Equipment List HQ and Milport Warehouse.pdf

PDF 27 KB Posted

Attached to
ITB 25-009-PW Transmission Water Main Replacements 23rd and Hayden Bridge
Solicitation number
S-P00140-00013302
Issued by
Lane County, Oregon

About this file

This equipment list document identifies HVAC and ventilation systems at two facilities operated by what appears to be a regional utility or similar organization: a headquarters and warehouse location at 9079 SE McLoughlin Boulevard and a secondary facility at 1777 SE Milport Road. At the McLoughlin Boulevard location, the inventory includes seven package HVAC units for office areas, three Liebert split systems for server room cooling, one Mitsubishi split system for warehouse offices, two large air handlers (SF1 and SF2) providing ventilation and cooling, two steam boilers supporting 65 in-wall steam radiators and 17 ceiling-hung down draft heaters, 17 rooftop exhaust ventilators, and eight restroom exhaust fans. The Milport Road facility contains one package unit for office space, one Liebert split system for the server room, six rooftop exhaust ventilators, and 10 ceiling-hung natural gas down draft heaters. This equipment list serves as a comprehensive inventory of the mechanical systems distributed across both locations.

The document provides no information regarding pricing, maintenance contracts, service terms, funding sources, or procurement timelines. It functions solely as an equipment inventory without specifications for replacement, repair, upgrade, or service requirements. No renewal options, set-asides, incumbent contractors, or pricing terms are detailed in the document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment List S-84500-00013303

At 9079 SE McLoughlin Blvd we have the following HVAC units.

- 7 Package units for office area.

- 3 Liebert split systems for server room.

- 1 Mitsubishi split system for warehouse offices.

We also have SF1 & SF2 are the giant air handlers that serve the office but are only ventilation and cooling. The heat is provided by way of the two steam boilers which service the 65 in wall steam heat radiators in the office area, and the 17-ceiling hung down draft heaters in the warehouse.

There are also 17 powered rooftop ventilators on the warehouse that are exhaust fans only, as well as 8 restroom exhaust fans throughout the office area.

At 1777 SE Milport Rd we have the following HVAC units.

- 1 package unit for the office area.

- 1 Liebert split system for the server room.

There are also 6 powered rooftop ventilators on the warehouse that are exhaust fans only and 10 ceiling hung natural gas down draft heaters

File details come from the government source that posted it. Updated .