The document is a comprehensive bid set of architectural and structural drawings for the Seismic Retrofit of the Public Works Building for the City of Pasadena, California. The project involves a voluntary seismic retrofit of a concrete tilt-up panel building with wood diaphragms, located at 233 W. Mountain St. The scope of work includes selective demolition and replacement of ceilings and roofing, strengthening wall out-of-plane connections to diaphragms, reinforcing connections and components for subdiaphragms, and strengthening roof plywood diaphragms. Additionally, the project encompasses ADA upgrades, such as replacing non-compliant millwork in the breakroom and kitchen, replacing drinking fountains, re-striping accessible parking stalls, and upgrading the path of travel from accessible parking to the building.
The project is funded through the Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) and American Rescue Plan Act (ARPA) funds. The building is a three-story structure with a total area of approximately 44,560 square feet (1st floor: 25,895 sf, 2nd floor: 17,945 sf, 3rd floor: 720 sf), with the retrofit work covering approximately 20,000 square feet. The construction is classified as Type IIIB and fully sprinklered, with no changes to the building's occupancy, height, or number of stories. The contractor will be required to perform work outside normal business hours, coordinate temporary relocation of staff workstations, and comply with reporting procedures outlined by the granting agencies.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOM NAME / NUMBER
/ AREA
EXISTING PARTITION / WALL
DEMO PARTITION / WALL
NEW PARTITION / WALL
EXISTING DOOR
NEW DOOR
DOOR TAG
WINDOW TAG
KEYNOTE
WALL TYPE TAG
INTERIOR ELEVATION
VIEW
DETAIL CALLOUT
DETAIL CUT
WALL SECTION CUT
ROOM NAME
ROOM NUMBER
CEILING HEIGHT
ROOM FINISHES CODE
ROOM AREA
ROOM NAME
150 SF
9'-0"
A101
OFFICE
CV-001
996 SF
RF-1 RB-1 P-1 GYP
PL-1
A-800
A101
A101
SIM
B6
W1
N
A101
8'-0"
FINISH MATERIAL TAG
EQUIPMENT TYPE TAG
CEILING HEIGHT TAG
GRID COLUMN CENTER
LINE
REVISION TAG
ALIGN ARROW SYMBOL
EXIT SIGN ANNOTATION SYMBOL
SPOT ELEVATION
NORTH ARROW
0 VIEW NAME
REFERENCE SHEET
A101
PHOTO REFERENCE
IDS
DATEDESCRIPTIONREV.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS GROUP
IDS PROJECT NO.
DRAWN BY
CHECKED BY
APPROVED BY
PROJECT IDENTIFICATION
THIS DRAWING WAS CREATED IN REVIT V. 2020
UNLESS OTHER WISE NOTED.
THE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND
COPYRIGHT OF IDS GROUP AND SHALL NOT BE USED ON ANY
OTHER PROJECT OR LOCATIONS EXPECT AS DESCRIBED ON THE
DRAWINGS, WITHOUT WRITTEN AGREEMENT WITH IDS GROUP.
SHEET NO. OF
ISSUE
STAMP
STAMP
ENGINEER/ARCHITECT
PROJECT NAME
CLIENT
21X051.01
SHEET TITLE
SHEET NUMBER
APPROVAL
Public Works
Building
Seismic Retrofit
Public Works Facility 233 W. Mountain St.
Pasadena, CA 91109
233 W. Mountain St. Pasadena, CA 91103
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
ID
S
G R
O U
P
F
IL
E L
O C
A T
IO
N
P
L O
T D
A T
E
U S
E R
JK
JS
JS
11/23/22PLAN CHECK RESUBMITTAL1
City of Pasadena
12/13/22P.C. APPROVED SET
01/16/23BID SET
/1
/2
:0 :2
P
M C
U s e rs \D a ri n .M c K e e \D o c u m e n ts
\2 X
.0 P
A S
A P
W
A d d S v c
B ld g S e is m ic
R e tr o fi t
R V
T d a ri n
.m c k e e
.r v t
A u th o r
G-001
PROJECT
INFORMATION
PASADENA PUBLIC WORKS BUILDING SEISMIC RETROFIT
ABBREVIATIONS VICINITY MAP SHEET INDEX
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC
ACT ACOUSTIC CEILING TILE
APC ACOUSTIC PANEL CEILING
AWP ACOUSTIC WALL PANEL
AWT ACOUSTIC WALL TREATMENT
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT. ALTERNATE
AL ALUMINUM
AB ANCHOR BOLT
APPROX. APPROXIMATE
ARCH ARHICTECT
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
A/V AUDIO-VISUAL
B BASEMENT
BALC BALCONY
BATH BATHROOM
BM BEAM
BR BEDROOM
BMRK BENCHMARK
BLK BLOCK/BLOCKING
BD BOARD
BKSH BOOKSHELVES
BOT BOTTOM
BRKT BRACKET
BC BROOM CLOSET
BLDG BUILDING
BLT-IN BUILT IN
BUR BUILT-UP ROOFING
BOS BOTTOM OF SLAB
CF/CI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CA CLEAR ANONDIZED
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEAN OUT
CLR CLEAR
COL COLUMN
CBP COMPOSITE BUILDING PANEL
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CJ CONTROL JOINT
COP COPPER
CG CORNER GUARD
CORR CORRIDOR
CTR COUNTER
CSMS COUNTERSUNK METAL SCREW
CSWS COUNTERSUNK WOOD SCREW
CRS COURSES
CC CUBICLE CURTAIN
CM CENTIMETER
DL DEAD LOAD
DE DUAL EGRESS
DEMO DEMOLISH / DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DO DITTO
DR DOOR
DH DOUBLE HUNG
DN DOWN
DS DOWN SPOUT
D DRAIN
DWR DRAWER
DWG DRAWING
DWGS DRAWINGS
DF DRINKING FOUNTAIN
DUP DUPLICATOR
DOP DISPERSED OIL PARTICULATE
(E) EXISTING
EXIST EXISTING
ETR EXISTING TO REMAIN
EA EACH
E EAST
EQ EQUAL
EQPT EQUIPMENT
EWC ELECTRIC WATER COOLER
ELEC ELECTRICAL
ELEV ELEVATOR
EMERG EMEGENCY
EG END GUARD
ENGR ENGINEER
EQUIP EQUIPMENT
EQPT EQUIPMENT
EXP EXPANSION
EB EXPANSION BOLT
EJ EXPANSION JOINT
EXPC EXPOSED CONSTRUCTION
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
FF FINISH FLOOR
FWC FABRIC WALL COVERING
FWS FABRIC WALL SYSTEM
FT FEET / FOOT
FG FINISH GRADE
FV FIELD VERIFY
FIN FINISH
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FP FIRE PROOFING
FRP FIBERGLASS REINFORCED PANEL
FIX FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FL FLOOR
FD FLOOR DRAIN
FS FLOOR SINK
FLUOR FLUORESCENT
FTG FOOTING
FDN FOUNDATION
FRMG FRAMING
FURN FURNACE
FTDF FIRE TREATED DOUGLAS FIR
FOF FACE OF FINISH
FOS FACE OF STUD
FLS FIRE LIFE SAFETY
GA GAGE
GALV GALVANIZED
GI GALVONIZED IRON
GEN GENERATOR
GL GLASS
GLB GLASS BLOCK
GB GRAB BAR
GR GRADE
GT GRANITE TILE
GFI GROUND FAULT CIRCUIT INTERRUPT
GUTT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
HR HAND RAIL
HDW HARDWIRE
HD WD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AND
AIR CONDITIONING
HT HEIGHT
HPAC HIGH PERMORMANCE
ARHICTECTURAL COATING
HP HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HC HOT AND COLD
HO HOLD-OPEN
HSS HOLLOW STEEL SECTION
IN INCH / INCHES
INFO INFORMATION
ID INSIDE DIAMETER
INS INSULATED
INSUL INSULATION
IR INTEGRAL RESILIENT BASE
INT INTERIOR
ILSM INTERIM LIFE SAFETY MEASURE
JAN JANITOR
JT JOINT
JST JOIST
KG KILOGRAM
KD KNOCK-DOWN FRAME
LL LIVE LOAD
LAB LABORATORY
LAV LAVATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LT LIGHT
LTWT LIGHT WEIGHT
LB POUNDS
LIN. DIFF. LINEAR DIFFUSER
LP LOW POINT
LLV LONG LEG VERTICAL
LVT LUXURY VINYL TILE
M METER
MM MILLIMETER
MACH MACHINE
MAT MATERIAL
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MT MARBLE TILE
MK MARK
MB MARKER BOARD
MO MASONRY OPENING
MAX MAXIMUM
MIN MINIMUM
MECH MECHANICAL
MC MEDICINE CHEST
MEMB MEMBRANE
MTL METAL
MFTSM MINERAL-FILLED THERMOPLASTIC
SURFACING MATERIAL
MDF MEDIUM DENSITY FIBERBOARD
MHO MAGNETIC HOLD-OPEN
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
(N) NEW
N NORTH
N/A NOT APPLICABLE
NF NATURAL FINISH
NOM NOMINAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO. NUMBER
OF/OI OWNER FURNISHED /
OWNER INSTALLED
OF/CI OWNER FURNISHED /
CONTRACOTR INSTALLED
OFF OFFICE
OC ON CENTER
OA OUTSIDE AIR
OPP OPPOSITE
OH OPPOSITE HAND
ORCH ORCHESTRA
OP ORNAMENTAL PAINT
OPL ORNAMENTAL PLASTER
OD OUTSIDE DIAMETER
P PAINT
PL PLATE
PNL PANEL
PLAM PLASTIC LAMINATE
PTC PEDESTRIAN TRAFFIC COATING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PREFAB PREFABRICATED
PERF PERFORATED
PLUMB PLUMBING
PROJECT INFORMATION
THIS PROJECT CONSISTS OF A VOLUNTARY SEISMIC RETROFIT OF A CONCRETE TILT UP PANEL
BUILDING WITH WOOD DIAPHRAGMS PER THE STRUCTURAL PLANS AND ADA UPGRADE
SCOPE OF WORK FOR THE SEISMIC RETROFIT WILL INCLUDE;
-SELECTIVE DEMOLITION AND REPLACEMENT OF THE CEILINGS & ROOFING
SCOPE OF WORK FOR THE ADA UPGRADE WILL INCLUDE;
1ST FLOOR;
-REMOVE AND REPLACE THE NON-COMPLIANT MILLWORK IN THE BREAKROOM #133
-REPLACE THE EXISTING NON-COMPLAINT DRINKING FOUNTAIN
-RE-STRIPE THE ACCESSIBLE PARKING STALLS AND
-UPGRADE THE PATH OF TRAVEL FROM THE ACCESSIBLE PARKING TO THE BUILDING
2ND FLOOR;
-REMOVE AND REPLACE THE NON-COMPLIANT MILLWORK IN THE KITCHEN #216
-REPLACE THE EXISTING NON-COMPLAINT DRINKING FOUNTAIN
OCCUPANCY AND USE (NO CHANGE)
A-3 B H-2
CONSTRUCTION CLASSIFICATION:
- TYPE IIIB
- FULLY SPRINKLERED
SEISMIC ZONE:
REFER TO STRUCTURAL DRAWINGS
NUMBER OF STORIES: (NO CHANGE)
3 STORIES
BUILDING HEIGHT: (NO CHANGE)
42'-3" TOP OF PARAPET
FLOOR AREAS: (NO CHANGE)
1ST FLOOR - 25, 895 SF
2ND FLOOR - 17,945 SF
3RD FLOOR - 720 SF
SCOPE OF WORK AREA: ~20,000 SF
AREA OF WORK LEVEL:
1ST FLOOR, 2ND FLOOR, 3RD FLOOR/ROOF
SYMBOL LEGEND
QTY QUANTITY
QT QUARRY TILE
RAD RADIUS
RDWD REDWOOD
REF REFRIGERATOR
REINF REINFORCED
REBAR REINFORCING BAR
REV REVISION
RO ROUGH OPENING
RM ROOM
RA RETURN AIR
RD ROOF DRAIN
RS RESILIENT SHEET FLOORING
REQ REQUIRED
SS STAINLESS STEEL
SMS SHEET METAL SCREW
SC SOLID CORE
SCH SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SLV SHORT LEG VERTICAL
SPR SINGLE PLY ROOFING
SL GL DR SLIDING GLASS DOOR
SP SOLID POLYMER
SAP SOUND ABSORTIVE PANEL
SPECS SPECIFICATIONS
SQ SQUARE
SQ FT SQUARE FEET
S&V STAIN AND VARNISH
STD STANDARD
STL STEEL
STLC STEEL CHANNEL
SEJ SEISMIC JOINT
SJ STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SWITCH
$ SWITCH
S SOUTH
SYM SYMMETRICAL
SIM SIMILAR
TBD TO BE DETERMINED
TB TACKBOARD
TELE TELEPHONE
TV TELEVISION
TG TEMPERED GLASS
TEMP TEMPORARY
TLT TOILET
TOS TOP OF SLAB
TO TOP OF
TYP TYPICAL
U/S UNDERSIDE
UC UNDER CABINET
UNFIN UNFINISHED
U.N.O. UNLESS NOTED OTHERWISE
VF/VI VENDOR FURNISHED /
VENDOR INSTALLED
VF/CI VENDOR FURNISHED /
CONTRACTOR INSTALLED
VAC VACUUM
VB VAPOR BARRIER
VERT VERTICAL
VIF VERIFY IN FIELD
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W/ WITH
W/O WITHOUT
WC WASH CLOSET
WD WOOD
WT WEIGHT
WP WATER PROOF
WRB WATER RESISTANT CEMENT BOARD
WWF WELDED WIRE FRAME
WWM WELDED WIRE MESH
WF WIDE FLANGE
W WEST
WD WOOD
YD YARD
GENERAL
G-001 PROJECT INFORMATION
G-002 GENERAL NOTES
G-003 ADA SITE AND PARKING DETAILS
G-004 2019 CBC CHAPTER 11B CODE COMPLIANCE NOTES
G-005 2019 CBC CHAPTER 11B ADA FIXTURES AND SIGNAGE DETAILS
ARCHITECTURAL
A-001 SITE PLAN - OVERALL
A-002 ENLARGED SITE PLANS
A-003 EXITING AND CODE ANALYSIS PLAN - 1ST FLOOR
A-004 EXITING AND CODE ANALYSIS PLAN - 2ND FLOOR
A-005 PROPOSED 1ST FLOOR PHASING PLAN
A-006 PROPOSED 2ND FLOOR PHASING PLAN
A-100 1ST FLOOR EXISTING /DEMO PLAN
A-101 2ND FLOOR EXISTING/ DEMO FLOOR & LOW ROOF PLAN
A-102 1ST FLOOR EXISTING/DEMO RCP
A-103 2ND & 3RD FLOOR EXISTING/DEMO RCP
A-104 EXISTING/DEMO ROOF PLAN
A-200 1ST FLOOR PLAN
A-201 2ND FLOOR & LOW ROOF PLAN
A-300 ENLARGED PLANS & INTERIOR ELEVATIONS
A-301 INTERIOR ELEVATIONS
A-400 DETAILS - MILLWORK
A-401 DETAILS - SUSPENDED GYP. BOARD CEILING
A-402 DETAILS - ACOUSTIC CEILING
A-403 DETAILS - ROOF
A-500 DETAILS - FIRESTOP & PENETRATIONS
A-501 DETAILS - FIRESTOP & PENETRATIONS
A-502 DETAILS - FIRESTOP & PENETRATIONS
A-600 PHOTOS (FOR REFERENCE ONLY)
A-601 PHOTOS (FOR REFERENCE ONLY)
A-602 PHOTOS (FOR REFERENCE ONLY)
A-603 PHOTOS (FOR REFERENCE ONLY)
A-604 PHOTOS (FOR REFERENCE ONLY)
A-605 PHOTOS (FOR REFERENCE ONLY)
A-606 PHOTOS (FOR REFERENCE ONLY)
A-607 PHOTOS (FOR REFERENCE ONLY)
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES
S-210 2ND FLOOR & LOW ROOF FRAMING PLAN
S-211 3RD FLOOR & ROOF FRAMING PLAN
S-500 SECTIONS AND DETAILS
S-501 SECTIONS AND DETAILS
TOTAL NUMBER OF SHEETS: 41
CODE REFERENCES
2019 CALIFORNIA ADMINISTRATIVE CODE (CAC)
2019 CALIFORNIA BUILDING CODE (CBC)
2019 CALIFORNIA ELECTRICAL CODE (CEC)
2019 CALIFORNIA MECHANICAL CODE (CMC)
2019 CALIFORNIA PLUMBING CODE (CPC)
2019 CALIFORNIA FIRE CODE (CFC)
2019 CALIFORNIA ENERGY CODE
SEOR
RAMI ELHASSAN
PHONE: 949-387-8500 EXT 113
DESIGN TEAM
IDS GROUP INC.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CALIFORNIA 92606
PROJECT MANAGER: MATTHEW MICHNEWICH
PHONE: 949-387-8500 EXT 133
EMAIL: MATTHEW.MICHNEWICH@IDGSI.COM
AOR
JOHN SILBER, AIA
PHONE: 949-387-8500 EXT 157
CITY OF PASADENA
PUBLIC WORKS FACILITY
233 W. MOUNTAIN ST.
PASADENA, CA 91103
OWNER
PROJECT LOCATION
233 W MOUNTAIN ST, PASADENA, CA 91103
IDS
DATEDESCRIPTIONREV.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS GROUP
IDS PROJECT NO.
DRAWN BY
CHECKED BY
APPROVED BY
PROJECT IDENTIFICATION
THIS DRAWING WAS CREATED IN REVIT V. 2020
UNLESS OTHER WISE NOTED.
THE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND
COPYRIGHT OF IDS GROUP AND SHALL NOT BE USED ON ANY
OTHER PROJECT OR LOCATIONS EXPECT AS DESCRIBED ON THE
DRAWINGS, WITHOUT WRITTEN AGREEMENT WITH IDS GROUP.
SHEET NO. OF
ISSUE
STAMP
STAMP
ENGINEER/ARCHITECT
PROJECT NAME
CLIENT
21X051.01
SHEET TITLE
SHEET NUMBER
APPROVAL
Public Works
Building
Seismic Retrofit
Public Works Facility 233 W. Mountain St.
Pasadena, CA 91109
233 W. Mountain St. Pasadena, CA 91103
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
ID
S
G R
O U
P
F
IL
E L
O C
A T
IO
N
P
L O
T D
A T
E
U S
E R
JK
JS
JS
11/23/22PLAN CHECK RESUBMITTAL1
City of Pasadena
12/13/22P.C. APPROVED SET
01/16/23BID SET
/1
/2
:0 :2
P
M C
U s e rs \D a ri n .M c K e e \D o c u m e n ts
\2 X
.0 P
A S
A P
W
A d d S v c
B ld g S e is m ic
R e tr o fi t
R V
T d a ri n
.m c k e e
.r v t
A u th o r
G-002
GENERAL NOTES
GENERAL NOTES
CONTRACTOR OBLIGATIONS FOR MITIGATION MONITORING AND REPORTING PROGRAM
1. THE CONTRACTOR SHALL INSTALL A VISUAL BARRIER (E.G., GREEN MESH FABRIC) ALONG THE
PERIMETER OF CONSTRUCTION SITES FOR VERTICAL CONSTRUCTION PROJECTS. THIS
REQUIREMENT SHALL BE SUBMITTED TO ARCHITECT AS A CONTRACTOR SUBMITTAL AND VERIFIED
BY THE COMMUNITY DEVELOPMENT DEPARTMENT PRIOR TO SITE WORK.
2. DUST CONTROL. THE CONTRACTOR SHALL BE REQUIRED TO COMPLY WITH SCAQMD RULES 402 AND 403, WHICH SHALL ASSIST IN REDUCING SHORT-TERM AIR POLLUTANT EMISSIONS. SCAQMD RULE 402 REQUIRES THAT AIR POLLUTANT EMISSIONS NOT BE A NUISANCE OFF SITE. SCAQMD RULE 403 (TABLES 1, 2, AND 3 OF RULE 403) REQUIRES THAT FUGITIVE DUST BE CONTROLLED WITH
THE BEST AVAILABLE CONTROL MEASURES SO THAT THE PRESENCE OF SUCH DUST DOES NOT
REMAIN VISIBLE IN THE ATMOSPHERE BEYOND THE PROPERTY LINE OF THE EMISSION SOURCE.
THIS REQUIREMENT SHALL RESUBMITTED TO ARCHITECT AS A CONTRACTOR SUBMITTAL AND
VERIFIED BY THE COMMUNITY DEVELOPMENT DEPARTMENT PRIOR TO SITE WORK.
3. ARCHITECTURAL COATINGS SHALL BE SELECTED SO THAT THE VOC CONTENT OF THE
COATINGS IS COMPLIANT WITH SCAQMD RULE 1113. THIS REQUIREMENT SHALL RESUBMITTED TO
ARCHITECT AS A CONTRACTOR SUBMITTAL AND VERIFIED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT PRIOR TO COATING WORK.
4. CONTRACTOR TO REDUCE PROJECT CONSTRUCTION AIR QUALITY IMPACTS DURING
CONSTRUCTION. THE FOLLOWING SHALL BE IMPLEMENTED BY CONTRACTOR DURING
CONSTRUCTION:
a. WATER ACTIVE SITES AT LEAST TWICE DAILY;• APPLY WATER THREE TIMES DAILY, OR NON-
TOXIC SOIL STABILIZERS ACCORDING TO MANUFACTURERS' SPECIFICATIONS, TO ALL UNPAVED
PARKING OR STAGING AREAS OR UNPAVED ROAD SURFACES;
b. ALL TRUCKS HAULING DIRT, SAND, SOIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED;•
PAVE ROAD AND ROAD SHOULDERS;• INSTALL WHEEL WASHERS WHERE VEHICLES ENTER AND
EXIT THE CONSTRUCTION SITE ONTO PAVED ROADS OR WASH OFF TRUCKS AND ANY
EQUIPMENT LEAVING THE SITE EACH TRIP;
c. APPLY NON-TOXIC SOIL STABILIZERS ACCORDING TO MANUFACTURERS' SPECIFICATIONS TO
ALL INACTIVE CONSTRUCTION AREAS (PREVIOUSLY GRADED AREAS INACTIVE FOR TEN DAYS
OR MORE);• SUSPEND ALL EXCAVATING AND GRADING OPERATIONS WHEN WIND SPEEDS(AS
INSTANTANEOUS GUSTS) EXCEED 25 MILES PER HOUR;
d. SWEEP STREETS AT THE END OF THE DAY IF VISIBLE SOIL IS CARRIED ONTO ADJACENT PUBLIC
PAVED ROADS;
e. APPOINT A CONSTRUCTION RELATIONS OFFICER TO ACT AS A COMMUNITY LIAISON
CONCERNING ON-SITE CONSTRUCTION ACTIVITY, INCLUDING RESOLUTION OF ISSUES RELATED
TO PM10 GENERATION; AND• REQUIRE ALL VEHICLES AND EQUIPMENT TO BE PROPERLY TUNED
AND MAINTAINED ACCORDING TO MANUFACTURERS' SPECIFICATIONS.
5. NOISE GENERATING: PROJECT CONSTRUCTION ACTIVITIES SHALL TAKE PLACE BETWEEN THE HOURS OF 7:00 AM AND 8:00 PM ON ANY DAY, AND ARE NOT PERMITTED ON SUNDAYS OR A CITY-
RECOGNIZED HOLIDAY.
6. CONTRACTOR TO INSTALL WINDOW ASSEMBLIES THAT ARE TESTED AND CERTIFIED TO
PREVENT THE INTRUSION OF EXTERIOR NOISE SO THAT THE INTERIOR NOISE LEVEL WITH
WINDOWS CLOSED, ATTRIBUTABLE TO EXTERIOR SOURCES, SHALL NOT EXCEED 45 DBA CNEL IN
ANY HABITABLE ROOM. THIS REQUIREMENT SHALL BE SUBMITTED TO ARCHITECT AS A
CONTRACTOR SUBMITTAL.
7. CONTRACTOR TO SUBMIT EVIDENCE TO THE ARCHITECT AND OWNER THAT THE FOLLOWING
NOISE REDUCTION MEASURES AS STATED ON THE CONSTRUCTION PLANS AND SPECIFICATIONS
ARE BEING IMPLEMENTED:
a. CONSTRUCTION TRAFFIC SHALL BE LIMITED TO HAUL ROUTES ESTABLISHED BY THE CITY .
b. STATIONARY EQUIPMENT (SUCH AS GENERATORS AND AIR COMPRESSORS) SHALL BE LOCATED
AS FAR FROM RESIDENCES, INCLUDING HOTEL ROOMS, AS FEASIBLE.
c. EQUIPMENT MAINTENANCE AND STAGING AREAS SHALL BE LOCATED AS FAR AWAY FROM
RESIDENCES AS FEASIBLE.
d. CONSTRUCTION EQUIPMENT SHALL BE FITTED WITH MANUFACTURER'S STANDARD, OR BETTER, NOISE-SHIELDING AND MUFFLING DEVICES TO REDUCE NOISE LEVELS TO THE MAXIMUM
EXTENT FEASIBLE.
e. THE PROJECT OWNER/DEVELOPER SHALL DESIGNATE A CONSTRUCTION COMPLAINT MANAGER
FOR THE PROJECT. A TELEPHONE CONTACT NUMBER SHALL BE CLEARLY POSTED AT ALL
ACTIVE ACCESS POINTS.
CUTTING AND PATCHING
1. THE CONTRACTOR SHALL IN THE WORK OF ALL TRADES, PERFORM ALL CUTTING, PATCHING, REPAIRING, RESTORING AND THE LIKE NECESSARY TO COMPLETE THE WORK AND TO RESTORE
ANY DAMAGED OR AFFECTED SURFACES RESULTING FROM THE WORK OF THIS CONTRACT TO
THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE OWNERS AND THE ARCHITECT.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, PATCHING, AND FIRE SAFING METHODS REQUIRED TO COMPLETE THE WORK INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
a. UNCOVERED PORTIONS OF THE WORK USED TO PROVIDE FOR INSTALLATION OF
UNSCHEDULED WORK.
b. REMOVE AND REPLACE DEFECTIVE WORK.
c. REMOVE AND REPLACE WORK NOT CONFORMING TO REQUIREMENTS OF CONTRACT
DOCUMENTS.
d. PROVIDE ROUTINE PENETRATIONS OF NON-STRUCTURAL SURFACES FOR INSTALLATION OF
PIPING AND ELECTRICAL CONDUIT.
e. REMOVE EXISTING WORK INDICATED IN THE DOCUMENTS AND AS MAY BE REQUIRED TO PERMIT
THE PROPER INSTALLATION OF NEW WORK THAT FORMS PART OF HIS CONTRACT. ALL
CUTTING,REPAIRING AND/OR PATCHING NECESSARY IN CONNECTION WITH SUCH REMOVALS
SHALL BE DONE WITHOUT EXTRA CHARGE, WHETHER OR NOT EVERY ITEM MAY BE
SPECIFICALLY DESCRIBED.
3. PROCEDURES FOR NON-STRUCTURAL CUTTING AND PATCHING:
a. PROVIDE ADEQUATE TEMPORARY SUPPORT AS NECESSARY TO ASSURE THE STRUCTURAL
VALUE INTEGRITY OF THE AFFECTED PORTION OF THE WORK.
b. PROVIDE DEVICES AND METHODS TO PROTECT OTHER PORTIONS OF THE PROJECT FROM
DAMAGE.
c. PROVIDE PROTECTION FROM THE ELEMENTS FOR THAT PORTION OF THE PROJECT WHICH MAY
BE EXPOSED BY CUTTING AND PATCHING WORK.
d. EXECUTE CUTTING BY METHODS WHICH WILL PREVENT DAMAGE TO OTHER WORK, AND WILL
PROVIDE PROPER SURFACES TO RECEIVE INSTALLATION OR REPAIRS.
e. EXECUTE FITTING AND ADJUSTMENT OF PRODUCTS TO PROVIDE A FINISHED INSTALLATION TO
COMPLY WITH SPECIFIED PRODUCTS, FUNCTIONS, TOLERANCES AND FINISHES, AND
MANUFACTURER'S CRITERIA.
f. RESTORE WORK WHICH HAS BEEN CUT OR REMOVED. INSTALL NEW PRODUCTS TO PROVIDE
COMPLETE WORK IN ACCORDANCE WITH REQUIREMENTS OF CONTRACT DOCUMENTS.
g. REFINISH ENTIRE SURFACE AS NECESSARY TO PROVIDE AN EVEN FINISH TO MATCH ADJACENT
FINISHES.
DEMOLITION
1. CONTRACTOR SHALL PROVIDE A "DISCOVERY PROCESS" TO IDENTIFY POTENTIAL
COMPLICATIONS WITHIN THE SCOPE OF WORK, PRIOR TO ANY DEMOLITION.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS ESPECIALLY PIPES, DUCTS, AND
CONDUIT.
3. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH CHAPTER 33 OF THE CALIFORNIA
BUILDING CODE, 2019 EDITION.
4. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH THE CALIFORNIA FIRE CODE, 2019
EDITION, SECTION 103.3.3 (INCLUDING ARTICLE 87).
5. THE CONTRACTOR SHALL FIELD SURVEY / AND VERIFY EXISTING CONDITIONS PRIOR TO
STARTING ANY WORK.
6. DURING THE DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED
FINAL RENOVATION CONDITIONS OF THE STRUCTURE AND THE REASON THE DEMOLITION WORK
IS BEING DONE.
7. THE CONTRACTOR MUST ALLOW FOR ADDITIONAL DEMOLITION THAT MAY NOT BE SHOWN, BUT
IS REQUIRED TO ACHIEVE THE FINISHED RESULT, AS SHOWN ON THE DRAWING.
8. DO NOT DISTURB OR DAMAGE IN ANY WAY EXISTING STRUCTURAL ELEMENTS. THE BUILDING
HAS TO COMPLY WITH ALL SAFETY REGULATIONS AT ALL TIMES.
9. THE CONTRACTOR SHALL RESTORE TO ITS ORIGINAL CONDITION ANY EXISTING WORK
DAMAGED DURING DEMOLITION BUT INDICATED TO REMAIN.
10. ALL REMOVED MATERIALS AND EQUIPMENT WHICH IN THE OPINION OF THE OWNER/ARCHITECT
ARE SALVAGEABLE, SHALL REMAIN THE PROPERTY OF THE OWNER. DELIVER SUCH SALVAGED
MATERIALS AND EQUIPMENT ON PREMISES AS DIRECTED, NEATLY PILE OR STORE THEM AND
PROTECT FROM DAMAGE. DO NOT REUSE MATERIALS AND EQUIPMENT UNLESS SPECIFICALLY
INDICATED ON PLANS OR SPECIFIED. REMOVE FROM PREMISES AND DISPOSE OF ALL
MATERIALS CONSIDERED BY THE OWNER/ARCHITECT TO BE SCRAP. RECYCLE MATERIALS PER
CURRENT JURISDICTIONAL CODE
11. ALL RUBBISH AND DEBRIS RESULTING FROM DEMOLITION AND/OR NEW WORK SHALL BE
RECYCLED AND/OR DISPOSED OF OFF-SITE AND SHALL NOT BE ALLOWED TO ACCUMULATE.
CONTRACTOR OBLIGATIONS
1. CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED
BUILDING PERMITS PRIOR TO COMMENCING WORK.
2. THE CONTRACTOR SHALL INSURE THAT ALL WORK IS DONE IN A PROFESSIONAL WORK-MAN-
LIKE MANNER BY SKILLED MECHANICS AND SHALL REPLACE ANY NEW AND/OR EXISTING
MATERIALS OR ITEMS INDICATED TO REMAIN DAMAGED BY ANY CAUSE DURING
CONSTRUCTION.
3. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL, PRIOR TO THE SUBMISSION OF HIS BID
OR PERFORMANCE OF WORK, NOTIFY THE OWNER OF ANY WORK CALLED OUT ON THE
DRAWINGS OR IN THE SPECIFICATIONS IN HIS TRADE THAT CANNOT BE FULLY GUARANTEED OR
WARRANTED FROM DEFECTIVE WORKMANSHIP OR MATERIAL DEFECTS.
4. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IF DETAILS ARE CONSIDERED UNSOUND,
UNSAFE, NOT WATERPROOF, OR NOT WITHIN CUSTOMARY TRADE PRACTICE. IF WORK IS
PERFORMED, IT WILL BE ASSUMED THAT THERE IS NO OBJECTIONS TO THE DETAIL. DETAILS
ARE INTENDED TO SHOW END RESULT OF DESIGN, MINOR MODIFICATIONS MAY BE REQUIRED
TO SUIT JOB CONDITIONS AND CURRENT TRADE PRACTICE AND SHALL BE INCLUDED AS PART
OF THIS PROJECT.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINISHES AT POINT OF CONNECTIONS FOR
ALL WORK (ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL) FINISHES WILL
MATCH THOSE SPECIFIED OR EXISTING IN LINE, TEXTURE AND FINISH. SPOT PAINTING IS NOT
ACCEPTABLE. NEW FINISHES SHALL BE FROM CORNER TO CORNER, FLOOR TO CEILING, ETC.
6. UNLESS OTHERWISE NOTED, ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY.
WHERE EXISTING MATERIALS ARE INDICATED TO BE SALVAGED, CONTRACTOR SHALL
INVENTORY, CLEAN,BOX PROTECT, AND STORE ITEMS FOR REUSE ON THE PROJECT. ITEMS
NOT REUSED SHALL BE RETURNED TO OWNER.
7. COORDINATION: THE GENERAL AND EACH SUB CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFICATION AND COORDINATION WITH OTHER SUB CONTRACTORS TO ASSURE COMPLIANCE
WITH DRAWINGS AND SPECIFICATIONS, AND THE ACCURATE LOCATION OF ARCHITECTURAL,
STRUCTURAL, MECHANICAL AND ELECTRICAL BUILDING ELEMENTS. THEIR REQUIRED
OPENINGS CLEARANCES SUPPORT SYSTEMS ARE ALL INTERCONNECTED AND COORDINATED.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES AND
FOR BEING AWARE OF ALL CONDITIONS THAT AFFECT THEIR WORK. NOTIFY OWNER, IN
WRITING, WITHIN 3 WORKING DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY
SCHEDULE, OF ANY EQUIPMENT, FINISHES OR MATERIAL, FOR WHICH THAT SCHEDULE WILL
PREVENT THE INSTALLATION FROM BEING COMPLETED AT THE TIME OF THE SCHEDULED
PROJECT COMPLETION.
COORDINATION OF WORK:
• THE CONTRACTORS SHALL PROVIDE AND COORDINATE THE EXACT DIMENSIONS SIZES AND
POSITIONS OF ALL SYSTEMS, EQUIPMENT, MOUNTING, AND ATTACHMENTS RELATING TO
THE WORK.
• THE CONTRACTOR SHALL PROVIDE AND COORDINATE ALL DIMENSIONS SIZES AND
POSITIONS OF OPENINGS IN SLABS AND WALLS NECESSARY TO THE INSTALLATION OF THE
WORK.
• ALL EQUIPMENT, CONTROLS AND TERMINATIONS SHALL BE POSITIONED FOR SAFE, DIRECT
AND EASY ACCESS.
• IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WITH THE
ARCHITECTURAL DRAWINGS BEFORE PROCEEDING WITH INSTALLATION OF CIVIL,
STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL WORK. SHOULD THERE BE ANY
DISCREPANCIES BETWEEN THE ARCHITECT'S AND THE ENGINEER'S DRAWINGS AND
SPECIFICATIONS THAT WOULD CAUSE A CONFLICT, IT SHALL BE BROUGHT TO THE
ARCHITECT'S ATTENTION FOR CLARIFICATION PRIOR TO INSTALLATION OF SAID WORK. ANY
WORK INSTALLED IN CONFLICT WITH THE ARCHITECTURAL DRAWINGS SHALL BE
CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO ADDITIONAL EXPENSE TO
THE OWNER OR ARCHITECT.
9. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS OF EXISTING SITE
PRIOR TO BIDDING AND START OF CONSTRUCTION. THE CONTRACTOR SHALL REPORT TO THE
ARCHITECT ALL CONDITIONS WHICH PREVENT THE PROPER EXECUTION OF ITS WORK. THE
DRAWINGS SHALL NOT BE SCALED.
10. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING
ABBREVIATIONS OR THEIR EXACT MEANING, THE ARCHITECT SHALL BE NOTIFIED IN WRITING
FOR CLARIFICATION.
11. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACK-UP PLATES, AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK, STAIR
RAILINGS, TOILET ACCESSORIES, PARTITIONS, AND OF ALL WALL MOUNTED OR SUSPENDED
MECHANICAL, ELECTRICAL, OR MISC. EQUIPMENT.
12. CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL MECHANICAL AND ELECTRICAL
PADS AND BASES AS WELL AS POWER OR WATER AND DRAIN INSTALLATIONS WITH EQUIPMENT
MANUFACTURERS BEFORE PROCEEDING WITH WORK. CHANGES TO ACCOMMODATE FIELD
CONDITIONS OR SUBSTITUTIONS SHALL BE MADE WITHOUT ADDITIONAL CHARGE TO OWNER.
13. CONTRACTOR IS FULLY AND SOLELY REPSONSIBLE FOR ALL SHORING REQUIRED IN ORDER
TO SAFELY ACHIEVE FINAL CONSTRUCTION SHOWN IN THE DRAWINGS. THIS INCLUDES
SUPPORT OF ANY STRUCTURAL ELEMENTS THAT ARE MODIFIED AND THEREBY REDUCED IN
STRENTH OR SUPPORT IN ANY WAY DURRING THE CONSTRUCTION. ALL SHORING
CALCULATIONS AND DRAWINGS SHALL BE STAMPED BY A CALIFORNIA REGISTERED ENGINEER
AND SUBMITTED FOR REVIEW PRIOR TO PERFORMING THE WORK.
4. SHAFT ENCLOSURES: OPENINGS EXTENDING VERTICALLY THROUGH FLOORS SHALL BE
ENCLOSED IN A SHAFT OF 1-HOUR FIRE-RESISTIVE CONSTRUCTION IF PENETRATING A 1-HOUR
FIRE RATED FLOOR ASSEMBLY. SHAFTS SHALL INCLUDE A GYPSUM BOARD HORIZONTAL
TERMINATION AT BOTTOM, ENGINEERED BY GENERAL CONTRACTOR. PROTECTION FOR
STAIRWAYS SHALL BE AS SPECIFIED IN CODE OF JURISDICTION.
GLAZING
1. ALL GLAZING SHALL COMPLY WITH C.P.S.C. 16 C.F.R. AND CBC.
2. GLASS DOORS, ADJACENT PANELS AND ALL GLAZED OPENINGS SHALL BE APPROVED FOR
IMPACT HAZARD PER C.B.C. SECTION 2406. PROVIDE IDENTIFICATION OF GLAZING PER SECTION 2406.2
3. PROVIDE TEMPERED GLASS AS REQUIRED BY CBC SECTION 2406 AND BY OTHER
APPLICABLE CODES.
SIGNAGE
1. FURNISH AND INSTALL SUPPORTS AND OTHER NECESSARY FINISH MATERIALS FOR A
COMPLETE SIGNAGE INSTALLATION. BOTH INTERIOR & EXTERIOR
2. DISABILITY SIGNAGE / IDENTIFICATION
a. THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL BE THE STANDARD USED TO
IDENTIFY FACILITIES THAT ARE ACCESSIBLE TO AND USEABLE BY PHYSICALLY DISABLED
PERSONS.
b. LETTERS AND NUMBERS ON SIGNS HAVE A WIDTH TO HEIGHT RATIO OF BETWEEN 3:5
AND 1:1 AND STROKE WIDTH TO HEIGHT RATIO OF BETWEEN 1:5 AND 1:10.
c. CHARACTERS AND SYMBOLS SHALL CONTRAST WITH THEIR BACKGROUND, EITHER
LIGHT CHARACTERS ON A DARK BACKGROUND OR DARK CHARACTERS ON A LIGHT
BACKGROUND.
d. ALL BUILDING ENTRANCES THAT ARE ACCESSIBLE TO AND USABLE BY PHYSICALLY
HANDICAPPED PERSONS SHALL BE IDENTIFIED WITH AT LEAST ONE STANDARD SIGN
AND WITH ADDITIONAL DIRECTIONAL SIGNS AS REQUIRED TO BE VISIBLE TO PERSONS
ALONG APPROACHING PEDESTRIAN WAYS.
e. ALL SANITARY FACILITIES WILL BE PROVIDED WITH APPROPRIATE IDENTIFICATION
SYMBOLS.
