This document is a solicitation for replacing HVAC systems in various buildings at the Tuscaloosa VA Medical Center. The solicitation requests proposals to provide all materials, labor, and supervision to complete project 679-22-106 per contract drawings and specifications. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due by November 29, 2023. The work includes general construction, alterations, and demolition to replace HVAC systems in multiple buildings. An organized site visit will be held on November 8, 2023. The period of performance is 365 calendar days after notice to proceed. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7.

View the file

Other files

File Type Posted
36C24724R0009 0007.docx DOCX document
22-1081.pdf PDF
36C24724R0009 0006.docx DOCX document
Additional Bid RFI Q_A.pdf PDF
36C24724R0009 0005.docx DOCX document
36C24724R0009 0004.docx DOCX document
Appendix B - Building 2.pdf PDF
UPDATED DBA WAGES AL20240098.pdf PDF
Appendix S - Building 46.pdf PDF
ACM - Appendix P - Building 46.pdf PDF
Project Manual specs.pdf PDF
Combined Bid Questions and Responses.pdf PDF
Replace HVAC Various buildings Site Visit.pdf PDF
CRL Mill 5 16 Aluminum Window Frame 144 CRL.pdf PDF
ACM - Appendix B - Building 2.pdf PDF
679-22-106 ICRA Final.pdf PDF
36C24724R0009 0003.docx DOCX document
36C24724R0009 0002.docx DOCX document
36C24724R0009 0001.docx DOCX document
Drawings.pdf PDF
DBA AL20230098 09-01-2023.pdf PDF
Attachment 1 - Experience Modification Rate Form 2022 Revised 2 2 2023.pdf PDF
Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf PDF
Specifications.pdf PDF
Past Performance Questionnaire.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24724R0009

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24724R0009 X 10-27-2023 679-24-1-5656-0001 679-22-106 Department of Veterans Affairs VISN 7 Network Contracting Office 3 FL Directors Office 3700 Crestwood Parkway Duluth

GA

30096 Same as Block 7

Joyce Powers Project Title: "Replace HVAC, Various Buildings", Project #679-22-106 Project Location: Tuscaloosa VAMC - 3701 Loop Rd, Tuscaloosa AL 35404

This acquisition is 100% Set-aside for Services Disabled Veteran Owned Small Businesses (SDVOSB) only.

The SDVOSB Business must be 51% or more owned and controlled by one or more service-connected veterans.

LIMITATIONS ON SUBCONTRACTING: (Reference VAAR 852.219-73 (d)(3) for further information): By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract in the case of a contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance excluding the cost of materials, to subcontractors that are not similarly situated entities/ Vet Cert SBA SDVOSBs. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded.

MAGNITUDE OF CONSTRUCTION: Between $1,000,000.00 and $2,000,000.00

NAICS Code: 238220; Small Business Standard: $19 Million

In order to be eligible for award, the offeror shall be registered at the following websites: System for Award Management at https://sam.gov with completed electronic annual representations and certifications and VetCert at https://veterans.certify.sba.gov/. Offerors MUST ensure registration in these websites are accurate, complete and have not expired prior to proposal due date.

Site Visit: An organized site visit is scheduled for 8 Nov, 2023, 9:00 AM (CT).

Location: Tuscaloosa VAMC, 3701 Loop Road East, Bldg 5, 2nd Floor Conference Room, Tuscaloosa, AL 35404 (Information provided at the site visit shall not alter the terms and conditions of the solicitation and terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. Contractors are required to submit all questions in writing to the Contracting Officer following the site visit.)

Requests for Information (RFIs): Due Date: NLT 15 Nov, 2023, 12:00 PM (ET) via email to joyce.powers1@va.gov Late RFIs may not be accepted and offerors are responsible of ensuring questions are received on time.

Responses will be provided in question and answer format via a posted amendment to SAM Contract Opportunities.

x x 52.211-10 X 1 electronic

2:00 PM

EST

11-29-2023 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

ITEM 1, BASE BID: $

ITEM 2, BID DEDUCT ALT 1: $

Department of Veterans Affairs VISN 7 Network Contracting Office 3 FL Directors Office 3700 Crestwood Parkway Duluth

GA

30096 Austin Payment Center Department of Veteran Affairs PO Box 149971 Austin

TX

78714-8971

(877) 353-9791

(512) 460-5545

JOYCE POWERS

VA-VHA-RPOE-2023-0023

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS5
2.1 STATEMENT OF WORK5
2.2 PRICE OFFER SCHEDULE6
2.3 PROPOSAL PREPARATION, EVALUATION CRITERIA8
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS15
1.1 52.216-1 TYPE OF CONTRACT (APR 1984)15
1.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)15
1.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)16
1.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)17
1.5 52.228-1 BID GUARANTEE (SEP 1996)18
1.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)19
1.7 52.233-2 SERVICE OF PROTEST (SEP 2006)19
1.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)19
1.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)20
1.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)20
1.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)20
REPRESENTATIONS AND CERTIFICATIONS22
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)22
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)26
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)28
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)30
GENERAL CONDITIONS33
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)33
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)33
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)34
4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)35
4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAR 2023)35
4.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)38
4.7 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)40
4.8 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)40
4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)41
4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS46
4.11 52.236-4 PHYSICAL DATA (APR 1984)46
4.12 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE II (APR 1984)47
4.13 52.244-2 SUBCONTRACTS (JUN 2020)48
4.14 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)51
4.15 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)52
4.16 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)54
4.17 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)54
4.18 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)57
4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)59
4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)60
4.21 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)61
4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019)61
4.23 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)63
4.24 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)64
4.25 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)64
4.26 List of Attachments66

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 STATEMENT OF WORK

SCOPE OF WORK/SYNOPSIS

Project Number:
679-22-106
Project Title:
Replace HVAC Various Buildings

Scope of Work:

Contractor shall provide all materials, supervision, and labor to perform project 679-22-106 Replace HVAC Various Buildings per contract drawings and specifications. Work includes but not limited to general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items.

Completion Time from receipt of NTP: 365 days after Notice to Proceed (NTP).

SAFETY:

Contractor to provide proof that all employees have tested negative for Tuberculosis prior to arriving on campus. Contractor to provide proof that the Supervisor has completed the 30-hour OSHA course and proof that all subcontractors have completed the 10-hour OSHA course prior to arriving on campus.

IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:

The Contractor’s FSE shall always wear visible identification while on the premises of the Tuscaloosa VA Medical Center. Contractor shall only park in the appropriate designated parking areas. Information on parking is available from the Tuscaloosa VA Medical Center Police Section. Tuscaloosa VA Medical Center will not invalidate or make reimbursements for parking violations of the contractor under any conditions. Smoking is prohibited inside and outside any buildings at Tuscaloosa VA Medical Center. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

OBTAINING VA IDENTIFICATION BADGE:

Contractor shall contact the Contracting Officer’s Representative (COR), upon contract award, to receive instructions on how to obtain a VA Identification Badge during the performance of this contract.

SECURITY:

The Contractor shall ensure compliance by its employees with the security regulations of the Veterans Administration where work is performed under this Contract. Contracted employees shall self-register at https://www.tms.va.gov/SecureAuth35/ . Once registered, enroll in class VA10176 VA Privacy and Information Security Awareness and Rules of Behavior. Contractors shall provide signed certifications of completion to the Contracting Officer’s Representative (COR) prior to starting work on this contract.

Photography or Video on medical center premises is strictly prohibited. Additionally, pursuant to 38 CFR 1.218(b) (23): Use of recording devices of any kind to record patients or employees is strictly prohibited. VA-designated employee shall provide escort in sensitive areas (e.g. patient areas, MACPAC, HAS, or any areas where sensitive information is kept) and in OIT areas.

SITE VISITS:

Please contact the COR with any questions during the site visit.

