PART 5-ITB 25-009-PW-EC_HAYDEN_BRIDGE_Drawing Set~1.pdf

PDF 2 MB Posted

Attached to
ITB 25-009-PW Transmission Water Main Replacements 23rd and Hayden Bridge
Solicitation number
S-P00140-00013302
Issued by
Lane County, Oregon

About this file

These documents are engineering drawings and technical specifications for the Eugene Water & Electric Board (EWEB) Water Distribution project involving a 45" Transmission Main Replacement from Hayden Bridge Water Filtration Plant to 33rd Street in Eugene, Oregon. The project work order number is 2202888 and involves water transmission infrastructure replacement with extensive erosion control and site management plans. The project documents include detailed site plans, erosion control strategies, standard construction details, trench installation specifications, and comprehensive site management protocols.

The project focuses on water infrastructure replacement with specific attention to environmental controls, including detailed erosion and sediment management strategies. The drawings indicate a complex urban infrastructure project involving approximately 0.647 acres of total site area, with precise mapping of pipe installation routes, utility considerations, and site-specific environmental protections. Key technical specifications include 45" welded steel water main installation, trench foundation stabilization, surface restoration requirements, and compliance with Oregon utility construction standards. The project documents are dated for implementation in May 2024, with engineering drawings digitally signed and set to expire on 05/31/2025, suggesting a project timeline of approximately one year.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DES

DWN

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

2/ 6/

:2

AM

E

RI

CH

R

AS

KA

FUNC BY CHK APP EWEB WORK

ORDER NO.

2202888

AS NOTED05/31/24

B-39355-EC1

CCI/AR

ESR

WATER SYSTEMS

WATER TRANSMISSION

HAYDEN BRIDGE TO 33RD ST

EROSION CONTROL SITE MANAGEMENT

COVER SHEET

EUGENE WATER & ELECTRIC BOARD

EUGENE, OREGON

HAYDEN BRIDGE WATER FILTRATION PLANT TO 33RD ST

45" TRANSMISSION MAIN REPLACEMENT

EWEB WORK ORDER: 2202888

Docusign Envelope ID: 1599ED59-AFE3-4E59-BB67-869747A2FF68

DIGITALLY SIGNED

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

2/ 6/

:2

AM

E

RI

CH

R

AS

KA

FUNC BY CHK APP EWEB WORK

ORDER NO.

2202888

AS NOTED5-31-24

B-39355-EC2

CCI

ESR

WATER DISTRIBUTION

WATER TRANSMISSION

HAYDEN BRIDGE TO 33RD ST

EROSION CONTROL SITE MANAGEMENT

NOTES, ABBREVIATION & LEGENDS

₂

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

2/ 6/

:2

AM

E

RI

CH

R

AS

KA

FUNC BY CHK APP EWEB WORK

ORDER NO.

2202888

AS NOTED5-31-24

B-39355-EC3

CCI

ESR

WATER DISTRIBUTION

WATER TRANSMISSION

HAYDEN BRIDGE TO 33RD ST

LAND AND DRAINAGE ALTERATION PROGRAM

(LDAP) NOTES

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

2/ 6/

:2

AM

E

RI

CH

R

AS

KA

FUNC BY CHK APP EWEB WORK

ORDER NO.

2202888

AS NOTED5-31-24

B-39355-EC4

CCI

ESR

WATER DISTRIBUTION

WATER TRANSMISSION

HAYDEN BRIDGE TO 33RD ST

EROSION CONTROL SITE MANAGEMENT

SHEET 1

NORTH

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

2/ 6/

:2

AM

E

RI

CH

R

AS

KA

FUNC BY CHK APP EWEB WORK

ORDER NO.

2202888

AS NOTED5-31-24

B-39355-EC5

CCI

ESR

WATER DISTRIBUTION

WATER TRANSMISSION

HAYDEN BRIDGE TO 33RD ST

EROSION CONTROL SITE MANAGEMENT

SHEET 2

NORTH

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

2/ 6/

:2

AM

E

RI

CH

R

AS

KA

FUNC BY CHK APP EWEB WORK

ORDER NO.

2202888

AS NOTED5-31-24

B-39355-EC6

CCI

ESR

WATER DISTRIBUTION

WATER TRANSMISSION

HAYDEN BRIDGE TO 33RD ST

EROSION CONTROL SITE MANAGEMENT

OREGON STANDARD DETAILS - SHEET 1

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

2/ 6/

:2

AM

E

RI

CH

R

AS

KA

FUNC BY CHK APP EWEB WORK

ORDER NO.

2202888

AS NOTED5-31-24

B-39355-EC7

CCI

ESR

WATER DISTRIBUTION

WATER TRANSMISSION

HAYDEN BRIDGE TO 33RD ST

EROSION CONTROL SITE MANAGEMENT

OREGON STANDARD DETAILS - SHEET 2

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

2/ 6/

:2

AM

E

RI

CH

R

AS

KA

FUNC BY CHK APP EWEB WORK

ORDER NO.

2202888

AS NOTED5-31-24

B-39355-EC8

CCI

ESR

WATER DISTRIBUTION

WATER TRANSMISSION

HAYDEN BRIDGE TO 33RD ST

EROSION CONTROL SITE MANAGEMENT

WCD - TRENCH DETAIL WC220

Sheets and Views
39355-EC1-B-39355-EC1
39355-EC1-B-39355-EC2
39355-EC1-B-39355-EC3
39355-EC1-B-39355-EC4
39355-EC1-B-39355-EC5
39355-EC1-B-39355-EC6
39355-EC1-B-39355-EC7
39355-EC1-B-39355-EC8
2025-03-19T17:06:45-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .