This document contains a past performance questionnaire template and information on a related federal contract opportunity for HVAC replacement services at various Department of Veterans Affairs buildings. The past performance questionnaire is to be completed by references for offerors submitting proposals in response to solicitation number 36C24724R0009, issued by the VA Veterans Health Administration VISN 7. It requests ratings on various performance factors including compliance, quality, scheduling, resolution of issues, safety, and invoices. Comments are also solicited. The federal contract opportunity is for replacing HVAC systems at multiple VA facilities and was issued with the identified solicitation number by the VA VHA VISN 7.

View the file

Other files

File Type Posted
36C24724R0009 0007.docx DOCX document
22-1081.pdf PDF
36C24724R0009 0006.docx DOCX document
Additional Bid RFI Q_A.pdf PDF
36C24724R0009 0005.docx DOCX document
36C24724R0009 0004.docx DOCX document
Appendix B - Building 2.pdf PDF
UPDATED DBA WAGES AL20240098.pdf PDF
Appendix S - Building 46.pdf PDF
ACM - Appendix P - Building 46.pdf PDF
Project Manual specs.pdf PDF
Combined Bid Questions and Responses.pdf PDF
Replace HVAC Various buildings Site Visit.pdf PDF
CRL Mill 5 16 Aluminum Window Frame 144 CRL.pdf PDF
ACM - Appendix B - Building 2.pdf PDF
679-22-106 ICRA Final.pdf PDF
36C24724R0009 0003.docx DOCX document
36C24724R0009 0002.docx DOCX document
36C24724R0009 0001.docx DOCX document
Drawings.pdf PDF
DBA AL20230098 09-01-2023.pdf PDF
Attachment 1 - Experience Modification Rate Form 2022 Revised 2 2 2023.pdf PDF
Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf PDF
Specifications.pdf PDF
36C24724R0009_1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE COVER SHEET

PAST PERFORMANCE QUESTIONNAIRE FOR SOLICITATION RFP #

Offerors submitting satisfactory past performance information are required to include this cover sheet with their proposal submission. The entire questionnaire should be forwarded to your previous clients for projects identified in the experience forms provided in response for factor 3 for completion. Clients shall directly return the cover sheet and questionnaire to Joyce Powers at e-mail address joyce.powers1@va.gov

It is the offeror’s responsibility to ensure correct and verifiable point of contact information.

(Offeror Fill-In Below)

1. Offeror Name (Name of Organization/Firm being Evaluated):

2. Name of Organization/Firm Providing Reference:

3. Address of Organization/Firm Providing Reference:

4. Contract Number:

5. Project Description:

6. Contract/Task Order Amount:

7. Performance Period:

8. Evaluator’s Point of Contact Information:

Name and Title:____________________________________________________________ Phone Number:____________________________________________________________ Fax Number:_______________________________________________________________ E-Mail Address:_____________________________________________________________

PAST PERFORMANCE QUESTIONNAIRE FOR SOLICITATION RFP #

ADJECTIVAL RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

E (EXCELLENT)
Performance meets contractual requirements and exceeds expectations. The contractual performance of the element assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. (High Confidence).
G (GOOD)
Performance meets contractual requirements and exceeds some requirements. The contractual performance of the element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. (Significant Confidence).
S (SATISFACTORY)
Performance meets contractual requirements. The contractual performance of the elements contains some minor problems for which corrective action taken by the contractor is satisfactory. (Confidence).
M (MARGINAL)
Performance does not meet some contractual requirements. The contractual performance of the element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. (Little Confidence).
P (POOR)
Performance does not meet most contractual requirements and recovery is no likely in a timely manner. The contractual performance of the element contains serious problems for which the contractor’s corrective actions appear or were ineffective. (No confidence).
NR (NO RATING)
No relevant past performance record is identifiable upon which to base a meaningful performance risk prediction. A search was unable to identify any relevant past performance information for the contractor or their key personnel. (This is neither a negative or positive assessment).

EVALUATOR: PLEASE CIRCLE THE ADJECTIVAL RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

Was this a competitive contract?
YES NO
Role of the contractor
Prime Contractor or Subcontractor
Compliance with contractual terms and conditions
E G S M P NR
Ability to meet quality standards specified for technical performance
E G S M P NR
Adequacy of initial progress schedule
E G S M P NR
Adherence to approved schedule
E G S M P NR
Resolution of Delays
E G S M P NR
Identification/correction of deficient work in a timely manner
E G S M P NR
Cooperation and responsiveness
E G S M P NR
Professional Conduct
E G S M P NR
Ability to hire and retain a qualified workforce to this effort.
E G S M P NR
Coordination and Control of Subcontractors(s)
E G S M P NR
Effectiveness of overall contract management (including ability to effectively lead, manage, and control the project.)
E G S M P NR
Effectiveness of on-site management and control of multidiscipline construction categories, including management of subcontractors.
E G S M P NR
Contractor was reasonable and cooperative in dealing with staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports).
E G S M P NR
Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E G S M P NR
Ability to successfully respond to emergency situations.
E G S M P NR
Payroll properly completed and submitted
E G S M P NR
Contractor Safety Record.
E G S M P NR
Contractor responsiveness to safety issues.
E G S M P NR
Contractor’s timeliness, completeness, and accuracy in submitting invoices.
E G S M P NR
Adequacy of Site Clean-up
E G S M P NR
Warranty Response
E G S M P NR

If this was a Government contract has the contract been terminated for default or Convenience? Indicate if show cause or cure notices were issued or any default action in the comment section below.

E G S M P NR

REMARKS: Please explain marginal or poor ratings.

Evaluator’s Point of Contact Information:

Signature and Title:_________________________________________________________ Phone Number:____________________________________________________________ E-Mail Address:_____________________________________________________________

File details come from the government source that posted it. Updated .