3. AREA AND OCCUPANCY SIGNAGE REQUIREMENTS OCCUPANT LOAD SIGN SHALL BE
POSTED IN EACH MEETING ROOM, ASSEMBLY ROOM OR SIMILAR PURPOSE ROOM HAVING AN
OCCUPANT LOAD OF 50 OR MORE.
4. EXIT SIGNS SHALL BE POSTED OVER EXITS DOORS SERVING 50 OR MORE AND ALL
HAZARDOUS AREAS. MINIMUM LETTER HEIGHT IS 6" AND SHALL CONFORM WITH CBC AND
LOCAL CODES. CBC SECTION 1003.2.8 AND UFC SECTION 12113A. SEE ELECTRICAL PLANS FOR
LOCATIONS AND FURTHER INFO.
5. AN APPROVED SIGN SHALL BE LOCATED AT EACH FLOOR LEVEL LANDING IN ALL ENCLOSED
STAIRWAYS. THE SIGN SHALL INDICATE FLOOR LEVEL, TERMINUS OF THE TOP AND BOTTOM OF
THE STAIRWAY, AND THE IDENTIFICATION OF THE STAIRWAY.
EXITS
1. EXIT DOORS SHALL BE OF THE PIVOTED OR SIDE-HINGED SWINGING TYPE. EXIT DOORS
SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN THE AREA SERVED HAS AN OCCUPANT
LOAD OF 50 OR MORE.
2. EVERY EXIT DOOR SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR
ANY SPECIAL KNOWLEDGE OR EFFORT. NOTE ALSO THAT FLUSH BOLTS OR SURFACE BOLTS
ARE PROHIBITED.
3. PANIC HARDWARE SHALL BE PROVIDED ON EXIT DOORS OF ROOMS, CORRIDORS,
STAIRWAYS, HANDLING AN OCCUPANT CAPACITY OF 50 OR MORE PERSONS.
4. EXIT SIGNS SHALL BE INSTALLED AT REQUIRED EXIT DOORWAYS AND WHERE OTHERWISE
NECESSARY TO CLEARLY INDICATE THE DIRECTION OF EGRESS IN COMPLIANCE WITH THE
CODE OF JURISDICTION.
5. EGRESS DOORS SHALL BE SET IN MOTION WHEN SUBJECTED TO A 30 LB. FORCE. THE DOOR
SHALL SWING TO THE FULLY OPEN POSITION WHEN AN OPENING FORCE NOT EXCEEDING 15
LBS IS APPLIED TO THE LATCH SIDE.
6. EACH DOOR IN A MEANS OF EGRESS FROM A GROUP 'A' OCCUPANCY SHALL NOT BE
PROVIDED WITH A LATCH OR LOCK UNLESS IT IS PANIC HARDWARE OR FIRE EXIT HARDWARE
(CBC 1008.1.9).
7. DOOR HANDLES, LOCK AND OTHER OPERATING DEVICES SHALL BE INSTALLED AT A MIN. 34"
AND A MAX. 48" A.F.F.
8. EXIT SIGNS SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM THAT WILL PROVIDE
AN ILLUMINATION OF NOT LESS THAT 90min IN DURATION. IN CASE OF PRIMARY POWER LOSS
(CBC 1011.2 - 1011.5.3)
9. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED AT ALL
TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS OCCUPIED.
THERMAL ENVELOPE NOTES
THERMAL INSULATION PERFORMANCE TO MEET LOCAL MINIMUM ENERGY CODES. INSULATION
ASSEMBLY, AS TESTED IN ACCORDANCE WITH ASTMC 518, TO PROVIDE A CONTINUOUS
THERMAL PERFORMANCE RATING AT EXTERIOR PERIMETER OF NEW WORK. PROVIDE
ASSEMBLY THICKNESS TO MEET THERMAL RESISTANCE 'R' VALUE AS INDICATED BUT NO LESS
THAN THE CODE. MINIMUM THERMAL RESISTANCE VALUES AS FOLLOWING:
• R-36 AT CEILING AND ATTIC SPACES
• R-19 AT EXTERIOR WALLS
• R-11 AT INTERIOR WALLS WHERE INSULATION IS USED FOR SOUND CONTROL
• R-13 AT FLOOR CRAWL SPACES
THERMAL ENVELOPE NOTES
1. DURING CONSTRUCTION OF THIS SCOPE OF WORK, CONTRACTORS MUST COMPLY AS
APPLICABLE TO CCR TITLE 24 CALIFORNIA FIRE CODE CHAPTER 33 FIRE SAFETY DURING
CONSTRUCTION AND DEMOLITION.
2. ENSURE EXITS PROVIDE FREE AND UNOBSTRUCTED EGRESS. PERSONNEL RECEIVE
TRAINING IF ALTERNATIVE EXITS MUST BE DESIGNATED. BUILDING/AREAS UNDER
CONSTRUCTION MUST MAINTAIN ESCAPE FACILITIES FOR CONSTRUCTION WORKERS AT ALL
TIMES. MEANS OF EGRESS IN CONSTRUCTION AREAS ARE INSPECTED DAILY.
3. FIRE ALARM, DETECTION & SUPPRESSION SYSTEMS ARE NOT TO BE IMPAIRED. A
TEMPORARY BUT EQUIVALENT SYSTEM SHALL BE PROVIDED WHEN ANY FIRE SYSTEM IS
IMPAIRED. TEMPORARY SYSTEMS MUST BE INSPECTED AND TESTED MONTHLY.
4. PROVIDE ADDITIONAL FIRE-FIGHTING EQUIPMENT AND USE TRAINIED PERSONNEL.
CONTRACTOR TO TRAIN STAFF ON LOCATION OF AFS SHUT OFF VALVES SERVING PROJECT
AREA.
5. SMOKING SHALL BE PROHIBITED AT ALL TIMES, IN OR ADJACENT TO ALL CONSTRUCTION
AREAS. NO SMOKING ON STATION.
6. DEVELOP AND ENFORCE STORAGE, HOUSEKEEPING, AND DEBRIS REMOVAL PRACTICES
THAT REDUCE THE FLAMMABLE AND COMBUSTIBLE FIRE LOAD OF THE BUILDING TO THE
LOWEST LEVEL NECESSARY FOR DAILY OPERATIONS COMPLY WITH CHAPTER 33 FIRE
SAFETY DURING CONSTRUCTION.
7. INCREASE SURVEILLANCE OF BUILDINGS, AND EQUIPMENT WITH SPECIAL ATTENTION TO
EXCAVATIONS, CONSTRUCTION AREAS, CONSTRUCTION STORAGE, AND FIELD OFFICES.
8. CONDUCT ORGANIZATION-WIDE SAFETY EDUCATION PROGRAMS TO ENSURE AWARENESS
OF ANY LIFE SAFETY CODE DEFICIENCIES, CONSTRUCTION HAZARDS AND INTERIM LIFE
SAFETY MEASURES.
9. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE APPROVED BY VETERANS AFFAIRS PROJECT
MANAGER.
GENERAL
THESE PLANS ARE THE PROPERTY OF IDS GROUP INC., AND ARE NOT TO BE USED FOR ANY
OTHER THAN THE LOCATION SHOWN HEREON.
1. NO CHANGES ARE TO BE MADE ON THESE PLANS WITHOUT THE KNOWLEDGE AND CONSENT
OF THE ARCHITECT OR ENGINEER WHOSE SIGNATURE APPEARS HEREON.
2. DO NOT SCALE DRAWINGS. ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF
CONCRETE MASONRY UNITS, CENTERLINE OF COLUMNS AND BEAMS, OR FACE OF STUDS,
UNLESS OTHERWISE NOTED. FINISH FLOOR ELEVATIONS ARE TO TOP OF CONCRETE SLAB OR
TOP OF INTERIOR PAVING UNLESS OTHERWISE NOTED.
3. ALL LEVELS REFERENCE POINTS ARE TAKEN FROM TOP OF SHEATHING OR TOP OF CONC.
SLAB/COMBO DECKING. DIMENSIONS ON ELEVATIONS, SECTIONS AND WALL SECTIONS ARE
REFERENCED TO THESE POINTS, UNLESS NOTED.
4. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL.
• THESE DRAWINGS DO NOT CONTAIN THE NECESSARY COMPONENTS FOR CONSTRUCTION
SAFETY.
• ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE
CONSTRUCTION SAFETY ORDERS ENFORCED BY THE STATE DIVISION OF INDUSTRIAL
SAFETY.
CODES
CONSTRUCTION SHALL COMPLY WITH APPLICABLE EDITION OF CALIFORNIA BUILDING CODE,
ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES, ORDINANCES, LAWS, REGULATIONS AND
PROTECTIVE COVENANTS GOVERNING THE WORK. IN CASE OF CONFLICTS, THE MORE
STRINGENT REQUIREMENT SHALL GOVERN.
PERMIT
1. THE CONSTRUCTION OR DEMOLITION OF ANY BUILDING, STRUCTURE,USING SCAFFOLDING
OR FALSEWORK MORE THAN 3 STORIES OR 36'-0" IN HEIGHT, REQUIRES A PERMIT FROM THE
STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY PRIOR TO THE ISSUANCE OF A
BUILDING PERMIT. ( 1PC.B.9 )
2. A SEPARATE INTERIOR IMPROVEMENT PERMIT IS REQUIRED FOR ANY TENANT
IMPROVEMENT IN THIS BUILDING.
3. A PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS IS REQUIRED FOR A PROTECTION
FENCE OR CANOPY ON OR OVER ANY STREET OR PUBLIC SPACE. PROTECTION OF
PEDESTRIANS DURING CONSTRUCTION SHALL BE PROVIDED PER C.B.C. SECTION 3303.
4. OBTAIN PERMIT FROM CITY ENGINEER PRIOR TO DOING ANY SIDEWALK AND CURB WORK.
5. SEPARATE PERMITS SHALL BE OBTAINED FOR SIGNS, FENCES, TRASH ENCLOSURES,
RETAINING WALLS, PLANTERS, AND POOLS.
METAL WORK
1. ALL METAL FRAMING MEMBERS SHALL BE ARRANGED AND SPACED AS TO PERMIT
INSTALLATION OF PIPE CONDUITS AND DUCTWORK WITH A MINIMUM OF CUTTING. SHAFT
WALLS SHALL BE PROVIDED WITH NECESSARY FRAMES, BRACING, AND SEALANT AROUND THE
OPENING.
2. CONTACT BETWEEN DISSIMILAR METAL SHALL BE PROTECTED.
WOOD WORK INCLUDING METAL STUDS
1. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACE WILL BE FLUSH. IF
STRUCTURAL PANELS ARE REQUIRED ON A WALL PLANE, THE ENTIRE WALL PLANE SHALL BE
FURRED OR FINISHED FLUSH.
2. INSTALL METAL CORNER BEADS AT ALL EXPOSED WALLBOARD EDGES. INSTALL CASING
BEADS WHEREVER WALLBOARD, PLASTER, ETC. ABUTS A DISSIMILAR FINISH MATERIAL AND
PROVIDE SEALANT AS REQUIRED.
3. GYPSUM BOARD SHALL EXTEND TO UNDERSIDE OF STRUCTURE ABOVE AT ALL EXTERIOR
PERIMETER WALLS
DOORS
1. DOORS IN RATED WALLS SHALL CONSIST OF SELF-CLOSING, SELF-LATCHING ASSEMBLIES
WITH SMOKE AND DRAFT SEALS AT HEAD AND JAMBS. DOOR ASSEMBLY RATINGS SHALL BE AS
INDICATED ON DOOR SCHEDULE. HOLD OPEN DEVICES ON RATED ASSEMBLIES SHALL BE
MAGNETICALLY OPERATED AND ACTIVIATED BY SMOKE DETECTORS.
2. DOOR SIZES SHOWN ON DOOR SCHEDULE ARE OPENING SIZES. ALLOWANCE FOR
THRESHOLDS, ECT., SHALL BE TAKEN OFF THE DOOR. DOORS AND FRAMES SHALL BE
REINFORCED WHERE REQUIRED FOR CLOSERS, STOPS, AND HARDWARE.
3. AIR LEAKAGE AT EXTERIOR DOORS SHALL BE LIMITED BY THE FOLLOWING:
a. ALL DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE AT THE HEAD AND
SILL.
b. DOORS MOUNTED ON EITHER THE INSIDE OR OUTSIDE OF AN EXTERIOR WALL SHALL
HAVE A MINIMUM 1/2" LAP AT EACH JAMB.
c. DOORS REQUIRING VERTICAL TRACK OR GUIDES SHALL USE A CONTINUOUS MOUNTING
ANGLE, SEALED IN ACCORDANCE WITH "G" LISTED HERE.
d. DOORS MOUNTED BETWEEN THE JAMBS SHALL HAVE A CONTINUOUS SEAL OR BAFFLE
AT EACH JAMB.
e. MEETING RAILS OR SECTION DOORS AND MEETING STILES OR RAILS OR BI-PARTING
DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE.
f. SWINGING DOORS SHALL BE WEATHERSTRIPPED AT THE HEAD, SILL AND JAMBS.
g. OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, BETWEEN WALL AND
FOUNDATIONS, BETWEEN WALL AND ROOF, BETWEEN WALL PANELS, AT PENETRATIONS
OF UTILITY SERVICES THROUGH WALLS, FLOORS AND ROOFS AND ALL OTHER
OPENINGS IN THE EXTERIOR ENVELOPE SHALL BE SEALED, CAULKED, GASKETED, OR
WEATHERSTRIPPED TO CREATE AN AIRTIGHT ASSEMBLY.
PRE-MANUFACTURED SIGN
TO COMPLY W/ THE
MANUAL OF UNIFORM
TRAFFIC CONTROL
DEVICES STANDARD,
R99C (CA) SIGN.
PROVIDE VAN
ACCESSIBLE
INSCRUPTION @ VAN
STALL LOCATIONS. USE
R7-8b SIGN.
SUPPORT STANDARD 3" DIA. GALV.
STEEL POLE W/ 2'-0" IMBEDMENT
ATTACH SIGN TO POLE W/ GALV.
STRAPS AT TOP & BOTTOM.
HEIGHT WHEN LOCATED IN
PATH OF TRAVEL; 36" MIN. FOR
WALL-MOUNTED
H.C. VAN SIGNAGE
1' - 0"
2'
0" 6"
0" M
IN
PRE-MANUFACTURED
SIGN TO COMPLY W/ THE
MANUAL OF UNIFORM
TRAFFIC CONTROL
DEVICES STANDARD,
R99C (CA) SIGN.
SUPPORT STANDARD 3" DIA. GALV.
STEEL POLE W/ 2'-0" IMBEDMENT
ATTACH SIGN TO POLE W/ GALV.
STRAPS AT TOP & BOTTOM.
HEIGHT WHEN LOCATED IN
PATH OF TRAVEL; 36" MIN.
FOR WALL-MOUNTED
H.C. SIGNAGE
1'-0"
2' -0
7'
M
IN
CBC 2019
SECTION 11B-502.6
NO
PARKING
12' - 0" MIN.
MIN. AISLE
5' - 0" 9' - 0" MIN.
M
IN
PEDESTRIAN ROUTE
ACCESSIBILITY SIGN PER LOCAL CODES
WHEEL STOP
WITHIN THE LOADING AND LANDING ACCESS AISLE PAINT
THE WORDS "NO PARKING" IN WHITE 12" HIGH LETTERS
TYPICAL PAVEMENT SYMBOL PER LOCAL CODES
VAN CAR
4-5" X 4-5" INTERNATIONAL SYMBOL OF ACCESSIBILITY
TYPICAL PAVEMENT SYMBOL PER LOCAL CODES
BLUE BORDER
AND SAMPLE RAMP DIMENSIONS
CBC 2019 SECTION 11B-502.2
4'
5"
4' - 5"
4" 3' - 9" 4"
2' - 8 1/2"
4" 3'
9"
4"
3'
0"
A
LI
G N
W / E
N D
O F
P A
R K
IN
G
S T
R
IP
IN
G
CALTRANS STANDARD , A24 C
BLUE
WHITE
CBC 2019 SECTION 11B-502.6.4.1
PARKING SIGN SHALL READ:
"UNAUTHORIZED VEHICLES PARKED
IN DESIGNATED ACCESSIBLE SPACES
NOT DISPLAYING DISTINGUISHING
PLACARDS OR SPECIAL LICENSE
PLATES ISSUED FOR PERSONS WITH
DISABILITIES WILL BE TOWED AWAY
AT THE OWNER'S EXPENSE.
TOWED VEHICLES MAY BE CLAIMED
AT (INSERT ADDRESS) OR BY
TELEPHONING (INSERT TELEPHONE
NUMBER)". ALL LETTERING SHALL BE
A MINUMUM OF 1" IN HEIGHT. USE
R100B (CA) SIGN.
APPROPRIATE
INFORMATION SHALL BE
ADDED TO SIGN.
FINISH GRADE / PAVEMENT
CONCRETE FOOTING
2" X 3" X 3/16" GALV. STEEL TUBE
AND PAINTED, CAP TUBE END.
E Q
7' -0
M
IN
2'-0"
4" 1'
2"
6"
1'-0"
CBC 2019 SECTION 11B-502.8.2CBC 2019 SECTION 11B-705.1
NO
PARKING
9'-0"
MIN. AISLE
5'-0" 9'-0" MIN.
'-0
M
IN
PEDESTRIAN ROUTE
ACCESSIBILITY SIGN PER LOCAL CODES
WHEEL STOP
WITHIN THE LOADING AND LANDING ACCESS AISLE PAINT
THE WORDS "NO PARKING" IN WHITE 12" HIGH LETTERS
TYPICAL PAVEMENT SYMBOL PER LOCAL CODES
CAR
4-5" X 4-5" INTERNATIONAL SYMBOL OF ACCESSIBILITY
TYPICAL PAVEMENT SYMBOL PER LOCAL CODES
BLUE BORDER
CAR
CBC 2019 SECTION 11B-502.3
1 1/2" = 1'-0"ACCESSIBLE PARKING SIGN 14 1/4" = 1'-0"ACCESSIBLE PARKING SPACES 23/4" = 1'-0"ACCESSIBLE SYMBOL 10
1" = 1'-0"PARKING SIGN DETAIL 91/4" = 1'-0"TRUNCATED DOME DETAIL 13 1/4" = 1'-0"ACCESSIBLE PARKING SPACES 1
IDS
DATEDESCRIPTIONREV.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS GROUP
IDS PROJECT NO.
DRAWN BY
CHECKED BY
APPROVED BY
PROJECT IDENTIFICATION
THIS DRAWING WAS CREATED IN REVIT V. 2020
UNLESS OTHER WISE NOTED.
THE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND
COPYRIGHT OF IDS GROUP AND SHALL NOT BE USED ON ANY
OTHER PROJECT OR LOCATIONS EXPECT AS DESCRIBED ON THE
DRAWINGS, WITHOUT WRITTEN AGREEMENT WITH IDS GROUP.
SHEET NO. OF
ISSUE
STAMP
STAMP
ENGINEER/ARCHITECT
PROJECT NAME
CLIENT
21X051.01
SHEET TITLE
SHEET NUMBER
APPROVAL
Public Works
Building
Seismic Retrofit
Public Works Facility 233 W. Mountain St.
Pasadena, CA 91109
233 W. Mountain St. Pasadena, CA 91103
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
ID
S
G R
O U
P
F
IL
E L
O C
A T
IO
N
P
L O
T D
A T
E
U S
E R
JK
JS
JS
11/23/22PLAN CHECK RESUBMITTAL1
City of Pasadena
12/13/22P.C. APPROVED SET
01/16/23BID SET
/1
/2
:0 :2
P
M C
U s e rs \D a ri n .M c K e e \D o c u m e n ts
\2 X
.0 P
A S
A P
W
A d d S v c
B ld g S e is m ic
R e tr o fi t
R V
T d a ri n
.m c k e e
.r v t
M F
G-003
ADA SITE AND
PARKING DETAILS
CEILING LINE
(WHERE OCCURS)
BUTT HINGE
DOOR LEAF
LIGHT SWITCH. (DASHED
LINE INDICATES LARGER
PLATE AT GANGED
SWITCHES)
FINISH FLOOR
DOOR FRAME
HARDWARE SET
ELECTRICAL OUTLET
WALL TELEPHONE/DATA OUTLET
NOTE:
TOP OF SWITCH TO BE AT 48" A.F.F. MAXIMUM. CENTER ALL OTHER DEVICES ON CENTERLINE OF LIGHT SWITCHES. TOP OF SWITCH TO BE AT 40" A.F.F. MAXIMUM WHERE SWITCH IS LOCATED ABOVE A COUNTER. INSTALL ELECTRICAL AND TELEPHONE WALL OUTLETS AND SWITCH PLATES TO NEAREST STUD LOCATION AS SCALED ON PLAN, UNLESS DIMENSIONED OTHERWISE.
THERMOSTAT
EVACUATION SIGNAGE
PULLSTATION5'
0"
6"
2 3/4"
5" E
Q
E Q
E
Q
CL
CL
CL
CARD READER
NOTE: 4'-0" TO
HIGHEST PORTION
OF ANY OPERABLE
EQUIPMENT (TYP)
CL
4'
0"
COAT HOOK (ON BACK
OF DOOR)
8'
0"
6'
8"
CL
CL
4'
0"
EXIT
SIGN
FIRE
STROBE
FIRE
EXTINGUISHER
CABINET
DOOR
HANDLE
EDGE OF WALL
(WHERE
OCCURS)
CL
1'
6"
CL
ELECTRICAL OUTLET
WALL TELEPHONE/DATA OUTLET
8'
6"
4'
0"
CL
LIGHT SWITCHES
(GANG WHERE
POSSIBLE)
SECONDARY
OVERRIDES
GREEN
LIGHT
INDICATOR
CL
CBC 2019 SECTION 11B-308.1.1 (ELECTRICAL SWITCHES)
CBC 2019 SECTION 11B-308.1.2 (ELECTRICAL RECEPTACLE OUTLETS)
CBC 2019 SECTION 11B-703.4.1 (SIGNS WITH TACTILE CHARACTER)
CBC 2019 SECTION 11B-309 (OPERABLE PARTS)
ABAAS 309 OPERABLE PARTS
1'
6"
CL
ABAAS 308.2.1. UNOBSTRUCTED FORWARD REACH
M
IN
" M
IN
4"
MAX
1. ANY PATH OF TRAVEL SHALL BE CONSIDERED A RAMP IF IT'S SLOPE IS GREATER THAN 1'-0" RISE
IN 20'-0" OF HORIZONTAL RUN.
2. ALL ACCESSIBLE ENTRANCES SHALL BE IDENTIFIED WITH AT LEAST ONE STANDARD SIGN AND
WITH ADDITIONAL DIRECTIONAL SIGNS, AS REQUIRED, VISIBLE FROM APPROACHING
PEDESTRIAN WAYS.
3. EVERY REQUIRED ENTRANCE OR PASSAGE DOORWAY SHALL BE OF A SIZE AS TO PERMIT THE INSTALLATION OF A DOOR NOT LESS THAN 3'-0" IN WIDTH AND NOT LESS THAN 6'-8" IN HEIGHT.
DOORS SHALL BE CAPABLE OF OPENING AT LEAST 90 DEGREES AND SHALL BE SO MOUNTED
THAT THE CLEAR WIDTH OF THE DOORWAY IS NOT LESS THAN 32".
4. HAND ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" TO 44" ABOVE
THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN
THE PATH OF TRAVEL, SHALL BE OPENABLE WITH A SINGLE EFFORT BY LEVER TYPE
HARDWARE, BY PANIC BARS, PUSH-PULL ACTIVATING BARS, OR OTHER HARDWARE DESIGNED
TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE.
LOCKED EXIT DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. HANDLES, PULLS,
LATCHES, LOCKS, AND OTHER OPERATING DEVICES ON ACCESSIBLE DOORS SHALL HAVE A
SHAPE THAT IS EASY TO GRASP WITH ONE HAND AND DOES NOT REQUIRE TIGHT GRASPING,
TIGHT PINCHING, OR TWISTING OF THE WRIST TO OPERATE. LEVER OPERATED MECHANISM,
PUSH-TYPE MECHANISM, AND U-SHAPE HANDLES ARE ACCEPTABLE DESIGNS. WHEN SLIDING
DOOR ARE FULLY OPEN, OPERATING HARDWARE SHALL BE EXPOSED AND USABLE FROM BOTH
SIDES.
5. THE WIDTH OF THE LEVEL AND CLEAR AREA ON THE SIDE TO WHICH THE DOOR SWINGS SHALL
EXTEND 24" PAST THE STRIKE EDGE OF THE DOOR FOR EXTERIOR DOORS AND 18" PAST THE
STRIKE EDGE FOR INTERIOR DOORS.
6. THE FLOOR OR LANDING SHALL NOT BE 1/2" LOWER THAN THE THRESHOLD OF THE DOORWAY.
CHANGE IN LEVEL BETWEEN 1/4" TO 1/2" SHALL BE BEVELED WITH A SLOPE NO GREATER THAN 1:2.
7. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 8 1/2 LBS. FOR EXTERIOR DOOR
AND 5 LBS. FOR INTERIOR DOORS. SUCH PULL OR PUSH EFFORT BEING APPLIED AT RIGHT
ANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF SLIDING OF FOLDING DOORS.
COMPENSATING DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE
ABOVE STANDARDS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT TO OPERATE
THE DOORS MAY BE INCREASED NOT TO EXCEED 15 LBS.
8. WALKS AND SIDEWALKS SHALL HAVE A CONTINUOUS SLIP RESISTANT SURFACE, NOT
INTERRUPTED BY STEPS OR BY ABRUPT CHANGES IN LEVEL EXCEEDING 1/2" AND SHALL
MAINTAIN A MINIMUM OF 44" IN WIDTH.
9. DOORS IN ANY POSITION SHALL NOT REDUCE THE MINIMUM DIMENSION OF THE RAMP LANDING TO LESS THAN 42" AND SHALL NOT REDUCE THE REQUIRED WIDTH BY MORE THAN 3 1/2" WHEN
FULLY OPEN.
10. THE WIDTH OF THE LANDING SHALL EXTEND 24" PAST THE STRIKE EDGE OF ANY DOOR OR GATE
FOR EXTERIOR RAMPS AND 18" PAST THE STRIKE EDGE FOR INTERIOR RAMPS.
11. IN BUILDINGS AND FACILITIES, FLOORS OF A GIVEN STORY SHALL BE A COMMON LEVEL
THROUGHOUT, OR SHALL BE CONNECTED BY PEDESTRIAN RAMPS, PASSENGER ELEVATORS,
OR SPECIAL ACCESS LIFTS.
12. ON DOORWAYS LEADING TO MEN'S SANITARY FACILITIES, AN EQUILATERAL TRIANGLE 1/4" THICK
WITH EDGES 12" LONG AND A VERTEX POINTING UPWARD SHALL BE PROVIDED AND ON
DOORWAY LEADING TO WOMEN'S SANITARY FACILITIES A CIRCLE 1/4" THICK AND 12" IN
DIAMETER SHALL BE PROVIDED. THESE GEOMETRIC SYMBOLS SHALL BE CENTERED ON THE
DOOR AT A HEIGHT OF 60" AND THEIR COLOR AND CONTRAST SHALL BE DISTINCTLY DIFFERENT
FROM THE COLOR AND CONTRAST OF THE DOOR. LETTERS AND NUMBERS SHALL BE RAISED
1/32", UPPERCASE, SANS SERIF OR SIMPLE SERIF TYPE AND SHALL BE ACCOMPANIED BY GRADE
2 BRAILLE.
13. LAVATORY FIXTURES. THE REQUIREMENT OF THIS SUBSECTION SHALL APPLY TO LAVATORY
FIXTURES, VANITIES, AND BUILT-IN LAVATORIES.
1. A CLEAR FLOOR SPACE OF 30" X 48" COMPLYING WITH SECTION 522(C) SHALL BE
PROVIDED IN FRONT OF A LAVATORY TO ALLOW A FORWARD APPROACH. SUCH CLEAR
FLOOR SPACE SHALL ADJOIN OR OVERLAP AN ACCESSIBLE ROUTE AND SHALL EXTEND
INTO KNEE AND TOE SPACE UNDERNEATH THE LAVATORY.
2. MIRRORS SHALL BE MOUNTED WITH THE BOTTOM EDGE NO HIGHER THAN 40" FROM THE
FLOOR
14. TOWEL, SANITARY NAPKINS, WASTE RECEPTACLES. WHERE TOWEL, SANITARY NAPKINS,
WASTE RECEPTACLES, AND OTHER SIMILAR DISPENSING AND DISPOSAL FIXTURES ARE
PROVIDED, AT LEAST ONE OF EACH TYPE SHALL BE LOCATED WITH ALL OPERABLE PARTS,
INCLUDING COIN SLOTS, WITHIN 40" FROM THE FINISHED FLOOR. TOILET
15. HEIGHT AND CLEARANCES. LAVATORIES SHALL BE MOUNTED WITH THE RIM OR COUNTER
SURFACE NO HIGHER THAN 34"(865MM) ABOVE THE FINISHED FLOOR. PROVIDE A CLEARANCE OF
AT LEAST 29" (735MM) FROM THE FLOOR TO THE BOTTOM OF THE APRON. KNEE AND TOE
CLEARANCE SHALL COMPLY WITH FIGURE 3 B THIS SHEET.
16. CLEAR FLOOR SPACE. A CLEAR FLOOR SPACE OF 30" X 48" (760MM X 1220MM) COMPLYING WITH
ACCESSIBILITY 4.2.4 SHALL BE PROVIDED IN FRONT OF A LAVATORY TO ALLOW FORWARD
APPROACH. SUCH CLEAR FLOOR SPACE SHALL ADJOIN OR OVERLAP AN ACCESSIBLE ROUTE
AND SHALL EXTEND A MAXIMUM OF 19" (485MM) UNDERNEATH THE LAVATORY. SEE FIGURE 2 A
THIS SHEET.
17. EXPOSED PIPES AND SURFACES. HOT WATER AND DRAIN PIPES UNDER LAVATORIES SHALL BE
INSULATED OR OTHERWISE COVERED. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES
UNDER LAVATORIES.
18. FAUCETS. FAUCETS SHALL COMPLY WITH ACCESSIBILITY 4.27.4. LEVER-OPERATED, PUSH-TYPE, AND ELECTRONICALLY CONTROLLED MECHANISMS ARE EXAMPLES OF ACCEPTABLE DESIGNS.
SELF-CLOSING VALVES ARE ALLOWED IF THE FAUCET REMAINS OPEN FOR AT LEAST 10
SECONDS.
19. LAVATORIES SHALL BE MOUNTED WITH A MINIMUM DISTANCE OF 18" TO THE CENTERLINE OF
THE FIXTURE.
20. THE CENTER OF RECEPTACLE OUTLETS SHALL BE NOT LESS THAN 15" ABOVE THE FLOOR OR
WORKING PLATFORM.
21. THE CENTER OF THE GRIP OF THE OPERATING HANDLE OF SWITCHES INTENDED TO BE USED BY
THE OCCUPANT OF THE ROOM OR AREA TO CONTROL LIGHTING AND RECEPTACLE OUTLETS,
APPLIANCES, OR COOLING, HEATING, AND VENTILATING EQUIPMENT, SHALL NOT BE LESS THAN
3'-0" OR MORE THAN 4'-0" ABOVE THE FLOOR OR WORKING PLATFORM.
22. THE CENTER OF FIRE ALARM INITIATING DEVICES (BOXES) SHALL BE LOCATED 48" ABOVE THE
LEVEL OF THE FLOOR, WORKING PLATFORM, GROUND SURFACES, OR SIDEWALK.
23. THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL BE THE STANDARD USED TO IDENTIFY FACILITIES THAT ARE ACCESSIBLE TO AND USABLE BY PHYSICALLY DISABLED PERSONS AS SET
FORTH IN THESE BUILDING STANDARDS AND ACCESSIBILITY. THE SYMBOL SPECIFIED ABOVE
SHALL CONSIST OF A WHITE FIGURE ON A BLUE BACKGROUND. THE BLUE SHALL BE EQUAL TO
COLOR NUMBER 15090 IN FEDERAL STANDARD 595A.
24. AT SINKS, FAUCET CONTROLS, AND OPERATING MECHANISMS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE
FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5LBS. LEVER-
OPERATED, PUSH-TYPE, AND ELECTRONICALLY CONTROLLED MECHANISMS ARE EXAMPLES OF
ACCEPTABLE DESIGNS. SELF-CLOSING VALVES ARE ALLOWED IF THE FAUCET REMAINS OPEN
FOR AT LEAST 10 SECONDS. SINKS SHALL BE MOUNTED ON COUNTER SURFACE NO HIGHER
THAN 34" ABOVE FINISH FLOOR AND SHALL PROVIDE KNEE CLEARANCE OF 27" HIGH (MIN.) X 30"
WIDE (MIN.) X 19": DEEP (MIN.) UNDERNEATH SINK.
25. IF EMERGENCY WARNING SYSTEMS ARE REQUIRED, THEY SHALL ACTIVATE A MEANS OF
WARNING THE HEARING IMPAIRED. FLASHING VISUAL WARNING SHALL HAVE A FREQUENCY OF
NOT MORE THAN 60 FLASHES PER MINUTE.
26. AREA OF REMODEL SHALL FULLY COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS.
11B-202.1 GENERAL
ADDITIONS AND ALTERATIONS TO EXISTING BUILDINGS OR FACILITIES SHALL COMPLY WITH
SECTION 11B-202.
11B-202.2 ADDITIONS
EACH ADDITION TO AN EXISTING BUILDING OR FACILITY SHALL COMPLY WITH THE REQUIREMENTS
FOR NEW CONSTRUCTION AND SHALL COMPLY WITH SECTION 11B-202.4.
11B-202.3 ALTERATIONS
WHERE EXISTING ELEMENTS OR SPACES ARE ALTERED, EACH ALTERED ELEMENT OR SPACE
SHALL COMPLY WITH THE APPLICABLE REQUIREMENTS OF DIVISION 2, INCLUDING SECTION
11B-202.4
11B-202.4 PATH OF TRAVEL REQUIREMENTS IN ALTERATIONS, ADDITIONS AND STRUCTURAL
REPAIRS
WHEN ALTERATIONS OR ADDITIONS ARE MADE TO EXISTING BUILDINGS OR FACILITIES, AN
ACCESSIBLE PATH OF TRAVEL TO THE SPECIFIC AREA OF ALTERATION OR ADDITION SHALL BE
PROVIDED. THE PRIMARY ACCESSIBLE PATH OF TRAVEL SHALL INCLUDE:
A PRIMARY ENTRANCE TO THE BUILDING OR FACILITY,
TOILET AND BATHING FACILITIES SERVING THE AREA,
DRINKING FOUNTAINS SERVING THE AREA,
PUBLIC TELEPHONES SERVING THE AREA, AND
SIGNS.
11B-203.9 EMPLOYEE WORKSTATIONS
EMPLOYEE WORKSTATIONS SHALL BE ON AN ACCESSIBLE ROUTE COMPLYING WITH DIVISION 4.
SPACES AND ELEMENTS WITHIN EMPLOYEE WORKSTATIONS SHALL ONLY BE REQUIRED TO
COMPLY WITH SECTIONS 11B-207.1, 11B-215.3, 11B-302, 11B-303, 11B-308.1.1, 11B-308.1.2, AND
11B- 404.2.3 UNLESS EXEMPTED BY OTHER PARTS OF THIS CODE. COMMON USE CIRCULATION
PATHS WITHIN EMPLOYEE WORKSTATIONS SHALL COMPLY WITH SECTION 11B-206.2.8.
EXCEPTION: RECEPTACLES, CONTROLS, AND SWITCHES THAT ARE AN INTEGRAL PART OF
WORKSTATION FURNISHINGS, FIXTURES, AND EQUIPMENT SHALL NOT BE REQUIRED TO
COMPLY WITH SECTIONS 11B-308.1.1 AND 11B-308.1.2
11B-215 FIRE ALARM SYSTEMS AND CARBON MONOXIDE ALARM SYSTEMS
11B-215.1 GENERAL
WHERE FIRE ALARM SYSTEMS AND CARBON MONOXIDE ALARM SYSTEMS PROVIDE AUDIBLE
ALARM COVERAGE, ALARMS SHALL COMPLY WITH SECTION 11B-215.
EXCEPTION: IN EXISTING FACILITIES, VISIBLE ALARMS FOR FIRE ALARM SYSTEMS SHALL NOT
BE REQUIRED EXCEPT WHERE AN EXISTING FIRE ALARM SYSTEM IS UPGRADED OR REPLACED,
OR A NEW FIRE ALARM SYSTEM IS INSTALLED.
11B-805 MEDICAL CARE AND LONG-TERM CARE FACILITIES
11B-805.1 GENERAL
MEDICAL CARE FACILITIES AND LONG-TERM CARE FACILITIES SHALL COMPLY WITH SECTION
11B-805.
11B-805.4 EXAMINATION, DIAGNOSTIC AND TREATMENT ROOMS
EXAMINATION, DIAGNOSTIC AND TREATMENT ROOMS SHALL COMPLY WITH SECTION 11B-805.4.
11B-805.4.1 BEDS, EXAM TABLES, PROCEDURE TABLES, GURNEYS AND LOUNGE CHAIRS
A 36-INCH (914 MM) MINIMUM WIDE CLEAR SPACE SHALL BE PROVIDED ALONG THE FULL
LENGTH OF EACH SIDE OF BEDS, EXAM TABLES, PROCEDURE TABLES, GURNEYS AND LOUNGE
CHAIRS.
EXCEPTION: GENERAL EXAM ROOMS IN NON-EMERGENCY SETTINGS MAY PROVIDE CLEAR
SPACE ON ONLY ONE SIDE OF BEDS, GURNEYS AND EXAM TABLES.
11B-805.4.2 EQUIPMENT
CLEAR SPACE COMPLYING WITH SECTION 11B-305.2 SHALL BE PROVIDED AS REQUIRED FOR
SPECIFIC EQUIPMENT.
11B-805.4.3 TURNING SPACE
TURNING SPACE COMPLYING WITH SECTION 11B-304 SHALL BE PROVIDED WITHIN THE ROOM
11B-805.7 BUILT-IN CABINETS AND WORK SURFACES
BUILT-IN CABINETS, COUNTERS AND WORK SURFACES SHALL BE ACCESSIBLE, INCLUDING:
PATIENT WARDROBES, NURSE'S STATIONS, ADMINISTRATIVE CENTERS, RECEPTION DESKS,
MEDICINE PREPARATION AREAS, LABORATORY WORK STATIONS, EQUIPMENT CONSOLES,
CLEAN AND SOILED UTILITY CABINETS, AND STORAGE AREAS; AND SHALL COMPLY WITH
SECTIONS 11B-225 AND 11B-902.
(A) FRONT APPROACH
" M
IN
(D) STOP OR LATCH APPROACH
MIN
24"
(C) POCKET OR HINGE APPROACH
" M
IN
MIN
22"
" M
IN
(B) SIDE APPROACH
CBC 2019 FIGURE 11B-404.2.4.2
ABAAS FIGURE 404.2.4.2
MANEUVERING CLEARANCES AT DOORWAYS WITHOUT
DOORS, SLIDING DOORS, GATES AND FOLDING DOORS
(F) HINGE APPROACH, PUSH SIDE
" M
IN
36" MIN60
" M
IN
(D) LATCH APPROACH, PULL
SIDE
(A) FRONT APPROACH, PULL SIDE
OF EXT. DOORS
24" MIN
AT EXT. SIDE
" M
IN
MIN
18"
MIN
(C) FRONT APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
M
IN
12"
(B) FRONT APPROACH, PUSH SIDE
" M
IN
(G) HINGE APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH
CLOSER AND LATCH
" M
IN
MIN
(H) LATCH APPROACH, PULL SIDE
MIN
24"
" M
IN
MIN
24"
(K) LATCH APPROACH, PUSH SIDE,
DOOR PROVIDED WITH BOTH CLOSER
(E) LATCH APPROACH, PULL SIDE
42" MIN
M
IN
M
IN
" M
IN
MIN
24"
(J) LATCH APPROACH, PUSH SIDE,
(I) LATCH APPROACH, PULL SIDE
DOOR PROVIDED…