Appendix B - Building 2.pdf

PDF 2 MB Posted

Attached to
Z2AA--679-22-106 Replace HVAC Various Buildings
Solicitation number
36C24724R0009
Issued by

About this file

This document contains an appendix related to a federal contract opportunity for replacing HVAC systems in various buildings at a Department of Veterans Affairs medical center. The appendix includes XRF testing data sheets, location plans, and photographic documentation from lead-based paint inspections conducted in Building 2 on the medical center campus. The testing identified several components with lead levels exceeding the hazardous waste standard, including metal ductwork, pipes, stairs, and an exterior crawlspace vent.

The related federal contract opportunity is to replace HVAC systems in various buildings as identified in project number 679-22-106. The contractor will provide all labor, materials, and supervision to complete the work according to contract drawings and specifications within 365 days of receiving the notice to proceed. Safety, security, and regulatory compliance requirements are outlined for contractor personnel working on the medical center campus. The contracting officer's representative is identified as the point of contact for site visits or other questions during the project.

View the file

Other files

File Type Posted
36C24724R0009 0007.docx DOCX document
22-1081.pdf PDF
36C24724R0009 0006.docx DOCX document
Additional Bid RFI Q_A.pdf PDF
36C24724R0009 0005.docx DOCX document
36C24724R0009 0004.docx DOCX document
UPDATED DBA WAGES AL20240098.pdf PDF
Appendix S - Building 46.pdf PDF
ACM - Appendix P - Building 46.pdf PDF
Project Manual specs.pdf PDF
Combined Bid Questions and Responses.pdf PDF
Replace HVAC Various buildings Site Visit.pdf PDF
CRL Mill 5 16 Aluminum Window Frame 144 CRL.pdf PDF
ACM - Appendix B - Building 2.pdf PDF
679-22-106 ICRA Final.pdf PDF
36C24724R0009 0003.docx DOCX document
36C24724R0009 0002.docx DOCX document
36C24724R0009 0001.docx DOCX document
Drawings.pdf PDF
DBA AL20230098 09-01-2023.pdf PDF
Attachment 1 - Experience Modification Rate Form 2022 Revised 2 2 2023.pdf PDF
Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf PDF
Specifications.pdf PDF
Past Performance Questionnaire.docx DOCX document
36C24724R0009_1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX B

BUILDING 2

MENTAL HEALTH BUILDING / OFFICES

INCLUDED IN APPENDIX B:

B‐1 – XRF Testing Data Sheets

B‐2 – XRF Testing Location Plans

B‐3 – Photographic Documentation

APPENDIX B‐1

XRF Testing Data Sheets

XRF TESTING DATA

VAMC TUSCALOOSA

BUILDING 2

3701 PELHAM LOOP ROAD EAST

TUSCALOOSA, AL 35404

SELC PROJECT #: 2014‐1107

NITON XLP 700‐303A

Serial #21385

Reading Lead

Number (mg/cm2)

1 7/31/2014 10:19 1.51* 2 7/31/2014 10:54 0.90 3 7/31/2014 10:55 0.90 4 7/31/2014 10:57 1.00 5 7/31/2014 11:08 Chair Rail Wood C Intact White Interior Ground Bldg 2 16 NP Negative 0.00 6 7/31/2014 11:09 Door Metal A Intact Brown Interior Ground Bldg 2 16 NP Negative 0.00 7 7/31/2014 11:10 Door Frame Metal A Intact Brown Interior Ground Bldg 2 16 NP Negative 0.00 8 7/31/2014 11:12 Wall Gypsum Board B Intact White Interior Ground Bldg 2 1c NP Negative 0.00 9 7/31/2014 11:13 Door Metal D Intact Brown Interior Ground Bldg 2 1c NP Negative 0.01 10 7/31/2014 11:13 Door Frame Metal D Intact Brown Interior Ground Bldg 2 1c NP Negative 0.00 11 7/31/2014 11:15 Door Frame Metal D Intact Brown Interior Ground Bldg 2 7b NP Null 0.00 12 7/31/2014 11:15 Door Frame Metal A Intact Brown Interior Ground Bldg 2 7b NP Negative 0.01 13 7/31/2014 11:17 Wall Gypsum Board C Intact White Interior Ground Bldg 2 24 NP Negative 0.01 14 7/31/2014 11:18 Radiator Metal D Intact White Interior Ground Bldg 2 24 NP Positive 1.80 15 7/31/2014 11:22 Wall Gypsum Board A Intact White Interior Ground Bldg 2 cg4 NP Negative 0.01 16 7/31/2014 11:24 Fire Ext. Cab. Door Metal D Intact Red Interior Ground Bldg 2 cg5 NP Negative 0.01

