Parkview_Loop_Waterline_Replacement_-_Bid_Set_Plans.pdf
PDF 14 MB Posted
- Attached to
- Parkview Loop Waterline Replacement
- Solicitation number
- 26-060
- Issued by
- Washington County, Barlow City, Oregon
About this file
Parkview Loop Waterline Replacement – Bid Set Plans
This is a comprehensive bid set plan document prepared by the City of Beaverton, Oregon (Public Works Department) for the Parkview Loop Waterline Replacement infrastructure project (CIP #4244). The project involves installing approximately 3,000 linear feet of new 8-inch ductile iron pipe (DIP) water main and 1,500 linear feet of new 6-inch DIP water main throughout SW Parkview Loop and connecting cul-de-sacs (Sheridan Court, Pearson Court, Reid Court, Wagon Wheel Court, and Tucker Wood Court), spanning from Greenway to Murphy Lane. Associated deliverables include eight fire hydrant assemblies, approximately 50 water service connections with new meter boxes, air release and blowoff assemblies, gate valves, valve boxes, 730 linear feet of concrete curbs and gutters, 2,300 square feet of concrete sidewalks, 3,360 square yards of asphalt concrete paving for trench resurfacing, and landscape restoration. The non-mandatory pre-bid conference is scheduled for March 31, 2026, at 10:00 a.m. via Zoom. Written questions must be submitted by April 14, 2026, at 5:00 p.m. Bids are due electronically by April 21, 2026, at 2:00 p.m. with virtual bid opening. The anticipated Notice to Proceed is July 6, 2026, with substantial completion required by October 30, 2026. The contract is fixed-price with monthly payments based on the City Engineer's estimate of completed work.
The estimated project cost ranges between $1,700,000 and $1,800,000. Bidders must be licensed by the Oregon Construction Contractors Board or State Landscape Contractors Board and comply with state prevailing wage rates under ORS 279C.800-279C.875 and federal prevailing wage rates under the Davis-Bacon Act. A 10 percent bid guaranty is required, along with submission of a Bidder Responsibility Form and Current Project Information Form. All bidders must comply with the City of Beaverton's Good Faith Effort (GFE) Program, requiring documented contact with COBID-certified firms for identified divisions of work including utilities, asphalt paving, concrete work, excavating, sewer/water/storm drain work, and landscaping. The successful contractor must obtain a City business license, maintain specified insurance coverage, provide a Faithful Performance Bond equal to minimum 100 percent of the estimated contracted cost, furnish a Labor and Material Payment Bond, and submit monthly certified payroll statements. A Public Works Bond of $30,000 applies. The City retains up to five percent of monthly payments until project completion and reserves the right to terminate the contract for breach with seven days' written notice and opportunity to cure, or for convenience with seven days' notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Parkview_Loop_Waterline_Replacement_(Addendum_#2_Revision).pdf | ||
| Parkview_Loop_Waterline_Replacement_(Addendum_#2_Revision).pdf | ||
| Parkview_Loop_Waterline_Replacement_-_Bid_Set_Plans.pdf | ||
| LABOR_AND_MATERIAL_PAYMENT_BOND.docx | DOCX document | |
| Laws_to_be_Observed.docx | DOCX document | |
| Construction_Contract_-_Sample.docx | DOCX document | |
| BLANK_Sole_Source_Justification_Form.pdf | ||
| Laws_to_be_Observed.docx | DOCX document | |
| Notice_to_Proceed.docx | DOCX document | |
| Construction_Contract_-_Sample.docx | DOCX document | |
| Performance_Bond.docx | DOCX document | |
| Locates.docx | DOCX document | |
| Locates.docx | DOCX document | |
| Notice_to_Proceed.docx | DOCX document | |
| BLANK_Sole_Source_Justification_Form.pdf | ||
| LABOR_AND_MATERIAL_PAYMENT_BOND.docx | DOCX document | |
| Performance_Bond.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SW
PAR
KVIEW
LP
SW PARKVIEW LP
SH
ER
ID
AN
C T
PEARSON CT
SW
G
RE
EN
W
AY
SW
G
R
EE
N W
AY
REID CT
TUCKER
MURPHY
WOOD CT
WAGON WHEEL CT
FA
NNOW
OOD
R
EB
EC
C
A
Greenway Park
Fa nn o C re ek
Greenway Park
PR
O
JEC
T SITE
PROJECT SITE
CITY OF BEAVERTON
1S1W27, COB INDEX 3716, 4017
CIP #4244 - PARKVIEW LOOP WATERLINE REPLACEMENT
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
DesignedAppv'd
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G001 COVER SHEET.DWG
G001
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
C O
VE
R
S H
EE
T
VICINITY MAP
N.T.S.
Scholls Ferry Rd
Barrows Rd
Tile Flat Rd
5t h Av e
Weir Rd
Brockman St
Allen Blvd
Denney Rd
M ur ra y
Bl vd Hall Blvd
Barnes Rd
Cornell Rd Sunset Hwy
Walker Rd
Jenkins Rd
BH Hwy
Canyon Rd
0t h Av e
Hart Rd
Davis Rd
Nora Rd
Garden Home Rd
Farmington Rd
TV Hwy
Ced ar
H ills
B lvd
Scholls Ferry Rd
CITY OF BEAVERTON PHONE NUMBER
Project Manager - Matt Palmer (971) 806-2536 (C)
Public Works Main (503) 526-2261
Water Operations - Troy Pierson (971) 246-0223 (C)
COMPANY PHONE NUMBER
Clean Water Services (503) 547-8100
Comcast - Zach Martin (503) 250-0436
Frontier - David Carnley (503) 940-9000
Verizon - Daniel Ruiz (503) 350-3251
PGE - Outage & Emergencies (503) 464-7777 or (800) 544-1795
Tualatin Hills Parks & Recreation --
BPA - Jim Clark (503) 304-5906 (O) or (503) 758-3883 (C)
Kinder Morgan (866) 762-8442
NW Natural (800) 882-3377
Tualatin Valley Water District (503) 848-3000
ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility
Notification Center. Those rules are set forth in OAR 952-001-0001 through
952-001-0090. You may obtain copies of the rules by calling the center.
NOTE: The telephone number for the Oregon Utility Notification Center is (503) 232-1987.
Basis of Bearing / Benchmark ORS 92.044 The basis of bearings and coordinates of this survey is the Oregon Coordinate Reference System, Portland Zone (OCRS-PDX). Coordinates are expressed in units of International Feet. (1 Int'l Foot = 0.3048 meters exactly). The average Combined Scale Factor for the project area is 0.99999714 (1:350,000) and the convergence angle is -0°02'04".
Elevations are NGVD29(47) datum, which is also locally known as the Washington County Datum. City of Beaverton benchmark "GREENWAY" (Elev 190.30'), a 2” brass disk located at the NE corner of Greenway and SW Parkview Loop, was held for elevation.
SHEET INDEX
Sheet # Sheet Title
G001 COVER SHEET
G002 GENERAL NOTES
G003 ABBREVIATIONS
G004 GENERAL LEGEND
G005 KEY PLAN
E100 EROSION CONTROL PLAN SOUTH
E101 EROSION CONTROL PLAN NORTH
C100–C113 PARKVIEW LP PLAN AND PROFILES
C200-C201 SHERIDAN CT PLAN AND PROFILES
C300-C301 PEARSON CT PLAN AND PROFILES
C400-C402 REID CT PLAN AND PROFILES
C500-C501 WAGONWHEEL CT PLAN AND PROFILES
C600-C601 TUCKERWOOD CT PLAN AND PROFILES
C700-C702 RECONNECTION PLANS
C703-708 HYDRANT PLAN AND PROFILES
D100-D110 STANDARD DETAILS
PROJECT SITE MAP
This design complies with ORS 92.044(7) in that no utility infrastructure is designed to be located within one foot of a survey monument location shown on a subdivision or partition plat. No design modification or final field location change shall be permitted if it would cause any utility infrastructure to be placed within a prohibited area.
Pressure Zone 410 Approximate Static Pressure: 101 psi
PROJECT SITE
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
S
ET
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G002 GENERAL NOTES.DWG
G002
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
G
EN
ER
A
L N
O
TE
GENERAL CONSTRUCTION NOTES
1. THE CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR AT LEAST 48 HOURS (TWO FULL
WORKING DAYS) PRIOR TO BEGINNING THE PROJECT. CONNECTIONS BETWEEN EXISTING
INFRASTRUCTURE AND NEW WORK SHALL NOT BE MADE UNTIL NECESSARY INSPECTIONS
AND TESTS HAVE BEEN COMPLETED ON THE NEW WORK AND IT IS FOUND TO CONFORM IN
ALL RESPECTS TO THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS.
2. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES WHERE
FACILITIES CROSS. CONTRACTOR SHALL POT HOLE EXISTING UTILITIES 200 FEET AHEAD OF
LAYING PIPE AT ALL CROSSINGS. IF CONFLICTS ARISE, THE CONTRACTOR SHALL NOTIFY THE
OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. UTILITY LOCATE ONE CALL #
1-800-332-2344
3. ALL CONSTRUCTION IS TO BE PERFORMED IN ACCORDANCE WITH THE MOST RECENT
VERSION OF CITY OF BEAVERTON STANDARDS, OREGON APWA/ODOT STANDARD
SPECIFICATIONS, CLEAN WATER SERVICES (CWS) STANDARDS (INCLUDING EROSION
PREVENTION AND SEDIMENT CONTROL) AND THE OREGON ADMINISTRATION RULES (OAR),
CHAPTER 333, UNLESS NOTED ON THE PLANS OR SPECIFIED OTHERWISE.
4. ALL EXISTING UTILITIES DISTURBED BY CONTRACTOR SHALL BE REPAIRED IMMEDIATELY AND
THE RESPECTIVE UTILITY COMPANY NOTIFIED OF THE DISTURBANCE WITHOUT DELAY.
5. CONTRACTOR SHALL SUBMIT "AS-BUILT" INFORMATION TO THE OWNER'S REPRESENTATIVE
UPON COMPLETION OF CONSTRUCTION.
6. THE CONTRACTOR SHALL NOT DAMAGE OR CUT EXISTING ASBESTOS CEMENT PIPE.
EXCAVATE AND EXPOSE EXISTING ASBESTOS CEMENT PIPE UNTIL APPROPRIATE JOINTS ARE
EXPOSED. DISCONNECT THE ASBESTOS CEMENT PIPE JOINT AND REMOVE THE APPROPRIATE
SECTIONS OF ASBESTOS CEMENT PIPE WITHOUT CUTTING OR DAMAGING THEM. DISPOSE OF
REMOVED ASBESTOS CEMENT PIPE IN A LEGAL MANNER AND IN CONFORMANCE WITH THE
REQUIREMENTS OF AUTHORITIES CONTROLLING AIR POLLUTION AND SOLID WASTE DISPOSAL.
CONTRACTOR SHALL COMPLY WITH APPLICABLE REQUIREMENTS OF ORS 468A.700 THROUGH
468A.760.
7. FINAL LOCATIONS OF ALL VALVES AND VALVE BOXES, FIRE HYDRANTS, AIR RELEASE
ASSEMBLIES, SERVICE CONNECTION CORPORATION STOPS, DRIVEWAY APRONS, SEWER
LATERALS, PERMANENT SIGNS, AND CATCH BASINS SHALL BE FIELD LOCATED. THE
CONTRACTOR SHALL COORDINATE FINAL LOCATIONS OF THE DESCRIBED ITEMS WITH THE
OWNER'S REPRESENTATIVE.
8. UTILITY CONSTRUCTION SEQUENCING WILL BE REQUIRED IN ORDER TO PREVENT CONFLICTS
WITH EXISTING UTILITIES REMAINING IN SERVICE UNTIL NEWLY INSTALLED UTILITIES ARE
CONNECTED AND IN SERVICE. CONTRACTOR SHALL SEQUENCE UTILITY WORK INCLUDING
TEMPORARY CONNECTIONS AND BYPASSES AS REQUIRED SUCH AS TO MINIMIZE DISRUPTION
OF SERVICES. SEE SECTION 105.4.01 OF THE SPECIFICATIONS REGARDING CONSTRUCTION
SEQUENCING REQUIREMENTS FOR THIS PROJECT.
9. MAINTENANCE OF THE WORK AREA AND APPROACH ROADS IS THE RESPONSIBILITY OF THE
CONTRACTOR. THE WORK AREA AND APPROACH ROADS SHALL BE MAINTAINED IN A CLEAN
CONDITION, FREE FROM OBSTRUCTIONS AND HAZARDS.
10. ANY CHANGE IN CONSTRUCTION AFTER PLAN APPROVAL MUST BE SUBMITTED IN WRITING
AND APPROVED BY THE CITY PRIOR TO CHANGE.
11. AT THE END OF EACH WORK DAY ALL TRENCHES SHALL BE BACKFILLED AND ALL TRENCHES
WITHIN STREETS SHALL BE TEMPORARY PAVED OR COVERED TO THE SATISFACTION OF THE
OWNER'S REPRESENTATIVE. STEEL SHEET PLACEMENTS SHALL BE LIMITED TO 36 HOURS IN
ANY ONE LOCATION. BEYOND 36 HOURS, EXCAVATIONS SHALL BE PAVED. ASPHALT
PAVEMENT, EITHER TEMPORARY OR PERMANENT, SHALL BE HOT MIX BITUMINOUS ASPHALT.
NO TRENCH, ON-SITE OR OFF-SITE, SHALL BE LEFT AT ANY TIME IN AN UNSAFE CONDITION.
THE CONTRACTOR IS RESPONSIBLE FOR AND IS LIABLE FOR HAZARDS OR DAMAGE
RESULTING FROM THE PROSECUTION OF THE WORK.
12. EFFECTIVE EROSION PREVENTION & SEDIMENT CONTROL, DUST CONTROL, AND DRAINAGE
CONTROL IS REQUIRED AT ALL TIMES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
PROTECTION OF ALL WORK, ADJACENT PROPERTIES AND DOWNSTREAM FACILITIES FROM
EROSION AND SILTATION DURING THE COURSE OF THE WORK. ANY DAMAGE RESULTING
FROM SUCH EROSION AND SILTATION SHALL BE CORRECTED AT THE SOLE EXPENSE OF THE
CONTRACTOR.
13. THE CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS. IF A DRIVEWAY MUST BE
BLOCKED, THE CONTRACTOR SHALL GIVE THE HOMEOWNER, APARTMENT MANAGER AND/OR
BUILDING OWNER 24 HOURS NOTICE AND SHALL ENSURE ACCESS TO DRIVEWAYS AT THE END
OF EACH WORK DAY.
14. THE CONTRACTOR SHALL EXERCISE ALL DUE CARE IN PROTECTING PROPERTY ALONG THE
ROUTE OF THE IMPROVEMENTS. THIS PROTECTION SHALL INCLUDE, BUT NOT BE LIMITED TO,
TREES, YARDS, FENCES, DRAINAGE LINES, MAIL BOXES, DRIVEWAYS, SHRUBS, LAWNS,
IRRIGATION SYSTEMS, WITHIN ANY RIGHTS-OF-WAYS AND EASEMENTS. IF ANY OF THE ABOVE
HAVE BEEN DISTURBED, THEY SHALL BE RESTORED AS NECESSARY TO AS NEAR THEIR
ORIGINAL CONDITION AS POSSIBLE OR REPLACED IN KIND.
15. ALL SURVEY MONUMENTS SHALL BE LOCATED AND PROTECTED, EXCEPT AS SPECIFICALLY
DIRECTED BY THE CITY ENGINEER.
16. THE CONTRACTOR SHALL PERFORM ALL THE WORK SHOWN ON THE DRAWINGS AND ALL
INCIDENTAL WORK CONSIDERED NECESSARY TO COMPLETE THE PROJECT IN AN
ACCEPTABLE MANNER.
17. THE CONTRACTOR AND/OR SUB-CONTRACTOR SHALL HAVE A MINIMUM OF ONE SET OF CITY
APPROVED CONSTRUCTION PLANS ON THE JOB SITE AT ALL TIMES DURING EACH
CONSTRUCTION PHASE WHILE WORK IS BEING PERFORMED.
18. ALL MATERIAL SUPPLIERS SHALL SUBMIT TO THE ENGINEER PROOF OF MATERIAL(S) TESTED
IN ACCORDANCE WITH SPECIFICATIONS. BY ACCEPTANCE OF THE CONTRACT WITH THE
OWNER/DEVELOPER, THE CONTRACTOR CERTIFIES THAT ALL MATERIALS DELIVERED TO THE
JOB SITE WILL MEET OR EXCEED THOSE SPECIFICATIONS. ANY MATERIAL NOT CONFORMING
SHALL BE REMOVED FROM THE SITE AT NO ADDITIONAL COST TO THE OWNER.
19. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL LEAVE THE PROJECT AREA FREE
OF DEBRIS AND UNUSED MATERIALS.
WATERLINE CONSTRUCTION NOTES
1. CONTRACTOR SHALL INFORM OWNER AND OWNER'S REPRESENTATIVE 5 WORKING DAYS IN
ADVANCE OF CONSTRUCTION AND/OR PLANNED DISRUPTION OF WATER SERVICE.
CONTRACTOR SHALL NOT ASSUME SHUTDOWN TIMES, BUT WILL RATHER SCHEDULE AND
COORDINATE SHUTDOWNS WITH THE CITY AND OTHER AFFECTED UTILITIES.
2. OWNER WILL PROVIDE NOTIFICATION TO AFFECTED WATER USERS FOR PLANNED SERVICE
DISRUPTIONS.
3. OWNER WILL PROVIDE SURVEYING AS REQUIRED FOR NEW WATERLINE CONSTRUCTION.
4. OPERATION OF EXISTING VALVES SHALL ONLY BE PERFORMED BY CITY STAFF.
5. EXISTING WATER MAINS AND SERVICES SHALL BE KEPT IN OPERATIONS UNTIL NEW MAINS
ARE CONNECTED AND IN SERVICE.
6. CONTRACTOR SHALL PROVIDE TEMPORARY THRUST BLOCKING WHERE REQUIRED ON THOSE
FITTINGS WHICH WILL SEE SERVICE PRESSURE BEFORE CONCRETE THRUST BLOCK
DEVELOPS FULL STRENGTH.
7. CONTRACTOR SHALL PLACE 8-MIL PLASTIC SHEETING BETWEEN THRUST BLOCK AND PIPE
FITTINGS.
8. ALL VALVES SHALL INCLUDE VALVE BOXES AND LIDS AS OUTLINED IN THE TECHNICAL
SPECIFICATIONS AND DRAWINGS.
9. ALL MATERIALS AND CONSTRUCTION METHODS SHALL COMPLY WITH AWWA, CITY OF
BEAVERTON, AND THE UNIFORM PLUMBING CODE AS APPLICABLE. ALL MATERIALS SHALL BE
OF NEW MANUFACTURE, AND MUST BE DOMESTIC. NO REBUILT OR USED MATERIALS WILL BE
ALLOWED. ALL MATERIALS SHALL HAVE DOCUMENTATION PROVIDING EVIDENCE THAT THE
MATERIALS USED IN THIS CONSTRUCTION WERE MANUFACTURED IN THE UNITED STATES. NO
FOREIGN MANUFACTURED MATERIALS WILL BE ALLOWED.
10. FIRE HYDRANTS SHALL BE LOCATED TO ALLOW A MINIMUM OF 36" CLEAR SPACE
SURROUNDING ALL PORTIONS OF THE HYDRANT. THERE SHALL ALSO BE NO OBSTRUCTIONS
DIRECTLY IN LINE WITH ANY OF THE PORTS OF THE HYDRANT FOR A DISTANCE OF 5 FEET.
11. ALL BACKFILL IN THE RIGHT OF WAY OR OTHER TRAFFIC AREAS SHALL BE ¾"-0" COMPACTED
CRUSHED ROCK, COMPACTED TO 95 PERCENT OF MAXIMUM DENSITY AS OBTAINED BY
AASHTO T-180 COMPACTION TEST.
12. CONTRACTOR SHALL FURNISH AND INSTALL WATER SERVICES IN ACCORDANCE WITH COB
STD DETAILA 660-3 OR 660-5. CONTRACTOR SHALL PROVIDE NEW COPPER TUBING, FITTINGS, AND OTHER HARDWARE TO FACILITATE NEW WATER SERVICE INSTALLATION.
13. WATER SERVICE CONNECTION LOCATIONS AND WATER SERVICE ALIGNMENTS SHOW ON THE
PLANS ARE APPROXIMATE AND MAY BE ADJUSTED IN THE FIELD BASED ON FIELD CONDITIONS.
COORDINATE WITH CITY INSPECTORS TO DETERMINE FINAL WATER SERVICE CONNECTION
LOCATIONS AND WATER SERVICE ALIGNMENTS.
14. UPON ACCEPTANCE OF THE MAINS AND SERVICES, THE CONTRACTOR SHALL COORDINATE
FINAL SERVICE CONNECTIONS WITH CITY WATER DEPARTMENT. CITY WATER DEPARTMENT
WILL INSTALL THE NEW METER. A PRIVATE PLUMING PERMIT IS REQUIRED FOR ALL WORK ON
THE CUSTOMER SIDE OF NEW WATER METER (BACKSIDE), AT CONTRACTOR'S EXPENSE.
15. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND ADJUST THE NEW WATER METER BOX TO
FINAL LINE AND GRADE. REMOVE AND DISPOSE OF THE OLD METER BOX AND OTHER EXCESS
MATERIALS. COMPLETE LANDSCAPING RESTORATION, CURB REPLACEMENT AND SIDEWALK
AS REQUIRED.
16. PRIOR TO TIE-IN, THE CONTRACTOR SHALL INSTALL TEMPORARY BLOW-OFF ASSEMBLIES FOR
PRESSURE TESTING AND CHLORINATION. ALL NEW WATER MAINS SHALL BE PRESSURE
TESTED AND DISINFECTED BEFORE CONNECTION TO THE EXISTING SYSTEM AND BEFORE ANY
SERVICE CONNECTIONS ARE MADE. PROVIDE 1" TEMPORARY TAPS FOR THE CHLORINATION
INJECTION AS REQUIRED. PLUG TEMPORARY TAPS WITH BRASS PLUG UPON ACCEPTANCE OF
NEW WATERLINE.
17. UPON COMPLETION OF INSTALLATION OF THE WATER SYSTEM, ALL LINES SHALL BE FLUSHED
AND DISINFECTED IN CONFORMANCE WITH OREGON HEALTH DIVISION GUIDELINES AND THE
REQUIREMENTS OF THE OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY. WATERLINES
SHALL BE PRESSURE TESTED FOLLOWING COMPLETION. THE MINIMUM TEST PRESSURE
SHALL BE 150 PSI. FOR LINES WORKING WITH OPERATION PRESSURES GREATER THAN 100
PSI, THE MINIMUM TEST PRESSURE SHALL BE ONE AND ONE-HALF TIMES THE DESIGN
OPERATION PRESSURE. ALLOWABLE LEAKAGE IS 0 PSI.
18. THE CONTRACTOR SHALL DISPOSE OF THE SUPER CHLORINATED WATER IN AN APPROVED
MANNER. DO NOT ALLOW DISINFECTION WATER TO FLOW INTO A WATERWAY WITHOUT
ADEQUATE DILUTION OR OTHER SATISFACTORY METHODS OF REDUCING CHLORINE
RESIDUALS TO A SAFE LEVEL AS MANDATED BY DEQ.