POC:, Monteal Wiggins, COR 1, Healthcare Engineer Engineering Service Phone: 205-554-2000, ext. 6490 Email: Monteal.Wiggins@va.gov

RECORDS AND INFORMATION MANAGEMENT

Project No. 679-22-106 Project Title: Replace HVAC Various Buildings

Upon completion or termination of the applicable contract(s) or agreement(s), return and/or destroy, at Covered Entity’s option, VA information gathered, created, received, or processed during the performance of the contract(s) or agreement(s). No data will be retained by Business Associate, or contractor, subcontractor, or other agent of Business Associate, unless retention is required by law and specifically permitted by Covered Entity. As deemed appropriate by and under the direction of Covered Entity, Business Associate shall provide written assurance that all VA information has been returned to Covered Entity or destroyed by Business Associate. If immediate return or destruction of all data is not possible, Business Associate shall notify Covered Entity and assure that all VA information retained will be safeguarded to prevent unauthorized Uses or Disclosures.

Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.

2.2 PRICE OFFER SCHEDULE

36C24724R0009

Page 1 of Page 1 of Price Offer Schedule

Description
U/I
QTY
UNIT PRICE
TOTAL PRICE

A. ITEM 1, BASE BID: All work shown or specified within the drawings and specifications. Work includes, but is not limited to, general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and certain other items.

Completion Time: 365 days from Notice to Proceed (NTP)

B. ITEM 2-BID DEDUCT ALTERNATE 1: Include all work in Item 1, minus the following: Delete the Building 46 ceiling and roof insulation addition in the Nave.

Completion Time: 300 days from NTP

JB

2.3 PROPOSAL PREPARATION, EVALUATION CRITERIA

Page 1 of

PROPOSAL PREPARATION AND EVALUATION INFORMATION

I. Proposal Submission and Evaluation Procedures

This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under Federal Acquisition Regulation (FAR) Subpart 15.1 using the tradeoff process and evaluated in accordance with FAR Subpart 15.3, Source Selection. This section describes the method for evaluating and selecting offers for this procurement.

A. Proposal Submission:

1. Submit one (1) Electronic Proposal by email to joyce.powers1@va.gov . Subject Line of Email should include “Company Name, RFP number, Project Title”.

2. The size of your file shall not exceed 10 MB. If you have multiple documents, please submit as separate emails.

3. Interested firms are responsible for ensuring electronic delivery of submission by the time and the date specified. It will be highly recommended interested firms confirm electronic submissions have been received by the Contracting Officer. Failure to provide a proposal in its entirety prior to the deadline will render the proposal noncompliant.

B. Proposal Preparation and Format Instructions:

Offerors must provide all requested information for each factor and sub-factor. Proposals must separately address each element of each factor and sub-factor as applicable to be considered responsive to this RFP. Factor and sub-factors headings must be highlighted in yellow or typed in bold text for identification. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format, the provided information is clearly understood and free of ambiguities.

Offerors proposals shall consist of technical, past performance, and price proposal, as described below.

1. TAB A: General Information:

(1) Cover Page with Solicitation Number, Project Title
(2) Table of Contents
(3) Signed offer/Acknowledgement of Amendments (SF1442)

(4) Price Offer Schedule

(5) Copy of current vetBiz.gov SDVOSB certification
(6) SAM UEI Number
(7) Cage Code
(8) Tax ID number

(9) Offer Guarantee Bond (DO NOT SEND HARD COPY) Electronic copy acceptable and should be emailed to Point of Contact listed above.

(10) Safety or Environmental Violations and Experience Modification (EMR) Rate

* Submit information regarding current experience modification rate form (See Attachment 1). An EMR of greater than 1.0 may disqualify the bidder/offeror.

(11) 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (Jan 2023) (Deviation), (Attachment 2).

2. TAB B: Technical Evaluation Factors:

· Factor 1 – Management Approach and Key Personnel

· Factor 2 – Technical Solutions

· Factor 3 – Schedule and Impact to Facility

3. TAB C: Past Performance

4. TAB D: Price Proposal

C. Evaluation Criteria:

1. The evaluation is subjective based on the information provided in response to the information requested in the evaluation factors. The three (3) factors to be evaluated include technical, past performance, and price.