17 7/31/2014 11:26 Wall Plaster A Intact White Interior Ground Bldg 2 Stairwell sc‐1 NP Negative 0.13

18 7/31/2014 11:26 Stringer Metal B Intact White Interior Ground Bldg 2 Stairwell sc‐1 NP Positive 2.90

19 7/31/2014 11:30 Stringer Metal C Intact White Interior First Bldg 2 Stairwell 123 NP Positive 4.60

20 7/31/2014 11:31 Door Metal C Intact White Interior First Bldg 2 Stairwell 123 NP Negative 0.01

21 7/31/2014 11:32 Door Frame Metal C Intact White Interior First Bldg 2 Stairwell 123 NP Negative 0.00

22 7/31/2014 11:32 Wall Plaster C Intact White Interior First Bldg 2 Stairwell 123 NP Negative 0.14

Date & Time Component Substrate Side Condition Results

Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573

Color Location Floor Building Room Inspector

ACTION LEVEL = 1.00 mg/cm2

BUILDING 2

3701 PELHAM LOOP ROAD EAST

TUSCALOOSA, AL 35404

SELC PROJECT #: 2014‐1107

NITON XLP 700‐303A

Serial #21385

Reading Lead

Number (mg/cm2) Date & Time Component Substrate Side Condition ResultsColor Location Floor Building Room Inspector

23 7/31/2014 11:33 Ceiling Plaster C Cracked White Interior First Bldg 2 Stairwell 123 NP Null 0.08

24 7/31/2014 11:33 Ceiling Plaster C Cracked White Interior First Bldg 2 Stairwell 123 NP Negative 0.06

25 7/31/2014 11:36 Wall Plaster B Intact White Interior First Bldg 2 109 NP Negative 0.40 26 7/31/2014 11:37 Door Frame Metal D Intact Brown Interior First Bldg 2 109 NP Negative 0.01 27 7/31/2014 11:39 Door Frame Metal B Intact Brown Interior First Bldg 2 Corridor 125 NP Negative 0.00 28 7/31/2014 11:39 Door Metal B Intact Brown Interior First Bldg 2 Corridor 125 NP Negative 0.01 29 7/31/2014 11:40 Wall Plaster A Intact White Interior First Bldg 2 104 NP Negative 0.07 30 7/31/2014 11:42 Column Plaster B Intact Beige Interior First Bldg 2 101 NP Negative 0.10 31 7/31/2014 11:43 Door Frame Metal C Intact Brown Interior First Bldg 2 101 NP Negative 0.00 32 7/31/2014 11:46 Wall Plaster C Intact White Interior First Bldg 2 115 NP Positive 1.70 33 7/31/2014 11:48 Fire Ext. Cab. Door Metal D Intact Red Interior First Bldg 2 Corridor 179 NP Negative 0.04 34 7/31/2014 11:49 Wall Gypsum Board B Intact Beige Interior First Bldg 2 113c NP Negative 0.00 35 7/31/2014 11:50 Wall Gypsum Board D Intact Beige Interior First Bldg 2 113c NP Negative 0.00 36 7/31/2014 11:52 Door Frame Metal D Intact Brown Interior First Bldg 2 113g NP Negative 0.00 37 7/31/2014 11:54 Wall Gypsum Board D Intact Beige Interior First Bldg 2 113g NP Negative 0.00

38 7/31/2014 11:57 Wall Plaster B Intact White Interior First Bldg 2 Stairwell 113c NP Negative 0.12

39 7/31/2014 11:58 Stringer Metal B Intact Gray Interior First Bldg 2 Stairwell 113c NP Positive 3.50

40 7/31/2014 11:59 Door Metal A Intact White Interior First Bldg 2 Stairwell 113c NP Negative 0.06

41 7/31/2014 12:00 Door Frame Metal A Intact White Interior First Bldg 2 Stairwell 113c NP Negative 0.08

42 7/31/2014 12:07 Wall Plaster C Cracked Beige Interior Second Bldg 2 205 NP Negative 0.01 43 7/31/2014 12:07 Door Frame Metal A Cracked Brown Interior Second Bldg 2 205 NP Negative 0.00 44 7/31/2014 12:08 Door Frame Metal C Intact Brown Interior Second Bldg 2 204 NP Negative 0.02

BUILDING 2

3701 PELHAM LOOP ROAD EAST

TUSCALOOSA, AL 35404

SELC PROJECT #: 2014‐1107

NITON XLP 700‐303A

Serial #21385

Reading Lead

Number (mg/cm2) Date & Time Component Substrate Side Condition ResultsColor Location Floor Building Room Inspector

45 7/31/2014 12:08 Wall Plaster A Intact White Interior Second Bldg 2 204 NP Negative 0.14 46 7/31/2014 12:11 Wall Plaster D Intact Beige Interior Second Bldg 2 Corridor 219 NP Negative 0.00 47 7/31/2014 12:13 Wall Gypsum Board C Intact White Interior Second Bldg 2 212b NP Negative 0.00 48 7/31/2014 12:14 Door Frame Metal A Intact Gray Interior Second Bldg 2 212b NP Negative 0.01 49 7/31/2014 12:14 Door Metal A Intact Gray Interior Second Bldg 2 212b NP Negative 0.01 50 7/31/2014 12:15 Door Metal D Intact Brown Interior Second Bldg 2 212d NP Negative 0.00 51 7/31/2014 12:17 Wall Plaster A Intact White Interior Second Bldg 2 213b NP Negative 0.00 52 7/31/2014 12:22 Window Sill Wood A Intact White Interior Attic Bldg 2 NP Positive 14.70 53 7/31/2014 12:23 Sprinkler Pipe Metal B Intact Red Interior Attic Bldg 2 NP Negative 0.04 54 7/31/2014 12:34 Sprinkler Pipe Metal A Intact Red Interior Attic Bldg 2 NP Negative 0.00 55 7/31/2014 12:35 Duct Metal Central Intact Orange Interior Attic Bldg 2 NP Positive 8.90 56 7/31/2014 12:36 Duct Metal Central Intact Orange Interior Attic Bldg 2 NP Positive 10.10 57 7/31/2014 12:36 Pipe Metal Central Poor Beige Interior Attic Bldg 2 NP Positive 10.10 58 7/31/2014 12:38 Floor Concrete Central Intact Gray Interior Attic Bldg 2 Elevator NP Negative 0.50 59 7/31/2014 12:39 Floor Concrete Central Intact Red Interior Attic Bldg 2 Elevator NP Negative 0.30 60 7/31/2014 12:39 Ladder Metal B Intact Gray Interior Attic Bldg 2 Elevator NP Positive 7.70 61 7/31/2014 12:39 Door Metal B Intact Gray Interior Attic Bldg 2 Elevator NP Positive 2.10 62 7/31/2014 12:40 Door Frame Metal B Intact Gray Interior Attic Bldg 2 Elevator NP Positive 2.00 63 7/31/2014 12:40 Duct Metal C Intact Gray Interior Attic Bldg 2 Elevator NP Positive 9.70 64 7/31/2014 12:42 Cage Metal Central Intact Green Interior Attic Bldg 2 Elevator NP Negative 0.26 65 7/31/2014 12:45 Motor Metal A Intact Blue Interior Attic Bldg 2 Elevator NP Negative 0.00

66 7/31/2014 13:30 Wall Brick A Intact White Interior Ground Bldg 2 Mechanical 8a NP Negative 0.00

67 7/31/2014 13:30 Door Metal A Intact White Interior Ground Bldg 2 Mechanical 8a NP Negative 0.00

68 7/31/2014 13:31 Door Frame Metal A Intact White Interior Ground Bldg 2 Mechanical 8a NP Negative 0.01

BUILDING 2

3701 PELHAM LOOP ROAD EAST

TUSCALOOSA, AL 35404

SELC PROJECT #: 2014‐1107

NITON XLP 700‐303A

Serial #21385

Reading Lead

Number (mg/cm2) Date & Time Component Substrate Side Condition ResultsColor Location Floor Building Room Inspector

69 7/31/2014 13:32 Wall Metal C Intact White Interior Ground Bldg 2 Mechanical 8a NP Negative 0.02

70 7/31/2014 13:33 Door Metal C Intact White Interior Ground Bldg 2 Mechanical 8a NP Negative 0.00

71 7/31/2014 13:33 Door Frame Metal C Intact White Interior Ground Bldg 2 Mechanical 8a NP Negative 0.00

72 7/31/2014 13:34 Ceiling Concrete C Peeling White Interior Ground Bldg 2 Mechanical 8a NP Negative 0.01

73 7/31/2014 13:35 Motor Metal C Intact Red Interior Ground Bldg 2 Mechanical 8a NP Negative 0.02

74 7/31/2014 13:35 Motor Metal C Intact Red Interior Ground Bldg 2 Mechanical 8a NP Negative 0.00

75 7/31/2014 13:36 Stairs Metal B Intact Black Interior Ground Bldg 2 Mechanical 8a NP Positive 8.40

76 7/31/2014 13:36 Handrail Metal B Intact Black Interior Ground Bldg 2 Mechanical 8a NP Positive 1.60

77 7/31/2014 13:38 Window Frame Metal C Intact White Exterior Ground Bldg 2 Mechanical 8a NP Negative 0.00

78 7/31/2014 13:39 Window Lintel Metal C Intact White Exterior Ground Bldg 2 NP Positive 1.20 79 7/31/2014 13:40 Window Lintel Metal B Intact White Exterior Ground Bldg 2 NP Negative 0.70 80 7/31/2014 13:41 Crawlspace Vent Metal B Poor White Exterior Ground Bldg 2 NP Positive 20.70 142 7/31/2014 15:18 1.00 143 7/31/2014 15:21 1.00 144 7/31/2014 15:22 1.00 145 7/31/2014 15:23 0.90

* = Reading number 1 is an internal diagnostic reading that does not represent lead content on any items.

Null = Incomplete test due to instrument movement or early trigger release.

Reading numbers 81 ‐ 141 apply to Building 12, also tested on same date. Please see corresponding building table for this data.

Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573

APPENDIX B‐2

XRF Testing Location Plans

APPENDIX B‐3

Photographic Documentation

Building 2 Photographic Documentation

SELC Project # 2014-1107 Page 1

Photograph 1 Damaged LBP on metal roof drain pipe.

Photograph 2 Damaged/deteriorated LBP on crawlspace vent on exterior.

NO PHOTOGRAPH NO PHOTOGRAPH

Appendix B Cover Sheet B2
Appendix B Divider Pages
BUILDING 2 DRAWINGS.pdf
2014-1107 - B2 - SHEET 1 OF 4
2014-1107 - B2 - SHEET 2 OF 4
2014-1107 - B2 - SHEET 3 OF 4
2014-1107 - B2 - SHEET 4 OF 4

File details come from the government source that posted it. Updated .