19. THERE MAY BE SHORT SECTIONS OF THE PIPE LINE THAT CONNECT TO THE EXISTING SYSTEM
THAT ARE DIFFICULT TO CHLORINATE. THE OWNER'S REPRESENTATIVE AND THE
CONTRACTOR SHALL IDENTIFY THESE SHORT SECTIONS OF PIPELINE AND AN ALTERNATIVE
METHOD OF DISINFECT ION EMPLOYED. APPLICATION OF 300mn/l CHLORINE SOLUTION SHALL
BE APPLIED BY SOAKING IN CONTAINER APPROVED BY OWNER'S REPRESENTATIVE. THE
CHLORINE SOLUTION SHALL REMAIN FOR THREE HOURS BEFORE FLUSHING. ALL SWABBING
AND SOAKING ACTIVITIES TO BE DONE WITH CITY WATER REPRESENTATIVE PRESENT.
20. CONTRACTOR SHALL PROTECT WATER PIPE ENDS FROM CONTAMINATED WATER AND DEBRIS
AT ALL TIMES. CONTRACTOR SHALL CAP AND/OR COVER PIPE ENDS AT THE END OF EACH
WORK DAY.
CURB AND SIDEWALK REPLACEMENT NOTES
1. FIELD VERIFICATION: THE CONTRACTOR SHALL COORDINATE WITH THE CITY INSPECTOR TO VERIFY
AND MARK REMOVAL LIMITS FOR SIDEWALKS AND CURBS PRIOR TO COMMENCING SAW CUTTING
OR DEMOLITION OPERATIONS.
2. PROTECTION OF EXISTING STRUCTURES: THE CONTRACTOR SHALL PROTECT ALL ADJACENT
SIDEWALK PANELS, CURBS, DRIVEWAYS, AND CURB RAMPS NOT DESIGNATED FOR REMOVAL. ANY
DAMAGE TO EXISTING CONCRETE STRUCTURES RESULTING FROM THE CONTRACTOR’S
OPERATIONS SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE OWNER.
3. FORM INSPECTION: ALL CONCRETE FORMWORK AND SUBGRADE PREPARATION MUST BE
INSPECTED AND APPROVED BY THE CITY INSPECTOR PRIOR TO PLACING CONCRETE. PROVIDE A
MINIMUM OF 24-HOUR NOTICE TO THE CITY INSPECTOR TO SCHEDULE THE INSPECTION.
1.0'
5.0'
10.0'
1.5'
TRAFFIC CONTROL NOTES
1. TRAFFIC CONTROL TO BE PERFORMED IN ACCORDANCE WITH THE MANUAL FOR UNIFORM
TRAFFIC CONTROL DEVICES AND OREGON AMENDMENTS AS REQUIRED. THE CITY CAN
REQUIRE ADDITIONAL TRAFFIC CONTROL MEASURES AS NEEDED TO PROVIDE FOR PUBLIC
SAFETY.
2. ON RESIDENTIAL LOCAL STREETS, THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE
ALL REQUIRED TRAFFIC CONTROL WHEN WORK IS BEING DONE IN THE RIGHT OF WAY.
3. ALL TRAFFIC CONTROL MEASURES NEED TO BE SUBMITTED TO THE CITY OF BEAVERTON FOR
REVIEW AT LEAST 5 (FIVE WORKING DAYS PRIOR TO CONSTRUCTION. ALL STREET CLOSURES
SHALL BE APPROVED BY THE CITY TRAFFIC ENGINEER, AT LEAST 5 (FIVE) WORKING DAYS IN
ADVANCE.
4. UPON APPROVAL, THE CONTRACTOR SHALL NOTIFY THE BEAVERTON POLICE DEPARTMENT,
TUALATIN VALLEY FIRE AND RESCUE AND THE BEAVERTON SCHOOL DISTRICT
TRANSPORTATION OFFICE AT LEAST 48 HOURS IN ADVANCE OF ANY STREET CLOSURE.
5. TRAFFIC CONTROL PLANS SHALL COMPLY WITH THE OREGON DEPARTMENT OF
TRANSPORTATION - "SHORT TERM TRAFFIC CONTROL HANDBOOK". TRAFFIC CONTROL
DEVICES SHALL COMPLY WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES"
PREPARED BY THE FEDERAL HIGHWAY ADMINISTRATION, LATEST REVISION. CONTRACTOR
SHALL COMPLY WITH ALL CONDITIONS SPECIFIED IN ROAD PERMITS ISSUED FOR THIS
PROJECT.
6. CONTRACTOR SHALL COORDINATE ALL STREET AND SIDEWALK CLOSURES WITH THE CITY.
CONTRACTOR SHALL SUPPLY SIGNING AND BARRICADES AS REQUIRED TO ASSURE
AUTOMOTIVE AND PEDESTRIAN SAFETY.
UTILITY CONFLICTS: SANITARY SEWER
1. IN SITUATIONS INVOLVING WATER LINES RUNNING PARALLEL TO A SEWER MAIN OR LATERAL, SEPARATION BETWEEN THE TWO SHALL BE AS FOLLOWS:
ZONE 1: PARALLEL WATER LINES PERMITTED. CROSSING RESTRICTIONS ONLY.
ZONE 2: NOT ALLOWED, UNLESS APPROVED BY OHA AND CITY ENGINEER.
ZONE 3: PARALLEL WATER LINES PROHIBITED.
ZONE 4: PARALLEL WATER LINES PROHIBITED.
2. IN SITUATIONS INVOLVING WATER LINES CROSSING A SEWER MAIN OR LATERAL, SEPARATION
SHALL BE AS FOLLOWS:
2.A. WHENEVER POSSIBLE, THE BOTTOM OF WATER LINES SHALL BE 1.5 FEET OR MORE
ABOVE THE TOP OF SEWER MAINS AND LATERALS WITH ONE FULL LENGTH OF PIPE
CENTERED AT THE CROSSING.
2.B. WHERE WATER LINES CROSS OVER SEWER MAINS OR LATERALS WITH CLEARANCE OF
LESS THAN 1.5 FEET: CENTER ONE FULL LENGTH OF WATER PIPE AT THE CROSSING AND
THE SEWER LINE SHALL BE REPLACED WITH A FULL LENGTH OF PIPE (MIN. 18 FEET)
CENTERED AT THE CROSSING POINT WITH C900, HDPE SDR 17, OR CLASS 52 DUCTILE
IRON PIPE.
2.C. WHERE WATER LINES CROSS UNDER SEWER MAINS OR LATERALS: FOLLOW
REQUIREMENTS AS DESCRIBED IN 2.B. BACKFILL SHALL BE 100 PSI CONTROLLED
LOW-STRENGTH MATERIAL (CLSM).
3. REFER TO OAR 333-061-0050(9) FOR FULL NOTES ON WATER LINE CROSSING REQUIREMENTS.
EX GROUND
EX SEWER MAIN
OR LATERAL
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
EROSION PREVENTION & SEDIMENT CONTROL NOTES
1. APPROVAL OF THIS EROSION PREVENTION & SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION
OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.).
2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE,
REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE
APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND
VEGETATION/LANDSCAPING IS ESTABLISHED.
3. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL
CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT
LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER
STANDARDS.
4. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED
SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE
UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT
SEDIMENT-LADEN WATER DOES NOT LEAVE THE SITE.
5. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS
NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
6. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN THE 24 HOURS FOLLOWING A STORM EVENT.
7. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO
PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE
DOWNSTREAM SYSTEM.
8. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES
MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF
THE PROJECT.
9. THE CONTRACTOR IS RESPONSIBLE FOR APPLYING FOR AND OBTAINING A CLEAN WATER
SERVICES DISCHARGE PERMIT FOR DISCHARGING CHLORINATED WATER INTO THE SANITARY
SEWER SYSTEM.
UTILITY CONFLICTS: NATURAL GAS:
1. WHERE WATER MAIN OR SERVICES CROSS GAS LINES WITH LESS THAN 12-INCHES OF
VERTICAL SEPARATION, INSTALL PROTECTIVE SHEATHING MATERIAL PROVIDED BY NW
NATURAL (AUSTIN JAUREGUI, 971-202-3930), OR A HALF-SECTION OF PVC PIPE. PROTECTIVE
MATERIAL SHALL BE PLACED BETWEEN THE GAS AND WATER LINES, 36 INCHES LONG,
CENTERED ON CROSSING.
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G003 ABBREVIATIONS.DWG
G003
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
A B
B R
EV
IA
TI
O
N
ABAN ABANDON
ABND ABANDONED
AC ASBESTOS CEMENT, ASPHALTIC CONCRETE
AD ALGEBRAIC DIFFERENCE
ADA AMERICANS WITH DISABILITIES ACT
ADD'L ADDITIONAL
APPROX APPROXIMATELY
APPVD APPROVED
APWA AMERICAN PUBLIC WORKS ASSOCIATION
ARV AIR RELEASE VALVE
ASSY ASSEMBLY
AUX AUXILIARY
AVE AVENUE
AVG AVERAGE
AWG AMERICAN WIRE GAGE
AWWA AMERICAN WATER WORKS ASSOCIATION
BC BEGIN CURVE, BACK OF CURB
BCR BEGIN CURVE RETURN
BF BLIND FLANGE
BFV BUTTERFLY VALVE
BLDG BUILDING
BLVD BOULEVARD
BO BLOW OFF
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
C/L CENTERLINE
CARV COMBINATION AIR & VACUUM RELEASE VALVE
COB CITY OF BEAVERTON
COMM COMMUNICATIONS
COT CITY OF TIGARD
CB CATCH BASIN
CF CUBIC FEET
CFS CUBIC FEER PER SECOND
CIP CAST IRON PIPE
CL CLASS
CLSM CONTROLLED LOW STRENGTH MATERIAL
CMP CORRUGATED METAL PIPE
COMP COMPRESSION
CO CLEANOUT
CONC CONCRETE
CPLG COUPLING
CTR CENTER
CU COPPER, CUBIC
CULV CULVERT
CWS CLEAN WATER SERVICES
CY CUBIC YARD
DEFL DEFLECT
DTL DETAIL
DIA DIAMETER
DIP DUCTILE IRON PIPE
EA EACH
ECC ECCENTRIC
EG EXISTING GRADE, EXISTING GROUND
ESMT EASEMENT
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EL, ELEV ELEVATION
ELL ELBOW
EMBED EMBEDDED
EOP EDGE OF PAVEMENT
EQ EQUAL
EQUIP EQUIPMENT
EX, EXTG EXISTING
FF FINISHED FLOOR
FG FINISH GRADE
FH FIRE HYDRANT
FITG FITTING
FLEX FLEXIBLE
FLG FLANGE
FLR FLOOR
FL FLOW LINE
FO FIBER OPTIC
FOC FACE OF CURB
FOG FACE OF GUTTER
FPS FEET PER SECOND
FPT FEMALE PIPE THREAD
FT FOOT, FEET
G GAS
GAL GALLON
GALV GALVANIZED
GB GRADE BREAK
GRND GRADE
GPM GALLONS PER MINUTE
GV GATE VALVE
HDPE HIGH DENSITY POLYETHLENE
HORIZ HORIZONTAL
HYD HYDRANT
HWY HIGHWAY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH
INV INVERT
IP IRON PIPE
IR IRON ROD
IRR IRRIGATION
JB JUNCTION BOX
JT JOINT
K RATE OF CURVATURE
LAT LATERAL
LF LINEAL FEET
LT LEFT
LVC LENGTH OF VERTICAL CURVE
MAX MAXIMUM
MATL MATERIAL
MFR MANUFACTURER
MGD MILLION GALLONS PER DAY
MH MANHOLE
MIN MINIMUM
MJ MECHANICAL JOINT
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
N NORTH
NA, N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
P POWER
PSF POUNDS PER SQUARE FOOT
PL, P/L PROPERTY LINE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PT POINT
PVI POINT OF VERTICAL INTERSECTION
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
PWR POWER
ROW, R/W RIGHT-OF-WAY
RCP REINFORCED CONCRETE PIPE
RDCR REDUCER
REQ'D REQUIRED
RESTR RESTRAINED
RIM RIM ELEVATION
RT RIGHT
S, SAN SANITARY SEWER
SCH SCHEDULE
SD, STM STORM
SLV SLEEVE
SP SPECIAL PROVISION, SPECIAL PROVISIONS
SPEC SPECIFICATIONS
SS SANITARY SEWER, SAMPLING STATION
STA STATION
STD STANDARD
STL STEEL
SVC SERVICE
S/W SIDEWALK
TBC TOP BACK CURB
TBD TO BE DETERMINED
TFC TOP FACE CURB
T, TEL TELEPHONE
TEMP TEMPORARY
THRD THREAD(ED)
TL TAXLOT
TOC TOP OF CURB
TOP TOP OF PIPE
TVWD TUALATIN VALLEY WATER DISTRICT
TYP TYPICAL
UGD UNDERGROUND
UNK UNKNOWN
VERT VERTICAL
VIF VERIFY IN FIELD
VLV VALVE
W, WAT WATER
ABBREVIATIONS
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
DETAIL NUMBER
DETAIL MARKER
SHEET WHERE
DETAIL IS LOCATED*
DETAIL TITLE
* FOR DETAILS ON THE SAME SHEET ON
WHICH IT IS CALLED OUT/LOCATED, THE
SHEET NUMBER IS REPLACED BY A DASH (-).
EXISTING
SHEET WHERE DETAIL
WAS CALLED OUT*
DETAIL NUMBER
PROPOSED DETAIL CALLOUTSABANDON
JB
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G004 SYMBOLOGY.DWG
G004
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
SY
M
B O
LO
G
Y
SYMBOLOGY
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\G005 KEY PLAN.DWG
G005
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
K
EY
P
LA
N
KEY PLAN TABLE
Sheet # Sheet Title
C100 SW PARKVIEW LP - STA 0+00PV TO 1+50PV
C101 SW PARKVIEW LP - STA 1+50PV TO 3+50PV
C102 SW PARKVIEW LP - STA 3+50PV TO 5+50PV
C103 SW PARKVIEW LP - STA 5+50PV TO 7+50PV
C104 SW PARKVIEW LP - STA 7+50PV TO 9+50PV
C105 SW PARKVIEW LP - STA 9+50PV TO 11+50PV
C106 SW PARKVIEW LP - STA 11+50PV TO 13+50PV
C107 SW PARKVIEW LP - STA 13+50PV TO 15+50PV
C108 SW PARKVIEW LP - STA 15+50PV TO 17+50PV
C109 SW PARKVIEW LP - STA 17+50PV TO 19+50PV
C110 SW PARKVIEW LP - STA 19+50PV TO 21+50PV
C111 SW PARKVIEW LP - STA 21+50PV TO 23+50PV
C112 SW PARKVIEW LP - STA 23+50PV TO 25+50PV
C113 SW PARKVIEW LP - STA 25+50PV TO 27+73PV
C200 SW SHERIDAN CT - STA 0+00S TO 1+50S
C201 SW SHERIDAN CT - STA 1+50S TO 2+61S
C300 SW PEARSON CT - STA 0+00P TO 1+50P
C301 SW PEARSON CT - STA 1+50P TO 3+02P
C400 SW REID CT - STA 0+00R TO 1+50R
C401 SW REID CT - STA 1+50R TO 3+50R
C402 SW REID CT - STA 3+50R TO 4+21R
C500 SW WAGONWHEEL CT - STA 0+00W TO 1+50W
C501 SW WAGONWHEEL CT - STA 1+50W TO 2+72W
C600 SW TUCKERWOOD CT - STA 0+00T TO 1+50T
C601 SW TUCKERWOOD CT - STA 1+50T TO 2+78T
C700 RECONNECTION AT SW FANNOWOOD LN
C701 RECONNECTION AT SW MURPHY LN
C702 RECONNECTION AT SW PARKVIEW LN
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\E100 EROSION CONTROL PLAN SOUTH.DWG
E100
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
ER
O
SI
O
N C
O N
TR
O
L
PL
A N
S O
U
TH
EROSION CONTROL PLAN NORTH
SEE SHEET E101 FOR
LEGEND
PROTECT STORM INLET PER DETAIL 920,
SHEET E101.
DIRECTION OF FLOW
SCALE
150750
ADDITIONAL MEASURES
THE EPSC MEASURES SHOWN ON THIS PLAN ARE THE
MINIMUM REQUIRED. THE CONTRACTOR IS RESPONSIBLE
FOR INSTALLING ANY ADDITIONAL MEASURES
NECESSARY TO PREVENT SEDIMENT DISCHARGE OR
PROTECT DOWNSTREAM AREAS. ALL SUCH ADDITIONAL
MEASURES SHALL BE CONSIDERED INCIDENTAL TO THE
EROSION CONTROL BID ITEM PER 00280.
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\E101 EROSION CONTROL PLAN NORTH.DWG
E101
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
ER
O
SI
O
N C
O N
TR
O
L
PL
A N
N O
R
TH
EROSION CONTROL PLAN SOUTH
SEE SHEET E100 FOR
LEGEND
PROTECT STORM INLET PER
DETAIL 920, THIS SHEET
DIRECTION OF FLOW
SCALE
150750
ADDITIONAL MEASURES
THE EPSC MEASURES SHOWN ON
THIS PLAN ARE THE MINIMUM
REQUIRED. THE CONTRACTOR IS
RESPONSIBLE FOR INSTALLING ANY
ADDITIONAL MEASURES NECESSARY
TO PREVENT SEDIMENT DISCHARGE
OR PROTECT DOWNSTREAM AREAS.
ALL SUCH ADDITIONAL MEASURES
SHALL BE CONSIDERED INCIDENTAL
TO THE EROSION CONTROL PAY ITEM
PER 00280.
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
JB JBCOM
M
JB
W M
W M
JB JBCOM
M
JB
W M
W M
SW PARKVIEW LP
2 3
S W
G R
E E
N W
A Y
A A
C
B C D
A A
2 3
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PROFILE "PV"
SCALE: 1" = 5' V
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C100
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
+0
0P V
TO
+5 0P
V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
+5 0P
V
SE
E
SH
EE
T
C
SCALE
0 2010
WATER CONSTRUCTION NOTES
STA 0+00PV, INSTALL:
(1) – 10"x8" TAPPING SLEEVE AND VALVE ASSEMBLY
APPROX. 1+04PV, 27' L, INSTALL:
(1) – 1" WATER SERVICE
9375 SW PARKVIEW LP
APPROX. 1+25PV, 12'R, INSTALL:
(1) – 2" WATER SERVICE
8900 SW GREENWAY
APPROX. 150 LF OF 8" RESTRAINED JOINT DIP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG, CENTERED
ON CROSSING, TYP. SHEATHING TO BE PROVIDED
BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
PROTECT EXISTING MAILBOX STRUCTURE.
MAINTAIN MAIL SVC DURING CONSTRUCTION.
A
B
C
D
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
3 4
A A
JBCO
M M
JBCO
M M
W M W M
JBCO
M M
JBCO
M M
W M W M
4 5
SW PARKVIEW LP
A
D
A
BC
BC
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C101
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
+5
0P V
TO
+5 0P
V
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
+5 0P
V
SE
E
SH
EE
T
C
2M
ATCHLINE STA: 1+50PV
SEE SHEET C100
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX. STA 1+71PV, INSTALL:
(1) – 8" DI 11.25° BEND (MJ)
APPROX. 1+77PV, 26' L, INSTALL:
(2) – 1" WATER SERVICE
9355 & 9325 PARKVIEW LP
APPROX. STA 2+11PV, INSTALL:
(1) – 8" DI 11.25° BEND (MJ)
APPROX. STA 2+49PV, INSTALL:
(1) – 8" DI 11.25° BEND (MJ)
APPROX. STA 2+71PV (STA 0+00FW), INSTALL:
(1) – 8" DI TEE (MJ)
(2) – 8" DI GATE VALVE (MJ) (W,E)
APPROX 200 LF OF 8" RESTRAINED JOINT DIP
FOR SW FANNOWOOD LN RECONNECTION
SEE SHEET C700
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
EX CONCRETE ENCASEMENT CENTERED ON
SANITARY AND STORM MAINLINE CROSSING.
CONFLICT NOT ANTICIPATED. VIF.
A
B
C
D
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
JBCO
M
JBCO
M M
JBCO
M M
JBCO
M M
JBCO
M M
JBCO
M M
W M
W M
W M
W M
W M
JBCO
M M
JBCO
M M
JBCO
M M
JBCO
M M
JBCO
M M
JBCO
M M
W M
W M
W M
W M
W M
SW PARKVIEW LP
A A
A
B C
BC
B C
B C
1 2
A
A
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C102
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
+5
0P V
TO
+5 0P
V
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
ATC
H
LIN
E STA: 5+50PV
SEE SH
EET C
M
AT
C H
LI
N
E
ST
A:
+5 0P
V
SE
E
SH
EE
T C
SCALE
0 2010
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
WATER CONSTRUCTION NOTES
APPROX. 3+70PV, 31' R, INSTALL:
(1) – 1" WATER SERVICE
9280 SW PARKVIEW LP
APPROX. 3+85PV, 7.0' L, INSTALL:
(2) – 1" WATER SERVICE
9275 & 9255 SW PARKVIEW LP
APPROX. 4+45PV, 31' R, INSTALL:
(2) – 1" WATER SERVICE
9260 & 9240 SW PARKVIEW LP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
A
B
C
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
JBCOM
JBCOM
MJBCOM
M
W M
W M
W M W M
JBCOM
M
JBCOM
MJBCOM
M
W M
W M
W M W M
SW PARKVIEW LP
A A
A
BC
BC
A
A
D
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C103
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
+5
0P V
TO
+5 0P
V
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
ATC
H
LIN
E STA: 7+50PV
SEE SH
EET C
M
AT
C H
LI
N
E
ST
A:
+5 0P
V
SE
E
SH
EE
T C
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX. STA 5+71PV, 31' R, INSTALL:
(2) – 1" WATER SERVICE
9220 & 9200 SW PARKVIEW LP
APPROX. STA 5+93PV (STA 0+00S), INSTALL:
(1) – 8" DI TEE (MJ)
(3) – 8" DI GATE VALVE (MJ) (NW,NE,SE)
APPROX. STA 7+06PV, 30' R, INSTALL:
(2) – 1" WATER SERVICE
9190 & 9180 SW PARKVIEW LP
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
SHERIDAN CT PLAN AND PROFILE
SEE SHEETS C200 AND C201 FOR
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
MAINTAIN 0% SLOPE BETWEEN STA 6+27 AND STA
7+56.
A
B
C
D
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
JBCOM
JBCOM
M
JBCOM
M
W M W M
W M
W M
JBCOM
M
JBCOM
M
JBCOM
M
W M W M
W M
W M
2 3
4 5 6
SW PARKVIEW LP
A
A
BC
BC
1 2
5 6 7
D
AA
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C104
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
+5
0P V
TO
+5 0P
V
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
ATC
H
LIN
E STA: 11+50PV
SEE SH
EET C
M
AT
C H
LI
N
E
ST
A:
+5 0P
V
SE
E
SH
EE
T
C
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX. STA 8+27PV, 8.0' L, INSTALL:
(2) – 1" WATER SERVICE
9175 & 9155 PARKVIEW LP
APPROX. STA 8+48PV, 30' R, INSTALL:
(2) – 1" WATER SERVICE
9160 & 9150 PARKVIEW LP
APPROX. STA 8+55PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
APPROX. STA 8+93PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
APPROX. STA 9+04PV, INSTALL:
(1) – 8" DI 11.25° BEND (MJ)
APPROX. STA 9+13PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 9+15PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
MAINTAIN 0% SLOPE BETWEEN STA 9+16 AND STA
9+84.
A
B
C
D
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
JB
COMM
JB
COMM
JB
COMM
JB
COMM
W M
W M
W M
W M
W M
W M
JB
COMM
JB
COMM
JB
COMM
JB
COMM
W M
W M
W M
W M
W M
W M
1 2 3
4 5
SW PARKVIEW LP
A
A
BC
BC
C
E
F
4 5
A
A
D
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C105
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
+5
0P V
TO
1+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
1+
PV
SE
E
SH
EE
T
C
M
AT
C H
LI
N
E
ST
A:
+5 0P
V
SE
E
SH
EE
T C
SCALE
0 2010
WATER CONSTRUCTION NOTES
APPROX. STA 9+81PV, 10.0' R, INSTALL:
(2) – 1" WATER SERVICE
9140 & 9120 SW PARKVIEW LP
APPROX. STA 9+84PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
APPROX. STA 10+31PV, 15' L, INSTALL:
(2) – 1" WATER SERVICE
9125 & 9105 SW PARKVIEW LP
APPROX. STA 10+50PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
APPROX. STA 10+72PV, INSTALL:
(1) – 8" DI 11.25° BEND (MJ)
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
MAINTAIN 0% SLOPE BETWEEN STA 9+16 AND STA
9+84.
SEE SHEET C106 FOR WATER SERVICE
CONNECTIONS.
PROTECT EXISTING MAILBOX STRUCTURE.
MAINTAIN MAIL SVC DURING CONSTRUCTION.
A
B
C
D
E
F
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
JB
COMM
JB
COMM
WM
WM
W M
W M
W M
W M
W M
JB
COMM
JB
COMM
JB
COMM
WM
WM
W M
W M
W M
W M
W M
SW
PARKVIEW
LP
SW PARKVIEW LP
A
A
A
B C
C
B C
D
7 8
A A
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C106
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
1+
PV
T O
3+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
ATCHLINE STA: 13+50PV
SEE SHEET C107
MATCHLINE STA: 11+50PV
SEE SHEET C105
SCALE
0 2010
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
WATER CONSTRUCTION NOTES
APPROX. STA 11+53PV, 31' R, INSTALL:
(2) – 1" WATER SERVICE
9110 & 9100 SW PARKVIEW LP
APPROX. STA 11+56PV, INSTALL:
(1) – 8"x6" DI TEE (MJ)
(1) – 8" DI GATE VALVE (MJ) (E)
(1) – 6" DI GATE VALVE (MJ) (S)
APPROX. STA 11+56PV, 34' R, INSTALL:
(1) – FIRE HYDRANT ASSEMBLY PER COB STD
DETAIL 650-2. SEE SHEET C703 FOR HYDRANT
PROFILE.
APPROX. STA 11+86PV, INSTALL:
(1) – 8" DI 11.25° BEND (MJ)
APPROX. STA 11+96PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
APPROX. STA 12+16PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 12+47PV, 31' R, INSTALL:
(2) – 1" WATER SERVICE
9050 & 9070 SW PARKVIEW LP
APPROX. STA 12+87PV, 7.0' L, INSTALL:
(1) – 1" WATER SERVICE
9045 SW PARKVIEW LP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
PROTECT EXISTING MAILBOX STRUCTURE.
MAINTAIN MAIL SVC DURING CONSTRUCTION.
A
B
C
D
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
CO
M M
W M
W M
W M W M
W M W M
JB
CO
M M
W M
W M
W M W M
W M W M
2 3
SW PARKVIEW LP
A A
B C
B C BC
1 2 3
A A
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C107
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
3+
PV
T O
5+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
ATC
H
LIN
E STA: 15+50PV
SEE SH
EET C
M
AT
C H
LI
N
E
ST
A:
3+
PV
SE
E
SH
EE
T C
SCALE
0 2010
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
WATER CONSTRUCTION NOTES
APPROX. STA 13+68PV, 7.0' L, INSTALL:
(2) – 1" WATER SERVICE
9025 & 8955 SW PARKVIEW LP
APPROX. STA 13+81PV, 31' R, INSTALL:
(2) – 1" WATER SERVICE
9030 & 8980 SW PARKVIEW LP
APPROX. STA 15+12PV, 32' R, INSTALL:
(2) – 1" WATER SERVICE
8960 & 8940 SW PARKVIEW LP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
A
B
C
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
M M
JB
CO
M M
JB
CO
M M
JB
CO
M M
W M
W M
W M
JB
CO
M M
JB
CO
M M
JB
CO
M M
JB
CO
M M
W M
W M
W M
2 3
SW PARKVIEW LP
A
A
B C
B C
1 2 4 5 6
3 7
A A
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C108
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
5+
PV
T O
7+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
ATC
H
LIN
E STA: 17+50PV
SEE SH
EET C
M
AT
C H
LI
N
E
ST
A:
5+
PV
SE
E
SH
EE
T
C
SCALE
0 2010
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
SW PEARSON CT PLAN AND PROFILESEE SHEETS C300 AND C301 FOR
WATER CONSTRUCTION NOTES
APPROX. STA, 15+76PV (STA 0+00P), INSTALL:
(1) – 8" DI TEE (MJ)
(3) – 8" DI GATE VALVE (MJ) (N,S,W)
APPROX. STA 15+82PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
(ROLL BEND)
APPROX. STA 15+84PV, 30' R, INSTALL:
(1) – 1" WATER SERVICE
8940 SW PARKVIEW LP
APPROX. STA 15+87PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
APPROX. STA 16+06PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 16+35PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 17+23PV, 10' R, INSTALL:
(2) – 1" WATER SERVICE
8860 & 8820 SW PARKVIEW LP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
A
B
C
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
M M
W M
JB
CO
M M
W M
1 7
SW PARKVIEW LP
A
3 4
BC B C
A
3 54
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C109
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
7+
PV
T O
9+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
9+
PV
SE
E
SH
EE
T
C
M
AT
C H
LI
N
E
ST
A:
7+
PV
SE
E
SH
EE
T
C
SCALE
0 2010
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
SW REID CT PLAN AND PROFILE
SEE SHEETS C400 THROUGH C402 FOR WATER CONSTRUCTION NOTES
APPROX. STA 18+23PV, 15' R, INSTALL:
(1) – SAMPLING STATION PER COB STD DETAIL 660-2
APPROX. STA 18+40PV, INSTALL:
(1) – 8" DI TEE (MJ)
(3) – 8" DI GATE VALVE (MJ) (N,S,W)
APPROX. STA 18+46PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
APPROX. STA 18+49PV, INSTALL:
(1) – 8" DI 22.5° BEND (MJ)
APPROX. STA 18+58PV, INSTALL:
(1) – 1" COMBINATION AIR RELEASE/AIR VACUUM
VALVE ASSEMBLY (BELOW GRADE) PER COB
STD DETAIL 640-5
APPROX. STA 18+71PV, 11' R, INSTALL:
(1) – 1" WATER SERVICE
8780 SW PARKVIEW LP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
A
B
C
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
M M
JB
CO
M M
W M
W M
JB
CO
M M
JB
CO
M M
W M
W M
1 2
SW PARKVIEW LP
A
BC
BC
A
3 4 6
A
A
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C110
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
9+
PV
T O
1+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
9+
PV
SE
E
SH
EE
T
C
SCALE
0 2010
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
SW WAGONWHEEL CT PLAN AND PROFILE
SEE SHEETS C500 AND C501 FOR WATER CONSTRUCTION NOTES
APPROX. STA 20+08PV, 11' R, INSTALL:
(1) – 1" WATER SERVICE
8760 SW PARKVIEW LP
APPROX. STA 20+18PV, 11' R, INSTALL:
(1) – 1" WATER SERVICE
8740 SW PARKVIEW LP
APPROX. STA 20+85PV, INSTALL:
(1) – 8" DI 11.25° BEND (MJ)
APPROX. STA 20+95PV, INSTALL:
(1) – 8" DI 11.25° BEND (MJ)
APPROX. STA 21+15PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
(ROLL BEND)
APPROX. STA 21+39PV, INSTALL:
(1) – 8" DI TEE (MJ)
(3) – 8" DI GATE VALVE (MJ) (SE,SW,NW)
APPROX. STA 21+46PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
(ROLL BEND)
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG, CENTERED
ON CROSSING, TYP. SHEATHING TO BE PROVIDED
BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
A
B
C M
ATC
H
LIN
E STA: 21+50PV
SEE SH
EET C
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
M M
JB
CO
M M
JB
CO
M M
JB
CO
M M
JB
CO
M M
JB
CO
M M
W M
W M
W M
W M
W M
W M
JB
CO
M M
JB
CO
M M
JB
CO
M M
JB
CO
M M
JB
CO
M M
JB
CO
M M
W M
W M
W M
W M
W M
W M
3 4
SW PARKVIEW LP
A
A
B C
BC
C
D
A A
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C111
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
1+
PV
T O
3+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
3+
PV
SE
E
SH
EE
T
C
SCALE
0 2010
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
WATER CONSTRUCTION NOTES
APPROX. STA 21+67PV, 31' R, INSTALL:
(2) – 1" WATER SERVICE
8720 & 8660 SW PARKVIEW LP
APPROX. STA 22+96PV, 7' L, INSTALL:
(2) – 1" WATER SERVICE
8655 & 8635 SW PARKVIEW LP
APPROX. STA 23+24PV, 31' R, INSTALL:
(1) – 1" WATER SERVICE
8640 SW PARKVIEW LP
APPROX. STA 23+32PV, 31' R, INSTALL:
(1) – 1" WATER SERVICE
8620 SW PARKVIEW LP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG,
CENTERED ON CROSSING, TYP. SHEATHING TO BE
PROVIDED BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
PROTECT EXISTING MAILBOX STRUCTURE.
MAINTAIN MAIL SVC DURING CONSTRUCTION.
A
B
C
D
M
ATC
H
LIN
E STA: 21+50PV
SEE SH
EET C
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
M M
JB
CO
M M
JB
CO
M M
W M
W M
W M
JB
CO
M M
JB
CO
M M
JB
CO
M M
W M
W M
W M1
7SW PARKVIEW LP
A
A
6 7
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C112
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
3+
PV
T O
5+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
5+
PV
SE
E
SH
EE
T C
M
AT
C H
LI
N
E
ST
A:
3+
PV
SE
E
SH
EE
T
C
SCALE
0 2010
APPROX. 200 LF OF 8" RESTRAINED JOINT DIP
SW TUCKERWOOD CT PLAN AND PROFILE
SEE SHEETS C600 AND C601 FOR
WATER CONSTRUCTION NOTES
APPROX. STA 23+67PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 23+94PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 24+04PV (STA 0+00T), INSTALL:
(1) – 8"x6" DI TEE (MJ)
(2) – 8" DI GATE VALVE (MJ) (N,S)
(1) – 6" DI GATE VALVE (MJ) (W)
APPROX. STA 24+50PV, INSTALL:
(1) – 8"x6" DI TEE (MJ)
(1) – 6" DI GATE VALVE (MJ) (E)
APPROX. STA 24+50PV, 16' R, INSTALL:
(1) – FIRE HYDRANT ASSEMBLY PER COB STD
DETAIL 650-2. SEE SHEET C704 FOR HYDRANT
PROFILE.
APPROX. STA 25+25PV, 27' L, INSTALL:
(2) – 1" WATER SERVICE
8575 & 8555 SW PARKVIEW LP
APPROX. STA 25+40PV, 11' R, INSTALL:
(1) – 1" WATER SERVICE
8560 SW PARKVIEW LP
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN NEW
WATERLINE AND EX GAS LINE, 36" LONG, CENTERED
ON CROSSING, TYP. SHEATHING TO BE PROVIDED
BY NW NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB STD
DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB AND
GUTTER PER COB STD DETAIL 2020
A
B
C
B C B C
BC
BC
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
COM
M
JB
COM
M
JB
COM
M W M
W M
JB
COM
M
JB
COM
M
JB
COM
M W M
W M
4 5 6
SW PARKVIEW LP
A
A
A
B C
3 4 5 6
7A A
A
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C113
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
P A
R K
VI
EW
L P
- S
TA
5+
PV
T O
7+
PV
PROFILE "PV"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
5+
PV
SE
E
SH
EE
T C
SCALE
0 2010
APPROX. 222 LF OF 8" DUCTILE IRON PIPE
FOR SW MURPHY LN RECONNECTION
SEE SHEET C701
WATER CONSTRUCTION NOTES
APPROX. STA 26+16PV, 10' R, INSTALL:
(2) – 1" WATER SERVICE
8540 & 8520 SW PARKVIEW LP
APPROX. STA 26+93PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 27+18PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 27+27PV (STA 0+00M), INSTALL:
(1) – 8"x8" DI TEE (MJ)
(2) – 8" DI GATE VALVE (MJ) (N,S)
APPROX. STA 27+39PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 27+41PV, INSTALL:
(1) – 8" DI 45° BEND (MJ)
APPROX. STA 27+72PV, INSTALL:
(1) – 8"x6" DI CROSS (MJ)
(1) – 8" DI PLUG (MJ) (N)
(2) – 6" DI GATE VALVE (MJ) (W,E)
GENERAL CONSTRUCTION NOTES
INSTALL SHEATHING MATERIAL BETWEEN
NEW WATERLINE AND EX GAS LINE, 36"
LONG, CENTERED ON CROSSING, TYP.
SHEATHING TO BE PROVIDED BY NW
NATURAL.
REPLACE CURB TIGHT SIDEWALK PER COB
STD DETAIL 2041
REPLACE STANDARD MONOLITHIC CURB
AND GUTTER PER COB STD DETAIL 2020
A
B
C
84675
RENEWS: 12/31/2026
M A T T H E W C H A R L E S P A L M E R
R E G I S T E R E D P R O F E S S I O N A LENG INEER
S E P T . 1 1 , 2 0 18
OREGON
BID
M
JB
COM
M
JB
COM
M
JB
COM
M
JB
COM
M
WM
WM
W M
W M
W M
W M
JB
COM
M
JB
COM
M
JB
COM
M
JB
COM
M
JB
COM
M
WM
WM
W M
W M
W M
W M
6 7
SW SHERIDAN CT
S W
P A
R K
V
IE
W L
P
A
A
BC
BC
B C
B C
2 4
5 6 7
A
A
SHEET #
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
PH
O N
E:
(5
) 5
-2
SW
M
IL
LI
KA
N W
AY
BE
AV
ER
TO
N , O
R
CIP PROJ #
CheckedDrawn
PLOT DATE: 2/26/2026
D
AT
E R
EV
IS
IO
N
BY
AP
R
VD
H:\CIP\4244 - PARKVIEW LP WATERLINE REPLACEMENT\05 DESIGN\5.9 FINAL DESIGN\MASTER_PLAN_PROFILE.DWG
C200
BDMP
W A
TE
R
LI
N
E R
EP
LA
C
EM
EN
T
PA
R
K
VI
EW
L
O O
P
MPBD
W A
TE
R
P
LA
N A
N D
P R
O
FI
LE
SW
S H
ER
ID
A N
C T
- S
TA
+0
0S T
O
+5 0S
PROFILE "S"
SCALE: 1" = 5' V
PLAN
SCALE: 1" = 20'
M
AT
C H
LI
N
E
ST
A:
+5 0S
SE
E
SH
EE
T C
SCALE
0 2010
APPROX. 119 LF OF 6" RESTRAINED JOINT DIP
APPROX. 31 LF OF 8" RESTRAINED JOINT DIP
WATER CONSTRUCTION NOTES
STA 0+00S (APPROX.