2. Relative Importance of the Factors: For evaluation purposes, all technical proposal factors 1-3, are equal in importance. All technical factors, when combined, are more important than past performance. All technical factors and past performance, when combined, are significantly more important than cost/price.

3. Offerors proposal shall address the following:

I. TECHNICAL EVALATION FACTORS:

A. FACTOR 1 - MANAGEMENT APPROACH AND KEY PERSONNEL (10 page max):

1) For the General Contractor, submit the following:

a) Identify Key Personnel assigned to this project

b) Submit an organizational chart

c) Include a narrative which describes the relevant experience of:

i) Firm’s Key personnel and experience, to include at least:

(1) Project Manager

· Similar projects worked on

· Education and/or certification(s)

· Valid OSHA 30 certificate (current within 5 years)

(2) Field Superintendent

· Similar projects worked on

· Education and/or certification(s)

· Valid OSHA 30 certificate

2) For the HVAC Subcontractor, submit the following:

a) Identify the Subcontractors performing all work that will not be performed by the General Contractor.

b) Submit an organizational chart showing the relationship between the Subcontractor and any Sub-Subcontractors.

c) Include a narrative which describes the relevant experience of:

i) Firm’s Key personnel and experience, to include at least:

(1) Project Manager

· Similar projects worked on

· Education and/or certification(s)

· Valid OSHA 10 certificate

(2) Field Superintendent

· Similar projects worked on

· Education and/or certification(s)

· Valid OSHA 10 certificate

3) For the Electrical Subcontractor, submit the following:

a) Identify the Subcontractors performing all work that will not be performed by the General Contractor.

b) Submit an organizational chart showing the relationship between the Subcontractor and any Sub-Subcontractors.

c) Include a narrative which describes the relevant experience of:

i) Firm’s Key personnel and experience, to include at least:

(1) Project Manager

· Similar projects worked on

· Education and/or certification(s)

· Valid OSHA 10 certificate

(2) Field Superintendent

· Similar projects worked on

· Education and/or certification(s)

· Valid OSHA 10 certificate

4) Quality Control Team: Describe the quality control team organization. Provide the specific description of the tasks and functions of the quality control personnel. Identify where each position will be physically located (e.g., field office, home office, etc.). Clearly identify each member's employer. Describe the Project team Quality Assurance program and safety record.

5) Warranty Support: Describe the organizations process and procedures to be established for warranty support.

B. FACTOR 2 - TECHNICAL SOLUTIONS

1) Technical

a) Briefly describe the firms specialized experience and technical competence working with HVAC involving health care facilities.

b) Briefly describe the firms experience working with the selected HVAC subcontractor on projects involving health care facilities.

c) Describe any technical difficulties that may be encountered in a project of this type. Provide a narrative of preventative measures or solutions to overcome these issues.

C. FACTOR 3 – SCHEDULE/IMPACT TO FACILITY

1) Operations

a) Submit a preliminary (CPM) Critical Path Method schedule for construction satisfying the requirements of this project. The schedule should show the critical paths of installation from beginning to end (submittals, equipment lead time, mobilization, demolition, installation, finalization etc.). Most importantly, the schedule should show length of downtime required.

b) Submit company safety procedures.

c) Submit company safety procedures specifically regarding shutdowns.

II. RECENT AND RELEVANT PAST PERFORMANCE:

Each offeror shall identify a maximum of three (3) references for similar services on Government contracts within the past three (3) years. The submission should include a brief description of the project, Contracting Officer’s Representative (COR) contact information for references, contract number, and dollar value.

1) Recent is defined as performance within the last three (3) years through the solicitation released date. Relevant is defined as performance similar or greater in scope, magnitude, and complexity than the effort described in this solicitations scope of work.

2) Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.

3) The Government will evaluate the offeror’s past performance on active and physically completed federal contracts. The Government will contact the offeror’s submitted references on Government contracts. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to: Contract Performance Assessment Reporting System (CPARS) or other databases, past performance questionaries, and interviews with Program Managers, Contracting Officers, and/or Contracting Officer Representatives. The past performance evaluation will assess the relative risks associated with an offeror’s likelihood of success in performing the scope of work requirements as indicated by the offeror’s record of past performance.

4) The following evaluation documents are acceptable:

i. Contractor Performance Assessment Report System (CPARS), or

ii. Past Performance Questionnaire (PPQ) evaluation (attached).

5) If a completed CPARS evaluation is available, it shall be submitted with the proposal. If a PPQ is submitted, but an official CPARS evaluation is found for that project in government databases, the official evaluation will take precedence. If a CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for each contract customer/reference.

Contractors shall not incorporate by references into their response, CPARS or PPQ evaluations previously submitted in response to other procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

III. PRICE PROPOSAL:

NOTE: LIMITATIONS ON SUBCONTRACTING: (Reference VAAR 852.219-73 (d)(3) for further information): By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract in the case of a contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities/ Vet Cert SBA SDVOSBs. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded.

1) The following cost elements shall be addressed:

a) Labor (Direct & Indirect),
b) Materials, Material Markups, Materials overhead,
c) Equipment
d) Subcontractor Cost
e) Other Direct Costs
f) Overhead expenses
g) Indirect Cost
h) Profit
i) Bonds

j) Breakdown of G&A expenses inclusive of all project staff and general requirements of the Prime Contractor.

2) Provide supporting documentation showing quotes/cost breakdowns for both prime and subs)

3) The Government will evaluate price based on the total price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

a.Comparison of proposed prices received in response to the RFP.
b.Comparison of proposed prices with the IGE.
c.Comparison of proposed prices with available historical information.
d.Comparison of market survey results.

II. Evaluation and Selection Criteria:

Proposals will be evaluated on the basis of three major evaluation criteria: Technical Proposal, Past Performance, and Price. The evaluation criteria are listed in descending order of relative importance. All technical proposal factors 1-3, are equal in importance. All technical factors, when combined, and past performance are significantly more important than cost/price.

1) The technical proposal described above will be evaluated and rated using an adjectival rating system.

2) Past Performance will be evaluated for Relevancy and Confidence levels.

3) For evaluation purposes, the technical proposal factors and past performance, will be considered significantly more important than price.

III. Evaluation and Award Determination:

1) This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under FAR Subpart 15.1, Tradeoff Process and evaluated in accordance with FAR Subpart 15.3, Source Selection. Award will be made based on offerors’ technical factors and past performance history and will be considered significantly more important than cost or price. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror.

2) Each pricing element will be evaluated to determine its reasonableness. The Government may use various price analysis techniques and procedures to make a price reasonableness determination. Offerors should assure that their ability to meet or exceed the minimum needs of the Government is adequately described in the offer.

3) Discussions: The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. Communication conducted to resolve minor or clerical errors would not constitute discussions and the Contracting Officer reserves the right to award a task order without the opportunity for proposals revisions or discussions. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

4) Evaluation Overview:

a. The Government intends to award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, technical, past performance, and price considered. The proposals must conform to the RFP's requirements and evaluated to represent the Best Value to the Government. The Best Value is the most advantageous offer, consistent with the Government's stated importance of evaluation criteria. This may result in award being made to a high-rated, higher-priced offeror where the Contracting Officer determines that the technical capability and past performance of the higher-priced offeror outweighs the price.

b. To receive consideration for award, a rating of no less than “Satisfactory” must be achieved for all technical evaluation factors. Offerors are cautioned that the award may not necessarily be made to the lowest priced offeror.

c. Offerors must provide all requested information for each factor and sub-factor. Proposals must separately address each element of the factors as applicable to be considered responsive to this RFP. Factors and sub-factor headings must be highlighted in yellow or typed in bold text for identification. Recommend each titled factor and sub-factor heading in the submitted proposal be stated in the chronological order shown below. This format establishes a direct correlation between the information provided and the factor and sub-factor for evaluation. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format, the provided information is clearly understood and free of ambiguities.

d. Best value will be determined by a comparative assessment of proposals against all source selection criteria in this RFP. In order to determine which proposal represents the best overall value, the Government will conduct a tradeoff analysis, comparing the strengths and weaknesses of the competing proposals to determine which proposal(s) represent(s) the best value to the Government and thus shall receive contract award.

e. The Government reserves the right to accept other than the lowest priced offer. The right is also reserved to reject any and all offers. The basis of award will be a conforming offer, the price or cost of which may or may not be the lowest. If other than the lowest offer, it must be sufficiently more advantageous than the lowest offer to justify the payment of additional amounts.

f. Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

g. Award will result in a firm-fixed price contract. It is the Offeror’s responsibility to ensure the submitted price proposal includes all costs for total project requirements and completion in accordance with the specifications and drawings herein. The Offeror assumes all risk for omissions in prime and/or subcontractor proposals.

h. The Government evaluation team will consider all information provided in the proposal individually. Once these individual analyses are completed, the team will meet and determine a rating by consensus decision.

i. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.

j. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.

5) Responsibility Determination: A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. The above information, along with other information obtained from Government and commercial systems, will be used to make the Determination of Responsibility. Any information received by the Government that would be cause for a negative Determination of Responsibility will make the offeror ineligible for award.

6) SDVOSB Verification: The Government will review SBA certification database (https://veterans.certify.sba.gov/ ) to confirm Service Disabled Veteran-owned Small Business (SDVOSB) status verification for the submitted proposals. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of SDVOSB verification status will be performed for the apparent award. For a Joint Venture to be considered eligible as an SDVOSB if the joint venture 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph 852.219-73(d) of the clause will be performed by the aggregate of the joint venture participants. Failure of a prospective SDVOSB to meet these certification requirements by the SBA shall result in elimination from consideration.

7) The prospective offeror must complete certification -- 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (Jan 2023) (DEVIATION)

8) Safety or Environmental Violations and Experience Modification Rate (EMR): Prospective offerors/bidders cannot have no more than three serious, or one repeat, or one willful Occupational Safety and Health Administration (OSHA) or Environmental Protection Agency (EPA) violation(s) in the past 3 years and must have an EMR of equal to or less than 1.0. Offerors/bidders with an EMR of 1.0 or higher will not be eligible/considered responsible." The Government reserves the right to obtain information from Government systems, such as the OSHA and EPA online inspection history databases to ensure the contractor meets the designated EMR rate.

Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

1.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

1.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

1.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
20.6 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is

TUSCALOOSA AL

(End of Provision)

1.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

1.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

1.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.

(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

(End of Provision)

1.7 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Email address to:

Joyce.powers1@va.gov

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

1.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

8 NOV 2023, 9:00 AM CT

(c) Participants will meet at— Tuscaloosa VAMC - Bldg 5, 2nd floor conference room (End of Provision)

1.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/

(End of Provision)

FAR Number
Title
Date
52.204-7
SYSTEM FOR AWARD MANAGEMENT
OCT 2018
52.204-16
COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
AUG 2020
52.204-22
ALTERNATIVE LINE ITEM PROPOSAL
JAN 2017
52.215-1
INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION
NOV 2021
52.236-28
PREPARATION OF PROPOSALS—CONSTRUCTION
OCT 1997

1.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.

(End of Clause)

1.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.

(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.

(End of Provision) PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:

Deputy Assistant Secretary for Acquisition and Logistics,
Risk Management Team, Department of Veterans Affairs
810 Vermont Avenue, N.W.
Washington, DC 20420

Or for solicitations issued by the Office of Construction and Facilities Management:

Director, Office of Construction and Facilities Management
811 Vermont Avenue, N.W.
Washington, DC 20420
FAR Number
Title
Date
852.223-70
INSTRUCTIONS TO OFFERORS—SUSTAINABLE ACQUISITION PLAN
SEP 2019
852.233-70
PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION
OCT 2018
852.239-75
INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE
FEB 2023

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238220.

(2) The small business size standard is $19 Million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .