
7 8"
9' -1
11 8"
S1 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Floor & Wall Support Layout 3/16" = 1'-0"
Required Unistrut Height: 9' - 6 3 16", +3
8" / -0 (2900mm, +10mm / -0) Unistrut height measured from finished floor to bottom of Unistrut.
Refer to Floor/Wall Support Legend - Sheet SL
Ta bl e Fl oo r P la te
Clea / Table
U N
I
Ty p.
C ei lin g
C le ar an ce Se e Sh ee t "
SD
2"
311 16
1' -2
2'
-2
2' -2
2'
-2
2' -2
3'-0"3'-0"
57 8"
215 16
2' -2
'-6
14'-0"
1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'
.5 m
1m 1.
5m 2m
2.
5m
3m 3.
5m
'-1
7 8"
9' -1
11 8"
S2 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an ag er
C on ta ct
N um be r:
Em ai l:
Ji n
C ho i
(8
) 4
-5 jin .c ho i@ ph ilip s.
co m
Ceiling Support Layout - Unistrut 3/16" = 1'-0"
Required Unistrut Height: 9' - 6 3 16", +3
8" / -0 (2900mm, +10mm / -0) Unistrut height measured from finished floor to bottom of Unistrut.
Refer to Ceiling Support Legend -
Ta bl e Fl oo r P la te
Clea / Table
SP SP
C ei lin g
C le ar an ce Se e Sh ee t "
SD
2"
1'-65 8"1'-65
8"
215 16
'-6
14'-0"
1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12'
.5 m
1m 1.
5m 2m
2.
5m
3m 3.
5m
5'-2"
5'-6"
2' -8
3'
-6
7'-4"
5'-4"
'-5
5'
-6
'-1
7 8"
9' -1
11 8"
S3 THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
Pr oj ec t D et ai ls Ph ili ps
C on ta ct s Pr oj ec t D ra w in g
N um be r
N -E
A S2
E
D at e D ra w n:
/2 0/
Q uo te
O rd er
A zu rio n
C
06.30.2023
1-
R Z4
M W
R ev
.0
.0
TH
E D
R
AW
IN
G
S
AN
D R
EL
AT
ED
IN
ST
R
U C
TI
O
N S
PR
O
VI
D
ED
B
Y
PH
IL
IP
S
AR
E
AC
C
EP
TA
BL
E
FO
R U
SE
B
Y
TH
E H
O
SP
IT
AL
'S A
R C
H
IT
EC
T
O R
E N
G
IN
EE
R
T O
U
SE
F O
R T
H E
D
EV
EL
O
PM
EN
T O
F C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
VA
M ed ic al C en te r D C
W as hi ng to n, D C
R oo m : C at h
La b
K on in kl ijk e Ph ilip s
El ec tro ni cs N
.V . 2
9.
A ll rig ht s re se rv ed . R ep ro du ct io n in w ho le o r i n pa rt is p ro hi bi te d w ith ou t p rio r w rit te n co ns en t o f t he c op yr ig ht h ol de r.
D ra w n
By : D an ie l B au m an
Pr oj ec t M an…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .